CN111042293A - Construction process of road central green belt seepage-proofing drainage structure - Google Patents
Construction process of road central green belt seepage-proofing drainage structure Download PDFInfo
- Publication number
- CN111042293A CN111042293A CN201911150582.0A CN201911150582A CN111042293A CN 111042293 A CN111042293 A CN 111042293A CN 201911150582 A CN201911150582 A CN 201911150582A CN 111042293 A CN111042293 A CN 111042293A
- Authority
- CN
- China
- Prior art keywords
- road
- green belt
- seepage
- water
- collecting tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a construction process of an anti-seepage drainage structure of a central green belt of a road, wherein a protective layer is laid below the green belt and comprises anti-seepage geotextile, emulsified asphalt and cement mortar surfaces, medium coarse sand of upper and lower water-permeable geotextiles is also laid above a water outlet, the anti-seepage effect is good, water falling into the green belt can be drained into a rainwater well through a PVC pipe through a soft water-permeable pipe, the problems that the water in the green belt invades a roadbed base layer, damages the road base and causes pits and collapse on the road surface are avoided, and the normal use of the road is ensured.
Description
Technical Field
The invention belongs to the technical field of road engineering, and particularly relates to a construction process of an anti-seepage drainage structure of a road central green belt.
Background
In urban main roads and express roads, a central road separation zone is generally arranged, and a central green belt and a central separation fence are mainly used. The central green belt can effectively avoid the influence on the light of the vehicles on the lane when the vehicles drive at night, reduce the situation that the pedestrians and the vehicles cross the road, relieve the visual fatigue of the driver and greatly increase the traffic safety of the road. The central green belt can beautify the environment, improve the air quality and improve the image of urban roads.
The design of the existing road central green belt is generally higher than the road surface, if heavy rain exists, excessive water in the green belt can not be discharged, the excessive water can invade a roadbed base layer, the road base is damaged, the problems of potholes and collapse and the like on the road surface are caused, and the normal use of the road is influenced, so that improvement is needed.
Disclosure of Invention
In order to solve the problems, the invention discloses a construction process of an anti-seepage drainage structure of a central green belt of a road, the drainage structure can timely drain excessive water in the green belt, the problems that the water in the green belt invades a roadbed base layer, damages are caused to a road foundation, pits and collapse occur on a road surface and the like are avoided, and the normal use of the road is ensured.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a construction process of an anti-seepage drainage structure of a road central green belt comprises the following steps:
(1) leveling and compacting the central dividing strip;
(2) excavating a drainage blind ditch;
(3) excavating a water collecting tank at the position of a reserved transverse drainage pipe, wherein the water collecting tank is generally arranged in the middle;
(4) cement mortar plastering is carried out on the bottom surface and the inclined surface of the whole median strip, and emulsified asphalt is coated on the plastering;
(5) laying impermeable geotextile on the whole median zone;
(6) sealing the outer side of the three-way pipe at the position of the water collecting tank by using asphalt hemp threads and then inserting the three-way pipe into the reserved pvc drain pipe;
(7) arranging soft water permeable pipes in the blind ditch and communicating the soft water permeable pipes with a three-way pipe in the water collecting tank;
(8) filling broken stones in the blind ditch and the water collecting tank and compacting;
(9) paving permeable geotextile on the top surface of the gravel;
(10) backfilling medium coarse sand with the thickness of 20cm, and compacting;
(11) paving permeable geotextile on the top surface of the medium coarse sand;
(12) and (5) backfilling green earthwork, wherein the earthwork is higher than the road surface.
As an improvement of the invention, the soft water permeable pipe is downwards inclined to communicate with the three-way pipe.
As an improvement of the invention, the number of the soft water-permeable pipes is 1-4.
The invention has the beneficial effects that:
according to the construction process of the road central green belt seepage-proofing drainage structure, the drainage structure can timely drain excessive water in the green belt, the problems that water in the green belt invades a roadbed base layer, damages are caused to a road foundation, pits and collapse occur on a road surface and the like are avoided, and normal use of a road is ensured.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figure. The construction process of the road central green belt seepage-proofing drainage structure comprises the following steps:
(1) leveling and compacting the central dividing strip;
(2) excavating a drainage blind ditch;
(3) excavating a water collecting tank at the position of a reserved transverse drainage pipe, wherein the water collecting tank is generally arranged in the middle;
(4) cement mortar plastering is carried out on the bottom surface and the inclined surface of the whole median strip, and emulsified asphalt is coated on the plastering;
(5) laying impermeable geotextile on the whole median zone;
(6) sealing the outer side of the three-way pipe at the position of the water collecting tank by using asphalt hemp threads and then inserting the three-way pipe into the reserved pvc drain pipe;
(7) 1-4 soft water permeable pipes are arranged in the blind ditch and are downwards inclined to be communicated with a three-way pipe;
(8) filling broken stones in the blind ditch and the water collecting tank and compacting;
(9) paving permeable geotextile on the top surface of the gravel;
(10) backfilling medium coarse sand with the thickness of 20cm, and compacting;
(11) paving permeable geotextile on the top surface of the medium coarse sand;
(12) and (5) backfilling green earthwork, wherein the earthwork is higher than the road surface.
The soft permeable pipe is a novel pipe with the functions of back filtering and water permeating (draining), integrates the capillary phenomenon and the siphon principle, integrates water absorbing, water permeating and water draining, can make water permeating from medium and coarse sand flow into a pvc water draining pipe, has the functions of pressure resistance, water permeating and back filtering, is not fractured due to geological and geographical temperature changes, can achieve the effect of discharging clean water, and does not cause secondary pollution to the environment.
According to the invention, the protective layer is laid below the green belt, and comprises the anti-seepage geotextile, the emulsified asphalt and the cement mortar surface, the medium coarse sand with the upper and lower permeable geotextiles is also laid above the water outlet, the anti-seepage effect is good, water falling into the green belt can be discharged into a rainwater well through the PVC pipe through the soft permeable pipe, the problems that the water in the green belt invades the roadbed base layer, the road foundation is damaged, the road surface is provided with pits and sinks and the like are solved, and the normal use of the road is ensured.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.
Claims (3)
1. A construction process of a road central green belt seepage-proofing drainage structure is characterized in that: the method comprises the following steps:
(1) leveling and compacting the central dividing strip;
(2) excavating a drainage blind ditch;
(3) excavating a water collecting tank at the position of a reserved transverse drainage pipe, wherein the water collecting tank is generally arranged in the middle;
(4) cement mortar plastering is carried out on the bottom surface and the inclined surface of the whole median strip, and emulsified asphalt is coated on the plastering;
(5) laying impermeable geotextile on the whole median zone;
(6) sealing the outer side of the three-way pipe at the position of the water collecting tank by using asphalt hemp threads and then inserting the three-way pipe into the reserved pvc drain pipe;
(7) arranging soft water permeable pipes in the blind ditch and communicating the soft water permeable pipes with a three-way pipe in the water collecting tank;
(8) filling broken stones in the blind ditch and the water collecting tank and compacting;
(9) paving permeable geotextile on the top surface of the gravel;
(10) backfilling medium coarse sand with the thickness of 20cm, and compacting;
(11) paving permeable geotextile on the top surface of the medium coarse sand;
(12) and (5) backfilling green earthwork, wherein the earthwork is higher than the road surface.
2. The construction process of the seepage-proofing and drainage structure of the road central green belt according to claim 1 is characterized in that: the soft water permeable pipe is downwards inclined to be communicated with the three-way pipe.
3. The construction process of the seepage-proofing and drainage structure of the road central green belt according to claim 1 is characterized in that: the number of the soft water permeable pipes is 1-4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911150582.0A CN111042293A (en) | 2019-11-21 | 2019-11-21 | Construction process of road central green belt seepage-proofing drainage structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911150582.0A CN111042293A (en) | 2019-11-21 | 2019-11-21 | Construction process of road central green belt seepage-proofing drainage structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111042293A true CN111042293A (en) | 2020-04-21 |
Family
ID=70232160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911150582.0A Pending CN111042293A (en) | 2019-11-21 | 2019-11-21 | Construction process of road central green belt seepage-proofing drainage structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111042293A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648199A (en) * | 2020-05-26 | 2020-09-11 | 中冶南方城市建设工程技术有限公司 | Water drainage structure system is prevented to city reconstruction road central authorities' median |
CN112663541A (en) * | 2020-12-22 | 2021-04-16 | 浙江交工集团股份有限公司 | Installation and construction method for ecological prefabricated guardrail of central separation zone |
CN114808599A (en) * | 2022-05-06 | 2022-07-29 | 广东晶通公路工程建设集团有限公司 | Environment-friendly civil engineering road drainage device |
CN115306009A (en) * | 2022-07-15 | 2022-11-08 | 中铁十局集团第三建设有限公司 | Novel drainage green belt construction method based on LID concept |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010087582A (en) * | 2000-03-07 | 2001-09-21 | 장필립 | Establish method for bicycle driveway |
CN202913366U (en) * | 2012-11-12 | 2013-05-01 | 中交第二公路勘察设计研究院有限公司 | Device for repairing waterproof and drainage capacity of original medial strip of road in non-excavation manner |
CN207775642U (en) * | 2018-01-17 | 2018-08-28 | 兰州石化职业技术学院 | A kind of water-saving greening type median strip of pressure sand |
CN108643317A (en) * | 2018-05-16 | 2018-10-12 | 安徽省交通控股集团有限公司 | A kind of discharge structure for superelevation road section surface |
-
2019
- 2019-11-21 CN CN201911150582.0A patent/CN111042293A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010087582A (en) * | 2000-03-07 | 2001-09-21 | 장필립 | Establish method for bicycle driveway |
CN202913366U (en) * | 2012-11-12 | 2013-05-01 | 中交第二公路勘察设计研究院有限公司 | Device for repairing waterproof and drainage capacity of original medial strip of road in non-excavation manner |
CN207775642U (en) * | 2018-01-17 | 2018-08-28 | 兰州石化职业技术学院 | A kind of water-saving greening type median strip of pressure sand |
CN108643317A (en) * | 2018-05-16 | 2018-10-12 | 安徽省交通控股集团有限公司 | A kind of discharge structure for superelevation road section surface |
Non-Patent Citations (2)
Title |
---|
中国水电金山湾生态城基础设施项目总承包部: "《百度文库》", 10 April 2016 * |
赵振乾: "关于高速公路工程的排水设计", 《交通标准化》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648199A (en) * | 2020-05-26 | 2020-09-11 | 中冶南方城市建设工程技术有限公司 | Water drainage structure system is prevented to city reconstruction road central authorities' median |
CN112663541A (en) * | 2020-12-22 | 2021-04-16 | 浙江交工集团股份有限公司 | Installation and construction method for ecological prefabricated guardrail of central separation zone |
CN114808599A (en) * | 2022-05-06 | 2022-07-29 | 广东晶通公路工程建设集团有限公司 | Environment-friendly civil engineering road drainage device |
CN114808599B (en) * | 2022-05-06 | 2024-05-03 | 广东晶通公路工程建设集团有限公司 | Environment-friendly civil engineering road drainage device |
CN115306009A (en) * | 2022-07-15 | 2022-11-08 | 中铁十局集团第三建设有限公司 | Novel drainage green belt construction method based on LID concept |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111042293A (en) | Construction process of road central green belt seepage-proofing drainage structure | |
CN202898938U (en) | Seepage and drainage combined pavement structure for urban road and landscape road | |
CN105256876A (en) | Siphon type draining system of superhigh excavation section of road | |
CN106351103A (en) | Permeable pavement structure with high strength and high permeability and paving method thereof | |
CN211036590U (en) | Roadbed protective structure permeates water | |
CN211596246U (en) | Permeable pavement structure | |
CN206219935U (en) | A kind of permeable pavement structure of high intensity, high osmosis | |
CN105507112A (en) | Pavement system for preventing waterlogging and supplying underground water | |
CN108239905A (en) | A kind of anti-ponding road and its construction method | |
CN205134481U (en) | Highway superelevation excavation highway section hydrocone type drainage system | |
CN109338839B (en) | Urban seepage storage system for recycling construction waste | |
CN210368504U (en) | Sidewalk permeable pavement and concave-down green land combined sponge city structure | |
CN218147579U (en) | High-grade highway structure using red bed mudstone to fill roadbed | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
CN216474335U (en) | A foundation structure for installing night light ceramic tile that permeates water | |
CN205529776U (en) | Infiltration structure of waterproof road in road surface | |
CN214116117U (en) | Sponge city permeable pavement | |
CN214301074U (en) | Gap type structural water permeable system for regulating and controlling rainwater runoff | |
CN212895755U (en) | Urban road sidewalk drainage device | |
CN211689719U (en) | Drainage type concrete road | |
CN107386053A (en) | A kind of construction method on pavement | |
CN211446435U (en) | Asphalt concrete road repairing structure convenient for drainage | |
CN113152628A (en) | V-shaped gully high-fill temporary drainage system and construction method thereof | |
CN111424495A (en) | Integrated kerbstone double-filtration drainage device and construction method | |
CN218711912U (en) | Multifunctional permeable pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200421 |
|
RJ01 | Rejection of invention patent application after publication |