CN103422863B - 一种复杂环境超深基坑施工方法 - Google Patents

一种复杂环境超深基坑施工方法 Download PDF

Info

Publication number
CN103422863B
CN103422863B CN201310313669.1A CN201310313669A CN103422863B CN 103422863 B CN103422863 B CN 103422863B CN 201310313669 A CN201310313669 A CN 201310313669A CN 103422863 B CN103422863 B CN 103422863B
Authority
CN
China
Prior art keywords
construction
unearthed
excavation
support
excavate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310313669.1A
Other languages
English (en)
Other versions
CN103422863A (zh
Inventor
刘文兵
马海贤
袁何
王希勇
匡建国
张道喜
朱善美
莫立汝
黄景新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201310313669.1A priority Critical patent/CN103422863B/zh
Publication of CN103422863A publication Critical patent/CN103422863A/zh
Application granted granted Critical
Publication of CN103422863B publication Critical patent/CN103422863B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了一种复杂环境超深基坑施工方法,按照以下施工步骤进行:(1)、围护结构施工;(2)、冠梁、挡墙施工以及轨行式龙门吊基础施工;(3)、开挖前施工准备;(4)、选用轨行式龙门吊进行横向出土,根据不同的土层,不同的空间尺寸,选择不同的机械进行开挖;(5)、混凝土支撑体系施工时和混凝土+锚索支撑体系时选择不同的开挖方法;(6)、基坑监测,对监测数据进行分析,指导下步施工。本发明采用轨行式龙门吊出土,解决了复杂坏境中空间受限难题使施工机械组合作业发挥最大效益;对岩石采用非爆破方式进行开挖,避免了爆破对基坑周边建筑物的扰动;各个工序和环节进行精心的策划,在施工过程中进行不断的优化,保证了施工安全及质量。

Description

一种复杂环境超深基坑施工方法
技术领域
本发明涉及一种施工方法,尤其涉及一种复杂环境超深基坑施工方法。
背景技术
在我国城市地面交通受到各方面限制,地下交通正处于快速发展阶段,超深基坑施工越来越多,不同支撑体系的施工技术,受层高和平面尺寸限制的机械选型、非爆破开挖技术,对超深基坑施工的安全和工期目标是十分重要的。
发明内容
本发明的目的是为了弥补已有技术的不足,提供了一种复杂环境超深基坑施工方法,选用轨行式龙门吊横向出土,根据不同的土层、不同的空间尺寸采用合适的破碎锤进行非爆破开挖,吊装效率较高,安全性较好。
本发明是通过以下技术方案来实现的:
一种复杂环境超深基坑施工方法,其特征在于:具体包括以下步骤:
(1)、围护结构施工;
(2)、冠梁、挡墙施工以及轨行式龙门吊基础施工;
(3)、开挖前施工准备;
(4)、选用轨行式龙门吊进行横向出土,根据不同的土层,不同的空间尺寸,选择不同的机械进行开挖;
(5)、混凝土支撑体系和混凝土锚索支撑体系为同一支撑时,其施工开挖顺序为:先施工盾构、暗挖井段,开挖时先挖中间部分,再挖两侧部分,开挖到支撑标高后,施做支撑,在盾构井、暗挖井在砼支撑等强同时,开挖轨排井段,开挖到底后,开始施做支撑,然后施工盾构暗挖井,如此循环保证基坑的安全;混凝土支撑体系和混凝土锚索支撑体系为不同支撑时,其施工开挖顺序为:
先开挖两侧,及时施做锚索支撑,然后开挖中间;
(6)、基坑监测,根据监测结果指导下步施工。
所述的复杂环境超深基坑施工方法,其特征在于:步骤(4)中采用轨行式50吨龙门吊配置20方出土斗出土,一~三层淤质软土采用4台卡特225挖掘机进行开挖;四层石方开挖层高小于5.0m,平面尺寸小于6.0m,轨排井段选用4台卡特225机型,每个支撑之间布设一台,另配一台卡特200挖掘机出土,盾构段选用卡特300破碎锤机型和一台150挖机配合出土,暗挖段选用1台卡特150破碎锤破碎;五~六层轨排井段为锚索支撑体系,层高和平面尺寸不受限制,采用3台卡特370破碎锤进行破碎,配一台卡特200挖机进行出土。
本发明的优点是:
本发明采用轨行式龙门吊出土,解决了复杂坏境中空间受限难题使施工机械组合作业发挥最大效益;对岩石采用非爆破方式进行开挖,避免了爆破对基坑周边建筑物的扰动;各个工序和环节进行精心的策划,在施工过程中进行不断的优化,保证了施工安全及质量。
附图说明
图1同一支撑时开挖施工图。
图2不同支撑时开挖施工图。
具体实施方式
一种复杂环境超深基坑施工方法,其特征在于:具体包括以下步骤:
(1)、围护结构施工;
(2)、冠梁、挡墙施工以及轨行式龙门吊基础施工;
(3)、开挖前施工准备;
(4)、选用轨行式龙门吊进行横向出土,根据不同的土层,不同的空间尺寸,选择不同的机械进行开挖;
(5)、如图1:混凝土支撑体系和混凝土锚索支撑体系为同一支撑时,其施工开挖顺序为:先施工盾构、暗挖井段,开挖时先挖中间部分,再挖两侧部分,开挖到支撑标高后,施做支撑,在盾构井、暗挖井在砼支撑等强同时,开挖轨排井段,开挖到底后,开始施做支撑,然后施工盾构暗挖井,如此循环保证基坑的安全;如图2:混凝土支撑体系和混凝土锚索支撑体系为不同支撑时,其施工开挖顺序为:
先开挖两侧,及时施做锚索支撑,然后开挖中间;
(6)、基坑监测,根据监测结果指导下步施工。
所述的复杂环境超深基坑施工方法,其特征在于:步骤(4)中采用轨行式50吨龙门吊配置20方出土斗出土,一~三层淤质软土采用4台卡特225挖掘机进行开挖;四层石方开挖层高小于5.0m,平面尺寸小于6.0m,轨排井段选用4台卡特225机型,每个支撑之间布设一台,另配一台卡特200挖掘机出土,盾构段选用卡特300破碎锤机型和一台150挖机配合出土,暗挖段选用1台卡特150破碎锤破碎;五~六层轨排井段为锚索支撑体系,层高和平面尺寸不受限制,采用3台卡特370破碎锤进行破碎,配一台卡特200挖机进行出土。

Claims (1)

1.一种复杂环境超深基坑施工方法,其特征在于:具体包括以下步骤:
(1)、围护结构施工;
(2)、冠梁、挡墙施工以及轨行式龙门吊基础施工;
(3)、开挖前施工准备;
(4)、选用轨行式龙门吊进行横向出土,根据不同的土层,不同的空间尺寸,选择不同的机械进行开挖;
(5)、混凝土支撑体系和混凝土锚索支撑体系为同一支撑时,其施工开挖顺序为:先施工盾构、暗挖井段,开挖时先挖中间部分,再挖两侧部分,开挖到支撑标高后,施做支撑,在盾构井、暗挖井在砼支撑等强同时,开挖轨排井段,开挖到底后,开始施做支撑,然后施工盾构暗挖井,如此循环保证基坑的安全;混凝土支撑体系和混凝土锚索支撑体系为不同支撑时,其施工开挖顺序为:先开挖两侧,及时施做锚索支撑,然后开挖中间;
(6)、基坑监测,根据监测结果指导下步施工;
步骤(4)中采用轨行式50吨龙门吊配置20方出土斗出土,一~三层淤质软土采用4台卡特225挖掘机进行开挖;四层石方开挖层高小于5.0m,平面尺寸小于6.0m,轨排井段选用4台卡特225机型,每个支撑之间布设一台,另配一台卡特200挖掘机出土,盾构段选用卡特300破碎锤机型和一台150挖机配合出土,暗挖段选用1台卡特150破碎锤破碎;五~六层轨排井段为锚索支撑体系,层高和平面尺寸不受限制,采用3台卡特370破碎锤进行破碎,配一台卡特200挖机进行出土。
CN201310313669.1A 2013-07-24 2013-07-24 一种复杂环境超深基坑施工方法 Active CN103422863B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310313669.1A CN103422863B (zh) 2013-07-24 2013-07-24 一种复杂环境超深基坑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310313669.1A CN103422863B (zh) 2013-07-24 2013-07-24 一种复杂环境超深基坑施工方法

Publications (2)

Publication Number Publication Date
CN103422863A CN103422863A (zh) 2013-12-04
CN103422863B true CN103422863B (zh) 2016-07-06

Family

ID=49648194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310313669.1A Active CN103422863B (zh) 2013-07-24 2013-07-24 一种复杂环境超深基坑施工方法

Country Status (1)

Country Link
CN (1) CN103422863B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781570B (zh) * 2016-04-14 2018-06-26 广州地铁设计研究院有限公司 一种地铁无内支撑轨排井的施工方法
CN113653067B (zh) * 2021-08-31 2023-03-31 天津大学 一种基坑开挖超前支护施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09112179A (ja) * 1995-10-19 1997-04-28 Hitachi Constr Mach Co Ltd 基礎坑掘削機
CN101139838A (zh) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 高承压水地区超深基坑的施工方法
JP2009174179A (ja) * 2008-01-24 2009-08-06 Kajima Corp シールド掘削機受口の構築方法およびシールド掘削機の到達方法
CN102108707A (zh) * 2011-03-15 2011-06-29 上海交通大学 超大超深基坑精确沉降及环保施工方法
CN102535475A (zh) * 2010-12-17 2012-07-04 上海市电力公司 复杂条件下深基坑工程结构受力与变形分析方法
CN202466597U (zh) * 2012-03-16 2012-10-03 北京市市政工程设计研究总院 “半逆作”环形板支撑体系超大地铁深基坑施工结构
CN202718126U (zh) * 2012-04-24 2013-02-06 浙江省建工集团有限责任公司 深基坑土方开挖转换平台

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09112179A (ja) * 1995-10-19 1997-04-28 Hitachi Constr Mach Co Ltd 基礎坑掘削機
CN101139838A (zh) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 高承压水地区超深基坑的施工方法
JP2009174179A (ja) * 2008-01-24 2009-08-06 Kajima Corp シールド掘削機受口の構築方法およびシールド掘削機の到達方法
CN102535475A (zh) * 2010-12-17 2012-07-04 上海市电力公司 复杂条件下深基坑工程结构受力与变形分析方法
CN102108707A (zh) * 2011-03-15 2011-06-29 上海交通大学 超大超深基坑精确沉降及环保施工方法
CN202466597U (zh) * 2012-03-16 2012-10-03 北京市市政工程设计研究总院 “半逆作”环形板支撑体系超大地铁深基坑施工结构
CN202718126U (zh) * 2012-04-24 2013-02-06 浙江省建工集团有限责任公司 深基坑土方开挖转换平台

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
深基坑开挖与支护技术;钱锦中;《民营科技》;20110228(第2期);270,212 *

Also Published As

Publication number Publication date
CN103422863A (zh) 2013-12-04

Similar Documents

Publication Publication Date Title
CN105298507B (zh) 一种上部明挖下部掘进机施工的地下管廊施工方法
CN103938617B (zh) 一种超深地下连续墙及其施工方法
CN102182466B (zh) 隧道双侧壁导坑结合拱部跳挖开挖方法
CN102644466B (zh) 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法
CN102535474B (zh) 一种深基坑挖土的施工方法
CN103939105B (zh) 一种于地下工程上方布设施工竖井的施工方法和结构
CN103590406A (zh) 一种超大型深基坑分区同步开挖的施工方法
CN104564085B (zh) 城市超浅埋条件下超大断面隧道开挖综合施工方法
CN105421461B (zh) 土岩地质条件下邻近既有隧道的建筑基坑开挖工法
CN104131565B (zh) 一种逆作土方正作开挖的施工方法
CN102828517B (zh) 一种车站出入口基坑开挖分层控制的施工方法
CN103061777A (zh) 预设加固桩群建立城市地下隧道盾构刀盘修复空间的方法
CN110374091A (zh) 一种矩形抗滑桩机械成孔施工方法
CN103422863B (zh) 一种复杂环境超深基坑施工方法
CN204851266U (zh) 一种暗挖车站正上方竖井结构
CN203835401U (zh) 一种于地下工程上方布设施工竖井的施工结构
CN105840216B (zh) 一种地下空间开发的暗挖构筑方法
CN106522572B (zh) 历史保护建筑物有限空间内构筑大空间地下通道施工方法
CN111764373A (zh) 不可拆除地下障碍物情况下地下连续墙施工方法
CN205712119U (zh) 一种临近已开挖深基坑的小基坑开挖施工结构
Senthilnath et al. Stacked Tunnelling Induced Surface Settlements in Soft Soil–A Case Study from Singapore
CN110005453A (zh) 大型地下乏燃料处置库机械化建造方法
CN204151794U (zh) 一种地铁换乘车站深基坑交叉施工结构
CN113882429B (zh) 地下结构的施工方法及施工结构
CN104404964A (zh) 一种含厚淤泥层深大基坑四同步作业开挖支护施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant