CN103556820A - 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法 - Google Patents

混凝土梁在加大加固时用的一种吊模以及该吊模施工方法 Download PDF

Info

Publication number
CN103556820A
CN103556820A CN201310528524.3A CN201310528524A CN103556820A CN 103556820 A CN103556820 A CN 103556820A CN 201310528524 A CN201310528524 A CN 201310528524A CN 103556820 A CN103556820 A CN 103556820A
Authority
CN
China
Prior art keywords
concrete beam
template
wood
lumps
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310528524.3A
Other languages
English (en)
Inventor
张宏
金喜龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd filed Critical HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201310528524.3A priority Critical patent/CN103556820A/zh
Publication of CN103556820A publication Critical patent/CN103556820A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种混凝土梁在加大加固时用的一种吊模以及该吊模施工方法,包括混凝土梁以及混凝土梁上的楼板,在所述混凝土梁两侧各设置有一吊杆,这两根吊杆的一端穿过所述楼板并固定,另一端固接有一竖向方木,该竖向方木上设置有左右两根横向方木,这两根横向方木上设置有模板,该模板与混凝土梁形成一封闭灌浆空间,该封闭灌浆空间用以混凝土梁加大加固用;所述楼板上还设有一灌浆孔,该灌浆孔与所述封闭灌浆空间相通;所述混凝土梁上还穿设有一穿梁螺杆,该穿梁螺杆的两端还分别穿过所述模板并固定。采用上述结构后,本发明使模板稳定性加强在浇筑无收缩灌浆料时不易漏浆,且避免了加大截面梁下方或侧面存在管道设备造成施工轴线位置偏离。

Description

混凝土梁在加大加固时用的一种吊模以及该吊模施工方法
技术领域
本发明公开了一种混凝土梁在加大加固时用的一种吊模以及该吊模施工方法,属于建筑施工技术领域。
背景技术
混凝土梁一般在高层建筑以及桥梁等地方出现,主要起整个建筑的支撑作用。我们在建筑的过程中,有时需要对混凝土梁进行加大加固,这时我们一般采用梁模板脚手架,这种脚手架主要由木模板、木方和钢管支架构成,用来稳定模板。采用这种方法,操作复杂且需要搭设满堂脚手架,拼装和搭建工作量大,施工效率低且浪费严重。主要体现在:1、在搭设顶板支撑时,由于通常的钢管架子多为固定尺寸,所以在高度上不能灵活多变,很难满足不同高度的需求,且地面一旦有高差或不平将对搭建工作造成很大影响;2、由于钢管长度与需求长度不符,因而随意切割截断、搭接的现象严重,造成资源浪费和管理困难,而且经常由于搭接不当造成施工质量问题;3、由于钢管为圆形,与木方结合点受力面积小,两种材质强度及变形量差距很大,所以常在接触点产生木方因受压变形的情况,从而造成施工过程中产生缝隙导致漏浆等情况。
发明内容
本发明的目的在于提供一种混凝土梁在加大加固时用的一种吊模以及该吊模的施工方法,其使模板稳定性加强在浇筑无收缩灌浆料时不易漏浆,且避免了加大截面梁下方或侧面存在管道设备造成施工轴线位置偏离;而且避免大量钢管因长度原因需要截断从而节省了工程成本。
为了达到上述目的,本发明的技术方案是:
一种混凝土梁在加大加固时用的一种吊模,包括混凝土梁以及混凝土梁上的楼板,在所述混凝土梁两侧各设置有一吊杆,这两根吊杆的一端穿过所述楼板并固定,另一端固接有一竖向方木,该竖向方木上设置有左右两根横向方木,这两根横向方木上设置有模板,该模板与混凝土梁形成一封闭灌浆空间,该封闭灌浆空间用以混凝土梁加大加固用;所述楼板上还设有一灌浆孔,该灌浆孔与所述封闭灌浆空间相通;所述混凝土梁上还穿设有一穿梁螺杆,该穿梁螺杆的两端还分别穿过所述模板并固定。
所述穿梁螺杆两侧各设置有一套筒。
混凝土梁在加大加固时用的一种吊模施工方法,该施工方法
(1)放线定位:根据混凝土梁加大加固的截面梁尺寸以及轴线位置进行放线;
(2)安装吊杆:在楼板上钻两孔,将吊杆穿过该孔,当钻孔时碰到板筋要避开,模板拆除后可将该孔封闭。
(3)安装底模:底模为方木,该方木可横向放置和竖向放置,竖向方木两端钻孔通过两根吊杆吊住,该竖向方木可用来支撑横向方木,横向方木上搁置拼装好的模板,该模板与混凝土梁形成一封闭灌浆空间。
(4)钻灌浆孔:在混凝土梁需加大截面范围内的楼板上钻灌浆孔,该灌浆孔与所述封闭灌浆空间相通,灌浆时保证灌浆料可以放入模板内;
(5)安装侧模:在混凝土梁梁中位置沿梁横向钻孔,在孔上穿设螺杆,在混凝土梁加厚范围内安装套筒避免模板向内侧产生位移,侧模安装前将里面垃圾清理完毕。
(6)缝隙封闭:待底模侧模安装完毕后需用发泡剂将模板拼接处以及模板与混凝土构件交接处进行封闭。
采用上述结构后,本发明替代了梁模板脚手架,使模板稳定性加强在浇筑无收缩灌浆料时不易漏浆,且避免了加大截面梁下方或侧面存在管道设备造成施工轴线位置偏离;而且避免大量钢管因长度原因需要截断从而节省了工程成本。
附图说明
图1是本发明结构示意图。
具体实施方式
如图1所示,一种混凝土梁在加大加固时用的一种吊模,包括混凝土梁1以及混凝土梁1上的楼板2,在所述混凝土梁1两侧各设置有一吊杆3,这两根吊杆3的一端穿过所述楼板2并固定,另一端固接有一竖向方木4,该竖向方木4上设置有左右两根横向方木5,这两根横向方木5上设置有模板6,该模板6与混凝土梁1形成一封闭灌浆空间7,该封闭灌浆空间7用以混凝土梁1加大加固用;所述楼板2上还设有一灌浆孔8,该灌浆孔8与所述封闭灌浆空间7相通,可将混凝土从灌浆孔8灌入封闭灌浆空间7内;所述混凝土梁1上还穿设有一穿梁螺杆9,该穿梁螺杆9的两端还分别穿过所述模板6并固定。所述穿梁螺杆9两侧各设置有一套筒10,该套筒10可防止模板6位移。
一种混凝土梁在加大加固时用的一种吊模施工方法,该施工方法
(1)放线定位:根据混凝土梁1加大加固的截面梁尺寸以及轴线位置进行放线;
(2)安装吊杆:在楼板2上钻两孔,将吊杆3穿过该孔,当钻孔时碰到板筋要避开,模板6拆除后可将该孔封闭。
(3)安装底模:底模为方木,该方木可横向放置和竖向放置,竖向方木4两端钻孔通过两根吊杆3吊住,该竖向方木4可用来支撑横向方木5,横向方木5上搁置拼装好的模板6,该模板6与混凝土梁1形成一封闭灌浆空间7。
(4)钻灌浆孔:在混凝土梁1需加大截面范围内的楼板上钻灌浆孔8,该灌浆孔8与所述封闭灌浆空间7相通,灌浆时保证灌浆料可以放入模板内;
(5)安装侧模:在混凝土梁1梁中位置沿梁横向钻孔,在孔上穿设螺杆,在混凝土梁1加厚范围内安装套筒10避免模板向内侧产生位移,侧模安装前将里面垃圾清理完毕。
(6)缝隙封闭:待底模侧模安装完毕后需用发泡剂将模板6拼接处以及模板6与混凝土构件交接处进行封闭。
本发明安装完毕后,混凝土从灌浆孔8灌入封闭灌浆空间7内,就可使混凝土梁加大加固。

Claims (3)

1.一种混凝土梁在加大加固时用的一种吊模,包括混凝土梁(1)以及混凝土梁(1)上的楼板(2),其特征在于:在所述混凝土梁(1)两侧各设置有一吊杆(3),这两根吊杆(3)的一端穿过所述楼板(2)并固定,另一端固接有一竖向方木(4),该竖向方木(4)上设置有左右两根横向方木(5),这两根横向方木(5)上设置有模板(6),该模板(6)与混凝土梁(1)形成一封闭灌浆空间(7),该封闭灌浆空间(7)用以混凝土梁(1)加大加固用;所述楼板(2)上还设有一灌浆孔(8),该灌浆孔(8)与所述封闭灌浆空间(7)相通;所述混凝土梁(1)上还穿设有一穿梁螺杆(9),该穿梁螺杆(9)的两端还分别穿过所述模板(6)并固定。
2.根据权利要求1所述混凝土梁在加大加固时用的一种吊模,其特征在于:所述穿梁螺杆(9)两侧各设置有一套筒(10)。
3.根据权利要求1所述混凝土梁在加大加固时用的一种吊模施工方法,其特征在于:该施工方法
(1)放线定位:根据混凝土梁(1)加大加固的截面梁尺寸以及轴线位置进行放线;
(2)安装吊杆:在楼板(2)上钻两孔,将吊杆(3)穿过该孔,当钻孔时碰到板筋要避开,模板(6)拆除后可将该孔封闭。
(3)安装底模:底模为方木,该方木可横向放置和竖向放置,竖向方木(4)两端钻孔通过两根吊杆(3)吊住,该竖向方木(4)可用来支撑横向方木(5),横向方木(5)上搁置拼装好的模板(6),该模板(6)与混凝土梁(1)形成一封闭灌浆空间(7)。
(4)钻灌浆孔:在混凝土梁(1)需加大截面范围内的楼板上钻灌浆孔(8),该灌浆孔(8)与所述封闭灌浆空间(7)相通,灌浆时保证灌浆料可以放入模板内;
(5)安装侧模:在混凝土梁(1)梁中位置沿梁横向钻孔,在孔上穿设螺杆,在混凝土梁(1)加厚范围内安装套筒(10)避免模板向内侧产生位移,侧模安装前将里面垃圾清理完毕。
(6)缝隙封闭:待底模侧模安装完毕后需用发泡剂将模板(6)拼接处以及模板(6)与混凝土构件交接处进行封闭。
CN201310528524.3A 2013-10-25 2013-10-25 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法 Pending CN103556820A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310528524.3A CN103556820A (zh) 2013-10-25 2013-10-25 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310528524.3A CN103556820A (zh) 2013-10-25 2013-10-25 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法

Publications (1)

Publication Number Publication Date
CN103556820A true CN103556820A (zh) 2014-02-05

Family

ID=50011156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310528524.3A Pending CN103556820A (zh) 2013-10-25 2013-10-25 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法

Country Status (1)

Country Link
CN (1) CN103556820A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760510A (zh) * 2017-01-10 2017-05-31 中铁城建集团第三工程有限公司 一种高大空间顶部增加结构梁的模具
CN107217865A (zh) * 2017-06-20 2017-09-29 中冶建工集团有限公司 一种主体框架扁梁截面的加大加固施工方法
CN109457994A (zh) * 2018-11-19 2019-03-12 中国矿业大学 一种增设钢筋混凝土梁模板的架设方法
CN110029814A (zh) * 2019-05-21 2019-07-19 广州交投城市道路建设有限公司 一种用于混凝土梁加大截面的组合式钢模架
CN111236681A (zh) * 2018-11-29 2020-06-05 杭州固力建筑工程有限公司 一种在混凝土板底新增叠合板时的吊模及其施工方法
CN114382019A (zh) * 2021-12-30 2022-04-22 浙江正方交通建设有限公司 现役t梁桥综合加固结构及施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003161043A (ja) * 2001-11-26 2003-06-06 Mitsubishi Kagaku Sanshi Corp コンクリート柱又は梁の補強構造及び補強工法
JP2006104726A (ja) * 2004-10-04 2006-04-20 Kateka:Kk 開口部耐震補強構造および開口部耐震補強工法
CN101041974A (zh) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 结构转换层型钢砼大梁挂模施工方法
JP2008031821A (ja) * 2006-06-29 2008-02-14 Ube Ind Ltd コンクリート梁の開口部の補強方法および補強構造
JP2009249851A (ja) * 2008-04-02 2009-10-29 Fujita Corp 既存建物の耐震補強工法
CN101575911A (zh) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 逆作降模模板系统及施工方法
CN201605810U (zh) * 2009-10-30 2010-10-13 华南理工大学 一种型钢梁自承重吊模支撑装置
CN202559569U (zh) * 2012-05-09 2012-11-28 宝钢建筑系统集成有限公司 一种装配整体式自保温暗密肋轻质叠合楼板

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003161043A (ja) * 2001-11-26 2003-06-06 Mitsubishi Kagaku Sanshi Corp コンクリート柱又は梁の補強構造及び補強工法
JP2006104726A (ja) * 2004-10-04 2006-04-20 Kateka:Kk 開口部耐震補強構造および開口部耐震補強工法
JP2008031821A (ja) * 2006-06-29 2008-02-14 Ube Ind Ltd コンクリート梁の開口部の補強方法および補強構造
CN101041974A (zh) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 结构转换层型钢砼大梁挂模施工方法
JP2009249851A (ja) * 2008-04-02 2009-10-29 Fujita Corp 既存建物の耐震補強工法
CN101575911A (zh) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 逆作降模模板系统及施工方法
CN201605810U (zh) * 2009-10-30 2010-10-13 华南理工大学 一种型钢梁自承重吊模支撑装置
CN202559569U (zh) * 2012-05-09 2012-11-28 宝钢建筑系统集成有限公司 一种装配整体式自保温暗密肋轻质叠合楼板

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760510A (zh) * 2017-01-10 2017-05-31 中铁城建集团第三工程有限公司 一种高大空间顶部增加结构梁的模具
CN107217865A (zh) * 2017-06-20 2017-09-29 中冶建工集团有限公司 一种主体框架扁梁截面的加大加固施工方法
CN107217865B (zh) * 2017-06-20 2019-08-30 中冶建工集团有限公司 一种主体框架扁梁截面的加大加固施工方法
CN109457994A (zh) * 2018-11-19 2019-03-12 中国矿业大学 一种增设钢筋混凝土梁模板的架设方法
CN111236681A (zh) * 2018-11-29 2020-06-05 杭州固力建筑工程有限公司 一种在混凝土板底新增叠合板时的吊模及其施工方法
CN110029814A (zh) * 2019-05-21 2019-07-19 广州交投城市道路建设有限公司 一种用于混凝土梁加大截面的组合式钢模架
CN114382019A (zh) * 2021-12-30 2022-04-22 浙江正方交通建设有限公司 现役t梁桥综合加固结构及施工方法
CN114382019B (zh) * 2021-12-30 2024-05-24 浙江正方交通建设有限公司 现役t梁桥综合加固结构及施工方法

Similar Documents

Publication Publication Date Title
CN103556820A (zh) 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法
CN204023778U (zh) 预制装配式混凝土梁柱的连接节点
CN103982199B (zh) 隧道二次衬砌模板台车用堵头模板、堵头节点及封堵方法
CN203808484U (zh) 一种整体悬挑附着式外脚手架
CN204983662U (zh) 一种对拉螺杆与钢管排架组合单侧支模装置
CN205000974U (zh) 一种用于隧道开挖施工的轮胎式自动升降组装台架
CN104453224A (zh) 一种地下室外墙的模板支护结构及其施工方法
CN204023411U (zh) 新型组装式托架牛腿施工装置
CN203429641U (zh) 建筑施工用单侧支模加固结构体系
CN103195450A (zh) 液压隧道仰拱作业台车及仰拱施工方法
CN202117341U (zh) 建筑钢结构地脚螺栓埋设的模板
CN206467667U (zh) 一种采用膨胀式固定钢筋网片的桩间挂网喷锚围护结构
CN106150087A (zh) 一种组合式框架柱模板及其施工方法
CN103790176B (zh) 一种预埋短肢柱结构的施工方法
CN104005556A (zh) 用于伸缩缝处剪力墙的定型组合模板施工工艺
CN105507573A (zh) 型钢悬挑外脚手架的安装方法
CN204960289U (zh) 悬挑脚手架悬挑钢梁整体组合可周转锚固件
CN206768833U (zh) 一种混凝土支撑与钢格柱连接结构
CN203906498U (zh) 一种大直径接长地脚螺栓
CN204754945U (zh) 矿山法隧道初期支护衬砌格栅钢架构造
CN106284978A (zh) 一种变形缝两侧剪力墙同步施工工艺及定型化模板
CN204173804U (zh) 一种结构梁承载式的内爬塔吊安装及顶升结构
CN108221954B (zh) 一种易拆卸的预制地下连续墙、吊具以及施工方法
CN102605945B (zh) 木大模板的制作方法
CN209907894U (zh) 一种花篮拉杆式悬挑脚手架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140205