CN208917611U - It is a kind of can anti-softening road structure - Google Patents

It is a kind of can anti-softening road structure Download PDF

Info

Publication number
CN208917611U
CN208917611U CN201821477226.0U CN201821477226U CN208917611U CN 208917611 U CN208917611 U CN 208917611U CN 201821477226 U CN201821477226 U CN 201821477226U CN 208917611 U CN208917611 U CN 208917611U
Authority
CN
China
Prior art keywords
layer
fixedly installed
triangle block
stability triangle
fine sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821477226.0U
Other languages
Chinese (zh)
Inventor
高燚
陈勤杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821477226.0U priority Critical patent/CN208917611U/en
Application granted granted Critical
Publication of CN208917611U publication Critical patent/CN208917611U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to technical field of buildings, especially it is a kind of can anti-softening road structure, including road surface, road surface lower surface is fixedly installed with Slag Layer, Slag Layer lower surface two sides are fixedly installed with the first stability triangle block, the opposite exterior lateral sides of first stability triangle block are fixedly installed with concrete layer, and concrete layer and road surface, Slag Layer is in contact, cement layer is fixedly installed between the first stability triangle block of two sides, and cement layer is fixedly connected with Slag Layer lower surface, cement layer lower surface is fixedly connected with filling soil layer, filling soil layer lower surface is fixedly connected with bituminous water-proof coating, bituminous water-proof coating lower surface is fixedly installed with fine sand layer, fine sand layer lower surface is fixedly installed with impervious barrier, impervious barrier lower surface is fixedly installed with sandy gravel stratum.The structure can greatly improve the overall stability of the road structure using the cooperation between stiffening plate and reinforcing rib.

Description

It is a kind of can anti-softening road structure
Technical field
The utility model relates to technical field of buildings, more particularly to it is a kind of can anti-softening road structure.
Background technique
Roadbed is the basis on track or road surface, is the earthen structure by excavating or filling and formed.The master of roadbed Act on be for track or road surfacing and train or driving operation necessary condition is provided, and bear track and rolling stock or The dead load and dynamic load of person road surface and traffic loading, while load being transmitted and being spread to ground depths.On vertical section, road Base must assure that the elevation that route needs;In the plane, roadbed connect the route that composition completely penetrates through with bridge, tunnel.In soil In wood engineering, roadbed is all occupied an important position in construction quantity, occupied area and investing.Traditional roadbed construction is seldom examined The softening problem for considering roadbed easily causes roadbed to soften so due to prolonged rain drop erosion, thus probably Bring the danger such as collapsing.
Utility model content
Purpose of the utility model is to solve disadvantage existing in the prior art, and propose it is a kind of can anti-softening Road structure.
To achieve the goals above, the utility model adopts the technical scheme that
Design it is a kind of can anti-softening road structure, including road surface, the upper surface pavement offer several drainage troughs, institute It states road surface lower surface and is fixedly installed with Slag Layer, Slag Layer lower surface two sides are fixedly installed with the first stability triangle block, The opposite exterior lateral sides of the first stability triangle block are fixedly installed with concrete layer, and concrete layer and road surface, Slag Layer are homogeneous It contacts, cement layer, and the fixed company of cement layer and Slag Layer lower surface is fixedly installed between the first stability triangle block described in two sides It connects, the cement layer lower surface is fixedly connected with filling soil layer, and it is anti-that filling soil layer lower surface is fixedly connected with pitch Water layer, the bituminous water-proof coating lower surface are fixedly installed with fine sand layer, and the fine sand layer lower surface is fixedly installed with impervious barrier, institute State impervious barrier lower surface and be fixedly installed with sandy gravel stratum, stiffening plate is fixedly installed in the middle part of the cement layer, and reinforce board ends according to Secondary to run through the first stability triangle block and the second stability triangle block and extend to concrete layer interior lower end, the stiffening plate two sides are certainly It is upper and under be fixedly installed with the second reinforcing rib of several uniform equidistant arrangements, and the second reinforcing rib through the first stability triangle block with Second stability triangle block simultaneously extends in the first stability triangle block.
Preferably, stiffening plate lower end on both sides of the middle is fixedly installed with the first reinforcing rib, and the first reinforcing rib is successively Through filling soil layer, bituminous water-proof coating, fine sand layer, impervious barrier and extend in sandy gravel stratum.
Preferably, several aqueducts are fixedly installed with inside the concrete layer, and are fixedly installed with filter inside aqueduct Net.
Preferably, the bituminous water-proof coating, filling soil layer, fine sand layer thickness be equal, and should with a thickness of impervious barrier With 2/3rds of fine sand layer.
The utility model proposes it is a kind of can anti-softening road structure, beneficial effect is: this can anti-softening roadbed Structure is easy for installation, and stability is extremely strong, which can greatly improve first with the cooperation between stiffening plate and reinforcing rib The overall stability of the road structure, secondly the cooperation between the first stability triangle block and the second stability triangle block can add again The stability of the strong structure, to prevent roadbed from softening.
Detailed description of the invention
Fig. 1 be the utility model proposes it is a kind of can anti-softening road structure schematic view of the front view.
Fig. 2 be the utility model proposes it is a kind of can anti-softening road structure overlooking structure diagram.
In figure: concrete layer 1, stiffening plate 2, strainer 3, road surface 4, cement layer 5, bituminous water-proof coating 6, filling soil layer 7, steel Slag blanket 8, the first stability triangle block 9, aqueduct 10, the second stability triangle block 11, sandy gravel stratum 12, impervious barrier 13, fine sand layer 14, One reinforcing rib 15, the second reinforcing rib 16, drainage trough 17.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-2, it is a kind of can anti-softening road structure, including road surface 4,4 upper surface of road surface offer several drainages Slot 17,4 lower surface of road surface are fixedly installed with Slag Layer 8, and 8 lower surface two sides of Slag Layer are fixedly installed with the first stability triangle block 9, the opposite exterior lateral sides of the first stability triangle block 9 are fixedly installed with concrete layer 1, are fixedly installed with inside concrete layer 1 several Aqueduct 10, and strainer 3 is fixedly installed with inside aqueduct 10, the material of strainer 3 is corrosion resistant plastic cement strainer, can be filtered Some stones, when meeting rain and snow weather, rainwater flows into 1 upper surface of concrete layer via drainage trough 17, subsequently flows into aqueduct In 10, and ground end is imported via aqueduct 10, the first stability triangle block 9 is triangle, has high stability, therefore can Greatly increase the stability of the structure, 4 both sides of road surface, which are arranged in, in concrete layer 1 can play the effect for surrounding and protecting road surface 4.
And concrete layer 1 is in contact with road surface 4, Slag Layer 8, is fixedly installed between two sides the first stability triangle block 9 Cement layer 5, and cement layer 5 is fixedly connected with 8 lower surface of Slag Layer, 5 lower surface of cement layer is fixedly connected with filling soil layer 7, 7 lower surface of filling soil layer is fixedly connected with bituminous water-proof coating 6, and 6 lower surface of bituminous water-proof coating is fixedly installed with fine sand layer 14, carefully 14 lower surface of sand bed is fixedly installed with impervious barrier 13, and 13 lower surface of impervious barrier is fixedly installed with sandy gravel stratum 12, and cement layer 5, which has, to be connected The effect connect, bituminous water-proof coating 6 can effectively waterproof, the collective effect of Slag Layer 8 and filling soil layer 7 enables road surface 4 Enough bear biggish stress.
Stiffening plate 2 is fixedly installed in the middle part of cement layer 5, and 2 both ends of stiffening plate sequentially pass through the first stability triangle block 9 and Two stability triangle blocks 11 simultaneously extend to 1 interior lower end of concrete layer, and 2 two sides of stiffening plate are fixedly installed with several uniform from top to bottom Second reinforcing rib 16 of equidistant arrangement, and the second reinforcing rib 16 runs through the first stability triangle block 9 and the second stability triangle block 11 simultaneously It extends in the first stability triangle block 9, the cooperation of stiffening plate 2 and the second reinforcing rib 16 enables to the stability of the structure significantly Increase, so as to be effectively prevented roadbed softening.
2 lower end on both sides of the middle of stiffening plate is fixedly installed with the first reinforcing rib 15, and the first reinforcing rib 15 is sequentially passed through and filled out It fills soil horizon 7, bituminous water-proof coating 6, fine sand layer 14, impervious barrier 13 and extends in sandy gravel stratum 12, bituminous water-proof coating 6, filling soil Earth layer 7, fine sand layer 14 thickness be equal, and should be with a thickness of 2/3rds of impervious barrier 13 and fine sand layer 14, bituminous water-proof coating 6, filling soil layer 7, fine sand layer 14 with a thickness of 2cm-3cm, the first reinforcing rib 15 can play good connection function.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (4)

1. one kind can anti-softening road structure, including road surface (4), road surface (4) upper surface offer several drainage troughs (17), which is characterized in that road surface (4) lower surface is fixedly installed with Slag Layer (8), Slag Layer (8) the lower surface two sides It is fixedly installed with the first stability triangle block (9), the opposite exterior lateral sides of the first stability triangle block (9) are fixedly installed with coagulation Soil layer (1), and concrete layer (1) is in contact with road surface (4), Slag Layer (8), the first stability triangle block (9) described in two sides it Between be fixedly installed with cement layer (5), and cement layer (5) is fixedly connected with Slag Layer (8) lower surface, cement layer (5) following table Face is fixedly connected with filling soil layer (7), and filling soil layer (7) lower surface is fixedly connected with bituminous water-proof coating (6), described Bituminous water-proof coating (6) lower surface is fixedly installed with fine sand layer (14), and fine sand layer (14) lower surface is fixedly installed with impervious barrier (13), impervious barrier (13) lower surface is fixedly installed with sandy gravel stratum (12), is fixedly installed with reinforcement in the middle part of the cement layer (5) Plate (2), and stiffening plate (2) both ends sequentially pass through the first stability triangle block (9) and the second stability triangle block (11) and extend to mixed Solidifying soil layer (1) interior lower end, stiffening plate (2) two sides be fixedly installed with from top to bottom several uniform equidistant arrangements second plus Strengthening tendons (16), and the second reinforcing rib (16) through the first stability triangle block (9) and the second stability triangle block (11) and extends to the In one stability triangle block (9).
2. one kind according to claim 1 can anti-softening road structure, which is characterized in that stiffening plate (2) lower end On both sides of the middle is fixedly installed with the first reinforcing rib (15), and the first reinforcing rib (15) sequentially passes through filling soil layer (7), pitch Waterproof layer (6), fine sand layer (14), impervious barrier (13) simultaneously extend in sandy gravel stratum (12).
3. one kind according to claim 1 can anti-softening road structure, which is characterized in that in the concrete layer (1) Portion is fixedly installed with several aqueducts (10), and is fixedly installed with strainer (3) inside aqueduct (10).
4. one kind according to claim 1 can anti-softening road structure, which is characterized in that the bituminous water-proof coating (6), Filling soil layer (7), fine sand layer (14) thickness be equal, and should with a thickness of impervious barrier (13) and fine sand layer (14) three/ Two.
CN201821477226.0U 2018-09-11 2018-09-11 It is a kind of can anti-softening road structure Expired - Fee Related CN208917611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821477226.0U CN208917611U (en) 2018-09-11 2018-09-11 It is a kind of can anti-softening road structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821477226.0U CN208917611U (en) 2018-09-11 2018-09-11 It is a kind of can anti-softening road structure

Publications (1)

Publication Number Publication Date
CN208917611U true CN208917611U (en) 2019-05-31

Family

ID=66705082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821477226.0U Expired - Fee Related CN208917611U (en) 2018-09-11 2018-09-11 It is a kind of can anti-softening road structure

Country Status (1)

Country Link
CN (1) CN208917611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846964A (en) * 2019-09-30 2020-02-28 东珠生态环保股份有限公司 Construction method of municipal soft soil roadbed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846964A (en) * 2019-09-30 2020-02-28 东珠生态环保股份有限公司 Construction method of municipal soft soil roadbed

Similar Documents

Publication Publication Date Title
CN209602892U (en) A kind of highway subgrade structure
CN103147614B (en) Pool with multi-layer structure and building method thereof
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN108677715B (en) A kind of highway bridge subgrade and pavement and its construction method
CN101914882B (en) Low embankment structure in phreatic high slity soil region and construction method thereof
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN207405427U (en) A kind of combined type permeable pavement structure
CN208917611U (en) It is a kind of can anti-softening road structure
CN103243624B (en) Construction method for salty soil district railway roadbed with water content lower than liquid limit
CN209584751U (en) A kind of road structure convenient for ponding inside discharge roadbed
CN209457025U (en) A kind of roadbed side slope safeguard structure
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN105544341A (en) Quick draining pavement structure for urban low-lying roads
CN212834837U (en) Town road with drainage function
CN214992786U (en) Municipal administration road design road surface domatic structure
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN208250846U (en) Surface drainage
CN208685362U (en) The arragement construction of city non-motorized lane
CN209010891U (en) A kind of multi-functional lobby drainage facility
CN207176423U (en) A kind of garden landscape paving structure
CN206521804U (en) Excavation section drainage system
CN209456831U (en) A kind of storage infiltration structure for Gobi desert terrain wind-light-electricity industrial zone road pavement
CN209227330U (en) A kind of highway collapse road structure
CN216615357U (en) Town road prevention of seepage project organization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190531

Termination date: 20190911

CF01 Termination of patent right due to non-payment of annual fee