CN109826065A - A kind of high-fill roadbed guard system and its construction method - Google Patents

A kind of high-fill roadbed guard system and its construction method Download PDF

Info

Publication number
CN109826065A
CN109826065A CN201910132986.0A CN201910132986A CN109826065A CN 109826065 A CN109826065 A CN 109826065A CN 201910132986 A CN201910132986 A CN 201910132986A CN 109826065 A CN109826065 A CN 109826065A
Authority
CN
China
Prior art keywords
cover board
drainpipe
ditch
gutter
french drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910132986.0A
Other languages
Chinese (zh)
Other versions
CN109826065B (en
Inventor
张忠桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Design Group Co ltd
Original Assignee
Wuxi Municipal Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Municipal Design Institute Co Ltd filed Critical Wuxi Municipal Design Institute Co Ltd
Priority to CN201910132986.0A priority Critical patent/CN109826065B/en
Publication of CN109826065A publication Critical patent/CN109826065A/en
Application granted granted Critical
Publication of CN109826065B publication Critical patent/CN109826065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The present invention relates to a kind of high-fill roadbed guard system and its construction methods, including gutter, the first drainpipe, the second drainpipe, step, vegetation and the gutter beside roadbed;Gutter includes cover board ditch and french drain, and cover board ditch is arranged on road shoulder surface, and the lower section of cover board ditch is arranged in french drain, and the first drainpipe is connected on cover board ditch, and the second drainpipe is connected on french drain, and step is provided on gutter, is provided with vegetation in road shoulder and side slope;Gutter is connected with river along the line.Construction method of the present invention is simple, after subgrade protection system is built up, it can exclude rainwater on road surface and road structure internal water, can slow down again rainwater side slope wash away and destruction of the inside configuration water to roadbed, the deficiency for improving that existing engineering protection cost is high, landscape effect is poor, is unfavorable for ecology in the present invention etc., existing plant protection is improved again to be easy to also improve existing slope protection system by the deficiency of rain drop erosion etc..

Description

A kind of high-fill roadbed guard system and its construction method
Technical field
The present invention relates to a kind of high-fill roadbed guard system and its construction methods, belong to urban municipal road technology neck Domain.
Background technique
The subgrade protection of high roadbed road can be divided into two classes according to supporting and retaining system mode: (1) rectilinear supporting and retaining system, as retaining wall, It paddles revetment etc.;(2) ramp type supporting and retaining system, such as plant slope protection, engineering slope protection.Since rectilinear supporting and retaining system cost is high, applies Work difficulty is big, for usefully condition outside road, generally uses ramp type supporting and retaining system.
Ramp type supporting and retaining system is banketed using the ramp system of slope ratio 1:1 to 1:2 that is, on the outside of the roadbed of road, utilizes slope The soil body protects roadbed.To slow down slope soil by rain drop erosion, slope soil surface generally uses plant protection or engineering anti- Shield.Slope plants protection is exactly to plant trees in ramped surfaces kind grass, or plant careless plant again after ramped surfaces are first laid with hollow concrete block Tree;Slope engineering protection is exactly or in ramped surfaces dry-laid rubble or to grout in ramped surfaces sandblasting slurry or joints cement concrete Slabstone.
Slope surface is disadvantageous in that using engineering protection: (1) engineering protection cost is high, difficulty of construction is big, the slope surface soil body Completely cut off completely with extraneous contacting by hard material, not only landscape effect is poor, and does not utilize and improve the ecological environment;(2) road Inside configuration water cannot exclude, and lower seep to soil matrix influences slope stability.Slope surface is disadvantageous in that using plant protection: (1) When rainfall is big, rainwater on road surface converges into slope surface, and slope surface is be easy to cause coombe occur, destroys slope vegetation, influences subgrade stability; (2) road structure internal water cannot exclude, and lower seep to soil matrix influences slope stability.
Summary of the invention
The purpose of the present invention is to solve the above problems, provide a kind of simple high-fill roadbed protection of construction method System and its construction method.
The present invention adopts the following technical scheme: a kind of high-fill roadbed guard system, including beside roadbed gutter, One drainpipe, the second drainpipe, step, vegetation and gutter;
The gutter includes cover board ditch and french drain, and on road shoulder surface, the french drain is arranged in cover board ditch for the cover board ditch setting Lower section, be connected with the first drainpipe on the cover board ditch, the second drainpipe be connected on the french drain, is arranged in the side slope There is step, the cover board ditch is connected to step by the first drainpipe, and the french drain is connected to step by the second drainpipe, road Vegetation is provided in shoulder and side slope;Gutter is connected with river along the line.
Further, the ditch body of the cover board ditch is made for C20 reinforced concrete is cast-in-place, and the cover board is that steel fibre concrete is prefabricated.
Further, the french drain is made for non-sand concrete is cast-in-place, described.
Further, the bottom of the french drain is equipped with several blind pipes, and the blind pipe is connected with the second drainpipe.
Further, the center vertical alignment of first drainpipe and the second drainpipe is arranged.
Further, cover board ditch is to collect and exclude rainwater on road surface, and french drain is to collect and exclude inside configuration water.
Further, cover board ditch and french drain are mutually independent drainage system.
The construction method of high-fill roadbed guard system, includes the following steps:
(1) anti-after the completion of subgrade construction to excavate soil matrix, construction drainage ditch basis and french drain (1-2), the second drainpipe (3), row Ditch basis is close to roadbed and is poured, and gutter (1) includes cover board ditch (1-1) and french drain (1-2), and french drain (1-2) setting exists The lower section of cover board ditch (1-1), french drain (1-2), which is that non-sand concrete is cast-in-place, to be made;Connect the second drainpipe (3) and blind pipe, the second draining Managing (3), laying, the gradient are not less than 2% from high to low;The spacing of second drainpipe (3) is 30 ~ 50m, and the cover board of the cover board ditch is Steel fibre concrete is prefabricated;
(2) after the completion of the last stage, construct road surface, after the completion of pavement construction, soil matrix on the outside of construction drainage ditch;
(3) construction drainage ditch two sides rubble, and then construct cover board ditch (1-1) and the first drainpipe (2), the cover board ditch (1- 1) setting is on road shoulder surface, and the ditch body of cover board ditch (1-1), which is that C20 reinforced concrete is cast-in-place, to be made, and the first drainpipe (2) applies from high to low If, the gradient be not less than 2%;First drainpipe (2) and the second drainpipe (3) correspond, and arrange in center vertical alignment;
(4) backfill gutter two sides are native and are compacted, and modify road shoulder, are arranged step (4);
(5) road slope, gutter are modified, step used for overhaul of constructing in the side slope by gutter makes the side of side slope bottom Ditch (5) is connected with river along the line;
(6) grass is planted at road shoulder and side slope to plant trees, form vegetable layer.
Construction method of the present invention is simple, after subgrade protection system is built up, can exclude in rainwater on road surface and road structure Portion's water, but can slow down rainwater side slope wash away and destruction of the inside configuration water to roadbed, improve existing work in the present invention The deficiency that journey protects that cost is high, landscape effect is poor, is unfavorable for ecology etc., but it is easy by rain drop erosion to improve existing plant protection Deng deficiency, also improve existing slope protection system.
Detailed description of the invention
Fig. 1 is the floor map of structure of the invention.
Fig. 2 is the schematic cross-section of structure of the invention.
Fig. 3 is the main section cross-section diagram of structure of the invention.
Appended drawing reference: gutter 1, cover board ditch 1-1, french drain 1-2, the first drainpipe 2, the second drainpipe 3, step 4, gutter 5。
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described.
As shown in Figure 1-Figure 3, a kind of high-fill roadbed guard system, including the gutter 1 beside roadbed, the first drainpipe 2, the second drainpipe 3, step 4, vegetation and gutter 5;Gutter 1 includes cover board ditch 1-1 and french drain 1-2, and cover board ditch 1-1 setting exists The lower section of cover board ditch 1-1 is arranged in road shoulder surface, french drain 1-2, is connected with the first drainpipe 2 on cover board ditch 1-1, on french drain 1-2 It is connected with the second drainpipe 3, is provided in the side slope step (4), the cover board ditch (1-1) and step (4) pass through first row Water pipe (2) connection, the french drain (1-2) are connected to step (4) by the second drainpipe (3), and plant is provided on road shoulder and side slope Quilt;Gutter 5 is connected with river along the line.
(1) the cover board ditch 1-1 of 1 top half of gutter mainly to exclude rainwater on road surface, 1 lower half portion of gutter French drain 1-2 is mainly used for excluding inside configuration water, and the cover board being arranged on cover board ditch 1-1 is able to bear vehicular load, does not influence The use of road shoulder.Cover board ditch: the sectional dimension of cover board ditch is width 50cm, high 40cm, thickness 10cm, and cover board ditch body is C20 reinforced concrete It is cast-in-place;The cover board of cover board ditch is rain grid, and the size of cover board is long 50cm, width 40cm, thickness 5cm, and cover board is that steel fibre concrete is pre- System.French drain: the sectional dimension of french drain is long 50cm, width 40cm, and french drain body is cast-in-place with non-sand concrete;Blind pipe is laid in french drain bottom, blind 10 cm of pipe diameter, blind pipe material are HDPE plastic pipe, tube wall spacing 10cm stagger mode cloth hole, aperture 1.0cm.The base in gutter Plinth: after soil compaction, 10cm thickness C15 fine-stone concrete is poured, roadbed, basic outside widening 10cm are close in basis inside.
2 connecting cover plate ditch of (2) first drainpipes 2 and 3: the first drainpipe of the second drainpipe, to exclude road surface water, second Drainpipe 3 connects french drain, to discharge structure internal water;First drainpipe 2: 15 cm of diameter, material are HDPE plastic pipe;The Two drainpipes 3: 10 cm of diameter, material are HDPE plastic pipe;
(3) step: step 4 also serves as the lower channel of management and maintenance personnel, every grade of step height mainly as drainage channel 20cm, step width determine that generally wide 25 ~ 40cm, step 4 are cast-in-place with C25 element concrete according to the gradient.
The construction method of high-fill roadbed guard system, includes the following steps:
(1) anti-after the completion of subgrade construction to excavate soil matrix, construction drainage ditch basis and french drain, the second drainpipe, gutter basis It is close to roadbed to pour, gutter includes cover board ditch and french drain, and the lower section of cover board ditch is arranged in the french drain, and french drain is existing for non-sand concrete It pours and is made;The second drainpipe and blind pipe are connected, the second drainpipe is laid from high to low, the gradient is not less than 2%;Second drainpipe Spacing is 30 ~ 50m, and the cover board of the cover board ditch is that steel fibre concrete is prefabricated;
(2) after the completion of the last stage, construct road surface, after the completion of pavement construction, soil matrix on the outside of construction drainage ditch;
(3) construction drainage ditch two sides rubble, and then construct cover board ditch and the first drainpipe, the cover board ditch are arranged in road shoulder table Face, the ditch body of cover board ditch, which is that C20 reinforced concrete is cast-in-place, to be made, and the first drainpipe is laid from high to low, the gradient is not less than 2%;First row Water pipe and the second drainpipe correspond, and arrange in center vertical alignment;
(4) backfill gutter two sides are native and are compacted, and modify road shoulder, and step is arranged;
(5) road slope, gutter are modified, step used for overhaul of constructing in the side slope by gutter makes the side of side slope bottom Ditch is connected with river along the line;
(6) grass is planted at road shoulder and side slope to plant trees, form vegetable layer.

Claims (8)

1. a kind of high-fill roadbed guard system, it is characterised in that: including the gutter (1) beside roadbed, the first drainpipe (2), the second drainpipe (3), step (4), vegetation and gutter (5);
The gutter (1) includes cover board ditch (1-1) and french drain (1-2), and the cover board ditch (1-1) is arranged in road shoulder surface, institute French drain (1-2) setting is stated to be connected with the first drainpipe (2) on the lower section of cover board ditch (1-1), the cover board ditch (1-1), it is described It is connected with the second drainpipe (3), is provided in the side slope step (4) on french drain (1-2), the cover board ditch (1-1) and step (4) it is connected to by the first drainpipe (2), the french drain (1-2) is connected to step (4) by the second drainpipe (3), road shoulder and side Vegetation is provided on slope;The gutter (5) of side slope bottom is connected with river along the line.
2. high-fill roadbed guard system as described in claim 1, it is characterised in that: the ditch body of the cover board ditch (1-1) is C20 reinforced concrete is cast-in-place to be made, and the cover board of the cover board ditch is that steel fibre concrete is prefabricated.
3. high-fill roadbed guard system as described in claim 1, it is characterised in that: the french drain (1-2) is existing for non-sand concrete It pours and is made.
4. high-fill roadbed guard system as described in claim 1, it is characterised in that: the bottom of the french drain (1-2) is laid with There are several blind pipes, the blind pipe is connected with the second drainpipe.
5. high-fill roadbed guard system as described in claim 1, it is characterised in that: first drainpipe (2) and second The center vertical alignment of drainpipe (3) is arranged.
6. high-fill roadbed guard system as described in claim 1, it is characterised in that: the cover board ditch (1-1) is to collect And rainwater on road surface is excluded, french drain (1-2) is to collect and exclude inside configuration water.
7. high-fill roadbed guard system as described in claim 1, it is characterised in that: the cover board ditch (1-1) and french drain (1- It 2) is mutually independent drainage system.
8. the construction method of high-fill roadbed guard system described in claim 1, characterized by the following steps:
(1) anti-after the completion of subgrade construction to excavate soil matrix, construction drainage ditch basis and french drain (1-2), the second drainpipe (3), row Ditch basis is close to roadbed and is poured, and gutter (1) includes cover board ditch (1-1) and french drain (1-2), and french drain (1-2) setting exists The lower section of cover board ditch (1-1), french drain (1-2), which is that non-sand concrete is cast-in-place, to be made;Connect the second drainpipe (3) and blind pipe, the second draining Managing (3), laying, the gradient are not less than 2% from high to low;The spacing of second drainpipe (3) is 30 ~ 50m, and the cover board of the cover board ditch is Steel fibre concrete is prefabricated;
(2) after the completion of the last stage, construct road surface, after the completion of pavement construction, soil matrix on the outside of construction drainage ditch;
(3) construction drainage ditch two sides rubble, and then construct cover board ditch (1-1) and the first drainpipe (2), the cover board ditch (1- 1) setting is on road shoulder surface, and the ditch body of cover board ditch (1-1), which is that C20 reinforced concrete is cast-in-place, to be made, and the first drainpipe (2) applies from high to low If, the gradient be not less than 2%;First drainpipe (2) and the second drainpipe (3) correspond, and arrange in center vertical alignment;
(4) backfill gutter two sides are native and are compacted, and modify road shoulder, are arranged step (4);
(5) road slope, gutter are modified, step used for overhaul of constructing in the side slope by gutter makes the side of side slope bottom Ditch (5) is connected with river along the line;
(6) grass is planted at road shoulder and side slope to plant trees, form vegetable layer.
CN201910132986.0A 2019-02-22 2019-02-22 High-fill roadbed protection system and construction method thereof Active CN109826065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910132986.0A CN109826065B (en) 2019-02-22 2019-02-22 High-fill roadbed protection system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910132986.0A CN109826065B (en) 2019-02-22 2019-02-22 High-fill roadbed protection system and construction method thereof

Publications (2)

Publication Number Publication Date
CN109826065A true CN109826065A (en) 2019-05-31
CN109826065B CN109826065B (en) 2021-04-16

Family

ID=66864193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910132986.0A Active CN109826065B (en) 2019-02-22 2019-02-22 High-fill roadbed protection system and construction method thereof

Country Status (1)

Country Link
CN (1) CN109826065B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206119A (en) * 2019-06-25 2019-09-06 四川省公路规划勘察设计研究院有限公司 A kind of double water system of road that road surface water is isolated with subgrade drainage
CN113684910A (en) * 2021-07-22 2021-11-23 中国市政工程西北设计研究院有限公司 Construction method for jacking pipe to exit from inclined slope
CN114875936A (en) * 2022-05-30 2022-08-09 中国二十冶集团有限公司 Construction method for drainage and protection of high cut slope side ditch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718723A (en) * 1993-06-30 1995-01-20 Teruo Hatori Adjustable-slope road side ditch
CN101343852A (en) * 2008-08-19 2009-01-14 中交第二公路勘察设计研究院有限公司 Method for filling highroad roadbed by waste steel slags
CN104480829A (en) * 2014-11-13 2015-04-01 长安大学 Pavement structure internal draining system for eliminating road surface water seepage
CN207376384U (en) * 2017-10-24 2018-05-18 山西省交通规划勘察设计院 A kind of fine grained soil of superelevation embankment fills structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718723A (en) * 1993-06-30 1995-01-20 Teruo Hatori Adjustable-slope road side ditch
CN101343852A (en) * 2008-08-19 2009-01-14 中交第二公路勘察设计研究院有限公司 Method for filling highroad roadbed by waste steel slags
CN104480829A (en) * 2014-11-13 2015-04-01 长安大学 Pavement structure internal draining system for eliminating road surface water seepage
CN207376384U (en) * 2017-10-24 2018-05-18 山西省交通规划勘察设计院 A kind of fine grained soil of superelevation embankment fills structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206119A (en) * 2019-06-25 2019-09-06 四川省公路规划勘察设计研究院有限公司 A kind of double water system of road that road surface water is isolated with subgrade drainage
CN113684910A (en) * 2021-07-22 2021-11-23 中国市政工程西北设计研究院有限公司 Construction method for jacking pipe to exit from inclined slope
CN114875936A (en) * 2022-05-30 2022-08-09 中国二十冶集团有限公司 Construction method for drainage and protection of high cut slope side ditch

Also Published As

Publication number Publication date
CN109826065B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN103147614B (en) Pool with multi-layer structure and building method thereof
CN106758638A (en) A kind of city sponge brick and its construction technology
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN106917522A (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN104831599A (en) Composite water storage-drainage eco-friendly floor
CN109457566A (en) A kind of assembled gap porous pavement
CN206428709U (en) A kind of highway slope protection
CN2635719Y (en) Artificial lawn sports field structure with permeability and elasticity
CN107142814A (en) A kind of sponge urban ecology pavement rainwater utilization structure
CN204780521U (en) Compound row water environmental protection ground of holding
CN110965420A (en) Construction structure and construction method for road reconstruction and upgrading sponge city
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN207484214U (en) A kind of water permeability and water storage ability terrace
CN203113863U (en) Multi-layer structure water pool
CN206859091U (en) A kind of coarse-grained soil high-fill roadbed discharge structure
CN107354989A (en) A kind of Rainwater collection system suitable for old cell
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN112323658A (en) Inter-mountain road landscape ecological structure based on corrugated plates and construction method
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN206359859U (en) A kind of pavement pavement structure
CN206941335U (en) A kind of road for storing rainwater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 214072 West floor, Lianchuang building, 901-2 yinxiu Road, Binhu District, Wuxi City, Jiangsu Province

Patentee after: Huaxin Design Group Co.,Ltd.

Address before: 214072 West floor, Lianchuang building, 901-2 yinxiu Road, Binhu District, Wuxi City, Jiangsu Province

Patentee before: WUXI MUNICIPAL DESIGN INSTITUTE Co.,Ltd.