CN103352580B - 多层砌体房屋内加电梯结构的施工方法 - Google Patents
多层砌体房屋内加电梯结构的施工方法 Download PDFInfo
- Publication number
- CN103352580B CN103352580B CN201310286798.6A CN201310286798A CN103352580B CN 103352580 B CN103352580 B CN 103352580B CN 201310286798 A CN201310286798 A CN 201310286798A CN 103352580 B CN103352580 B CN 103352580B
- Authority
- CN
- China
- Prior art keywords
- elevator
- newly
- add
- newly add
- former
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 3
- 230000008901 benefit Effects 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310286798.6A CN103352580B (zh) | 2013-07-09 | 2013-07-09 | 多层砌体房屋内加电梯结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310286798.6A CN103352580B (zh) | 2013-07-09 | 2013-07-09 | 多层砌体房屋内加电梯结构的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103352580A CN103352580A (zh) | 2013-10-16 |
CN103352580B true CN103352580B (zh) | 2015-09-09 |
Family
ID=49308988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310286798.6A Active CN103352580B (zh) | 2013-07-09 | 2013-07-09 | 多层砌体房屋内加电梯结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103352580B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677527B (zh) * | 2016-12-28 | 2018-10-26 | 中国建筑第八工程局有限公司 | 电梯井内隔梁一次浇筑成型施工方法 |
CN106978910A (zh) * | 2017-05-23 | 2017-07-25 | 华东建筑设计研究院有限公司 | 砌体房屋新增楼梯间的方法及砌体房屋的楼梯间 |
CN108978713B (zh) * | 2018-08-27 | 2023-12-15 | 江苏船谷重工有限公司 | 一种工厂预制电梯井道基坑及其安装方法 |
CN109208936B (zh) * | 2018-11-02 | 2024-06-14 | 中国建筑一局(集团)有限公司 | 一种既有建筑电梯井道结构加建结构及其施工方法 |
CN110593599B (zh) * | 2019-09-12 | 2021-04-20 | 浙江大学城市学院 | 一种运营高压电缆井顶板临时开孔防护结构及施工方法 |
CN113120722B (zh) * | 2021-03-04 | 2023-01-13 | 中建科工集团有限公司 | 一种钢结构建筑电梯施工方法及钢结构建筑电梯 |
CN115092792A (zh) * | 2022-06-21 | 2022-09-23 | 上海美上置业开发有限公司 | 一种预制电梯混凝土结构一体化装配式结构及其方法 |
CN115262577A (zh) * | 2022-08-05 | 2022-11-01 | 茅金声 | 梯井基坑钢混框架构件及其施工法 |
CN115506621A (zh) * | 2022-09-27 | 2022-12-23 | 浙江中天精诚装饰集团有限公司 | 一种室内加装电梯结构及施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11159153A (ja) * | 1997-11-26 | 1999-06-15 | Sato Kogyo Co Ltd | 住戸アクセス用昇降設備の増設方法およびその施工手順 |
JP2003013615A (ja) * | 2001-07-03 | 2003-01-15 | Chikashi Soda | 既存階段室型集合住宅へのエレベータ設置方法 |
JP2004124676A (ja) * | 2002-10-07 | 2004-04-22 | Yutaka Osanai | 階段室型集合住宅のバリアフリー昇降施設の構造および施工方法 |
CN2625496Y (zh) * | 2003-07-23 | 2004-07-14 | 程宗颢 | 多层建筑加层加建电梯结构 |
CN2628649Y (zh) * | 2003-07-23 | 2004-07-28 | 程宗颢 | 多层住宅加层结构和加装电梯结构 |
CN2639439Y (zh) * | 2003-07-23 | 2004-09-08 | 程宗颢 | 多层建筑改造加建电梯结构 |
JP5162315B2 (ja) * | 2008-04-28 | 2013-03-13 | 富士セラ株式会社 | エレベータシャフト内のアスベスト処理工法 |
-
2013
- 2013-07-09 CN CN201310286798.6A patent/CN103352580B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11159153A (ja) * | 1997-11-26 | 1999-06-15 | Sato Kogyo Co Ltd | 住戸アクセス用昇降設備の増設方法およびその施工手順 |
JP2003013615A (ja) * | 2001-07-03 | 2003-01-15 | Chikashi Soda | 既存階段室型集合住宅へのエレベータ設置方法 |
JP2004124676A (ja) * | 2002-10-07 | 2004-04-22 | Yutaka Osanai | 階段室型集合住宅のバリアフリー昇降施設の構造および施工方法 |
CN2625496Y (zh) * | 2003-07-23 | 2004-07-14 | 程宗颢 | 多层建筑加层加建电梯结构 |
CN2628649Y (zh) * | 2003-07-23 | 2004-07-28 | 程宗颢 | 多层住宅加层结构和加装电梯结构 |
CN2639439Y (zh) * | 2003-07-23 | 2004-09-08 | 程宗颢 | 多层建筑改造加建电梯结构 |
JP5162315B2 (ja) * | 2008-04-28 | 2013-03-13 | 富士セラ株式会社 | エレベータシャフト内のアスベスト処理工法 |
Also Published As
Publication number | Publication date |
---|---|
CN103352580A (zh) | 2013-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103352580B (zh) | 多层砌体房屋内加电梯结构的施工方法 | |
CN103991773A (zh) | 装配式模块化钢结构电梯井道的设计与安装方法 | |
CN108589771B (zh) | 一种已运营地下车站增层换乘节点施工方法 | |
CN204385634U (zh) | 铁路不停运跨线箱涵整体顶进装置 | |
CN101736909A (zh) | 一种底部框架柱震损房屋建筑的修复方法 | |
CN103195085A (zh) | 一种向下加层地下室及其建造方法 | |
CN106013053A (zh) | 一种用于建造地下车库沉井的钢板桩支护施工方法 | |
CN107326928A (zh) | 一种部分涉及地下室的深层地下车库的施工方法 | |
CN105839784B (zh) | 拼装顶升式建筑施工方法 | |
CN111456025A (zh) | 超深基坑组合式换撑拆撑施工方法 | |
CN103243931B (zh) | 多层砌体住宅单元门式外加电梯结构及其施工方法 | |
CN203922362U (zh) | 装配式模块化钢结构电梯井道 | |
CN102900241A (zh) | 混凝土结构改建中“新梁老柱”的节点一体化施工方法 | |
CN203394095U (zh) | 多层砌体房屋内加电梯结构 | |
CN105888281A (zh) | 一种利用顶升增层技术提升小区整体功能的方法 | |
CN102493472B (zh) | 一种桥梁深水软土地基逆作法低桩承台复合基础施工工艺 | |
CN204282399U (zh) | 一种地铁围护结构 | |
CN105155669A (zh) | 暗梁楼板构造柱结构以及施工方法 | |
CN206128077U (zh) | 一种深基坑支护的内支撑结构 | |
CN203201171U (zh) | 多层砌体住宅单元门式外加电梯结构 | |
CN103352579B (zh) | 采用外加廊桥和外加电梯的加固改造砌体结构及施工方法 | |
CN105298147A (zh) | 超深基坑螺旋下降物料快速运输通道及其施工方法 | |
CN109779144A (zh) | 利用u型砌块预制的门窗过梁及其施工方法 | |
Zayed et al. | A case productivity model for automatic climbing system | |
CN104963344B (zh) | 砼支撑拆除和结构施工同步进行的深基坑地下施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Du Lihong Inventor before: Dong You Inventor before: Ju Shusen Inventor before: Wan Zhao Inventor before: Xie Jianming |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171110 Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing Patentee after: Beijing Yong Bo Science and Technology Ltd. Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building Patentee before: Beijing Aeido International Engineering Technology Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20171227 Address after: 401220 Chongqing City longevity zone, saddle saddle Green square 1 unit 2-4 Patentee after: Li Wenkang Address before: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing Patentee before: Beijing Yong Bo Science and Technology Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180607 Address after: 422000 D-02, middle section of Shaoyang Avenue, Shuang Qing District, Shaoyang, Hunan. Patentee after: Asian Fuji elevator Limited by Share Ltd Address before: 401220 1 unit 2-4, riding saddle Green square, Changshou District, Chongqing Patentee before: Li Wenkang |
|
TR01 | Transfer of patent right |