CN104047215B - Cement concrete pavement changes the method for pervious concrete pavement into - Google Patents

Cement concrete pavement changes the method for pervious concrete pavement into Download PDF

Info

Publication number
CN104047215B
CN104047215B CN201410217596.0A CN201410217596A CN104047215B CN 104047215 B CN104047215 B CN 104047215B CN 201410217596 A CN201410217596 A CN 201410217596A CN 104047215 B CN104047215 B CN 104047215B
Authority
CN
China
Prior art keywords
concrete pavement
macropore
pervious concrete
cement concrete
geotextiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410217596.0A
Other languages
Chinese (zh)
Other versions
CN104047215A (en
Inventor
陈代果
姚勇
李谦
苏军
朱榆萍
任耕北
石军
邓勇军
褚云朋
张兆强
高红伟
徐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lianggu Ecological Environment Technology Co ltd
Southwest University of Science and Technology
Original Assignee
Mianyang Jing Gu Science And Technology Ltd
Southwest University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mianyang Jing Gu Science And Technology Ltd, Southwest University of Science and Technology filed Critical Mianyang Jing Gu Science And Technology Ltd
Priority to CN201410217596.0A priority Critical patent/CN104047215B/en
Publication of CN104047215A publication Critical patent/CN104047215A/en
Application granted granted Critical
Publication of CN104047215B publication Critical patent/CN104047215B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Cement concrete pavement changes a method for pervious concrete pavement into, it is characterized in that: A, determine pervious concrete porosity P, and prepares corresponding pervious concrete; B, evenly to hole on cement concrete pavement, and guarantee that cement concrete pavement layer (5) is run through until roadbed (6) in each hole, described hole is made up of equally distributed macropore (2) and the aperture (4) be evenly distributed on around macropore (2), and cement concrete pavement percent opening Φ need be greater than P; C, cement concrete pavement layer (5) after piercing lay geotextiles (3), and at chance macropore (2) aperture place by geotextiles (3) opening, openings of sizes and macropore (2) aperture in the same size, make macropore (2) through geotextiles (3); D, geotextiles (3) upper pervious concrete surface layer (1) laid, and pervious concrete is tamped in macropore (2); Just pervious concrete pavement is formed after E, maintenance.

Description

Cement concrete pavement changes the method for pervious concrete pavement into
Technical field
The present invention relates to one " change " process in vain black in Pavement Improvement construction method, the particularly remodeling method of the region such as city trees and shrubs, parking lot cement concrete pavement.
Background technology
Along with the continuous progress of science and technology, ecological, environmental protective construction coming into one's own all the more, different kinds of roads retrofit work just carries out ruly, and wherein, the transformation of the area road such as city trees and shrubs, parking lot occupies certain ratio.Conventional pav adopts pitch, concrete, stone slab or cement brick to lay mostly, therefore is called as hard surfacing.Its advantage is that road surface is neat, intensity is high, good endurance, and maximum shortcoming is waterproof, and draining relies on underground sewer, and during rainfall, rainwater is directly processed as sewage, has blocked rainwater supplementing underground water, has been unfavorable for the water circulation of natural environment.And for the not smooth area of drainage system, rain, sewage, easily in road surface alluvial, have a strong impact on municipal sanitary after dissolving in household garbage.In addition, hard surfacing easily absorbs, store and reflect solar heat, and ground average temperature is raised, the formation of aggravation urban heat land effect, thus causes environment and ecological negative effect, is unfavorable for the ecological homeostasis and environmental protection.
In order to solve this series of problem, the researchers of various countries are actively thinking deeply the paving material exploring development of new, and therefore pervious concrete also arises at the historic moment.Compared with conventional pav material, pervious concrete pavement has permeable, ventilative, adjustment urban climate, advantage such as reduction surface temperature, alleviating urban heat island phenomenon etc.; Simultaneously, urban groundwater resource can be supplemented, maintain the soil moisture, improve the life condition of urban surface plants and soil biology, be conducive to the ecological homeostasis, and pervious concrete can absorb the noise that vehicle to run produces, be conducive to creating quiet comfortable traffic environment, pervious concrete effectively can alleviate the problems such as the road drainage system burden that rainwater causes.
Detection shows, when pervious concrete terrace porosity reaches 15%-25%, its permeable speed reaches 31118L/m 2/ h-51196L/m 2/ h, discharge rate is high.The sustainable development of pervious concrete to urban ecological environment is significant.
Pervious concrete is used for road reformation engineering and mainly utilizes this material to be different from the water permeability of ordinary concrete, and therefore, how effectively improving its water permeability is the main points that each construction corps considers.Investigation display, in existing road reformation engineering, the constructing structure method of pervious concrete pavement mainly directly covers and builds pervious concrete on original cement concrete pavement.
Summary of the invention
The object of the invention is the water permeability being intended to utilize pervious concrete itself, adopt the construction method more optimized to promote the water permeability that cement concrete pavement changes pervious concrete pavement, reach permeable effect better.
The present invention is achieved in that
Cement concrete pavement changes a method for pervious concrete pavement into, it is characterized in that the method is carried out according to the following steps successively:
A, according to local conditions determination pervious concrete porosity P, and prepare corresponding pervious concrete;
B, evenly to hole on cement concrete pavement, and guarantee that cement concrete pavement layer is run through until roadbed in each hole, described hole is made up of equally distributed macropore and the aperture be evenly distributed on around macropore, and the quantity of macropore is far fewer than the quantity of aperture, orifice area sum and cement concrete pavement area ratio are called cement concrete pavement percent opening Φ, then need Φ to be greater than P;
C, cement concrete pavement layer after piercing lay geotextiles, and at chance macropore aperture place by geotextiles opening, openings of sizes and macropore aperture in the same size, make the through geotextiles of macropore;
D, the geotextiles upper pervious concrete surface layer laid, and pervious concrete is tamped in macropore;
Just pervious concrete pavement is formed after E, maintenance.
Further scheme to be the quantity of aperture the be 5-20 of the quantity of macropore doubly.
In the present invention:
Pervious concrete in macropore and pervious concrete surface layer monobloc cast, rainwater can penetrate into lower soil by macropore; Meanwhile, top pervious concrete surface layer and bottom cement concrete pavement layer are formed occlusion structure by " post " that the pervious concrete in macropore is formed, thus, " post " should play the overall structural effect of strengthening.
Keyhole formation water-permeable passage, strengthens water permeable ability.
This structure forms the water-permeable passage of size two kinds of diameters respectively, makes whole road surface can both be permeable, ensure that the water permeable ability of pervious concrete pavement.
The isolation of geotechnique's layer of cloth, impurity screening, avoid blocking water-permeable passage.
Water-permeable passage is communicated with roadbed, plays directly permeable effect.
And in the past in road reformation, most of construction method directly lays pervious concrete on Portland Cement Concrete Surface Course, can not reach the permeable effect of expection like this, can not ensure the globality of structure, easily occurs the phenomenon of Local Cracking.
Porosity P and percent opening Φ mainly determines according to situations such as local geology, weathers, particularly amount of precipitation.
The quantity of the quantity of aperture and size, macropore and size, pitch of holes etc., except should meeting percent opening Φ and requiring, also should be determined according to combined factors such as the thickness of Portland Cement Concrete Surface Course, intensity.Experiment shows, the quantity of aperture is 5-20 times of the quantity of macropore.
Advantage of the present invention:
The pervious concrete material of this structure itself is a kind of green material, maximum feature is its pervious function, in addition, the loose structure of material makes it have sound absorption reduction, absorb the effect of solar radiation, can also need to change concrete color according to use, well can merge with environment.The method utilizes rational topology layout, improve constructing structure in the past can not utilize the present situation of pervious concrete water permeability completely, road structure is optimized more.With regard to structure itself, major diameter pervious concrete post is closely engaged with Old cement concrete, and the overall performance of road structure is guaranteed.The setting of geotechnique's layer of cloth not only can prevent aggregate blocking channel in work progress, and can isolate impurity, is convenient to follow-up cleaning.Meanwhile, major diameter, minor diameter two kinds of water-permeable passage forms are set, both can have strengthened the bulk strength on transformation road surface, the requirement of water permeability can be met again.
Accompanying drawing explanation
Fig. 1 is road surface structure vertical generalized section after laying pervious concrete.
Fig. 2 is the schematic top plan view after former cement concrete pavement perforate.
In figure, 1 is pervious concrete surface layer, and 2 is macropore, and 3 is geotextiles, and 4 is aperture, and 5 is cement concrete pavement layer, and 6 is roadbed.
Detailed description of the invention:
Below in conjunction with specific embodiment, the present invention is further described.But range of application of the present invention is not limited to the following example.
As Fig. 1 and Fig. 2, a kind of cement concrete pavement changes the method for pervious concrete pavement into, it is characterized in that the method is carried out according to the following steps successively:
A, according to local conditions determination pervious concrete porosity P, and prepare corresponding pervious concrete;
B, evenly to hole on cement concrete pavement, and guarantee that cement concrete pavement layer 5 is run through until roadbed 6 in each hole, described hole is made up of equally distributed macropore 2 and the aperture 4 be evenly distributed on around macropore 2, and the quantity of macropore 2 is far fewer than the quantity of aperture 4, orifice area sum and cement concrete pavement area ratio are called cement concrete pavement percent opening Φ, then need Φ to be greater than P;
C, cement concrete pavement layer 5 after piercing lay geotextiles 3, and at chance macropore 2 aperture place by geotextiles 3 opening, openings of sizes and macropore 2 aperture in the same size, make the through geotextiles 3 of macropore 2;
D, the geotextiles 3 upper pervious concrete surface layer 1 laid, and pervious concrete is tamped in macropore 2;
Just pervious concrete pavement is formed after E, maintenance.
The quantity of aperture 4 is that the 5-20 of the quantity of macropore 2 is doubly advisable.
During construction, the instrument punchings such as electric drill can be used, will guarantee during punching that each water-permeable passage all runs through cement concrete layer, after completing, clean out each passage; The laying of geotechnique's layer of cloth, should note exposing macropore hole in process of deployment, covered all apertures and met geotextiles construction requirement; In pervious concrete surface layer 5 and macropore 2, the work such as the building of pervious concrete, maintenance meets related specifications.

Claims (1)

1. cement concrete pavement changes a method for pervious concrete pavement into, it is characterized in that the method is carried out according to the following steps successively:
A, according to local conditions determination pervious concrete porosity P, and prepare corresponding pervious concrete;
B, evenly to hole on cement concrete pavement, and guarantee that cement concrete pavement layer (5) is run through until roadbed (6) in each hole, described hole is made up of equally distributed macropore (2) and the aperture (4) be evenly distributed on around macropore (2), and the quantity of aperture (4) is 5-20 times of the quantity of macropore (2), orifice area sum and cement concrete pavement area ratio are called cement concrete pavement percent opening Φ, then need Φ to be greater than P;
C, cement concrete pavement layer (5) after piercing lay geotextiles (3), and at chance macropore (2) aperture place by geotextiles (3) opening, openings of sizes and macropore (2) aperture in the same size, make macropore (2) through geotextiles (3);
D, geotextiles (3) upper pervious concrete surface layer (1) laid, and pervious concrete is tamped in macropore (2);
Just pervious concrete pavement is formed after E, maintenance.
CN201410217596.0A 2014-05-21 2014-05-21 Cement concrete pavement changes the method for pervious concrete pavement into Active CN104047215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410217596.0A CN104047215B (en) 2014-05-21 2014-05-21 Cement concrete pavement changes the method for pervious concrete pavement into

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410217596.0A CN104047215B (en) 2014-05-21 2014-05-21 Cement concrete pavement changes the method for pervious concrete pavement into

Publications (2)

Publication Number Publication Date
CN104047215A CN104047215A (en) 2014-09-17
CN104047215B true CN104047215B (en) 2016-04-13

Family

ID=51500588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410217596.0A Active CN104047215B (en) 2014-05-21 2014-05-21 Cement concrete pavement changes the method for pervious concrete pavement into

Country Status (1)

Country Link
CN (1) CN104047215B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714645A (en) * 2014-12-22 2016-06-29 天津工众生物技术有限公司 Construction method of permeable concrete pavements
CN105113362B (en) * 2015-09-21 2017-12-01 绍兴明煌建材科技有限公司 A kind of cobblestone channelizing road
CN105544340A (en) * 2015-12-04 2016-05-04 浙江方远建材科技有限公司 Water permeable pavement
CN105839492A (en) * 2016-04-18 2016-08-10 方耀 Application method of novel colored water-permeable concrete
CN107165017A (en) * 2017-07-24 2017-09-15 上海市市政规划设计研究院 The permanent composite pavement structure transformed for old asphalt pavement
GB201818513D0 (en) 2018-11-13 2018-12-26 Imperial Innovations Ltd High strength porous cement-based materials
CN110804918B (en) * 2019-10-22 2021-09-28 滁州市富邦商品混凝土有限公司 Concrete road surface structure of preventing collapsing of antidetonation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
JP3900404B2 (en) * 2001-10-17 2007-04-04 ケミカルグラウト株式会社 Paved road
CN102031744A (en) * 2010-11-22 2011-04-27 长沙理工大学 Composite pavement structure and construction method thereof
CN202766945U (en) * 2012-08-10 2013-03-06 吉林省中力通信工程有限公司 Water containing road surface capable of solving waterlogging
CN203334156U (en) * 2013-06-05 2013-12-11 北京中景橙石建筑科技有限公司 Drainage floor structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
JP3900404B2 (en) * 2001-10-17 2007-04-04 ケミカルグラウト株式会社 Paved road
CN102031744A (en) * 2010-11-22 2011-04-27 长沙理工大学 Composite pavement structure and construction method thereof
CN202766945U (en) * 2012-08-10 2013-03-06 吉林省中力通信工程有限公司 Water containing road surface capable of solving waterlogging
CN203334156U (en) * 2013-06-05 2013-12-11 北京中景橙石建筑科技有限公司 Drainage floor structure

Also Published As

Publication number Publication date
CN104047215A (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN104047215B (en) Cement concrete pavement changes the method for pervious concrete pavement into
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN105794523A (en) Tree pool device with rainwater infiltration, storage and purification functions
CN105064489A (en) Biological filter and design method thereof
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN106087632A (en) A kind of laying brick having both row's water storage function based on sponge urban construction
CN106013386A (en) Serially-connected multi-level-rain-garden permeation system for existing residential areas
CN205529748U (en) Concrete brick that permeates water with cooling function
CN106917522A (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN207032427U (en) A kind of Rainwater collection system suitable for old cell
CN104831599A (en) Composite water storage and drainage environment-friendly ground
CN207143643U (en) Water drainage template
CN105401499A (en) Ecologic water-permeable terrace provided with siphoning type drained water collection and reutilization system
CN109338839B (en) Urban seepage storage system for recycling construction waste
CN207176440U (en) A kind of discharge structure for the water-permeable pavement of pavement half
CN206545257U (en) A kind of novel greening band water storage structure
CN204780521U (en) Composite water storage and drainage environment-friendly ground
CN206616661U (en) A kind of sponge city concave herbaceous field
CN206090204U (en) Height ecological road surface structure of permeating water
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN214656073U (en) Natural permeable quarrying paving structure for sponge city
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN107354989A (en) A kind of Rainwater collection system suitable for old cell
CN106368096A (en) Permeable road surface structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 621010, No. 59, Qinglong Avenue, Qinglong Town, Fucheng District, Sichuan, Mianyang

Co-patentee after: SICHUAN LGLITTER TECHNOLOGY GROUP CO.,LTD.

Patentee after: Southwest University of Science and Technology

Address before: 621010, No. 59, Qinglong Avenue, Qinglong Town, Fucheng District, Sichuan, Mianyang

Co-patentee before: MIANYANG LIANGGU TECHNOLOGY CO.,LTD.

Patentee before: Southwest University of Science and Technology

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190807

Address after: 621010 Fucheng District, Sichuan, Mianyang

Co-patentee after: Xinjiang Lianggu Science and Technology Co.,Ltd.

Patentee after: Southwest University of Science and Technology

Address before: 621010, No. 59, Qinglong Avenue, Qinglong Town, Fucheng District, Sichuan, Mianyang

Co-patentee before: SICHUAN LGLITTER TECHNOLOGY GROUP CO.,LTD.

Patentee before: Southwest University of Science and Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200109

Address after: 621010 Fucheng District, Sichuan, Mianyang

Co-patentee after: SICHUAN LGLITTER TECHNOLOGY GROUP CO.,LTD.

Patentee after: Southwest University of Science and Technology

Address before: 621010 Fucheng District, Sichuan, Mianyang

Co-patentee before: Xinjiang Lianggu Science and Technology Co.,Ltd.

Patentee before: Southwest University of Science and Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200507

Address after: 621010 Fucheng District, Sichuan, Mianyang

Co-patentee after: Shanghai Lianggu Ecological Environment Technology Co.,Ltd.

Patentee after: Southwest University of Science and Technology

Address before: 621010 Fucheng District, Sichuan, Mianyang

Co-patentee before: SICHUAN LGLITTER TECHNOLOGY GROUP Co.,Ltd.

Patentee before: Southwest University of Science and Technology

TR01 Transfer of patent right