CN102535475A - 复杂条件下深基坑工程结构受力与变形分析方法 - Google Patents

复杂条件下深基坑工程结构受力与变形分析方法 Download PDF

Info

Publication number
CN102535475A
CN102535475A CN2010105925852A CN201010592585A CN102535475A CN 102535475 A CN102535475 A CN 102535475A CN 2010105925852 A CN2010105925852 A CN 2010105925852A CN 201010592585 A CN201010592585 A CN 201010592585A CN 102535475 A CN102535475 A CN 102535475A
Authority
CN
China
Prior art keywords
foundation pit
stress
analysis
pit engineering
analysis method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105925852A
Other languages
English (en)
Other versions
CN102535475B (zh
Inventor
陈祖元
陈峥
朱伟林
王卫东
王杰
高倚山
徐勍
乐俊律
王沪生
刘晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN201010592585.2A priority Critical patent/CN102535475B/zh
Publication of CN102535475A publication Critical patent/CN102535475A/zh
Application granted granted Critical
Publication of CN102535475B publication Critical patent/CN102535475B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本发明涉及复杂条件下深基坑工程结构受力与变形分析方法,该分析方法主要包括以下几个方面:(1)施工阶段围护结构的受力变形分析;(2)施工与使用阶段地下结构的受力变形分析;(3)基坑开挖实测数据的对比分析。与现有技术相比,本发明具有设计合理、有效指导现场施工和异常情况处理、结构的安全性和可靠性好等优点。

Description

复杂条件下深基坑工程结构受力与变形分析方法
技术领域
本发明涉及一种深基坑工程,尤其是涉及复杂条件下深基坑工程结构受力与变形分析方法。
背景技术
深基坑工程的研究已经取得了很多重要的成果。我国建设部、冶金部相继颁布了建筑基坑工程的行业标准,各地也先后颁布了地方性的建筑基坑技术规程。但随着基坑深度的不断加深、新的支护方法与施工工艺的出现以及人们对基坑工程的安全提出了更高的要求,超深基坑工程给我们提出了更多新的问题。超深基坑工程是一个更为复杂的系统工程,影响超深基坑工程工作特性的因素更多,因此研究软土地基中超深基坑工程结构受力变形特性具有重要的理论与实践意义。
上海500千伏世博变工程项目为大容量全地下变电站,作为世博会重要配套工程,建设规模列全国同类工程之首。该工程建于上海市静安区成都路、北京西路、山海关路和大田路合围之处,周边环境十分复杂。该工程为全地下结构,地下结构四层,直径约130m,基坑开挖深度33.5m。变电所地下结构型式采用框架剪力墙结构,地下主体结构外墙(地下连续墙和内衬墙)以及内部的进出风井墙体为剪力墙,其余部分为框架结构,逆作法施工。该地区土质条件差,富含承压水层,周围环境复杂,其规模和复杂性是空前的,设计与施工都面临极大挑战。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种设计合理、有效指导现场施工和异常情况处理、结构的安全性和可靠性好的复杂条件下深基坑工程结构受力与变形分析方法。
本发明的目的可以通过以下技术方案来实现:复杂条件下深基坑工程结构受力与变形分析方法,其特征在于,该分析方法的步骤如下所示:
(1)采用有限元分析软件对基坑开挖过程进行了数值分析,获得各主要施工阶段地下连续墙的量包括水平变形、环向应力、弯矩和剪力;
(2)分析基坑开挖阶段和正常使用阶段立柱桩、抗拔桩、地连墙竖向刚度及承载力;
(3)采用有限元方法分析基坑开挖阶段、抗浮阶段和正常使用阶段地下结构的变形和内力;
(4)基于横观各向同性弹性理论,提出抗浮桩复合地基模型;
(5)施工过程中对围护结构、支撑体系和立柱、周边环境进行监测,得到监测数据,并对其进行计算,得到计算结果;
(6)对坑外地表变形、坑外水位、地下连续墙墙体水平位移、围护结构内力、坑底回弹进行了分析,得到的数据即为实测数据,并与计算结果进行了比较;
(7)通过对实测数据的分析及与原计算结果的比较,验证计算参数、计算模型和计算方法的合理性。
所述的深基坑工程是由围护结构、水平支撑、地基土、地下水和地下结构组成的一个复杂系统。
所述的有限元分析软件包括PLAXIS和ANSYS。
与现有技术相比,本发明通过对施工过程关键步骤的模拟分析,研究土体分步开挖、内衬施工、坑内降水等各种施工因素对围护结构的受力与变形及周围土体流场影响,验证设计的合理性,有效指导现场施工和异常情况处理;通过正常使用条件下结构受力和整体抗浮、抗震分析,研究结构的安全性能;通过对施工期监测数据的分析,验证结构内力和变形以及结构的安全性和可靠性。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
复杂条件下深基坑工程结构受力与变形分析方法,该分析方法的如下:采用PLAXIS和ANSYS等有限元分析软件对基坑开挖过程进行了数值分析,获得各主要施工阶段地下连续墙的水平变形、环向应力、弯矩与剪力等量,研究渗流、温度、非对称施工荷载、内衬等因素对围护结构内力和变形的影响。分析基坑开挖阶段和正常使用阶段立柱桩、抗拔桩、地连墙竖向刚度及承载力,在此基础上,采用有限元方法分析了基坑开挖阶段、抗浮阶段和正常使用阶段地下结构的变形和内力。基于横观各向同性弹性理论,提出抗浮桩复合地基模型。施工过程中对围护结构、支撑体系和立柱、周边环境进行了监测,得到了大量监测数据,并对其进行计算,得到计算结果。对坑外地表变形、坑外水位、地下连续墙墙体水平位移、围护结构内力、坑底回弹以下监测量进行了分析,得到的数据即为实测数据,并与计算结果进行了比较。通过对实测数据的分析及与原计算结果的比较,验证了计算参数、计算模型和计算方法的合理性。
深基坑工程是由围护结构、水平支撑、地基土、地下水以及地下结构共同组成的一个复杂系统,围护结构与地下结构受力变形特性是项目建设成功与否的决定因素。对于复杂的超深基坑工程问题,常规设计方法已经很难满足要求,要合理地解决上述难题,需要实现理论创新,辅以有限元分析方法对复杂受力系统进行计算分析,最后通过现场实测,对分析理论与计算方法进行验证和完善。

Claims (3)

1.复杂条件下深基坑工程结构受力与变形分析方法,其特征在于,该分析方法的步骤如下所示:
(1)采用有限元分析软件对基坑开挖过程进行了数值分析,获得各主要施工阶段地下连续墙的量包括水平变形、环向应力、弯矩和剪力;
(2)分析基坑开挖阶段和正常使用阶段立柱桩、抗拔桩、地连墙竖向刚度及承载力;
(3)采用有限元方法分析基坑开挖阶段、抗浮阶段和正常使用阶段地下结构的变形和内力;
(4)基于横观各向同性弹性理论,提出抗浮桩复合地基模型;
(5)施工过程中对围护结构、支撑体系和立柱、周边环境进行监测,得到监测数据,并对其进行计算,得到计算结果;
(6)对坑外地表变形、坑外水位、地下连续墙墙体水平位移、围护结构内力、坑底回弹进行了分析,得到的数据即为实测数据,并与计算结果进行了比较;
(7)通过对实测数据的分析及与原计算结果的比较,验证计算参数、计算模型和计算方法的合理性。
2.根据权利要求1所述的复杂条件下深基坑工程结构受力与变形分析方法,其特征在于,所述的深基坑工程是由围护结构、水平支撑、地基土、地下水和地下结构组成的一个复杂系统。
3.根据权利要求1所述的复杂条件下深基坑工程结构受力与变形分析方法,其特征在于,所述的有限元分析软件包括PLAXIS和ANSYS。
CN201010592585.2A 2010-12-17 2010-12-17 复杂条件下深基坑工程结构受力与变形分析方法 Active CN102535475B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010592585.2A CN102535475B (zh) 2010-12-17 2010-12-17 复杂条件下深基坑工程结构受力与变形分析方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010592585.2A CN102535475B (zh) 2010-12-17 2010-12-17 复杂条件下深基坑工程结构受力与变形分析方法

Publications (2)

Publication Number Publication Date
CN102535475A true CN102535475A (zh) 2012-07-04
CN102535475B CN102535475B (zh) 2015-12-16

Family

ID=46343380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010592585.2A Active CN102535475B (zh) 2010-12-17 2010-12-17 复杂条件下深基坑工程结构受力与变形分析方法

Country Status (1)

Country Link
CN (1) CN102535475B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422863A (zh) * 2013-07-24 2013-12-04 中铁四局集团第四工程有限公司 一种复杂环境超深基坑施工方法
CN103498474A (zh) * 2013-10-11 2014-01-08 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN103761400A (zh) * 2014-01-28 2014-04-30 浙江省建筑设计研究院 水平荷载作用下带支腿地连续墙计算方法
CN103981855A (zh) * 2014-04-28 2014-08-13 浙江省建筑设计研究院 带支腿地连续墙沉降计算方法
CN108228971A (zh) * 2017-12-12 2018-06-29 中国电建集团河北省电力勘测设计研究院有限公司 一种扩底抗拔长桩抗拔极限承载力标准值计算方法
CN112541219A (zh) * 2020-12-14 2021-03-23 西南科技大学 一种节状地下连续墙基础抗拔位移的计算方法
CN114417480A (zh) * 2022-02-07 2022-04-29 中铁十一局集团有限公司 一种矩形基坑变刚度地下连续墙及其动态设计方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221754A (ja) * 1996-02-19 1997-08-26 Fujita Corp 土木構造物の解析方法および装置
JP2003020649A (ja) * 2001-07-10 2003-01-24 Ohbayashi Corp 掘削底部地盤の変状予測方法およびプログラム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221754A (ja) * 1996-02-19 1997-08-26 Fujita Corp 土木構造物の解析方法および装置
JP2003020649A (ja) * 2001-07-10 2003-01-24 Ohbayashi Corp 掘削底部地盤の変状予測方法およびプログラム

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
任丽芳等: "地下连续墙基坑开挖及其变形数值模拟分析", 《人民长江》 *
李琳等: "软土地区深基坑变形特性分析", 《土木工程学报》 *
谢弘帅: "深基坑开挖对临近地铁车站基坑影响的有限元计算分析", 《上海地质》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422863A (zh) * 2013-07-24 2013-12-04 中铁四局集团第四工程有限公司 一种复杂环境超深基坑施工方法
CN103422863B (zh) * 2013-07-24 2016-07-06 中铁四局集团第四工程有限公司 一种复杂环境超深基坑施工方法
CN103498474A (zh) * 2013-10-11 2014-01-08 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN103498474B (zh) * 2013-10-11 2016-02-17 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN103761400A (zh) * 2014-01-28 2014-04-30 浙江省建筑设计研究院 水平荷载作用下带支腿地连续墙计算方法
CN103761400B (zh) * 2014-01-28 2016-08-17 浙江省建筑设计研究院 水平荷载作用下带支腿地下连续墙计算方法
CN103981855A (zh) * 2014-04-28 2014-08-13 浙江省建筑设计研究院 带支腿地连续墙沉降计算方法
CN103981855B (zh) * 2014-04-28 2016-01-20 浙江省建筑设计研究院 带支腿地连续墙沉降计算方法
CN108228971A (zh) * 2017-12-12 2018-06-29 中国电建集团河北省电力勘测设计研究院有限公司 一种扩底抗拔长桩抗拔极限承载力标准值计算方法
CN112541219A (zh) * 2020-12-14 2021-03-23 西南科技大学 一种节状地下连续墙基础抗拔位移的计算方法
CN112541219B (zh) * 2020-12-14 2022-07-08 西南科技大学 一种节状地下连续墙基础抗拔位移的计算方法
CN114417480A (zh) * 2022-02-07 2022-04-29 中铁十一局集团有限公司 一种矩形基坑变刚度地下连续墙及其动态设计方法

Also Published As

Publication number Publication date
CN102535475B (zh) 2015-12-16

Similar Documents

Publication Publication Date Title
CN102535475A (zh) 复杂条件下深基坑工程结构受力与变形分析方法
CN103243747B (zh) 预应力混凝土管桩桩基的纠偏方法
CN203129006U (zh) 一种智能支座系统
CN106570221B (zh) 一种圆筒式基坑支护桩桩顶冠梁水平抗侧刚度计算方法
Wang et al. Analysis of deep foundation pit construction monitoring in a metro station in Jinan city
CN102561293B (zh) 软土深基坑水土压力测试方法
CN104141500B (zh) 一种板结砂砾石地层洞室施工方法
CN115495956A (zh) 一种深大岩质基坑卸荷变形的安全评价方法
CN202000356U (zh) 复杂条件下深基坑工程结构受力与变形分析装置
CN107798166B (zh) 盾构隧洞复合衬砌内水压力下荷载结构共同作用计算方法
CN101307602A (zh) 架空式大型设备基础结构
CN112597674B (zh) 一种基坑开挖引起旁侧管道横向附加内力的确定方法
CN201554033U (zh) 一种用于深基坑的塔式吊机基础
CN113027464A (zh) 一种基于矿山法托换桩基的隧道结构施工方法
CN210239677U (zh) 一种控制地铁盾构隧道变形的结构体系
CN207244634U (zh) 一种建筑基坑内外支撑结构
CN112036068A (zh) 一种基于bim技术的深基坑减震抗浮锚杆施工优化方法
CN103590405A (zh) 一种基坑施工方法
CN204551514U (zh) 用于陡峭山区输电塔的子母基础框架
CN220394518U (zh) 一种利用钢护筒进行超灌桩施工的装置
Li et al. Analysis of the Influence of Adjacent New Pile Foundation Construction on the Structural Deformation of the In-service Subway Tunnels
CN219973220U (zh) 隧洞进口深基坑施工结构
CN203821427U (zh) 一种格构柱钢筋混凝土平台塔机基础
CN201649768U (zh) 一种冷却塔支柱
CN210563544U (zh) 一种敏感环境复杂地层深基坑施工用支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI POWER COM

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20121228

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121228

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Jiulong Electric Power Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant