CN201460373U - 拉线杆塔基础 - Google Patents

拉线杆塔基础 Download PDF

Info

Publication number
CN201460373U
CN201460373U CN2009201251444U CN200920125144U CN201460373U CN 201460373 U CN201460373 U CN 201460373U CN 2009201251444 U CN2009201251444 U CN 2009201251444U CN 200920125144 U CN200920125144 U CN 200920125144U CN 201460373 U CN201460373 U CN 201460373U
Authority
CN
China
Prior art keywords
steel beam
bracing wire
base
girder steel
mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201251444U
Other languages
English (en)
Inventor
沈忠明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAXIN TELECOMMUNICATION CONSULTING DESIGN INST CO Ltd
Huaxin Consulting Co Ltd
Original Assignee
HUAXIN TELECOMMUNICATION CONSULTING DESIGN INST CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAXIN TELECOMMUNICATION CONSULTING DESIGN INST CO Ltd filed Critical HUAXIN TELECOMMUNICATION CONSULTING DESIGN INST CO Ltd
Priority to CN2009201251444U priority Critical patent/CN201460373U/zh
Application granted granted Critical
Publication of CN201460373U publication Critical patent/CN201460373U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型所设计的拉线杆塔基础,它主要包括拉线桅杆,拉线桅杆底部设有底座,底座是主钢梁与次钢梁交叉形成,主钢梁和次钢梁的末端埋入支撑物,拉线桅杆上设有与底座连接的塔脚板。主钢梁是由两根型材通过支撑架焊接连接,次钢梁是在垂直主钢梁的方向外侧分别用两根型材与之通过加劲板和螺栓固定。支撑物可以是后浇混凝土墩子。本实用新型所得到的拉线杆塔基础,其施工工期短,不易破环原建筑的防水层,这种拉线杆塔基础可以达到常规混凝土基础不能达到的效果。其施工工期只需要两天左右,比混凝土基础现场施工工期缩短了十多天,且本基础与建筑面层接触面积大,有足够的摩擦力,对屋面压强小。

Description

拉线杆塔基础
技术领域
本实用新型涉及一种杆塔基础,特别是一种拉线杆塔基础。
背景技术
在人口较密集的市区,拉线杆塔是运营商选择较多的屋顶塔桅形式之一。拉线杆塔的基础常规设计成长方体的混凝土基础,需破坏原有防水层后浇筑混凝土,等混凝土养护完毕后安装上部杆塔。常规混凝土基础的工期较长,并且容易破坏原建筑的防水层。当建设工期紧,房屋业主有要求不能破坏防水时,常规混凝土基础就不能完全满足这个要求。
实用新型内容
本发明的目的是为了解决上述技术的不足而提供一种施工工期短且不易破坏原建筑防水层的拉线杆塔基础。
为了达到上述目的,本实用新型所设计的拉线杆塔基础,它主要包括拉线桅杆,拉线桅杆底部设有底座,底座是主钢梁与次钢梁交叉形成,主钢梁和次钢梁的末端埋入支撑物,拉线桅杆上设有与底座连接的塔脚板。主钢梁是由两根型材通过支撑架焊接连接,次钢梁是在垂直主钢梁的方向外侧分别用两根型材与之通过加劲板和螺栓固定。支撑物可以是后浇混凝土墩子。底座与塔脚板通过螺栓连接。拉线桅杆和塔脚板通过螺栓与底座固定,为了保证主钢梁和次钢梁的支撑力,所述的型材可以是槽钢,所述的支撑架是角钢。主钢梁和次钢梁的末端埋入后浇混凝土墩子,这样保证了底座有足够大的承受能力,与建筑面层接触面积大,有足够的摩擦力,使得对屋面的压力变小。
本实用新型所得到的拉线杆塔基础,其施工工期短,不易破环原建筑的防水层,结构简单、工作可靠。它的结构简单,价格廉,可普遍使用。特别是当建设工期紧,房屋业主有要求不能破坏防水时,这种拉线杆塔基础可以达到常规混凝土基础不能达到的效果。其施工工期只需要两天左右,比混凝土基础现场施工工期缩短了十多天,且本基础与建筑面层接触面积大,有足够的摩擦力,对屋面压强小。
附图说明
图1是本实用新型拉线杆塔装置结构示意图;
图2是本实用新型塔脚板俯视图;
图3是本实用新型A-A示意图;
图4是本实用新型B-B示意图;
图5是本实用新型加劲板剖视图。
图中:主钢梁1、次钢梁2、支撑架3、支撑物4、加劲板5、塔脚板6、螺栓7、型材8、底座9、支撑物10、拉线桅杆11。
具体实施方式
下面通过实施例结合附图对本实用新型作进一步的描述。
实施例1
如图1和图2所示,本实用新型所设计的拉线杆塔基础,它主要包括拉线桅杆11,拉线桅杆11底部设有底座9,底座9是主钢梁1与次钢梁2交叉形成,主钢梁1和次钢梁2的末端埋入支撑物4,拉线桅杆11上设有与底座9连接的塔脚板6。主钢梁2是由两根型材8通过支撑架3焊接连接,次钢梁2是在垂直主钢梁1的方向外侧分别用两根型材8与之通过加劲板5和螺栓7固定。支撑物4为是后浇混凝土墩子。如图2、图3、图4和土5所示,底座9与塔脚板6通过螺栓7连接。拉线桅杆11和塔脚板6通过螺栓7与底座9固定,为了保证主钢梁1和次钢梁2的支撑力,所述的型材8是槽钢,所述的支撑架3是角钢。主钢梁1和次钢梁2的末端埋入后浇混凝土墩子,这样保证了底座9有足够大的承受能力,与建筑面层接触面积大,也进一步增强了杆塔的稳定性,使杆塔不易松动,有足够的摩擦力,使得对屋面的压力变小。

Claims (5)

1.一种拉线塔杆基础,它主要包括拉线桅杆(11),其特征是拉线桅杆(11)底部设有底座(9),底座是主钢梁(1)与次钢梁(2)交叉形成,主钢梁和次钢梁的末端埋入支撑物(10),拉线桅杆(11)上设有与底座(9)连接的塔脚板(6)。
2.根据权利要求1所述的拉线塔杆基础,其特征是所述的主钢梁(1)是由两根型材(8)通过支撑架(3)焊接连接,次钢梁(2)是在垂直主钢梁(1)的方向外侧分别用两根型材(8)与之通过加劲板(5)和螺栓(7)固定。
3.根据权利要求1或2所述的拉线塔杆基础,其特征是所述的支撑物(10)为后浇混凝土墩子。
4.根据权利要求1或2所述的拉线塔杆基础,其特征是所述的底座(9)与塔脚板(6)通过螺栓(7)连接。
5.根据权利要求3所述的拉线塔杆基础,其特征是所述的底座(9)与塔脚板(6)通过螺栓(7)连接。
CN2009201251444U 2009-07-16 2009-07-16 拉线杆塔基础 Expired - Fee Related CN201460373U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201251444U CN201460373U (zh) 2009-07-16 2009-07-16 拉线杆塔基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201251444U CN201460373U (zh) 2009-07-16 2009-07-16 拉线杆塔基础

Publications (1)

Publication Number Publication Date
CN201460373U true CN201460373U (zh) 2010-05-12

Family

ID=42387727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201251444U Expired - Fee Related CN201460373U (zh) 2009-07-16 2009-07-16 拉线杆塔基础

Country Status (1)

Country Link
CN (1) CN201460373U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906754A (zh) * 2010-07-09 2010-12-08 清华大学 一种钢梁与混凝土桥墩的刚性连接方法
CN103434948A (zh) * 2013-09-06 2013-12-11 中国建筑第八工程局有限公司 一种桅杆式吊装装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906754A (zh) * 2010-07-09 2010-12-08 清华大学 一种钢梁与混凝土桥墩的刚性连接方法
CN103434948A (zh) * 2013-09-06 2013-12-11 中国建筑第八工程局有限公司 一种桅杆式吊装装置
CN103434948B (zh) * 2013-09-06 2015-12-09 中国建筑第八工程局有限公司 一种桅杆式吊装装置

Similar Documents

Publication Publication Date Title
CN203939288U (zh) 防风网结构
CN201212190Y (zh) 混合暗支撑耗能双肢剪力墙
CN201546227U (zh) 用于支撑基坑围护桩墙和地下室结构外墙的钢支撑梁
CN204510467U (zh) 一种用于地下室无梁楼盖结构的柱帽节点
CN105544593A (zh) 基础预制预应力梁板式风力发电塔基础
JP2011108854A (ja) 太陽光発電装置の設置構造及び設置方法
CN201581409U (zh) 深基坑钢格构柱支承十字交叉梁的组合式塔吊基础
CN207017483U (zh) 再生式钢骨架全预制剪力墙结构体系
KR101319784B1 (ko) 철탑 보강구조 및 보강방법
CN108412087A (zh) 提高夯土墙整体性的预制加强结构及夯土墙
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN201460373U (zh) 拉线杆塔基础
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN205369295U (zh) 基础预制预应力梁板式风力发电塔基础
EP2702217B1 (en) A wind turbine tower made of wood and a method of erection thereof
CN107313551A (zh) 一种钢筋桁架混凝土预制墙板及结构体系及其施工方法
CN201588413U (zh) 一种对原有厂房混凝土牛腿的加固结构
CN2554230Y (zh) 螺旋锚
CN206457838U (zh) 一种用于输电塔的装配式基础
CN201144463Y (zh) 双梁结构
CN201753481U (zh) 定位钢筋支撑基点系统
CN203008402U (zh) 单层硬山搁檩砌体住宅的钢架护顶结构
CN207538511U (zh) 一种钢结构别墅
CN202047419U (zh) 带柱帽无梁地下车库基础底板
CN111456281A (zh) 一种预应力自复位空心砌块砌体组合结构及施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20170716

CF01 Termination of patent right due to non-payment of annual fee