CN106522572B - 历史保护建筑物有限空间内构筑大空间地下通道施工方法 - Google Patents
历史保护建筑物有限空间内构筑大空间地下通道施工方法 Download PDFInfo
- Publication number
- CN106522572B CN106522572B CN201610999284.9A CN201610999284A CN106522572B CN 106522572 B CN106522572 B CN 106522572B CN 201610999284 A CN201610999284 A CN 201610999284A CN 106522572 B CN106522572 B CN 106522572B
- Authority
- CN
- China
- Prior art keywords
- protective buildings
- channel
- historical protective
- buildings object
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明涉及一种历史保护建筑物有限空间内构筑大空间地下通道施工方法,具体步骤是:1)拆除通道范围内历史保护建筑物结构,对通道范围两侧山墙及外墙加固保护,2)拆除通道范围内历史保护建筑物地下室顶板,向内灌注中粗砂并注浆密实回填至地面,3)施工地坪及导墙,用钻机进行障碍物清除与围护结构施工,4)凿除硬地坪,开槽进行首道支撑的施工,5)分层、分块进行土方开挖至基底,并在开挖过程中架设相应的支撑体系并清除历史保护建筑物的老基础与桩基,6)施工通道底板结构,向上施工通道结构并拆除相应的支撑体系,7)施工完毕后,通道顶部采用中粗砂进行回填,通道周边采用素砼回填。采用本发明,可对老建筑物下的空间进行第二次开发利用。
Description
技术领域
本发明涉及一种历史保护建筑物内的施工方法,尤其是一种历史保护建筑物有限空间内构筑大空间地下通道的施工方法。
背景技术
随着城市化进程的加快,地下空间的开发利用也越加迅速,但与此同时,地下空间所面临的施工环境也变得越来越严峻,尤其是在历史保护建筑群中进行地下空间的开发,不仅要面对历史建筑的保护,还需要尽可能的将地下空间的资源利用率最大化,使其满足建筑使用要求。这就使得地下空间的设计在有限的空间内需要兼顾地下通道的使用空间、外墙保护所需空间、机械设备的操作空间和施工误差,并考虑机械的清障功能且能够很好的对周边的环境进行保护。在将这些因素全盘考虑后方能达到空间的最大化。
本发明的具体背景如下:
1、历史保护建筑本身已经倾斜,需要进行加固处理,但是通道需要穿越老建筑物并紧邻历史保护建筑,必须要对其进行保护。
2、预先切除历史保护建筑围护结构施工区域的底板是为了防止老底板的转动,减小围护结构施工时对历史保护建筑物的扰动。
3、灌砂并注浆密实回填至地面,施工300mm厚硬地坪,是为了保证地面能够承受围护结构的施工机械的重量。
4、围护结构的施工机械需自带清障功能是由于历史保护建筑物的底板下存留桩基。
发明内容
本发明是要提供一种历史保护建筑物有限空间内构筑大空间地下通道施工方法,该方法可在保护历史建筑物的同时,对其地下结构进行第二次的开发利用,推动国内关于地下室进行二次开发的效率及利用率,使地下空间得到进一步资源整合。
为实现上述目的,本发明的技术方案是:一种历史保护建筑物有限空间内构筑大空间地下通道的施工方法,具体步骤是:
1)拆除通道范围内历史保护建筑物的结构,并对通道范围两侧15m范围内的山墙及外墙进行加固保护;
2)拆除通道范围内历史保护建筑物地下室顶板,预先切除围护结构施工区域的历史保护建筑物的老基础,然后向内灌注中粗砂并注浆密实回填至地面,若通道侧山墙下无承重结构则进行支墩施工;
3)施工300mm厚硬地坪及导墙,采用全回转钻机进行障碍物清除与围护结构施工,全回转钻机与历史保护建筑物山墙保持1m净距;
4)凿除硬地坪,开槽进行首道支撑的施工;
5)分层、分块进行土方开挖至基底,并在开挖过程中架设相应的支撑体系并清除历史保护建筑物的老基础与桩基,施工通道底板结构;
6)向上施工通道结构并拆除相应的支撑体系;
7)通道结构施工完毕后,通道顶部采用中粗砂进行回填,通道周边采用素砼进行回填。
本发明的有益效果是:采用本发明,可在保护历史建筑物的同时,对其地下结构进行第二次的开发利用,推动国内关于地下室进行二次开发的效率及利用率,使地下空间得到进一步资源整合。
附图说明
图1~3是历史保护建筑物下构筑大空间地下通道施工方法过程示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
如图1~3所示,一种历史保护建筑物有限空间内构筑大空间地下通道的施工方法,具体步骤是:
1)拆除通道范围内历史保护建筑物1的结构,并对通道范围两侧15m范围内的山墙及外墙2进行加固保护(图1);
2)拆除通道范围内历史保护建筑物地下室顶板3,预先切除围护结构施工区域的历史保护建筑物的老基础9,然后向内灌注中粗砂并注浆4,密实回填至地面,若通道侧山墙下无承重结构则进行支墩5施工(图1);
3)施工300mm厚硬地坪6及导墙,采用全回转钻机进行障碍物清除与围护结构7施工,全回转钻机与历史保护建筑物山墙保持1m净距(图1);
4)凿除硬地坪6,开槽进行首道支撑11的施工(图2);
5)分层、分块进行土方开挖至基底,并在开挖过程中架设相应的支撑体系12并清除历史保护建筑物的老基础9与桩基10,施工通道底板结构13(图2);
6)向上施工通道结构14并拆除相应的支撑体系11(图3);
7)通道结构施工完毕后,通道顶部采用中粗砂15进行回填,通道周边采用素砼16进行回填(图3)。
Claims (3)
1.一种历史保护建筑物有限空间下构筑大空间地下通道施工方法,其特征在于,具体步骤是:
1)拆除通道范围内历史保护建筑物(1)的结构,并对通道范围两侧15m范围内的山墙及外墙(2)进行加固保护;
2)拆除通道范围内历史保护建筑物地下室顶板(3),预先切除围护结构施工区域的历史保护建筑物的老基础,然后向内灌注中粗砂并注浆(4),密实回填至地面;
3)施工300mm厚硬地坪(6)及导墙,采用全回转钻机进行障碍物清除与围护结构(7)施工;
4)凿除硬地坪(6),开槽进行首道支撑(11)的施工;
5)分层、分块进行土方开挖至基底,并在开挖过程中架设相应的支撑体系(12)并清除历史保护建筑物的老基础的桩基,施工地下通道底板结构(13);
6)向上施工通道结构(14)并拆除相应的支撑体系(11);
7)通道结构施工完毕后,通道顶部采用中粗砂(15)进行回填,通道周边采用素砼(16)进行回填。
2.根据权利要求1所述的历史保护建筑物有限空间下构筑大空间地下通道施工方法,其特征在于:上述2)步骤中,若通道侧山墙下无承重结构则进行支墩(5)施工。
3.根据权利要求1所述的历史保护建筑物有限空间下构筑大空间地下通道施工方法,其特征在于:上述3)步骤中,全回转钻机与历史保护建筑物山墙保持1m净距。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610999284.9A CN106522572B (zh) | 2016-11-14 | 2016-11-14 | 历史保护建筑物有限空间内构筑大空间地下通道施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610999284.9A CN106522572B (zh) | 2016-11-14 | 2016-11-14 | 历史保护建筑物有限空间内构筑大空间地下通道施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522572A CN106522572A (zh) | 2017-03-22 |
CN106522572B true CN106522572B (zh) | 2019-02-19 |
Family
ID=58352006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610999284.9A Active CN106522572B (zh) | 2016-11-14 | 2016-11-14 | 历史保护建筑物有限空间内构筑大空间地下通道施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522572B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107687176B (zh) * | 2017-08-31 | 2021-05-07 | 广州枫叶管业有限公司 | 一种聚乙烯管非开挖施工方法 |
CN108468438B (zh) * | 2018-04-13 | 2020-05-12 | 河南国安建设集团有限公司 | 一种处理在空间条件限制下的夯土墙综合施工方法 |
CN110512644B (zh) * | 2019-07-22 | 2021-03-02 | 上海建工一建集团有限公司 | 新旧建筑之间增设地下连通道的明挖施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1136608A (ja) * | 1997-07-17 | 1999-02-09 | Taisei Corp | 既存構造物の基礎免震化工法 |
CN1632243A (zh) * | 2004-08-05 | 2005-06-29 | 邹五金 | 地铁站构筑方法 |
CN101397852A (zh) * | 2007-09-26 | 2009-04-01 | 上海市第二建筑有限公司 | 一种对原建筑增建多层地下室的施工方法 |
CN102127974A (zh) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | 既有建筑下方新增地下室的设计和施工方法 |
CN103912134A (zh) * | 2014-03-21 | 2014-07-09 | 上海建工四建集团有限公司 | 既有建筑原位地下空间结构及施工方法 |
CN105113540A (zh) * | 2015-09-01 | 2015-12-02 | 上海域邦建设集团有限公司 | 在保护建筑下新建大型深基坑地下室的施工方法 |
CN105350589A (zh) * | 2015-12-01 | 2016-02-24 | 中铁建工集团有限公司 | 穿越既有保护性建筑结构桩基托换施工方法 |
CN105735383A (zh) * | 2016-03-25 | 2016-07-06 | 上海建工四建集团有限公司 | 一种保留结构体系的局部地下清障施工方法 |
-
2016
- 2016-11-14 CN CN201610999284.9A patent/CN106522572B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1136608A (ja) * | 1997-07-17 | 1999-02-09 | Taisei Corp | 既存構造物の基礎免震化工法 |
CN1632243A (zh) * | 2004-08-05 | 2005-06-29 | 邹五金 | 地铁站构筑方法 |
CN101397852A (zh) * | 2007-09-26 | 2009-04-01 | 上海市第二建筑有限公司 | 一种对原建筑增建多层地下室的施工方法 |
CN102127974A (zh) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | 既有建筑下方新增地下室的设计和施工方法 |
CN103912134A (zh) * | 2014-03-21 | 2014-07-09 | 上海建工四建集团有限公司 | 既有建筑原位地下空间结构及施工方法 |
CN105113540A (zh) * | 2015-09-01 | 2015-12-02 | 上海域邦建设集团有限公司 | 在保护建筑下新建大型深基坑地下室的施工方法 |
CN105350589A (zh) * | 2015-12-01 | 2016-02-24 | 中铁建工集团有限公司 | 穿越既有保护性建筑结构桩基托换施工方法 |
CN105735383A (zh) * | 2016-03-25 | 2016-07-06 | 上海建工四建集团有限公司 | 一种保留结构体系的局部地下清障施工方法 |
Non-Patent Citations (2)
Title |
---|
地下通道穿越古建筑墙基施工的墩式托换技术;王胜天等;《建筑技术开发》;20080831;第79、80、83页 |
论公路砼桥梁裂缝的处理措施;王戊申;《科学之友》;20101231;第82-83页 |
Also Published As
Publication number | Publication date |
---|---|
CN106522572A (zh) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204253054U (zh) | 山岭隧道桩拱盖挖法综合支护结构 | |
CN102535474B (zh) | 一种深基坑挖土的施工方法 | |
CN105863287A (zh) | 框架结构建筑物顶升增层和隔震方法 | |
CN106522572B (zh) | 历史保护建筑物有限空间内构筑大空间地下通道施工方法 | |
CN108867692A (zh) | 城市大断面明挖隧道临近建筑物保护及隧道基坑挖掘方法 | |
CN102828517A (zh) | 一种车站出入口基坑开挖分层控制的施工方法 | |
CN108867723B (zh) | 框架结构建筑物纠倾并地下增层的方法 | |
CN105569051A (zh) | 一种砂卵石漂石地质层基坑支护体系及施工方法 | |
Tan et al. | Practical solutions for concurrent excavation of neighboring mega basements closely surrounded by utility tunnels in Shanghai Hongqiao CBD | |
CN105421464A (zh) | 小型基坑土方开挖方法 | |
CN110984132B (zh) | 复杂地质条件下地下连续墙成槽的施工方法 | |
CN109025349B (zh) | 砖混结构建筑物纠倾并地下增层的方法 | |
CN204825923U (zh) | 一种接力式基坑支护结构 | |
Calin et al. | Dewatering system of a deep of excavation in urban area–Bucharest case study | |
CN109113092A (zh) | 地下大直径管道原位通水保护施工方法 | |
CN101748735A (zh) | 软土地区减少桩偏斜的基坑开挖方法 | |
CN210195766U (zh) | 一种拱盖暗挖顺筑地下结构 | |
CN110725344A (zh) | 一种防止卸载土方时既有隧道上浮的方法 | |
CN210195752U (zh) | 一种拱盖暗挖逆筑地下结构 | |
CN209907365U (zh) | 阶梯状易风化软砂岩层基底地基的处理结构 | |
CN101824821B (zh) | 一种基岩中建造混凝土地下连续墙的方法 | |
CN109083122A (zh) | 深厚泥炭土地区施工操作平台的施工方法 | |
CN102758444A (zh) | 苯加氢工程土方施工方法 | |
CN203022005U (zh) | 滩涂围垦区深基坑支护的防护结构 | |
CN113931228B (zh) | 一种用于地下室施工的材料平台施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |