CN209114263U - A kind of waterproof anti-settling highway subgrade - Google Patents

A kind of waterproof anti-settling highway subgrade Download PDF

Info

Publication number
CN209114263U
CN209114263U CN201821767567.1U CN201821767567U CN209114263U CN 209114263 U CN209114263 U CN 209114263U CN 201821767567 U CN201821767567 U CN 201821767567U CN 209114263 U CN209114263 U CN 209114263U
Authority
CN
China
Prior art keywords
layer
settling
concrete
rammed earth
collection chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821767567.1U
Other languages
Chinese (zh)
Inventor
路远
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Tengxu Municipal Engineering Design Co Ltd
Original Assignee
Yunnan Tengxu Municipal Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Tengxu Municipal Engineering Design Co Ltd filed Critical Yunnan Tengxu Municipal Engineering Design Co Ltd
Priority to CN201821767567.1U priority Critical patent/CN209114263U/en
Application granted granted Critical
Publication of CN209114263U publication Critical patent/CN209114263U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of waterproof anti-settling highway subgrades, including underlayment, sub-surface and anti-settling layer, the inside of underlayment is respectively arranged with three concrete columns, anti-settling layer is provided at the top of sub-surface, the first rammed earth layer is provided at the top of anti-settling layer, reinforcing layer is provided at the top of first rammed earth layer, reverse osmosis layer is provided at the top of reinforcing layer, impervious barrier is provided at the top of second rammed earth layer, the first concrete layer is provided at the top of impervious barrier, geogrids layer is equipped at the top of first concrete layer, the surface of geogrids layer has poured the second concrete layer.The utility model solves the problems, such as that existing highway subgrade waterproof anti-settling effect is poor by setting concrete column, anti-settling layer, the first rammed earth layer, reverse osmosis layer, water collection chamber, soakaway trench, conduit, impervious barrier, the first concrete layer, geogrids layer and water seepage hole.

Description

A kind of waterproof anti-settling highway subgrade
Technical field
The utility model relates to highway subgrade technical field, specially a kind of waterproof anti-settling highway subgrade.
Background technique
Roadbed refers to the banded structure object as road bed built according to route allocation and certain technical requirements, is The basis of railway and highway, roadbed is linear structure object made of being built with soil or building stones, continuous with Chinese society economy Development, the quantity of highway is also constantly increasing, and in existing pavement structure, too simple structural measure is difficult to thoroughly solve The problem of roadbed subsidence, the road especially built in the poor location of geological conditions, because roadbed is a kind of geotechnique's knot, Roadbed is often subject to the invasion and destruction of the natural conditions such as geology, water, rainfall, weather, earthquake variation, and resistivity is poor, in road After the completion of road is built, road surface can be caused phenomena such as cracking and being recessed occur because of the sedimentation of roadbed, to cause to highway It destroys;Can occur phenomena such as cracking and being recessed because of highway pavement simultaneously, when the vehicle passes by, will lead to vehicle and jolt, Even vehicle can be made phenomena such as direction offset occur, so as to cause traffic accident, be made to the security of the lives and property of people Therefore at great hidden danger, so roadbed should have enough robustnesses, stability and waterproofness.
But the prior art deposits the following deficiency:
1, existing highway subgrade waterproof effect is poor, the influence vulnerable to water and rainfall.
2, existing highway subgrade causes roadbed to settle vulnerable to geology and water wave influence.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of waterproof anti-settling highway subgrade, solves existing Highway subgrade waterproof anti-settling effect difference problem.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of waterproof anti-settling highway subgrade, including Underlayment, sub-surface and anti-settling layer, the inside of the underlayment are respectively arranged with three concrete columns, and the top of concrete column Portion is provided with sub-surface, is provided with anti-settling layer at the top of the sub-surface, and anti-settling layer be internally provided with mud mat with Anti-settling column is provided with the first rammed earth layer at the top of the anti-settling layer, and is provided with reinforcing layer at the top of the first rammed earth layer, it is described plus Gu being provided with reverse osmosis layer at the top of layer, and reverse osmosis layer is internally provided with water collection chamber, the top on the inside of the water collection chamber is equipped with Soakaway trench, the two sides of the water collection chamber are separately installed with conduit, and the second rammed earth layer, and the second rammed earth are provided at the top of reverse osmosis layer The top of layer is provided with impervious barrier, and the first concrete layer, and the top of the first concrete layer are provided at the top of the impervious barrier It is equipped with geogrids layer, the surface of the geogrids layer has poured the second concrete layer.
Preferably, the sub-surface is located at the inside of underlayment.
Preferably, the mud mat is located at the bottom on the inside of anti-settling layer, is respectively arranged with three at the top of the mud mat Anti-settling column.
Preferably, the surface at the top of the water collection chamber is provided with water seepage hole.
Preferably, one end of the conduit is connect with water collection chamber, and the other end of conduit extends to the outside of reverse osmosis layer.
(3) beneficial effect
The utility model provides a kind of waterproof anti-settling highway subgrade, have it is following the utility model has the advantages that
(1) the utility model makes this reality by setting reverse osmosis layer, water collection chamber, soakaway trench, conduit, impervious barrier and water seepage hole Has the effect of waterproof with novel, being intercepted limitation partition when water reaches impervious barrier when use, it continues lower infiltration, when fraction of Then water flow is penetrated into reverse osmosis layer by impervious barrier by the second rammed earth layer is seeped by several water seepage holes at the top of water collection chamber Enter to soakaway trench, then be flowed into the bottom of water collection chamber by soakaway trench, is finally discharged again by the conduit that water collection chamber two sides are installed It goes, has achieved the effect that waterproof and draining, so that the service life of highway subgrade increases.
(2) the utility model passes through setting concrete column, anti-settling layer, the first rammed earth layer, the first concrete layer and geotechnological lattice Grid layer makes the utility model have the effect of anti-settling, and concrete column is used to support fixed so that bottom is tied in bottom when using Structure is more stable, and anti-settling layer concrete column top and be internally provided with anti-settling column and mud mat to play secondary support anti- Heavy effect, the first rammed earth layer are used to consolidate soil layer construction, and geogrids layer is laid on the surface of the first concrete layer, in geotechnique The surface of grid layer pour paving the second concrete layer make the stability of roadbed stronger, avoid leading to road surface by moisture attack Sink.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the enlarged drawing of water collection chamber in the utility model Fig. 1.
In figure: 1, underlayment;2, concrete column;3, sub-surface;4, mud mat;5, anti-settling column;6, anti-settling layer;7, first Rammed earth layer;8, reinforcing layer;9, reverse osmosis layer;10, water collection chamber;11, soakaway trench;12, conduit;13, the second rammed earth layer;14, impervious barrier; 15, the first concrete layer;16, geogrids layer;17, the second concrete layer;18, water seepage hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model It clearly and completely describes, it is clear that described embodiment is only the utility model a part of the embodiment, rather than whole realities Apply example.Based on the embodiments of the present invention, under the premise of not making creative work described in those of ordinary skill in the art Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of embodiment: a kind of waterproof anti-settling highway subgrade, including base Layer 1, sub-surface 3 and anti-settling layer 6, the inside of underlayment 1 are respectively arranged with three concrete columns 2, and the top of concrete column 2 It is provided with sub-surface 3, concrete column 2 is used to support fixed so that bottom structure is more stable, and prevents in bottom when using Heavy layer 6 concrete column 2 top and be internally provided with anti-settling column 5 and mud mat 4 plays the anti-settling effect of secondary support, first Rammed earth layer 7 is used to consolidate soil layer construction, and geogrids layer 16 is laid on the surface of the first concrete layer 15, in geogrids layer 16 Surface pour paving the second concrete layer 17 make the stability of roadbed stronger, avoid causing under road surface by moisture attack It is heavy, so that the utility model is had the effect of anti-settling, sub-surface 3 is located at the inside of underlayment 1, and the top of sub-surface 3 is set It is equipped with anti-settling layer 6, and anti-settling layer 6 is internally provided with mud mat 4 and anti-settling column 5, mud mat 4 is located at the bottom of anti-settling 6 inside of layer Portion, the top of mud mat 4 are respectively arranged with three anti-settling columns 5, and the top of anti-settling layer 6 is provided with the first rammed earth layer 7, and first rams The top of soil layer 7 is provided with reinforcing layer 8, and the top of reinforcing layer 8 is provided with reverse osmosis layer 9, and being internally provided with for reverse osmosis layer 9 is catchmented Chamber 10, the surface at 10 top of water collection chamber are provided with water seepage hole 18, and the top of 10 inside of water collection chamber is equipped with soakaway trench 11, water collection chamber 10 two sides are separately installed with conduit 12, and one end of conduit 12 is connect with water collection chamber 10, and the other end of conduit 12 extends to instead The outside of infiltration layer 9, the top of reverse osmosis layer 9 is provided with the second rammed earth layer 13, and the top of the second rammed earth layer 13 is provided with impervious barrier 14, limitation partition can be intercepted when water reaches impervious barrier 14 when use, and it continues lower infiltration, when fraction of water flow passes through impervious barrier 14 It is penetrated into reverse osmosis layer 9 by the second rammed earth layer 13 and then penetrates into infiltration by 10 several water seepage holes 18 of top of water collection chamber Pipe 11, then pass through the bottom that soakaway trench 11 is flowed into water collection chamber 10,12 row of conduit finally installed again by 10 two sides of water collection chamber It goes out, has achieved the effect that waterproof and draining, so that the service life of highway subgrade increases, make the utility model that there is waterproof Effect, the top of impervious barrier 14 is provided with the first concrete layer 15, and the top of the first concrete layer 15 is equipped with geotechnological lattice Grid layer 16, the surface of geogrids layer 16 have poured the second concrete layer 17.
Working principle: rainwater drops into the second concrete layer 17 and penetrates into impervious barrier 14 the utility model when in use, Impervious barrier 14 can stop most underwater infiltration at this time, when fraction of water flow is penetrated by impervious barrier 14 by the second rammed earth layer 13 When in reverse osmosis layer 9, water can be penetrated into soakaway trench by the water seepage hole 18 that top is arranged by the water collection chamber 10 inside reverse osmosis layer 9 11, then pass through the bottom that soakaway trench 11 is flowed into water collection chamber 10, finally it is discharged again by the conduit 12 that 10 two sides of water collection chamber are installed Go, achieved the effect that waterproof and draining, at the same time concrete column 2 bottom be used to support it is fixed so that bottom structure more For stabilization, and anti-settling layer 6 concrete column 2 top and be internally provided with anti-settling column 5 and mud mat 4 to play secondary support anti- Heavy effect, the first rammed earth layer 7 are used to consolidate soil layer construction, and geogrids layer 16 is laid on the surface of the first concrete layer 15, Make the stability of roadbed stronger pouring the second concrete layer 17 of paving on the surface of geogrids layer 16, so that the waterproof of roadbed is anti- Effect of settling is more preferable, avoids leading to road surface subsidence by moisture attack.
It can to sum up obtain, the utility model is by being arranged concrete column 2, anti-settling layer 6, the first rammed earth layer 7, reverse osmosis layer 9, catchmenting Chamber 10, soakaway trench 11, conduit 12, impervious barrier 14, the first concrete layer 15, geogrids layer 16 and water seepage hole 18 solve existing Highway subgrade waterproof anti-settling effect difference problem.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that it is described do not depart from the principles of the present invention and spirit in the case where can to these embodiments carry out it is a variety of variation, Modification, replacement and variant, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of waterproof anti-settling highway subgrade, including underlayment (1), sub-surface (3) and anti-settling layer (6), it is characterised in that: The inside of the underlayment (1) is respectively arranged with three concrete columns (2), and is provided with road surface base at the top of concrete column (2) Layer (3) is provided with anti-settling layer (6) at the top of the sub-surface (3), and being internally provided with of anti-settling layer (6) mud mat (4) with Anti-settling column (5) is provided with the first rammed earth layer (7) at the top of the anti-settling layer (6), and is provided at the top of the first rammed earth layer (7) Reinforcing layer (8) is provided with reverse osmosis layer (9) at the top of the reinforcing layer (8), and reverse osmosis layer (9) is internally provided with water collection chamber (10), the top on the inside of the water collection chamber (10) is equipped with soakaway trench (11), and the two sides of the water collection chamber (10) are separately installed with Conduit (12) is provided with the second rammed earth layer (13) at the top of reverse osmosis layer (9), and is provided with antiseepage at the top of the second rammed earth layer (13) Layer (14) is provided with the first concrete layer (15) at the top of the impervious barrier (14), and the top paving of the first concrete layer (15) Equipped with geogrids layer (16), the surface of the geogrids layer (16) has poured the second concrete layer (17);
Surface at the top of the water collection chamber (10) is provided with water seepage hole (18).
2. a kind of waterproof anti-settling highway subgrade according to claim 1, it is characterised in that: sub-surface (3) position In the inside of underlayment (1).
3. a kind of waterproof anti-settling highway subgrade according to claim 1, it is characterised in that: the mud mat (4) is located at Bottom on the inside of anti-settling layer (6) is respectively arranged with three anti-settling columns (5) at the top of the mud mat (4).
4. a kind of waterproof anti-settling highway subgrade according to claim 3, it is characterised in that: one end of the conduit (12) It is connect with water collection chamber (10), and the other end of conduit (12) extends to the outside of reverse osmosis layer (9).
CN201821767567.1U 2018-10-30 2018-10-30 A kind of waterproof anti-settling highway subgrade Active CN209114263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821767567.1U CN209114263U (en) 2018-10-30 2018-10-30 A kind of waterproof anti-settling highway subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821767567.1U CN209114263U (en) 2018-10-30 2018-10-30 A kind of waterproof anti-settling highway subgrade

Publications (1)

Publication Number Publication Date
CN209114263U true CN209114263U (en) 2019-07-16

Family

ID=67202912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821767567.1U Active CN209114263U (en) 2018-10-30 2018-10-30 A kind of waterproof anti-settling highway subgrade

Country Status (1)

Country Link
CN (1) CN209114263U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441208A (en) * 2020-04-16 2020-07-24 张健 Anti-settlement highway subgrade

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441208A (en) * 2020-04-16 2020-07-24 张健 Anti-settlement highway subgrade

Similar Documents

Publication Publication Date Title
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
CN207003475U (en) Eco-friendly barrier wall structure for covering layer slope
CN207672343U (en) A kind of curb construction reducing railway subgrade surface width
CN200999325Y (en) Highway pipe road surface drainage arrangement
CN103147614A (en) Pool with multi-layer structure and building method thereof
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN101914882B (en) Low embankment structure in phreatic high slity soil region and construction method thereof
CN108239905B (en) Water accumulation preventing road and construction method thereof
CN112392127A (en) Dendritic embedded type flexible ecological slope drainage ditch and construction method
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN218147579U (en) High-grade highway structure using red bed mudstone to fill roadbed
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN204325845U (en) The earth shoulder blind-drainage system of a kind of road surface edge central drainage
CN110886378A (en) Construction method of water storage vibration reduction device installed under greening road and sidewalk
CN100501019C (en) Water drainage device for quickly guiding seepage and accumulation of collecting rain
CN212895755U (en) Urban road sidewalk drainage device
CN213358855U (en) Can collect interception ditch of permeable material basic unit rainwater
CN203360969U (en) Central separation belt drainage system for expressway reconstruction and extension project
CN208917611U (en) It is a kind of can anti-softening road structure
CN209010891U (en) A kind of multi-functional lobby drainage facility
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN113152628A (en) V-shaped gully high-fill temporary drainage system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant