CN201649768U - 一种冷却塔支柱 - Google Patents

一种冷却塔支柱 Download PDF

Info

Publication number
CN201649768U
CN201649768U CN2010201383465U CN201020138346U CN201649768U CN 201649768 U CN201649768 U CN 201649768U CN 2010201383465 U CN2010201383465 U CN 2010201383465U CN 201020138346 U CN201020138346 U CN 201020138346U CN 201649768 U CN201649768 U CN 201649768U
Authority
CN
China
Prior art keywords
strut
cooling tower
prefabricated
construction
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201383465U
Other languages
English (en)
Inventor
石天庆
张珂
杨大卫
杨雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hennan Electric Power Survey and Design Institute
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN2010201383465U priority Critical patent/CN201649768U/zh
Application granted granted Critical
Publication of CN201649768U publication Critical patent/CN201649768U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种冷却塔支柱,它包括预制支柱本体,在预制支柱本体的下方设置预埋定位埋板,在预制支柱本体内预埋支撑连接管。采用上述技术方案的本实用新型,其优点主要有下面几点:(1)由于支柱本体采用预制方式施工,可以大大减少冷却塔总体施工作业时间;(2)支柱内部设置的支撑连接管和支柱下方设置的定位埋板,均能很好的保证支柱安装后的稳定性和稳固性,起到良好的传力作用;(3)可以和冷却塔局部交叉施工;(4)消除现浇方式施工可能带来的安全隐患,减少后期维护费用;(5)外型美观,保护层适中;(6)可以做到工业化生产,现场组装、安装较为便利。

Description

一种冷却塔支柱
技术领域
本实用新型涉及一种自然通风冷却塔的支柱。
背景技术
自然通风冷却塔是火力发电、核能发电循环水冷却系统重要的建构筑物。土建部分主要有两部分构成:塔筒和淋水构架。目前这两部分均采用钢筋混凝土结构。塔筒为旋转薄壳结构,塔筒曲线下部为戴锥或圆柱,上部为抛物线、椭圆或双曲线。支柱是塔筒筒壁和塔基之间的传力构件,原设计支柱均采用现浇方式施工,其施工周期较长,某些情况下不适应现在电建施工工期的要求,且现浇施工时钢筋混凝土保护层不易控制,易造成露筋缩颈现象,影响美观和实用。如果施工中形成缺陷而又没有整改,带病投运并经过一段时间运行后,就会出现钢筋锈蚀、混凝土剥落现象,形成安全隐患。现实生产中许多电厂存在进行维修的实例,如图1所示。
发明内容
本实用新型的目的是提供一种不易出现钢筋锈蚀、混凝土剥落等现象的自然通风冷却塔支柱。
为实现上述目的,本实用新型采用以下技术方案:
本实用新型包括预制支柱本体,在预制支柱本体的下方设置预埋定位埋板,在预制支柱本体内预埋支撑连接管。
所述的支撑连接管为钢管。
所述预制支柱本体的形状为人字形、V字形、X字形或I字形中的任意一种。
采用上述技术方案的本实用新型,其优点主要有下面几点:(1)由于支柱本体采用预制方式施工,可以大大减少冷却塔总体施工作业时间;(2)支柱内部设置的支撑连接管和支柱下方设置的定位埋板,均能很好的保证支柱安装后的稳定性和稳固性,起到良好的传力作用;(3)可以和冷却塔局部交叉施工;(4)消除现浇方式施工可能带来的安全隐患,减少后期维护费用;(5)外型美观,保护层适中;(6)可以做到工业化生产,现场组装、安装较为便利。
附图说明
图1为现有技术中冷却塔的结构示意图;
图2为本实用新型的整体结构示意图。
具体实施方式
如图2所示,本实用新型包括预制支柱本体1,在预制支柱本体1的下方设置预埋定位埋板2,在预制支柱本体1内预埋支撑连接管3。
需要说明的是,上述的支撑连接管3以钢管为最佳实施方式。预制支柱本体1的截面形状可以为矩形、圆形、正六边形或正八边形中的任意一种;且预制支柱本体1的整体形式可以为人字形、V字形、X字形或I字形中的任意一种。
改进后的支柱设计方案采用预制方式,可以采用立式预制或卧式预制,预制出的构建外型美观,保护层适中,施工单位可根据自己的施工时间灵活安排预制时间,支柱预制可以与塔基同时开始,也可以在塔基开工前预制,预制场地利用淋水构架预制场地,待下部基础施工就绪后即可进行吊装作业,大大减少整个冷却塔施工周期。预制支柱方案需要在塔基上预埋定位埋板2,支柱内预埋支撑连接钢管3,具体设计时根据支柱的重量和联系尺寸修改预埋钢板和钢管的大小。支柱预制方案比现浇方案多增加一些投入,但其优点也是很明显的。

Claims (3)

1.一种冷却塔支柱,其特征在于:它包括预制支柱本体(1),在预制支柱本体(1)的下方设置预埋定位埋板(2),在预制支柱本体(1)内预埋支撑连接管(3)。
2.根据权利要求1所述的冷却塔支柱,其特征在于:所述支撑连接管(3)为钢管。
3.根据权利要求1所述的冷却塔支柱,其特征在于:所述预制支柱本体(1)的形状为人字形、V字形、X字形或I字形中的任意一种。
CN2010201383465U 2010-03-23 2010-03-23 一种冷却塔支柱 Expired - Fee Related CN201649768U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201383465U CN201649768U (zh) 2010-03-23 2010-03-23 一种冷却塔支柱

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201383465U CN201649768U (zh) 2010-03-23 2010-03-23 一种冷却塔支柱

Publications (1)

Publication Number Publication Date
CN201649768U true CN201649768U (zh) 2010-11-24

Family

ID=43114997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201383465U Expired - Fee Related CN201649768U (zh) 2010-03-23 2010-03-23 一种冷却塔支柱

Country Status (1)

Country Link
CN (1) CN201649768U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372967A (zh) * 2014-11-18 2015-02-25 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372967A (zh) * 2014-11-18 2015-02-25 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法
CN104372967B (zh) * 2014-11-18 2016-08-17 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法

Similar Documents

Publication Publication Date Title
CN202152463U (zh) 基础承压梁板式风力发电塔基础
CN103114604B (zh) 预应力混凝土圆筒型风力发电机组基础
CN203755778U (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN202627017U (zh) 预制装配整体式风力发电机基础
CN204551516U (zh) 一种汽轮发电机弹簧隔振基础
CN103867019A (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN206481251U (zh) 一种采用张弦桁架梁的光伏支架装置
CN206015707U (zh) 一种预应力锚栓风机基础加固装置
CN201722702U (zh) 工厂化预制构件的拼装基础
CN206313716U (zh) 一种山地灌注桩调节立柱光伏电站支架
CN201377090Y (zh) 风电机组方形承压式网格嵌入式风力发电塔基础
CN201649768U (zh) 一种冷却塔支柱
CN203403699U (zh) 高层建筑钢结构风光发电塔楼
CN101736751A (zh) 海上风电场测风塔与桩基础之间的连接结构
CN101705728B (zh) 波形钢腹板剪力墙结构
CN201554033U (zh) 一种用于深基坑的塔式吊机基础
CN203905531U (zh) 农村装配式钢结构住宅体系
CN217949406U (zh) 一种复位橡胶外置型隔震体系
CN201460373U (zh) 拉线杆塔基础
CN202055600U (zh) 一种新型组合式风力发电塔架
CN201908319U (zh) 用于蓄能地下水池的支撑构件
CN206396741U (zh) 一种新型静压可伸缩钢桩
CN205444443U (zh) 一种采用环保型墙体的建筑物窗组件结构
CN204783489U (zh) 一种格构式风力发电机塔架
CN104532805A (zh) 用于水电站地下厂房发电机层以上的厂房结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20140323