CN103266780A - 树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 - Google Patents
树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 Download PDFInfo
- Publication number
- CN103266780A CN103266780A CN2013101671225A CN201310167122A CN103266780A CN 103266780 A CN103266780 A CN 103266780A CN 2013101671225 A CN2013101671225 A CN 2013101671225A CN 201310167122 A CN201310167122 A CN 201310167122A CN 103266780 A CN103266780 A CN 103266780A
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- steel column
- tree
- assembly unit
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明公开一种树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法,胎架组合系统主要由中央胎架及数个位列于中央胎架周围的长方形拼装胎架组成;长方形拼装胎架包括左右两根立杆、垂直连接于立杆之间的上弦托梁和下弦胎架杆;立杆内侧翼缘板上开有数个竖直方向的定位孔,上弦托梁通过定位孔连接固定于立杆。胎架可根据分枝的位置、角度、数量等特性,自由变换位置。解决了树状钢柱分枝因各向异性而导致的定位组装问题,满足了日益提高的工程质量、节能环保的施工要求。
Description
技术领域
本发明涉及一种树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法,属于钢结构工程技术领域。
背景技术
树状结构是空间仿生结构的一种,是一种比较新颖的结构形式,具有合理的传力路径,承载力较高,支撑覆盖范围广,可以用较小的杆件形成较大的支撑空间。在国外,树状结构已有较多应用,在国内的运用也日趋广泛,特别是在一些大跨度空间结构中。树状钢柱结构,建筑造型独特,空间结构布置灵活多变,结构用钢量少,更加顺应了当今节能建筑的大趋势。树状钢柱分枝构件安装的空间位置轴线独立、标高不一、角度各异,且每个钢柱的端点空间坐标都不相同。安装过程中,设计灵活多变的拼装胎架至关重要。现有的拼装胎架设计结构呆板,往往只具有支撑的功能,而在实际应用中,往往会遇到设计、加工制作及安装导致的误差,为安装带来难以克服的困难。
发明内容
本发明提供一种树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法,该胎架组合系统具有调节分枝杆件高度及各个分枝杆件夹角的功能,该胎架组合系统结构设计灵活,忽略误差,为安装带来方便。
为解决以上技术问题,本发明提供如下技术方案:一种树状钢柱施工拼装胎架组合系统,所述胎架组合系统主要由中央胎架及数个位列于中央胎架周围的长方形拼装胎架组成;长方形拼装胎架包括左右两根立杆、垂直连接于立杆之间的上弦托梁和下弦胎架杆;立杆内侧翼缘板上开有数个竖直方向的连接孔,上弦托梁通过连接孔连接固定于立杆;所述上弦托梁的上翼缘板开有定位孔,定位孔处固定有定位块;下弦胎架杆位于上弦托梁的下方;所述胎架组合系统中部设有胎架,胎架上部设有大平台,大平台上设有小平台,小平台的四个角底部分别设有可供调节小平台高度的螺杆。
一种树状钢柱拼装施工方法,所述施工方法的步骤如下:
步骤一:长方形拼装胎架及中央胎架的制作,制作可调节的大平台与小平台,大小平台之间通过调节螺杆连接,通过调节螺杆找平钢柱水平度,钢柱在铸造时需标识各向轴线和基准点。
步骤二:以钢柱为中心,放出分枝杆件的投影线。
步骤三:根据投影位置确定钢柱分枝杆件及长方形拼装胎架位置,钢柱分枝胎架的高度通过计算机三维模拟计算可知。
步骤四:通过汽车吊吊装分枝杆件及长方形拼装胎架,施工人员辅助对就位,同时测量人员负责观测钢柱分枝杆件水平盖板中心线的轴线、标高及水平度。
步骤五:调节分枝杆件与钢柱对接口适量调整焊缝间隙,根据设计要求焊接连接分枝杆件及钢柱。
本发明涉及的这种树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法,是由几个独立的长方形拼装胎架自由组合而成,胎架可根据分枝的位置、角度、数量等特性,自由变换位置。胎架由几根型钢组焊成型,支撑树形钢柱的分枝,可根据结构的高度和重量调整杆件高度和截面规格。施工人员通过定位块来控制安装精度,通过上弦托梁辅助树形钢柱分枝就位。钢柱分枝就位后,就可脱钩,提高了吊装作业的效率;尤其是在结构吊次多,吊装设备少的情况下,可调多变式胎架组合系统拼装支撑技术能够大大提高吊机的吊装效率,满足日常吊次的需求。
附图说明
图1为本发明钢架及中央胎架结构示意图;
图2为树状钢柱施工过程示意图;
图3为本发明树状钢柱拼装胎架组合系统结构图;
图4为本发明树状钢柱拼装胎架组合系统结构图;
附图标记:1-钢柱、2-小平台、3-大平台、4-中央胎架、5-长方形拼装胎架、51-定位块、52-上弦托梁、53-立杆、54-下弦胎架杆、6-投影线、7-分枝杆件、8-盖板、9-调节螺杆。
具体实施方式
如图1-2所示,长方形拼装胎架5包括左右两根立杆53、立杆53内侧翼缘板开有定位孔。两根立杆53之间连接有下弦胎架杆54。下弦胎架杆54位于立杆53下部。两根立杆53之间通过连接孔连接上弦托梁52,上弦托梁52的高度可根据分枝杆件7的高度调整,只需变换连接孔即可实现分枝杆件7高度的主调。上弦托梁52上翼缘板上开有定位孔,定位孔连接用于控制分枝杆件7位置的定位块51,定位块51可实现调节分枝杆件7连接的角度。长方形胎架背部可设置撑杆,撑杆顶部可设置空心丝杆,可实现分枝杆件7高度及角度的微调。胎架组合系统中部设有中央胎架4,中央胎架4上部设有大平台3,大平台3上设有小平台2,小平台2的四个角底部分别设有可供调节高度的调节螺杆9。小平台2上可作为钢柱1拼装之用。立杆53、下弦胎架杆54、上弦托梁52可为 H 型钢或工字钢,撑杆可为钢管。
本发明的树状钢柱拼装施工过程如下:
步骤一:长方形拼装胎架及中央胎架的制作,制作可调节的大平台及小平台,通过大、小平台找平钢柱1水平度,钢柱在铸造时需标识各向轴线和基准点,参见图2所示。
步骤二:以钢柱为中心,放出分枝杆件7的投影线,参见图2所示。
步骤三:根据投影位置确定钢柱分枝杆件7及长方形拼装胎架5的位置,钢柱分枝杆件7及长方形拼装胎架5的高度通过计算机三维模拟计算可知,参见图3所示。
步骤四:通过汽车吊吊装方形拼装胎架5及中央胎架4,施工人员辅助就位,同时测量人员负责观测分枝杆件7水平盖板中心线的轴线、标高及水平度,参见图4所示。
步骤五:调节分枝杆件7与钢柱对接口适量调整焊缝间隙,根据设计要求焊接连接分枝杆件7及钢柱1。
本发明涉及的这种树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法,高度可调,角度可调,能够更好的控制组装、吊装质量及安全,解决了树状钢柱分枝因各向异性而导致的定位组装问题,满足了日益提高的工程质量、节能环保的施工要求。可广泛应用于树状钢柱等空间杆件各向异性钢结构拼装施工领域。
本发明所述的具体实施方式并不构成对本申请范围的限制,凡是在本发明构思的精神和原则之内,本领域的专业人员能够作出的任何修改、等同替换和改进等均应包含在本发明的保护范围之内。
Claims (2)
1.一种树状钢柱施工拼装胎架组合系统,其特征在于,所述胎架组合系统主要由中央胎架及数个位列于中央胎架周围的长方形拼装胎架组成;长方形拼装胎架包括左右两根立杆、垂直连接于立杆之间的上弦托梁和下弦胎架杆;立杆内侧翼缘板上开有数个竖直方向的连接孔,上弦托梁通过连接孔连接固定于立杆;所述上弦托梁的上翼缘板开有定位孔,定位孔处固定有定位块;下弦胎架杆位于上弦托梁的下方;所述胎架组合系统中部设有胎架,胎架上部设有大平台,大平台上设有小平台,小平台的四个角底部分别设有可供调节小平台高度的螺杆。
2.一种树状钢柱拼装施工方法,其特征在于,所述施工方法的步骤如下:
步骤一:长方形拼装胎架及中央胎架的制作,制作可调节的大平台与小平台,大小平台之间通过调节螺杆连接,通过调节螺杆找平钢柱水平度,钢柱在铸造时需标识各向轴线和基准点;
步骤二:以钢柱为中心,放出分枝杆件的投影线;
步骤三:根据投影位置确定钢柱分枝杆件及长方形拼装胎架位置,钢柱分枝胎架的高度通过计算机三维模拟计算可知;
步骤四:通过汽车吊吊装分枝杆件及长方形拼装胎架,施工人员辅助对就位,同时测量人员负责观测钢柱分枝杆件水平盖板中心线的轴线、标高及水平度;
步骤五:调节分枝杆件与钢柱对接口适量调整焊缝间隙,根据设计要求焊接连接分枝杆件及钢柱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310167122.5A CN103266780B (zh) | 2013-05-08 | 2013-05-08 | 树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310167122.5A CN103266780B (zh) | 2013-05-08 | 2013-05-08 | 树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103266780A true CN103266780A (zh) | 2013-08-28 |
CN103266780B CN103266780B (zh) | 2015-10-07 |
Family
ID=49010434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310167122.5A Expired - Fee Related CN103266780B (zh) | 2013-05-08 | 2013-05-08 | 树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103266780B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005564A (zh) * | 2014-05-13 | 2014-08-27 | 南通晋弘钢结构工程有限公司 | 一种大型钢管斜立柱的安装工艺 |
CN114016756A (zh) * | 2021-12-14 | 2022-02-08 | 中建八局第二建设有限公司 | 一种钢结构转换胎架及制作方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11336327A (ja) * | 1998-05-26 | 1999-12-07 | Daiwa House Ind Co Ltd | 鉄骨造・rc造複合構造建物の構築方法およびその型枠 |
CN101936055A (zh) * | 2010-08-27 | 2011-01-05 | 江苏沪宁钢机股份有限公司 | 一种组合钢柱及其制作方法 |
CN102777047A (zh) * | 2012-08-22 | 2012-11-14 | 河北二十冶工程技术有限公司 | 大跨度管桁架屋面梁的组拼安装方法 |
CN203223004U (zh) * | 2013-05-08 | 2013-10-02 | 北京城建精工钢结构工程有限公司 | 树状钢柱施工拼装胎架组合系统 |
-
2013
- 2013-05-08 CN CN201310167122.5A patent/CN103266780B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11336327A (ja) * | 1998-05-26 | 1999-12-07 | Daiwa House Ind Co Ltd | 鉄骨造・rc造複合構造建物の構築方法およびその型枠 |
CN101936055A (zh) * | 2010-08-27 | 2011-01-05 | 江苏沪宁钢机股份有限公司 | 一种组合钢柱及其制作方法 |
CN102777047A (zh) * | 2012-08-22 | 2012-11-14 | 河北二十冶工程技术有限公司 | 大跨度管桁架屋面梁的组拼安装方法 |
CN203223004U (zh) * | 2013-05-08 | 2013-10-02 | 北京城建精工钢结构工程有限公司 | 树状钢柱施工拼装胎架组合系统 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005564A (zh) * | 2014-05-13 | 2014-08-27 | 南通晋弘钢结构工程有限公司 | 一种大型钢管斜立柱的安装工艺 |
CN104005564B (zh) * | 2014-05-13 | 2016-03-02 | 南通晋弘钢结构工程有限公司 | 一种大型钢管斜立柱的安装工艺 |
CN114016756A (zh) * | 2021-12-14 | 2022-02-08 | 中建八局第二建设有限公司 | 一种钢结构转换胎架及制作方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103266780B (zh) | 2015-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635209B (zh) | 仿古建筑大屋顶大跨度飞檐斗拱钢骨架及其施工工法 | |
CN201771197U (zh) | 一种具有标高调节功能的拼装胎架 | |
CN104110140B (zh) | 一种网架节点定位调节装置及定位调节方法 | |
CN104631684A (zh) | 基于混凝土建筑的单层网壳钢结构屋面系统及其组装方法 | |
CN103556836A (zh) | 受限空间条件下球形网壳拼装施工方法 | |
CN104674665B (zh) | 大空间钢结构连廊桥安装方法 | |
CN114086669B (zh) | 一种大型空间异形曲面钢网架模块化快速建造方法 | |
CN102296858A (zh) | 水泥生产线熟料储存库屋面钢结构及其施工方法 | |
CN102179651A (zh) | 超大焊接球网架现场平面桁架及立体分段的拼装方法 | |
CN109057366A (zh) | 一种钢结构旋转楼梯分段拼装方法 | |
CN113123469A (zh) | 复杂曲面造型屋面网架结构施设方法 | |
CN108952178B (zh) | 一种不规则自由曲面钢屋盖的双向角位移累积提升方法 | |
CN205857035U (zh) | 一种预制立柱与承台的拼装定位装置 | |
CN208202597U (zh) | 大跨度弧形桁架安装用支撑胎架 | |
CN105951600A (zh) | 一种预制立柱与承台的拼装定位方法和装置 | |
CN206646835U (zh) | 一种自提升式钢结构滑移措施支架 | |
CN205852606U (zh) | 三维空间管桁架拼装胎架 | |
CN209227583U (zh) | 钢结构厂房独立基础短柱组装结构 | |
CN103266780A (zh) | 树状钢柱拼装胎架组合系统及树状钢柱拼装施工方法 | |
CN106760275A (zh) | 采用组合支架安装不锈钢旋转楼梯的施工方法 | |
CN203867201U (zh) | 钢结构拼装可调式工装胎架 | |
CN203223004U (zh) | 树状钢柱施工拼装胎架组合系统 | |
CN104196165B (zh) | 一种超大型多腔钢结构巨柱及其制作方法 | |
CN109763660B (zh) | 一种双球嵌套网架施工方法 | |
CN204645668U (zh) | 一种网架安装型钢支撑架的顶部支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151007 Termination date: 20170508 |
|
CF01 | Termination of patent right due to non-payment of annual fee |