foundation
batch production
short column
sole plate
securing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020184249XU
Other languages
English (en)
Inventor
郎金权
唐明桃
章立鹰
钱阮富
张光烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dy-Link Engineering & Technology Co ltd
Original Assignee
Dy-Link Engineering & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dy-Link Engineering & Technology Co Ltd filed Critical Dy-Link Engineering & Technology Co Ltd
Priority to CN201020184249XU priority Critical patent/CN201722702U/zh
Application granted granted Critical
Publication of CN201722702U publication Critical patent/CN201722702U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种工厂化预制基础,公开了一种将基础各构件通过紧固件拼接成一体、共同工作的工厂化预制构件的拼装基础。它包括基础底板(2),所述基础底板(2)上装设有基础短柱(1),基础短柱(1)通过紧固件(31)与基础底板(2)固定连接。本实用新型采用工厂化制作形式的基础,减少现场作业且能有效控制工作时间;减少了基础建设给周围环境带来的不和谐,大大提高了基站建站的成功率。

Description

工厂化预制构件的拼装基础
技术领域
本实用新型涉及一种工厂化预制基础,尤其涉及一种将基础各构件通过紧固件拼接成一体、共同工作的工厂化预制构件的拼装基础。
背景技术
现有的通信技术中,常规基础建设周期为30天左右,而且很多施工地都会涉及湿作业,受周围环境和天气等影响,为保证施工安全,基础施工周期通常会拖着很长,施工进程显得非常缓慢,因此迫切需要缩短基础施工周期来尽可能的避免在施工期间出现的突发事情。
而且,通过检索现有公开的专利文献中,没有发现工厂化制作的钢混组合基础,减少现场作业时间。因此,为了缩短基站建设的施工工期,提高快速建站能力,急需开发完成一种新型的工厂化预制拼装基础以满足运营商的需求。
实用新型内容
本实用新型针对现有技术存在的不足进行改进,而提供一种可有效减少现场作业工序、且能有效控制工作时间、将基础各构件通过紧固件拼接成一体、共同工作的工厂化预制构件的拼装基础。
为解决上述技术问题,本实用新型通过下述技术方案得以解决:
工厂化预制构件的拼装基础,包括基础底板,所述基础底板上装设有基础短柱,基础短柱通过紧固件与基础底板固定连接。
作为优选,所述基础短柱、紧固件和基础底板之间为可拆式连接。采用可拆式连接方式,安装方便,以后维修更换部件也方便。
作为优选,所述基础短柱通过紧固件与外接杆体固定连接。
作为优选,所述基础短柱、紧固件和外接杆体之间为可拆式连接。采用可拆式连接方式,安装方便,以后维修更换部件也方便。
作为优选,所述基础底板为至少一块,可以为多块。
作为优选,所述基础底板为两块,该两块基础底板通过紧固件拼接成整体。
作为优选,所述两块基础底板和紧固件之间为可拆式连接。采用可拆式连接方式,安装方便,以后维修更换部件也方便。
作为优选,所述基础短柱的上半部分位于水位面上方,基础短柱的下半部分和基础底板位于水位面下方。
本技术方案中,通过紧固件固定上部外接杆体结构,通过紧固件将基础短柱连接于基础底板上,通过紧固件将两块基础底板拼接成整体。
为了配合快速建站的要求,把塔体基础由传统的现场湿作业式改为工厂化形式。因考虑基础自重和运输限制要求,把工厂化基础的底板分成两块,并通过有效的技术手段进行可靠的连接,整体工作,以达到设计使用要求。
与现有技术相比,本实用新型由于采用了以上技术方案,具有显著的技术效果:一是采用工厂化制作形式的基础,减少现场作业且能有效控制工作时间;二是减少了基础建设给周围环境带来的不和谐,大大提高了基站建站的成功率。
附图说明
图1为本实用新型实施例的结构示意图。
图2为图1的俯视图。
图3为图1中基础短柱的结构示意图。
图4为图3的俯视图。
图5为图1中基础底板的结构示意图。
图6为图5的俯视图。
具体实施方式
下面将结合附图1至6和实施例对本实用新型作进一步详细描述:
实施例如图1至图6所示,工厂化预制构件的拼装基础,包括基础底板2,所述基础底板2上装设有基础短柱1,基础短柱1通过紧固件31与基础底板2固定连接。
所述基础短柱1通过紧固件30与外接杆体固定连接;基础底板2为两块,该两块基础底板2通过紧固件32拼接成整体。
上述连接方式均采用可拆式连接,安装方便,以后维修更换部件也方便。
本实施例中,通过若干个紧固件30固定上部外接杆体结构,通过若干个紧固件31将基础短柱1连接于基础底板上,通过若干个紧固件32将两块基础底板拼接成整体。基础短柱1的上半部分位于水位面4上方,基础短柱1的下半部分和基础底板2位于水位面4下方。
为了配合快速建站的要求,把塔体基础由传统的现场湿作业式改为工厂化形式。因考虑基础自重和运输限制要求,把工厂化基础的底分成两块,并通过有效的技术手段进行可靠的连接,整体工作,以达到设计使用要求。
本实用新型不局限于上述实施方式,不论在其形状大小上作任何变化,凡是利用本实用新型所述基础构件组装原理所实施的技术方案,均落在本实用新型的保护范围之内。总之,本实用新型的保护范围应包括那些对本领域普通技术人员来说显而易见的变换或替代以及改形。

Claims (8)

1.工厂化预制构件的拼装基础,包括基础底板(2),其特征在于:所述基础底板(2)上装设有基础短柱(1),基础短柱(1)通过紧固件(31)与基础底板(2)固定连接。
2.根据权利要求1所述的工厂化预制构件的拼装基础,其特征在于:所述基础短柱(1)、紧固件(31)和基础底板(2)之间为可拆式连接。
3.根据权利要求1所述的工厂化预制构件的拼装基础,其特征在于:所述基础短柱(1)通过紧固件(30)与外接杆体固定连接。
4.根据权利要求3所述的工厂化预制构件的拼装基础,其特征在于:所述基础短柱(1)、紧固件(30)和外接杆体之间为可拆式连接。
5.根据权利要求1所述的工厂化预制构件的拼装基础,其特征在于:所述基础底板(2)为至少一块。
6.根据权利要求1所述的工厂化预制构件的拼装基础,其特征在于:所述基础底板(2)为两块,该两块基础底板(2)通过紧固件(32)拼接成整体。
7.根据权利要求6所述的工厂化预制构件的拼装基础,其特征在于:所述两块基础底板(2)和紧固件(32)之间为可拆式连接。
8.根据权利要求1所述的工厂化预制构件的拼装基础,其特征在于:所述基础短柱(1)的上半部分位于水位面(4)上方,基础短柱(1)的下半部分和基础底板(2)位于水位面(4)下方。
CN201020184249XU 2010-05-10 2010-05-10 工厂化预制构件的拼装基础 Expired - Lifetime CN201722702U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020184249XU CN201722702U (zh) 2010-05-10 2010-05-10 工厂化预制构件的拼装基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020184249XU CN201722702U (zh) 2010-05-10 2010-05-10 工厂化预制构件的拼装基础

Publications (1)

Publication Number Publication Date
CN201722702U true CN201722702U (zh) 2011-01-26

Family

ID=43491017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020184249XU Expired - Lifetime CN201722702U (zh) 2010-05-10 2010-05-10 工厂化预制构件的拼装基础

Country Status (1)

Country Link
CN (1) CN201722702U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590419A (zh) * 2013-11-25 2014-02-19 山东电力工程咨询院有限公司 装配式可调高压电抗器基础
CN107059911A (zh) * 2017-06-13 2017-08-18 吉林省电力勘测设计院 一种预制装配式基础及其组装方法
CN108005099A (zh) * 2017-11-24 2018-05-08 国网江苏省电力公司南京供电公司 一种杆塔预制装配式混凝土阶梯形基础及其拼装方法
CN111379269A (zh) * 2018-12-27 2020-07-07 北京京诚华宇建筑设计研究院有限公司 装配式独立基础及装配方法
CN114934541A (zh) * 2022-03-07 2022-08-23 中国五冶集团有限公司 一种杯口式后置埋件施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590419A (zh) * 2013-11-25 2014-02-19 山东电力工程咨询院有限公司 装配式可调高压电抗器基础
CN103590419B (zh) * 2013-11-25 2015-08-05 山东电力工程咨询院有限公司 装配式可调高压电抗器基础
CN107059911A (zh) * 2017-06-13 2017-08-18 吉林省电力勘测设计院 一种预制装配式基础及其组装方法
CN108005099A (zh) * 2017-11-24 2018-05-08 国网江苏省电力公司南京供电公司 一种杆塔预制装配式混凝土阶梯形基础及其拼装方法
CN108005099B (zh) * 2017-11-24 2023-08-15 国网江苏省电力公司南京供电公司 一种杆塔预制装配式混凝土阶梯形基础及其拼装方法
CN111379269A (zh) * 2018-12-27 2020-07-07 北京京诚华宇建筑设计研究院有限公司 装配式独立基础及装配方法
CN114934541A (zh) * 2022-03-07 2022-08-23 中国五冶集团有限公司 一种杯口式后置埋件施工方法

Similar Documents

Publication Publication Date Title
CN201722702U (zh) 工厂化预制构件的拼装基础
CN201972237U (zh) 一种节段预制矩形钢管混凝土桁架
CN203939043U (zh) 一种新型塔式起重机预制钢筋混凝土基础
CN105133731B (zh) 一种装配式钢与混凝土组合结构
CN201785940U (zh) 一种钢筋砼预制梁
CN202482887U (zh) 一种混凝土预制拼装基础
CN202866343U (zh) 无梁体系地下车库
CN201695406U (zh) 预制构件的拼装基础
CN204418510U (zh) 楼承板钢筋桁架结构
CN205242701U (zh) 一种由缀板连接的格构式型钢混凝土剪力墙
CN203499082U (zh) 一种用于侧边钢板肋混凝土叠合楼板的连接暗梁
CN103225312B (zh) 一种塔桅结构的预制装配式基础
CN202401384U (zh) 钢桁斜拉桥压重构造
CN202865731U (zh) 钢桁斜拉桥压重钢箱构造
CN201588413U (zh) 一种对原有厂房混凝土牛腿的加固结构
CN204781435U (zh) 一种新型剪力墙结构
CN204804035U (zh) 一种单层厂房排架结构
CN103498512B (zh) 一种装配式建筑墙梁稳定连接结构
CN203961026U (zh) 一种大梁与柱的连接结构
CN107542223A (zh) 一种t型低配筋外包混凝土型钢异形柱
CN204001330U (zh) 一种钢结构楼板
CN209742152U (zh) 一种基于自复位组合端柱浆锚剪力墙的装配式复合剪力墙
CN202148614U (zh) 一种钢框架与钢筋混凝土筒体抗震结构
CN208309616U (zh) 一种拼缝错开的装配式活动房预制基础
CN203795293U (zh) 一种少支架横向拼装波形钢腹板组合箱梁

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311222, No. five, 7589 Jiangdong Road, Jiangdong Industrial Park, Xiaoshan District, Hangzhou, Zhejiang, Hangzhou

Patentee after: Dy-link Engineering & Technology Co.,Ltd.

Address before: 310016. B seat, Sam Wo Business Plaza, 238 hang Hai Road, Zhejiang, Hangzhou

Patentee before: DY-Link Engineering & Technology Co., Ltd.

Address after: 311222, No. five, 7589 Jiangdong Road, Jiangdong Industrial Park, Xiaoshan District, Hangzhou, Zhejiang, Hangzhou

Patentee after: Dy-link Engineering & Technology Co.,Ltd.

Address before: 310016. B seat, Sam Wo Business Plaza, 238 hang Hai Road, Zhejiang, Hangzhou

Patentee before: DY-Link Engineering & Technology Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20110126

CX01 Expiry of patent term