CN102828517A - 一种车站出入口基坑开挖分层控制的施工方法 - Google Patents

一种车站出入口基坑开挖分层控制的施工方法 Download PDF

Info

Publication number
CN102828517A
CN102828517A CN2012103151697A CN201210315169A CN102828517A CN 102828517 A CN102828517 A CN 102828517A CN 2012103151697 A CN2012103151697 A CN 2012103151697A CN 201210315169 A CN201210315169 A CN 201210315169A CN 102828517 A CN102828517 A CN 102828517A
Authority
CN
China
Prior art keywords
excavation
foundation pit
exit
control
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103151697A
Other languages
English (en)
Other versions
CN102828517B (zh
Inventor
周冠南
崔涛
李有德
赵立华
朱瑶宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN201210315169.7A priority Critical patent/CN102828517B/zh
Publication of CN102828517A publication Critical patent/CN102828517A/zh
Application granted granted Critical
Publication of CN102828517B publication Critical patent/CN102828517B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种车站出入口基坑开挖分层控制的施工方法,其特征在于:所述的车站出入口基坑开挖分层控制的施工方法,包括以下步骤:步骤一、首先建造地下围护结构;步骤二、地下围护结构完成后,在所述地下围护结构范围内进行分层开挖,制定分层开挖时的变形控制值,并进行相应动态监测控制。本发明的优点:本发明所述的车站出入口基坑开挖分层控制的施工方法,由于采用了分层控制的施工方法,在各开挖层分别设定不同的变形控制标准,确保整个施工过程中基坑变形在可控范围之内,实现了对基坑变形的有效控制。

Description

一种车站出入口基坑开挖分层控制的施工方法
技术领域
本发明涉及了基坑开挖过程中控制基坑变形的施工方法,特别涉及了一种车站出入口基坑开挖分层控制的施工方法。
背景技术
随着城市地下空间的发展,产生了大量基坑工程,而复杂的周边环境越对基坑的变形要求却越来越严格。基坑工程施工会引起周围建筑物产生沉降,较大沉降或不均匀沉降都会危及周围建筑物的安全。
目前在基坑变形控制标准方面一般是基于各地区规范和类似工程经验确定本标段基坑工程监测各项目的控制标准,未对基坑开挖过程中的分层控制标准进行设定,特别是软土地区,周边又有文物建筑保护要求时,分层开挖时控制基坑变形至关重要。
发明内容
本发明的目的是为了避免基坑工程施工所引起的周围建筑物产生沉降问题,特提供了一种车站出入口基坑开挖分层控制的施工方法。
本发明提供了一种车站出入口基坑开挖分层控制的施工方法,其特征在于:所述的车站出入口基坑开挖分层控制的施工方法,包括以下步骤:
步骤一、首先建造地下围护结构;
步骤二、地下围护结构完成后,在所述地下围护结构范围内进行分层开挖,制定分层开挖时的变形控制值,并进行相应动态监测控制。
步骤一中,所述地下围护结构为劲性水泥土搅拌桩法桩或钻孔灌注桩,在靠近变形敏感性建筑时需加长围护结构的深度。
步骤二中,基坑开挖时先对容易渗水的接缝处进行试挖,挖土时挖至2~3根支撑位置进行架设围檩和钢支撑。
步骤二中,需设置分层开挖基坑变形控制标准,标准根据基坑等级和周边建筑物保护等级确定,对于二级基坑,一般要求周围地面最大沉降量≤2‰H,围护墙体最大水平位移≤3‰H(H为基坑开挖深度),变形速率控制值为3mm/天。分层控制标准具体如下:
Figure BDA00002075063400021
步骤二中,在上一层满足变形控制要求的情况下进行下一层开挖。
基坑开挖至坑底时,立即进行分段施工垫层和防水层。
开挖时先对不同围护结构接缝处进行试挖,若无渗漏水情况,则正常开挖;若出现渗漏,及时进行封堵,渗漏过大不易封堵时进行土方回填处理,并采取注浆进行封堵。
土方开挖按先挖中间架设支撑,后挖两边的土体,减少围护结构的位移,为减小基坑无支撑暴露时间,采用先开挖中间的土体,再开挖边角的斜撑区域的土体。
在安装钢支撑之前,保证排桩与钢围檩接触点密贴,当支撑位置的钢围檩与围护存在间隙时,先采用垫钢板等措施垫实,严禁在钢围檩与桩体之间未垫实的情况下安装钢支撑并施加预应力。
通过对监测数据分析,观测周边环境,在开挖变形最大位置,围护结构交界处、基坑拐角处增加临时钢支撑。
本发明的控制基坑变形方法,由于采用了分层控制的施工方法,在各开挖层分别设定不同的变形控制标准,确保整个施工过程中基坑变形在可控范围之内,实现了对基坑变形的有效控制。
本发明的优点:
本发明所述的车站出入口基坑开挖分层控制的施工方法,由于采用了分层控制的施工方法,在各开挖层分别设定不同的变形控制标准,确保整个施工过程中基坑变形在可控范围之内,实现了对基坑变形的有效控制。
附图说明
下面结合附图及实施方式对本发明作进一步详细的说明:
图1为本发明的施工流程图;
图2为本发明在基坑纵断面上的施工图;
图3为本发明在基坑横断面上的施工图。
具体实施方式
实施例
本发明提供了一种车站出入口基坑开挖分层控制的施工方法,其特征在于:所述的车站出入口基坑开挖分层控制的施工方法,包括以下步骤:
步骤一、首先建造地下围护结构;
步骤二、地下围护结构完成后,在所述地下围护结构范围内进行分层开挖,制定分层开挖时的变形控制值,并进行相应动态监测控制。
步骤一中,所述地下围护结构为劲性水泥土搅拌桩法桩或钻孔灌注桩,在靠近变形敏感性建筑时需加长围护结构的深度。
步骤二中,基坑开挖时先对容易渗水的接缝处进行试挖,挖土时挖至2~3根支撑位置进行架设围檩和钢支撑。
步骤二中,需设置分层开挖基坑变形控制标准,标准根据基坑等级和周边建筑物保护等级确定,对于二级基坑,一般要求周围地面最大沉降量≤2‰H,围护墙体最大水平位移≤3‰H(H为基坑开挖深度),变形速率控制值为3mm/天。分层控制标准具体如下:
Figure BDA00002075063400041
步骤二中,在上一层满足变形控制要求的情况下进行下一层开挖。
基坑开挖至坑底时,立即进行分段施工垫层和防水层。
开挖时先对不同围护结构接缝处进行试挖,若无渗漏水情况,则正常开挖;若出现渗漏,及时进行封堵,渗漏过大不易封堵时进行土方回填处理,并采取注浆进行封堵。
土方开挖按先挖中间架设支撑,后挖两边的土体,减少围护结构的位移,为减小基坑无支撑暴露时间,采用先开挖中间的土体,再开挖边角的斜撑区域的土体。
在安装钢支撑之前,保证排桩与钢围檩接触点密贴,当支撑位置的钢围檩与围护存在间隙时,先采用垫钢板等措施垫实,严禁在钢围檩与桩体之间未垫实的情况下安装钢支撑并施加预应力。
通过对监测数据分析,观测周边环境,在开挖变形最大位置,围护结构交界处、基坑拐角处增加临时钢支撑。
本发明的控制基坑变形方法,由于采用了分层控制的施工方法,在各开挖层分别设定不同的变形控制标准,确保整个施工过程中基坑变形在可控范围之内,实现了对基坑变形的有效控制。

Claims (6)

1.一种车站出入口基坑开挖分层控制的施工方法,其特征在于:所述的车站出入口基坑开挖分层控制的施工方法,包括以下步骤:
步骤一、首先建造地下围护结构;
步骤二、地下围护结构完成后,在所述地下围护结构范围内进行分层开挖,制定分层开挖时的变形控制值,并进行相应动态监测控制。
2.按照权利要求1所述的车站出入口基坑开挖分层控制的施工方法,其特征在于:步骤一中,所述地下围护结构为劲性水泥土搅拌桩法桩或钻孔灌注桩,在靠近变形敏感性建筑时需加长围护结构的深度。
3.按照权利要求1所述的车站出入口基坑开挖分层控制的施工方法,其特征在于:步骤二中,基坑开挖时先对容易渗水的接缝处进行试挖,挖土时挖至2~3根支撑位置进行架设围檩和钢支撑。
4.按照权利要求1所述的车站出入口基坑开挖分层控制的施工方法,其特征在于:步骤二中,需设置分层开挖基坑变形控制标准,标准应根据基坑等级和周边建筑物保护等级确定,对于二级基坑,一般要求周围地面最大沉降量≤2‰H,围护墙体最大水平位移≤3‰H(H为基坑开挖深度),变形速率控制值为3mm/天。
5.按照权利要求1所述的车站出入口基坑开挖分层控制的施工方法,其特征在于:步骤二中,在上一层满足变形控制要求的情况下进行下一层开挖。
6.按照权利要求1所述的车站出入口基坑开挖分层控制的施工方法,其特征在于:基坑开挖至坑底时,立即进行分段施工垫层和防水层。
CN201210315169.7A 2012-08-30 2012-08-30 一种车站出入口基坑开挖分层控制的施工方法 Active CN102828517B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210315169.7A CN102828517B (zh) 2012-08-30 2012-08-30 一种车站出入口基坑开挖分层控制的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210315169.7A CN102828517B (zh) 2012-08-30 2012-08-30 一种车站出入口基坑开挖分层控制的施工方法

Publications (2)

Publication Number Publication Date
CN102828517A true CN102828517A (zh) 2012-12-19
CN102828517B CN102828517B (zh) 2014-12-10

Family

ID=47331809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210315169.7A Active CN102828517B (zh) 2012-08-30 2012-08-30 一种车站出入口基坑开挖分层控制的施工方法

Country Status (1)

Country Link
CN (1) CN102828517B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498474A (zh) * 2013-10-11 2014-01-08 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN105064371A (zh) * 2015-08-03 2015-11-18 河海大学 一种深基坑变形报警方法
CN105804086A (zh) * 2014-12-31 2016-07-27 上海建工二建集团有限公司 一种基坑逆作法施工中换撑节点的施工方法
CN106320261A (zh) * 2016-08-22 2017-01-11 中交天航港湾建设工程有限公司 一种超长港池边坡开挖的施工方法
CN109537598A (zh) * 2018-12-05 2019-03-29 上海公路桥梁(集团)有限公司 控制基坑开挖变形方法
CN110397079A (zh) * 2019-07-06 2019-11-01 中铁二十五局集团第五工程有限公司 海相富水岩溶地层明挖车站施工工艺
CN112177008A (zh) * 2020-09-07 2021-01-05 中国一冶集团有限公司 深基坑开挖的施工方法
CN113152476A (zh) * 2021-05-10 2021-07-23 中铁九局集团第六工程有限公司 一种既有线车站的软地质基坑开挖施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191258A (zh) * 1997-02-21 1998-08-26 同济大学 基坑开挖的时空效应法
CN1563605A (zh) * 2004-03-23 2005-01-12 孙学毅 地面开挖控制变形工法
CN101892668A (zh) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 联合支护开挖溶蚀地质深基坑及其施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191258A (zh) * 1997-02-21 1998-08-26 同济大学 基坑开挖的时空效应法
CN1563605A (zh) * 2004-03-23 2005-01-12 孙学毅 地面开挖控制变形工法
CN101892668A (zh) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 联合支护开挖溶蚀地质深基坑及其施工方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498474A (zh) * 2013-10-11 2014-01-08 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN103498474B (zh) * 2013-10-11 2016-02-17 广东电白建设集团有限公司 一种用于深基坑开挖的施工方法
CN105804086A (zh) * 2014-12-31 2016-07-27 上海建工二建集团有限公司 一种基坑逆作法施工中换撑节点的施工方法
CN105064371A (zh) * 2015-08-03 2015-11-18 河海大学 一种深基坑变形报警方法
CN106320261A (zh) * 2016-08-22 2017-01-11 中交天航港湾建设工程有限公司 一种超长港池边坡开挖的施工方法
CN106320261B (zh) * 2016-08-22 2018-06-08 中交天航港湾建设工程有限公司 一种超长港池边坡开挖的施工方法
CN109537598A (zh) * 2018-12-05 2019-03-29 上海公路桥梁(集团)有限公司 控制基坑开挖变形方法
CN110397079A (zh) * 2019-07-06 2019-11-01 中铁二十五局集团第五工程有限公司 海相富水岩溶地层明挖车站施工工艺
CN110397079B (zh) * 2019-07-06 2021-12-17 中铁二十五局集团第五工程有限公司 海相富水岩溶地层明挖车站施工工艺
CN112177008A (zh) * 2020-09-07 2021-01-05 中国一冶集团有限公司 深基坑开挖的施工方法
CN113152476A (zh) * 2021-05-10 2021-07-23 中铁九局集团第六工程有限公司 一种既有线车站的软地质基坑开挖施工方法

Also Published As

Publication number Publication date
CN102828517B (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
CN102828517B (zh) 一种车站出入口基坑开挖分层控制的施工方法
WO2020173100A1 (zh) 加固装置及富水砂砾地层中深基坑局部冷冻加固施工方法
Cui et al. Mitigation of geohazards during deep excavations in karst regions with caverns: a case study
Ni et al. Characterising the failure pattern of a station box of Taipei Rapid Transit System (TRTS) and its rehabilitation
CN103321244B (zh) 砂土地基既有建筑增设地下室的施工方法
CN108412503A (zh) 偏压浅埋隧道洞口施工防护结构及其施工方法
CN108867692A (zh) 城市大断面明挖隧道临近建筑物保护及隧道基坑挖掘方法
Tan et al. Excavation of middle Huai-Hai road station of Shanghai metro line 13: Challenges, risks, countermeasures, and performance assessment
Zumrawi et al. Importance of deep excavation support and its influence on adjacent buildings
CN109577322A (zh) 一种用于土体内部既有桩基接桩的施工装置
CN106522572B (zh) 历史保护建筑物有限空间内构筑大空间地下通道施工方法
CN108252307A (zh) 一种用于地铁隧道上方的基坑修建方法
CN209941754U (zh) 一种高压电力管涵原地保护结构
Ilyichev et al. Deformations of the retaining structures upon deep excavations in Moscow
Grigson et al. Second Avenue Subway Project: deep excavation support of a cut-and-cover station
CN110055973A (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN109113092A (zh) 地下大直径管道原位通水保护施工方法
CN206768832U (zh) 一种钢管前撑、锚索后拉h型构件围护结构
CN209703493U (zh) 一种用于土体内部既有桩基接桩的施工装置
CN212642730U (zh) 一种湿陷性黄土地区隧道穿越人防结构
CN105019462B (zh) 吊脚嵌岩灌注桩围护基坑开挖方法
CN109371979B (zh) 喷锚逆作与冲孔桩组合的深基坑围护结构
CN208235540U (zh) 一种深埋管线工作井临时开挖支护结构
Chu et al. Integrate approach for deep excavation along soft ground (MTRC) tunnels
Xu et al. Influence of extreme shallow jacked box tunnelling on underlying metro tunnels: A case study

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant