CN104032119A CN201410270789.2A CN201410270789A CN104032119A CN 104032119 A CN104032119 A CN 104032119A CN 201410270789 A CN201410270789 A CN 201410270789A CN 104032119 A CN104032119 A CN 104032119A
Authority
CN
China
Prior art keywords
heating surface
heat treatment
angle steel
circular hole
tube bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410270789.2A
Other languages
English (en)
Other versions
CN104032119B (zh
Inventor
陈雅斌
陈凯
侯延斌
张建豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410270789.2A priority Critical patent/CN104032119B/zh
Publication of CN104032119A publication Critical patent/CN104032119A/zh
Application granted granted Critical
Publication of CN104032119B publication Critical patent/CN104032119B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Resistance Heating (AREA)

Abstract

本发明锅炉受热面管排伸缩式热处理夹具,包括分别设置于受热面管排上下两端的热处理陶瓷加热器、分别设置于两片热处理陶瓷加热器外端的保温棉层以及分别设置于保温棉层外端的固定框架以及滑动插装于固定框架内的活动框架,若干螺栓Ⅱ穿过上下两个活动框架以及两个固定框架后并穿过两层保温棉层、两层热处理陶瓷加热器以及受热面管排后通过螺母锁紧固定。根据受热面管排的长度使活动框架相对固定框架滑动调整至长度匹配。之后再将螺栓Ⅰ插入圆孔Ⅰ以及圆孔Ⅱ中再利用螺母锁紧固定。利用螺栓Ⅱ将受热面管排与保温棉层以及热处理陶瓷加热器的连接固定,安装拆卸简单,固定牢固,对不同长度的受热面管排适应性强,提高了工作效率以及焊口的热处理质量。

Description

锅炉受热面管排伸缩式热处理夹具
技术领域
本发明涉及夹具装置技术领域,具体涉及一种锅炉受热面管排伸缩式热处理夹具。
背景技术
在火力发电厂建设中,锅炉管道主要集中在受热面,一般30MW以上的机组中锅炉受热面管道以合金钢为主,大部分都需要焊口热处理。受热面管排管道无论是在地面组合还是在现场安装,管排管道焊后热处理中加热片的固定给热处理造成很大困难,现场通过各种方法也制作了很多夹具,但是有些夹具笨重,有些夹具使局部固定不良,造成热处理温度测量不准等很多问题。
发明内容
本发明为了克服以上技术的不足,提供了一种轻便、适应不同长度受热面管排的锅炉受热面管排伸缩式热处理夹具。
本发明克服其技术问题所采用的技术方案是:
本锅炉受热面管排伸缩式热处理夹具,包括分别设置于受热面管排上下两端的热处理陶瓷加热器、分别设置于两片热处理陶瓷加热器外端的保温棉层以及分别设置于保温棉层外端的固定框架以及滑动插装于固定框架内的活动框架,所述固定框架以及活动框架上沿长度方向分别设置有若干圆孔Ⅰ以及若干圆孔Ⅱ,螺栓Ⅰ依次穿过圆孔Ⅰ和圆孔Ⅱ后通过螺母锁紧固定,若干螺栓Ⅱ穿过上下两个活动框架以及两个固定框架后并穿过两层保温棉层、两层热处理陶瓷加热器以及受热面管排后通过螺母锁紧固定。
上述固定框架包括两个彼此相对布置的角钢Ⅰ、纵向连接于两个角钢Ⅰ两端的两个连接钢筋Ⅰ以及横向连接于两个连接钢筋Ⅰ之间的若干连接钢筋Ⅱ,所述活动框架包括两个彼此相对布置的角钢Ⅱ、纵向连接于两个角钢Ⅱ两端的两个连接钢筋Ⅲ以及横向连接于两个连接钢筋Ⅲ之间的若干连接钢筋Ⅳ,所述角钢Ⅰ以及角钢Ⅱ的侧边上沿长度方向分别设置有若干圆孔Ⅰ和圆孔Ⅱ,所述两个角钢Ⅱ外缘距离与两个角钢Ⅰ内档距离相匹配。
为了提高适应性,还包括若干置于固定框架或活动框架外侧的钢板,所述钢板上设置有长孔。
为了提高固定牢固度,还包括若干铁丝面所述铁丝将两层保温棉层、两片热处理陶瓷加热器与受热面管排捆扎固定。
本发明的有益效果是:根据受热面管排的长度使活动框架相对固定框架滑动调整至长度匹配。之后再将螺栓Ⅰ插入圆孔Ⅰ以及圆孔Ⅱ中再利用螺母锁紧固定。利用螺栓Ⅱ将受热面管排与保温棉层以及热处理陶瓷加热器的连接固定,安装拆卸简单,固定牢固,对不同长度的受热面管排适应性强,提高了工作效率以及焊口的热处理质量。
附图说明
图1为本发明的立体结构示意图;
图2为本发明热处理陶瓷加热器及保温棉层固定部位结构示意图;
图3为本发明的固定框架与活动框架连接部位结构示意图;
图中,1.角钢Ⅰ 2.连接钢筋Ⅰ 3.连接钢筋Ⅱ 4.圆孔Ⅰ 5.螺母 6.螺栓Ⅰ 7.角钢Ⅱ 8.连接钢筋Ⅲ 9.连接钢筋Ⅳ 10.圆孔Ⅱ 11.钢板 12.长孔 13.螺栓Ⅱ 14.保温棉层 15.热处理陶瓷加热器 16.受热面管排 17.铁丝。
具体实施方式
下面结合附图1、附图2、附图3对本发明做进一步说明。
本锅炉受热面管排伸缩式热处理夹具,包括分别设置于受热面管排16上下两端的热处理陶瓷加热器15、分别设置于两片热处理陶瓷加热器15外端的保温棉层14以及分别设置于保温棉层14外端的固定框架以及滑动插装于固定框架内的活动框架,固定框架以及活动框架上沿长度方向分别设置有若干圆孔Ⅰ 4以及若干圆孔Ⅱ 10,螺栓Ⅰ 6依次穿过圆孔Ⅰ 4和圆孔Ⅱ 10后通过螺母5锁紧固定,若干螺栓Ⅱ 13穿过上下两个活动框架以及两个固定框架后并穿过两层保温棉层14、两层热处理陶瓷加热器15以及受热面管排16后通过螺母锁紧固定。安装前先松开螺栓Ⅰ 6以及螺母5,将螺栓Ⅰ 6从固定框架以及活动框架上的圆孔Ⅰ 4以及圆孔Ⅱ 10中抽出,之后根据受热面管排16的长度使活动框架相对固定框架滑动调整至长度匹配。之后再将螺栓Ⅰ 6插入圆孔Ⅰ 4以及圆孔Ⅱ 10中再利用螺母5锁紧固定。之后将螺栓Ⅱ 13插入受热面管排16上下两端的活动框架以及固定框架,并穿过两层保温棉层14以及两片热处理陶瓷加热器,螺栓Ⅱ 13从受热面管排16之间的对口时切开的鳍片中插入。最终实现将受热面管排16与保温棉层14以及热处理陶瓷加热器15的连接固定,安装拆卸简单,固定牢固,对不同长度的受热面管排16适应性强,提高了工作效率以及焊口的热处理质量。
如附图3所示,固定框架包括两个彼此相对布置的角钢Ⅰ 1、纵向连接于两个角钢Ⅰ 1两端的两个连接钢筋Ⅰ 2以及横向连接于两个连接钢筋Ⅰ 2之间的若干连接钢筋Ⅱ 3,活动框架包括两个彼此相对布置的角钢Ⅱ 7、纵向连接于两个角钢Ⅱ 7两端的两个连接钢筋Ⅲ 8以及横向连接于两个连接钢筋Ⅲ 8之间的若干连接钢筋Ⅳ 9,角钢Ⅰ 1以及角钢Ⅱ 7的侧边上沿长度方向分别设置有若干圆孔Ⅰ 4和圆孔Ⅱ 10,两个角钢Ⅱ 7外缘距离与两个角钢Ⅰ 1内档距离相匹配。固定框架以及活动框架均由角钢加钢筋制成,在保证强度的条件下又做到了重量轻盈方便移动以及制造的特点。
如附图1所示,还可以包括若干置于固定框架或活动框架外侧的钢板11,钢板11上设置有长孔12。螺栓Ⅱ 13穿过两个钢板11的长孔12后再利用螺母固定,由于螺栓Ⅱ 13可以在长孔12中调整位置,因此提高了对不同规格受热面管排16的适应性。
如附图2,还可以包括若干铁丝17将两层保温棉层14、两片热处理陶瓷加热器15与受热面管排16捆扎固定。在利用固定框架以及活动框架固定受热面管排16之前,先利用铁丝17将保温棉层14以及热处理陶瓷加热器15与受热面管排16进行预固定,进一步提高了固定牢固度。

Claims (4)

1.一种锅炉受热面管排伸缩式热处理夹具,其特征在于:包括分别设置于受热面管排(16)上下两端的热处理陶瓷加热器(15)、分别设置于两片热处理陶瓷加热器(15)外端的保温棉层(14)以及分别设置于保温棉层(14)外端的固定框架以及滑动插装于固定框架内的活动框架,所述固定框架以及活动框架上沿长度方向分别设置有若干圆孔Ⅰ(4)以及若干圆孔Ⅱ(10),螺栓Ⅰ(6)依次穿过圆孔Ⅰ(4)和圆孔Ⅱ(10)后通过螺母(5)锁紧固定,若干螺栓Ⅱ(13)穿过上下两个活动框架以及两个固定框架后并穿过两层保温棉层(14)、两层热处理陶瓷加热器(15)以及受热面管排(16)后通过螺母锁紧固定。
2.根据权利要求1所述的锅炉受热面管排伸缩式热处理夹具,其特征在于:所述固定框架包括两个彼此相对布置的角钢Ⅰ(1)、纵向连接于两个角钢Ⅰ(1)两端的两个连接钢筋Ⅰ(2)以及横向连接于两个连接钢筋Ⅰ(2)之间的若干连接钢筋Ⅱ(3),所述活动框架包括两个彼此相对布置的角钢Ⅱ(7)、纵向连接于两个角钢Ⅱ(7)两端的两个连接钢筋Ⅲ(8)以及横向连接于两个连接钢筋Ⅲ(8)之间的若干连接钢筋Ⅳ(9),所述角钢Ⅰ(1)以及角钢Ⅱ(7)的侧边上沿长度方向分别设置有若干圆孔Ⅰ(4)和圆孔Ⅱ(10),所述两个角钢Ⅱ(7)外缘距离与两个角钢Ⅰ(1)内档距离相匹配。
3.根据权利要求2所述的锅炉受热面管排伸缩式热处理夹具,其特征在于:还包括若干置于固定框架或活动框架外侧的钢板(11),所述钢板(11)上设置有长孔(12)。
4.根据权利要求1或2所述的锅炉受热面管排伸缩式热处理夹具,其特征在于:还包括若干铁丝(17)面所述铁丝(17)将两层保温棉层(14)、两片热处理陶瓷加热器(15)与受热面管排(16)捆扎固定。
CN201410270789.2A 2014-06-18 2014-06-18 锅炉受热面管排伸缩式热处理夹具 Active CN104032119B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410270789.2A CN104032119B (zh) 2014-06-18 2014-06-18 锅炉受热面管排伸缩式热处理夹具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410270789.2A CN104032119B (zh) 2014-06-18 2014-06-18 锅炉受热面管排伸缩式热处理夹具

Publications (2)

Publication Number Publication Date
CN104032119A true CN104032119A (zh) 2014-09-10
CN104032119B CN104032119B (zh) 2016-02-03

Family

ID=51463112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410270789.2A Active CN104032119B (zh) 2014-06-18 2014-06-18 锅炉受热面管排伸缩式热处理夹具

Country Status (1)

Country Link
CN (1) CN104032119B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789745A (zh) * 2015-03-31 2015-07-22 中国神华能源股份有限公司 一种用于管屏焊缝热处理的加热装置
CN108977647A (zh) * 2018-09-27 2018-12-11 中国电建集团山东电力建设第工程有限公司 锅炉受热面销钉焊后热处理专用工装及热处理方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046254A (ja) * 1996-07-31 1998-02-17 Kawasaki Steel Corp 電縫鋼管シーム部の熱処理方法及び装置
JP2002361470A (ja) * 2001-05-31 2002-12-18 Toshiba Corp 伝熱管パネルの熱処理装置およびその熱処理方法
JP2009079248A (ja) * 2007-09-26 2009-04-16 Jfe Steel Kk 電縫鋼管の熱処理方法
JP2009263712A (ja) * 2008-04-24 2009-11-12 Jfe Steel Corp 電縫管溶接部の熱処理装置
CN201999968U (zh) * 2011-01-21 2011-10-05 上海电力安装第二工程公司 一种用于管道热处理加热板的支撑装置
CN103276188A (zh) * 2013-06-13 2013-09-04 武汉大学 一种电站锅炉水冷壁安装用焊后热处理装置
CN203530382U (zh) * 2013-08-02 2014-04-09 山东电力建设第二工程公司 钢管高压焊口热处理保温装置
CN203923304U (zh) * 2014-06-18 2014-11-05 山东电力建设第一工程公司 锅炉受热面管排伸缩式热处理夹具

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046254A (ja) * 1996-07-31 1998-02-17 Kawasaki Steel Corp 電縫鋼管シーム部の熱処理方法及び装置
JP2002361470A (ja) * 2001-05-31 2002-12-18 Toshiba Corp 伝熱管パネルの熱処理装置およびその熱処理方法
JP2009079248A (ja) * 2007-09-26 2009-04-16 Jfe Steel Kk 電縫鋼管の熱処理方法
JP2009263712A (ja) * 2008-04-24 2009-11-12 Jfe Steel Corp 電縫管溶接部の熱処理装置
CN201999968U (zh) * 2011-01-21 2011-10-05 上海电力安装第二工程公司 一种用于管道热处理加热板的支撑装置
CN103276188A (zh) * 2013-06-13 2013-09-04 武汉大学 一种电站锅炉水冷壁安装用焊后热处理装置
CN203530382U (zh) * 2013-08-02 2014-04-09 山东电力建设第二工程公司 钢管高压焊口热处理保温装置
CN203923304U (zh) * 2014-06-18 2014-11-05 山东电力建设第一工程公司 锅炉受热面管排伸缩式热处理夹具

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789745A (zh) * 2015-03-31 2015-07-22 中国神华能源股份有限公司 一种用于管屏焊缝热处理的加热装置
CN104789745B (zh) * 2015-03-31 2017-02-01 中国神华能源股份有限公司 一种用于管屏焊缝热处理的加热装置
CN108977647A (zh) * 2018-09-27 2018-12-11 中国电建集团山东电力建设第工程有限公司 锅炉受热面销钉焊后热处理专用工装及热处理方法
CN108977647B (zh) * 2018-09-27 2023-09-22 中国电建集团山东电力建设第一工程有限公司 锅炉受热面销钉焊后热处理专用工装及热处理方法

Also Published As

Publication number Publication date
CN104032119B (zh) 2016-02-03

Similar Documents

Publication Publication Date Title
US1894835A (en) Method of and apparatus for joining pipes
CN203923304U (zh) 锅炉受热面管排伸缩式热处理夹具
CN104032119A (zh) 锅炉受热面管排伸缩式热处理夹具
CN106321990A (zh) 一种承插式结构壁缠绕管及其连接方法
CN104989906B (zh) 一种连续钢管护套电缆电伴热方法
CN201764119U (zh) 一种衬塑钢管固定装置
CN204075614U (zh) 水暖弯管焊接装置的焊接定位架
CN203504777U (zh) 一种桩腿主舷管加热装置
CN105222121B (zh) 一种锅炉省煤器
CN203787598U (zh) 一种电缆分接箱专用接地线
CN104179381B (zh) 一种钢管连接件
CN201937015U (zh) 电力线路接续用线夹
CN209743836U (zh) 一种新型的复合管道组合连接件
CN204717141U (zh) 直埋蒸汽管滑动支架结构
CN201396545Y (zh) 铜管件管路绕曲结构
CN214275886U (zh) 一种地下热力管网非开挖修复结构
CN202328835U (zh) 一种太阳能热水器
CN215060382U (zh) 管路油用高效防爆加热器
CN202901670U (zh) Pe给水管件的热熔承插连接结构
CN204901208U (zh) 外套管封气堵
CN204975761U (zh) 管道预热加热装置
CN215967121U (zh) 一种用于余热锅炉受热管片与外置集箱的连接固定装置
CN207234352U (zh) 一种电缆绝缘支架
CN206643473U (zh) 一种承插型盘扣式斜拉杆螺母点焊机
RU143273U1 (ru) Обогреваемый трубопровод

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.6 building, zone 2, Hanyu financial and business center, hi tech Zone, Jinan City, Shandong Province

Patentee after: SEPCO1 ELECTRIC POWER CONSTRUCTION CORPORATION Co.,Ltd.

Address before: 250131 No. 244 Industrial North Road, Jinan City, Shandong Province

Patentee before: SEPCO1 ELECTRIC POWER CONSTRUCTION Corp.