CN108532406A - Can rapid construction high-bearing capacity pervious surface and laying method - Google Patents
Can rapid construction high-bearing capacity pervious surface and laying method Download PDFInfo
- Publication number
- CN108532406A CN108532406A CN201810434449.7A CN201810434449A CN108532406A CN 108532406 A CN108532406 A CN 108532406A CN 201810434449 A CN201810434449 A CN 201810434449A CN 108532406 A CN108532406 A CN 108532406A
- Authority
- CN
- China
- Prior art keywords
- permeable
- reinforced concrete
- special
- slab
- aquifer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 title claims abstract description 10
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 54
- 239000011449 brick Substances 0.000 claims abstract description 41
- 239000004567 concrete Substances 0.000 claims abstract description 19
- 239000010410 layer Substances 0.000 claims description 33
- 239000004570 mortar (masonry) Substances 0.000 claims description 16
- 239000004575 stone Substances 0.000 claims description 11
- 230000006641 stabilisation Effects 0.000 claims description 10
- 238000011105 stabilization Methods 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000002699 waste material Substances 0.000 claims description 8
- 239000012790 adhesive layer Substances 0.000 claims description 5
- 239000002002 slurry Substances 0.000 claims description 5
- 239000002344 surface layer Substances 0.000 claims description 5
- 238000005553 drilling Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 239000000203 mixture Substances 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 15
- 230000035699 permeability Effects 0.000 description 6
- 239000011148 porous material Substances 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 239000012466 permeate Substances 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 239000002352 surface water Substances 0.000 description 2
- 240000003537 Ficus benghalensis Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003911 water pollution Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/222—Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/04—Pavings made of prefabricated single units made of bricks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
Description
技术领域:Technical field:
本发明涉及一种可快速施工的高承载力透水地面以及铺设方法,它属于道路路面铺设技术领域,特别是人行横道的路面铺设技术。The invention relates to a fast-construction high-bearing-capacity permeable ground and a laying method, belonging to the technical field of road pavement laying, in particular to the pavement laying technology of pedestrian crossings.
背景技术:Background technique:
海绵城市,是新一代城市雨水管理理念,主要思想是城市需要弹性地应对雨水带来的洪涝灾害,即对于雨水能够充分地进行吸收、蓄积、渗透和净化,而当需要的时候则可以释放蓄存的水以充分利用。雨水渗透是海绵城市工程中的第一环,如果暴雨时雨水不能快速就地渗透下去,极易造成雨水汇聚,引起涝灾,海绵城市也将成空谈。Sponge city is a new generation of urban rainwater management concept. The main idea is that cities need to flexibly deal with flood disasters caused by rainwater, that is, they can fully absorb, store, infiltrate and purify rainwater, and release the stored water when needed. Save water to make full use of it. Rainwater infiltration is the first link in the sponge city project. If the rainwater cannot quickly infiltrate in place during a heavy rainstorm, it will easily cause rainwater to gather and cause waterlogging, and the sponge city will become empty talk.
当前,人行道及广场雨水渗透到地下的方式采用的是透水砖渗透。目前国内外的透水砖,都是利用混凝土骨料之间的细小孔隙和砖体之间连接的缝隙透水。由于这些孔隙、缝隙极易被灰尘、泥土等填充密实,失去透水功能,因此目前的透水砖在铺装完成半年到一年后,大多失去透水性能。即便是尚未失去透水功能的普通透水砖,其铺设方法也会使暴雨时渗入地下的雨水微乎其微。其原因是:a)透水砖下方的基层基本不透水,如果将基层做成透水的基层,其强度很难保证,致使道路极易损坏;b)基层下方没有蓄水层,对于某些土壤渗透率极低的地区则无助于解决城市雨洪灾害问题。Currently, permeable bricks are used to infiltrate rainwater from sidewalks and squares into the ground. At present, the permeable bricks at home and abroad all use the small pores between the concrete aggregates and the gaps connected between the bricks to permeate water. Since these pores and gaps are easily filled with dust, soil, etc., and lose their water permeability, most of the current permeable bricks lose their water permeability after half a year to one year of paving. Even ordinary permeable bricks that have not lost their water-permeable function can be laid in such a way that little rainwater seeps into the ground during heavy rains. The reasons are: a) the base layer under the permeable bricks is basically impermeable. If the base layer is made into a permeable base layer, its strength is difficult to guarantee, resulting in the road being easily damaged; Areas with extremely low water pollution rates will not help solve the problem of urban rain and flood disasters.
申请号201720189632.6的专利文件公开了一种适用于城市透水地面铺设的高承载力透水地面结构及铺设方法。它包括自上而下设置的透水地面砖面层、砂浆粘结层、钢筋混凝土受力层和碎石或建筑垃圾碎块蓄水层。在透水地面砖面层粘牢后,沿透水砖上的透水孔向下钻孔,将砂浆粘结层和混凝土受力层钻透。当雨水落到路面时,透水地面砖的表面水会流入导水槽和导水孔直接流到蓄水层的碎石中。该专利透水地面可以长期有效地维持透水地面的透水效果、并可以大大提高透水地面的承载能力。The patent document with application number 201720189632.6 discloses a high-bearing-capacity permeable ground structure and a laying method suitable for laying urban permeable ground. It includes a permeable ground brick surface layer, a mortar bonding layer, a reinforced concrete stress layer and a water storage layer of gravel or construction waste fragments arranged from top to bottom. After the surface layer of the permeable floor brick is firmly bonded, drill down along the permeable hole on the permeable brick to penetrate the mortar bonding layer and the concrete stress layer. When rainwater falls on the road surface, the surface water of the permeable floor tiles will flow into the water guide groove and the water guide hole and directly flow into the gravel in the aquifer. The patented permeable ground can effectively maintain the permeable effect of the permeable ground for a long time, and can greatly improve the bearing capacity of the permeable ground.
上述现有技术的缺点是:虽然透水路面砖的透水原理可以使透水砖本身具有极高的透水率,但是它下面的粘结砂浆和混凝土受力层都是不透水的,必须要在透水砖铺设完成并粘牢后,再对其下方的砂浆和混凝土钻孔,多数施工单位会觉得麻烦,施工周期长而产生抵触情绪。另外,钢筋混凝土受力层须现场浇筑施工,施工难度大,成本高。The disadvantage of the above-mentioned prior art is: although the permeable principle of the permeable pavement brick can make the permeable brick itself have a very high water permeability, the bonded mortar and concrete stress layer under it are impermeable and must be installed on the permeable brick. After the laying is completed and glued firmly, most construction units will find it troublesome to drill the mortar and concrete below it, and the construction period will be long and they will have resistance. In addition, the reinforced concrete bearing layer must be poured on site, which is difficult and costly.
发明内容:Invention content:
本发明在于提供一种铺设效率高且透水效果好的可快速施工的高承载力透水地面以及铺设方法。The invention aims to provide a permeable floor with high bearing capacity and a laying method with high laying efficiency and good water permeability effect, which can be quickly constructed.
本发明的目的是这样实现的:The purpose of the present invention is achieved like this:
一种可快速施工的高承载力透水地面,它包括自下而上叠加的蓄水层、钢筋混凝土透水大板、设置在蓄水层和钢筋混凝土透水大板之间的碎石稳定层、设置在钢筋混凝土透水大板上表面的粘接层,在所述的粘接层上设置的透水砖,它还包括专用路缘石,所述专用路缘石的截面结构是由左半部分和右半部分构成的折线台阶形结构,所述的专用路缘石的右半部分底端深入到蓄水层中;所述的钢筋混凝土透水大板置于专用路缘石的右半部分的顶端;所述的钢筋混凝土透水大板为均布有多个透水孔的网板状结构,在所述的网板的避开透水孔的位置设置有钢筋。A high-bearing-capacity permeable ground capable of rapid construction, which includes an aquifer superimposed from bottom to top, a reinforced concrete permeable slab, a gravel stabilization layer arranged between the aquifer and the reinforced concrete permeable slab, and a set The adhesive layer on the upper surface of the reinforced concrete permeable slab, the permeable bricks arranged on the adhesive layer, it also includes a special curb stone, the cross-sectional structure of the special curb stone is composed of the left half and the right half The broken line step-shaped structure is formed, the bottom of the right half of the special curb goes deep into the aquifer; the reinforced concrete permeable slab is placed on the top of the right half of the special curb; the steel bar The large concrete permeable slab is a mesh-like structure uniformly distributed with a plurality of water-permeable holes, and steel bars are arranged at positions avoiding the water-permeable holes of the mesh plate.
所述的专用路缘石的右半部分顶端到左半部分顶端高度等于粘接层、钢筋混凝土透水大板、和砌筑砂浆层和透水砖的厚度之和;所述的专用路缘石的长度L与钢筋混凝土透水大板的宽度W相等。The height from the top of the right half of the special curb to the top of the left half is equal to the sum of the thicknesses of the bonding layer, the reinforced concrete permeable slab, the masonry mortar layer and the permeable brick; the length L of the special curb It is equal to the width W of the reinforced concrete permeable slab.
所述的钢筋混凝土透水大板的透水孔为上大下小的斗状结构。The permeable holes of the reinforced concrete permeable slab are bucket-shaped structures with a large top and a small bottom.
所述的透水砖为带有圆形透水孔的透水砖。The permeable bricks are permeable bricks with circular permeable holes.
一种上述可快速施工的高承载力透水地面的铺设方法,它包括如下的步骤:A method for laying the above-mentioned high-bearing-capacity permeable ground capable of rapid construction, which includes the following steps:
A:在工厂预制好钢筋混凝土透水大板、专用路缘石和带有圆形透水孔的透水砖;A: Reinforced concrete permeable slabs, special curbstones and permeable bricks with circular permeable holes are prefabricated in the factory;
B:在人行道位置挖出与人行道等宽的沟;B: Dig a ditch equal to the width of the sidewalk at the position of the sidewalk;
C:铺设单粒径建筑垃圾再生骨料且摊平,形成蓄水层;C: lay single-size construction waste recycled aggregate and flatten it to form an aquifer;
D:在蓄水层上方铺设碎石稳定层,用轻型压路机压平;D: Lay a gravel stabilization layer above the aquifer and flatten it with a light roller;
E:靠近树木一侧埋设专用路缘石,专用路缘石的右半部分底端深入到蓄水层中,挖窄沟后坐浆铺设;E: A special curb is buried near the side of the tree, and the bottom of the right half of the special curb goes deep into the aquifer, and is laid with slurry after digging a narrow ditch;
F:在专用路缘石和碎石稳定层上方铺设钢筋混凝土透水大板,用找平砂浆层找平;钢筋混凝土透水大板铺设位置与专用路缘石错缝铺设,二者接触面处坐浆铺设;F: Reinforced concrete permeable slabs are laid above the special curb and gravel stabilization layer, and leveled with a leveling mortar layer; the laying position of the reinforced concrete permeable slab is staggered with that of the special curb, and the contact surface between the two is laid with grout;
G:在钢筋混凝土透水大板的透水孔中填充有无砂大孔陶粒混凝土;G: The permeable hole of the reinforced concrete permeable slab is filled with sand-free macroporous ceramsite concrete;
H:在钢筋混凝土透水大板上方铺设带有圆形透水孔的透水砖构成人行道面层,铺设时采用普通砌筑砂浆坐浆铺筑;H: Permeable bricks with circular permeable holes are laid on the top of the reinforced concrete permeable slab to form the sidewalk surface, and ordinary masonry mortar is used for paving when laying;
I:安装道路另一侧的普通路缘石。I: Install ordinary curbs on the other side of the road.
所述的蓄水层为单粒级建筑垃圾再生骨料或普通碎石铺设。The aquifer is paved with single-grain grade construction waste recycled aggregate or ordinary gravel.
本发明可实现有效的快速透水,且在不降低透水地面的承载能力的前提下,提高工厂化生产水平,避免现浇混凝土和现场钻孔等现场操作,提高施工效率,降低生产成本。The invention can realize effective rapid permeation, and without reducing the bearing capacity of the permeable ground, improve the factory production level, avoid on-site operations such as cast-in-place concrete and on-site drilling, improve construction efficiency, and reduce production costs.
附图说明:Description of drawings:
图1为本发明的透水地面截面结构示意图Fig. 1 is the cross-sectional structure schematic diagram of permeable ground of the present invention
图2为本发明专用路缘石的结构示意图Fig. 2 is the structural representation of special-purpose curb stone of the present invention
图3为本发明钢筋混凝土透水大板的结构示意图Fig. 3 is the structural representation of reinforced concrete permeable slab of the present invention
图4为本发明透水砖的结构示意图Fig. 4 is the structural representation of permeable brick of the present invention
图5为本发明具体实施的透水路面的截面结构示意图Fig. 5 is a schematic cross-sectional structure diagram of a permeable pavement implemented in the present invention
具体实施方式:Detailed ways:
下面结合图1、图2、图3、图4和图5,对本发明进行进一步的说明:Below in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, the present invention is further described:
本发明所涉及的道路主要是人行道位置,现有的道路设计,在人行道上都栽种植物,也是为了环境美化而设计的。本发明的透水路面的构成如下:The road involved in the present invention is mainly the position of the sidewalk. In the existing road design, plants are planted on the sidewalk, which is also designed for environmental beautification. The composition of permeable pavement of the present invention is as follows:
在本实施例中,本发明的透水路面包括自下而上叠加的蓄水层7、钢筋混凝土透水大板5、设置在蓄水层7和钢筋混凝土透水大板5之间的碎石稳定层6、设置在钢筋混凝土透水大板5上表面的粘接层4,在所述的粘接层4上设置的透水砖3,为了实现本发明的目的,它还包括专用路缘石1,所述专用路缘石1的截面结构是由左半部分和右半部分构成的折线台阶形结构,所述的专用路缘石1的右半部分底端深入到蓄水层7中;所述的钢筋混凝土透水大板5置于专用路缘石1的右半部分的顶端;所述的钢筋混凝土透水大板5为均布有多个透水孔52的网板状结构,在所述的网板的避开透水孔的位置设置有钢筋51。In this embodiment, the permeable pavement of the present invention includes an aquifer 7 stacked from bottom to top, a reinforced concrete permeable slab 5, and a gravel stabilization layer arranged between the aquifer 7 and the reinforced concrete permeable slab 5 6. The bonding layer 4 arranged on the upper surface of the reinforced concrete permeable slab 5, the permeable brick 3 arranged on the bonding layer 4, in order to achieve the purpose of the present invention, it also includes a special curb 1, the The cross-sectional structure of the special curb 1 is a broken line stepped structure composed of the left half and the right half, the bottom of the right half of the special curb 1 goes deep into the aquifer 7; the reinforced concrete permeable The large slab 5 is placed on the top of the right half of the special curb 1; the reinforced concrete permeable slab 5 is a mesh-like structure uniformly distributed with a plurality of permeable holes 52, and the water-permeable The positions of the holes are provided with steel bars 51 .
所述的专用路缘石1的右半部分顶端到左半部分顶端高度H等于砌筑砂浆2、钢筋混凝土透水大板5、粘接层4和透水砖3的厚度之和。The height H from the top of the right half of the special curb 1 to the top of the left half is equal to the sum of the thicknesses of the masonry mortar 2, the reinforced concrete permeable slab 5, the bonding layer 4 and the permeable brick 3.
所述的专用路缘石1的长度L与钢筋混凝土透水大板5的宽度W相等,可以实现路沿石与透水大板错缝铺设。The length L of the special-purpose curb 1 is equal to the width W of the reinforced concrete permeable slab 5, so that the curb stone and the permeable slab can be laid in staggered joints.
在本实施例中,所述的钢筋混凝土透水大板5的透水孔52为上大下小的斗状结构。In this embodiment, the permeable holes 52 of the reinforced concrete permeable slab 5 are bucket-shaped structures with a large top and a small bottom.
在本实施例中所述的透水砖3为带有圆形透水孔31的透水砖,如图4所示,The permeable brick 3 described in this embodiment is a permeable brick with a circular permeable hole 31, as shown in Figure 4,
本发明的可快速施工的高承载力透水地面的铺设方法,包括如下的步骤:The laying method of the high bearing capacity permeable ground capable of rapid construction of the present invention comprises the following steps:
A:在工厂按照上述的结构,预制好钢筋混凝土透水大板5、专用路缘石1和带有圆形透水孔31的透水砖3;这样就减少了现场施工的难度,节省了工时。A: Prefabricated reinforced concrete permeable slab 5, special curb 1 and permeable brick 3 with circular permeable hole 31 in the factory according to the above structure; this reduces the difficulty of on-site construction and saves man-hours.
B:在人行道位置挖出与人行道等宽的沟;B: Dig a ditch equal to the width of the sidewalk at the position of the sidewalk;
C:铺设单粒径建筑垃圾再生骨料且摊平,形成蓄水层7;C: Lay single-size construction waste recycled aggregate and flatten it to form an aquifer 7;
D:在蓄水层7上方铺设碎石稳定层6,用轻型压路机压平;D: Lay the gravel stabilization layer 6 above the aquifer 7, and flatten it with a light road roller;
E:靠近树木一侧埋设专用路缘石1,专用路缘石1的右半部分底端深入到蓄水层7中,挖窄沟后坐浆铺设;E: A special curb stone 1 is buried near the side of the tree, the bottom of the right half of the special curb stone 1 goes deep into the aquifer 7, and the slurry is laid after digging a narrow ditch;
F:在专用路缘石1和碎石稳定层6上方铺设钢筋混凝土透水大板5,需要使用找平砂浆层2找平;钢筋混凝土透水大板5铺设位置与专用路缘石1错缝铺设,二者接触面处坐浆铺设;F: The reinforced concrete permeable slab 5 is laid on the top of the special curb 1 and the gravel stabilization layer 6, and the leveling mortar layer 2 is required for leveling; Sitting slurry laying on the surface;
G:在钢筋混凝土透水大板5的透水孔52中填充有无砂大孔陶粒混凝土;G: the permeable hole 52 of the reinforced concrete permeable slab 5 is filled with sand-free macroporous ceramsite concrete;
H:在钢筋混凝土透水大板5上方铺设带有圆形透水孔的透水砖3,构成人行道面层,铺设时采用普通砌筑砂浆坐浆铺筑;H: Lay permeable bricks 3 with circular permeable holes on top of the reinforced concrete permeable slab 5 to form the pavement surface layer, which is paved with ordinary masonry mortar;
I:安装道路另一侧的普通路缘石。I: Install ordinary curbs on the other side of the road.
最终铺设好的路面的截面如图5中所示。The cross-section of the final paved road surface is shown in Fig. 5 .
在本实施例中,所述路缘石1为防止榕树根破坏而设的专用路缘石,其结构如图2所示,即所述专用路缘石1的截面结构是由左半部分和右半部分构成的折线台阶形结构,其中右半部分的底端埋入蓄水层7,自右半部分的顶端起,往上依次铺设钢筋混凝土透水大板5,含找平砂浆层2、粘接层4和由透水砖3铺成的人行道面层。因此,路缘石的右下部分顶端到左上部分顶端高度H等于上述各层的厚度之和。路缘石的长度L与钢筋混凝土透水大板5的宽度W相等。In this embodiment, the curb stone 1 is a special curb stone designed to prevent banyan tree roots from being damaged, and its structure is shown in Figure 2, that is, the cross-sectional structure of the special curb stone 1 is composed of the left half and the right half. A folded line stepped structure is formed, in which the bottom of the right half is buried in the aquifer 7, and from the top of the right half, reinforced concrete permeable large slabs 5 are laid sequentially upwards, including a leveling mortar layer 2 and an adhesive layer 4 And the pavement surface layer paved by permeable bricks 3. Therefore, the height H from the top of the lower right part of the curb to the top of the upper left part is equal to the sum of the thicknesses of the above layers. The length L of the curb is equal to the width W of the reinforced concrete permeable slab 5 .
在本实施例中,人行道面层采用带有圆形透水孔31的透水砖3铺设,以保证该结构的快速透水性。In this embodiment, the sidewalk surface is paved with permeable bricks 3 with circular permeable holes 31 to ensure rapid water permeability of the structure.
透水砖3也可采用带有圆形透水孔的正方形或正六边形的结构的透水砖进行铺设。Permeable brick 3 also can adopt the permeable brick of the square or regular hexagonal structure that has circular permeable hole to lay.
在本实施例中,所述粘结层4为普通砌筑砂浆,用于连接钢筋混凝土透水大板5和透水砖铺设的人行道面层。采用这种普通砂浆坐浆铺设,可以增加地面的牢固性。In this embodiment, the bonding layer 4 is common masonry mortar, which is used to connect the reinforced concrete permeable slab 5 and the pavement pavement paved with permeable bricks. The use of this ordinary mortar to lay the ground can increase the firmness of the ground.
如图3所示,本发明的钢筋混凝土透水大板5为均布有多个透水孔52的网板状结构,在所述的网板结构中设置有钢筋51,所述钢筋混凝土透水大板5采用工厂预制的模式进行生产,以提高其抗弯刚度。在钢筋混凝土透水大板5均布有上大下小的斗形透水孔52。在所述的斗形透水孔52内填充有无砂大孔陶粒混凝土。这种结构靠钢筋混凝土来提高透水地面的抗弯承载能力,靠无砂大孔陶粒混凝土实现以下功能:1)其强度满足对路面砖的向下压力的承托;2)起到快速透水的作用;3)一旦透水路面砖上的圆形透水孔堵塞,用钢钎等简单工具将堵塞物戳到所述陶粒混凝土中就可以恢复透水功能。As shown in Figure 3, the reinforced concrete permeable large slab 5 of the present invention is a mesh-like structure evenly distributed with a plurality of water-permeable holes 52, and steel bars 51 are arranged in the mesh structure, and the reinforced concrete permeable large slab 5 is produced using factory prefabricated patterns to increase its bending rigidity. In the reinforced concrete permeable large slab 5, bucket-shaped permeable holes 52 are evenly distributed. The bucket-shaped permeable hole 52 is filled with sand-free macroporous ceramsite concrete. This structure relies on reinforced concrete to improve the flexural bearing capacity of the permeable ground, and relies on sand-free macroporous ceramsite concrete to achieve the following functions: 1) its strength meets the downward pressure on the pavement bricks; 2) it can quickly permeate 3) Once the circular permeable hole on the permeable pavement blocks is blocked, the permeable function can be restored by poking the blockage into the ceramsite concrete with a simple tool such as a steel drill.
所述碎石稳定层6可采用与蓄水层7相同的原材料,但是其颗粒粒径应比蓄水层7的原材料粒径小一级或两级,以便于采用轻型压路机压平及钢筋混凝土透水大板5平整铺设。The gravel stabilization layer 6 can be made of the same raw material as the aquifer 7, but its particle size should be one or two grades smaller than the raw material particle size of the aquifer 7, so that it can be flattened and reinforced concrete with a light road roller. The permeable slab 5 is laid flat.
所述蓄水层7宜采用单粒级建筑垃圾再生骨料或普通碎石铺设而成。废混凝土再生骨料的蓄水率实测结果详见附表1。The aquifer 7 should be paved with single-grain construction waste recycled aggregate or common gravel. See attached table 1 for the measured results of water storage rate of waste concrete recycled aggregate.
表1蓄水层材料的蓄水率(%)Table 1 Water storage rate of aquifer materials (%)
本发明的主要工作原理:Main working principle of the present invention:
1)首先在工厂将钢筋混凝土透水大板事先预制好。当施工需要时,直接将钢筋混凝土透水大板运送至施工现场,进行装配安装。1) First, the reinforced concrete permeable slab is prefabricated in the factory. When the construction needs, the reinforced concrete permeable slab is directly transported to the construction site for assembly and installation.
2)由于钢筋混凝土透水大板的斗形透水孔中填充了无砂大孔陶粒混凝土,铺设时一旦有砂浆堵塞透水砖的透水孔,可以采用钢钎沿透水孔戳烂孔下方的陶粒,使之恢复透水性能,而不必采用冲击钻等工具进行钻孔。2) Since the bucket-shaped permeable hole of the reinforced concrete permeable slab is filled with sand-free large-pore ceramsite concrete, once the permeable hole is blocked by mortar during laying, the ceramsite below the hole can be poked with a steel drill along the permeable hole , so that it can restore the water permeability without having to use tools such as percussion drills for drilling.
3)当雨水落到路面时,透水砖3的表面水会流入导水槽然后经圆形透水孔31流向钢筋混凝土透水大板的漏斗形透水孔中,再经漏斗形透水孔中的陶粒混凝土直接流入蓄水层7中。3) When the rain falls on the road, the surface water of the permeable brick 3 will flow into the water guide groove and then flow through the circular permeable hole 31 to the funnel-shaped permeable hole of the reinforced concrete permeable slab, and then pass through the ceramsite concrete in the funnel-shaped permeable hole directly into the aquifer 7.
4)在使用了一段时间后,如果透水砖的圆形透水孔被泥沙堵塞,可以用钢钎或充电式手电钻进行钻孔清理维护,以持久保持其透水功能。4) After using it for a period of time, if the circular permeable hole of the permeable brick is blocked by sand, you can use a steel drill or a cordless hand drill to clean and maintain the hole to maintain its permeable function for a long time.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
1)高效施工。可以在工厂事先预制好钢筋混凝土透水大板,它们在运送至施工现场后,能够快速、高效地进行安装。1) Efficient construction. Reinforced concrete permeable slabs can be prefabricated in the factory, and after they are transported to the construction site, they can be installed quickly and efficiently.
2)对道路交通影响小。仅在人行道施工,施工区域范围小,不需要封路或者仅需要短时间采取交通管制方案。2) Little impact on road traffic. Only on the sidewalk, the construction area is small, no road closure or only a short-term traffic control plan is required.
3)配筋路缘石和钢筋混凝土透水大板的配合使用,能够防止路边植物根系击穿透水地面结构,大大延长了结构的使用寿命。3) The combined use of reinforced curbstones and reinforced concrete permeable slabs can prevent the roots of roadside plants from penetrating the permeable ground structure, greatly prolonging the service life of the structure.
4)整个结构的后期维护简单,维护成本低。适用范围广,可以用在城市人行道、城市广场、城市公园、居民住宅区等地。4) The post-maintenance of the whole structure is simple and the maintenance cost is low. It has a wide range of applications and can be used in urban sidewalks, urban squares, urban parks, residential areas and other places.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810434449.7A CN108532406A (en) | 2018-05-08 | 2018-05-08 | Can rapid construction high-bearing capacity pervious surface and laying method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810434449.7A CN108532406A (en) | 2018-05-08 | 2018-05-08 | Can rapid construction high-bearing capacity pervious surface and laying method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108532406A true CN108532406A (en) | 2018-09-14 |
Family
ID=63476616
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810434449.7A Pending CN108532406A (en) | 2018-05-08 | 2018-05-08 | Can rapid construction high-bearing capacity pervious surface and laying method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108532406A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109516768A (en) * | 2018-11-13 | 2019-03-26 | 四川锐源能环科技有限公司 | A kind of production method of sintered type water-permeable brick |
| CN109972474A (en) * | 2018-12-12 | 2019-07-05 | 山东大学 | Using waste plastic to make layered permeable concrete pavement |
| CN110485238A (en) * | 2019-07-11 | 2019-11-22 | 上海市政工程设计研究总院(集团)有限公司 | A kind of fabricated permeable pavement concrete slab |
| CN110485237A (en) * | 2019-07-11 | 2019-11-22 | 上海市政工程设计研究总院(集团)有限公司 | A kind of production method of fabricated permeable pavement concrete slab |
| CN111304989A (en) * | 2019-11-14 | 2020-06-19 | 北京顺景园林股份有限公司 | Stable ecological permeable pavement and manufacturing method thereof |
| CN115852770A (en) * | 2022-11-17 | 2023-03-28 | 天元建设集团有限公司 | Municipal sponge road structure and construction method |
| CN115929089A (en) * | 2023-01-30 | 2023-04-07 | 广州大学 | An ecological parking lot that takes into account greening, solidification and water permeability |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104532718A (en) * | 2014-12-15 | 2015-04-22 | 沈阳市政集团有限公司 | L-shaped concrete kerb and preparation method thereof |
| CN205741822U (en) * | 2016-05-24 | 2016-11-30 | 沈阳建筑大学 | A kind of monoblock type water drainage curb |
| CN106801371A (en) * | 2017-02-28 | 2017-06-06 | 深圳市建筑科学研究院股份有限公司 | High-bearing capacity permeable ground structure and laying method |
| CN206928165U (en) * | 2017-05-19 | 2018-01-26 | 上海市园林工程有限公司 | A kind of water penetration armored concrete basic unit |
| CN208748462U (en) * | 2018-05-08 | 2019-04-16 | 深圳市市政工程咨询中心有限公司 | Can rapid construction high-bearing capacity pervious surface |
-
2018
- 2018-05-08 CN CN201810434449.7A patent/CN108532406A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104532718A (en) * | 2014-12-15 | 2015-04-22 | 沈阳市政集团有限公司 | L-shaped concrete kerb and preparation method thereof |
| CN205741822U (en) * | 2016-05-24 | 2016-11-30 | 沈阳建筑大学 | A kind of monoblock type water drainage curb |
| CN106801371A (en) * | 2017-02-28 | 2017-06-06 | 深圳市建筑科学研究院股份有限公司 | High-bearing capacity permeable ground structure and laying method |
| CN206928165U (en) * | 2017-05-19 | 2018-01-26 | 上海市园林工程有限公司 | A kind of water penetration armored concrete basic unit |
| CN208748462U (en) * | 2018-05-08 | 2019-04-16 | 深圳市市政工程咨询中心有限公司 | Can rapid construction high-bearing capacity pervious surface |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109516768A (en) * | 2018-11-13 | 2019-03-26 | 四川锐源能环科技有限公司 | A kind of production method of sintered type water-permeable brick |
| CN109972474A (en) * | 2018-12-12 | 2019-07-05 | 山东大学 | Using waste plastic to make layered permeable concrete pavement |
| CN110485238A (en) * | 2019-07-11 | 2019-11-22 | 上海市政工程设计研究总院(集团)有限公司 | A kind of fabricated permeable pavement concrete slab |
| CN110485237A (en) * | 2019-07-11 | 2019-11-22 | 上海市政工程设计研究总院(集团)有限公司 | A kind of production method of fabricated permeable pavement concrete slab |
| CN111304989A (en) * | 2019-11-14 | 2020-06-19 | 北京顺景园林股份有限公司 | Stable ecological permeable pavement and manufacturing method thereof |
| CN115852770A (en) * | 2022-11-17 | 2023-03-28 | 天元建设集团有限公司 | Municipal sponge road structure and construction method |
| CN115929089A (en) * | 2023-01-30 | 2023-04-07 | 广州大学 | An ecological parking lot that takes into account greening, solidification and water permeability |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108532406A (en) | Can rapid construction high-bearing capacity pervious surface and laying method | |
| CN205420946U (en) | Novel ecology that prevents surface gathered water road structure of permeating water | |
| CN110130466A (en) | Sponge urban ecology town road | |
| CN204875416U (en) | Porous pavement structure | |
| CN112726325B (en) | Sidewalk drainage structure and combined drainage method of sidewalk drainage structure and drainage curb | |
| CN203295913U (en) | Novel ecological permeable road structure | |
| CN105908588A (en) | Permeable pavement system for weakly-permeable soil regions | |
| CN209227320U (en) | A kind of permeable tile work pavement structure that solid cement concrete layer is set | |
| CN209024909U (en) | A Sponge City Multifunctional Pavement Structure | |
| CN104343177B (en) | underground drainage channel | |
| CN205474666U (en) | Novel it mats formation to permeate water pavement | |
| CN110924255A (en) | Gardens permeable pavement structure | |
| CN107794822B (en) | Permeable pavement based on sponge city idea | |
| CN208748462U (en) | Can rapid construction high-bearing capacity pervious surface | |
| CN206581379U (en) | A kind of garden way tooth drainage system | |
| CN211848713U (en) | Permeable pavement drainage structure | |
| CN108411728A (en) | Surface drainage | |
| CN204266137U (en) | A kind of novel municipal porous pavement road drainage structure | |
| CN106801371A (en) | High-bearing capacity permeable ground structure and laying method | |
| CN218373102U (en) | Assembled retaining road surface structure with water purification effect | |
| CN111749073A (en) | Water permeable reconstruction technology based on existing road base layer | |
| CN217438590U (en) | Full water-permeable shoulder structure suitable for heavy-load pavement | |
| CN1644799B (en) | Porous brickwalk laying method | |
| CN206721596U (en) | A kind of pavement structure of permeable road | |
| CN204282150U (en) | A kind of surface drainage that graded broken stone french drain is set |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |
|
| RJ01 | Rejection of invention patent application after publication |