CN103217585A - 一种t型输电线路正序电容测量方法 - Google Patents

一种t型输电线路正序电容测量方法 Download PDF

Info

Publication number
CN103217585A
CN103217585A CN2013100865079A CN201310086507A CN103217585A CN 103217585 A CN103217585 A CN 103217585A CN 2013100865079 A CN2013100865079 A CN 2013100865079A CN 201310086507 A CN201310086507 A CN 201310086507A CN 103217585 A CN103217585 A CN 103217585A
Authority
CN
China
Prior art keywords
positive sequence
circuit
transmission line
electricity
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100865079A
Other languages
English (en)
Inventor
张源森
崔德民
曹清涛
柴永强
刘鹏
李晓博
胡志坚
张承学
李传奇
王晶
陈世纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Wuhan University WHU
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU, Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Wuhan University WHU
Priority to CN2013100865079A priority Critical patent/CN103217585A/zh
Publication of CN103217585A publication Critical patent/CN103217585A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种T型输电线路正序电容测量方法,具体为:将待测T型输电线路停电,依次在T型输电线路三个分支线路首端加正序电压,其余未加压分支线路末端三相开路,将加压端得到的正序电压和正序电流数据通过傅里叶算法得到正序基波电压相量和正序基波电流相量,再通过正序基波电压相量和正序基波电流相量的关系式,求解出T型输电线路各分支线路的正序电容参数。本发明方法改善了现有测量方法的不足,提高了T型输电线路正序电容参数测量结果的精度。

Description

一种T型输电线路正序电容测量方法
技术领域
本发明属于电力系统测量技术领域,特别是涉及一种T型输电线路正序电容测量方法。
背景技术
输电线路是电力系统主要的组成部分之一,也是电力输送的载体,在电力系统中所起的作用极大。
输电线路的参数主要指其工频参数,它包括正序阻抗、零序阻抗、正序电容、零序电容以及多回线路之间的耦合电容和互感阻抗等,这些参数主要用于电力系统故障分析、潮流计算、短路电流计算、继电保护整定计算以及选择电力系统运行方式等,这些线路参数是在工作之前建立电力系统数学模型的必备参数,没有准确的线路参数很难保证上述计算的正确,就无法保证装置的正确动作,进而影响到电力系统的正常运行。
随着近年我国电力系统的不断发展壮大,电力负荷的增长和国内电网密度的增加,由于客观条件限制,为节约线路走廊和经济投资等诸多方面考虑,电网结构越来越复杂,T型输电线路越来越多地出现在高压电力网中,即使随着电网建设和改造的推进,一次电网结构更加合理化,但出于经济性等因素的考虑,我国110kV电网中的T型输电线路仍大量存在。T接线一种特殊的接线形式,准确获得其输电线路参数,对电网安全稳定运行意义重大。因此,研究理论上正确,实践中可行的T型输电线路参数测量方法不仅具有重要的理论价值,而且具有很大的经济效益与社会效益。
发明内容
本发明的目的在于,克服现有方法在测量T型输电线路正序电容参数的不足,提出了一种T型输电线路正序电容参数的新测量方法。
为实现本发明的目的,本发明提供的技术方案是:
一种T型输电线路正序电容参数测量方法,包括以下步骤:
步骤1:选择停电测量待测T型输电线路,所述T型输电线路由第一线路、第二线路和第三线路组成。
测量接线如附图1所示。
开始测量,测量方式如下:
1)T型输电线路第二线路和第三线路末端分别三相开路,在第一线路首端加三相正序测试电压源,分别测量第一线路首端的正序电压和正序电流;
2)T型输电线路第一线路和第三线路末端分别三相开路,在第二线路首端加三相正序测试电压源,分别测量第二线路首端的正序电压和正序电流;
3)T型输电线路第一线路和第二线路末端分别三相开路,在第三线路首端加三相正序测试电压源,分别测量第三线路首端的正序电压和正序电流。
步骤2:对步骤1所得每个独立测量方式下测量得到的正序电压数据和正序电流数据,采用傅里叶算法得到该独立测量方式下首端的正序基波电压相量和正序基波电流相量;再根据三个独立测量方式下首端的正序基波电压相量和正序基波电流相量,将T型输电线路三个线路的正序电容参数求解出来。
步骤2中,T型输电线路三个线路的正序电容参数求解过程如下:
基于集中参数模型的T型输电线路T形等效电路模型如附图2所示。
为使数学方程式简化,直接采用每条线路正序阻抗的一半ZN1(N=1、2、3),每条线路对地电纳yN1(N=1、2、3)的倒数YN1(N=1、2、3)来进行数学运算。
根据附图3列写T接线路的正序电压、正序电流关系方程:
U · 11 I · 11 = [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) Z 21 + Y 21 + Z 31 + Y 31 + Z 11 ] * Y 11 [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) Z 21 + Y 21 + Z 31 + Y 31 + Z 11 ] + Y 11 + Z 11 U · 21 I · 21 = [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) Z 11 + Y 11 + Z 31 + Y 31 + Z 21 ] * Y 21 [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) Z 11 + Y 11 + Z 31 + Y 31 + Z 21 ] + Y 21 + Z 21 U · 31 I · 31 = [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) Z 11 + Y 11 + Z 21 + Y 21 + Z 31 ] * Y 31 [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) Z 11 + Y 11 + Z 21 + Y 21 + Z 31 ] + Y 31 + Z 31 - - - ( 1 )
式(1)中,Z11为T接线第一线路正序阻抗的1/2,Z21为T接线第二线路正序阻抗的1/2,Z31为T接线第三线路正序阻抗的1/2,Z11、Z21和Z31均为已知量。Y11为T接线第一线路正序电纳y11的倒数,Y21为T接线第二线路正序电纳y21的倒数,Y31为T接线第三线路正序电纳y31的倒数。
Figure BDA00002931869800032
为第一线路加压时第一线路端点处正序电压测量相量值,
Figure BDA00002931869800033
为第一线路加压时第一线路端点处正序电流测量相量值,
Figure BDA00002931869800041
为第二线路加压时第二线路端点处正序电压测量相量值,
Figure BDA00002931869800042
为第二线路加压时第二线路端点处正序电流测量相量值,为第三线路加压时第三线路端点处正序电压测量相量值,
Figure BDA00002931869800044
为第三线路加压时第三线路端点处正序电流测量相量值。
对(1)式去分母整理得:
U · 11 I · 11 = Y 11 [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) + Z 11 ( Z 21 + Y 21 + Z 31 + Y 31 ) ] ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) + ( Z 11 + Y 11 ) ( Z 21 + Y 21 + Z 31 + Y 31 ) + Z 11 U · 21 I · 21 = Y 21 [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) + Z 21 ( Z 11 + Y 11 + Z 31 + Y 31 ) ] ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) + ( Z 21 + Y 21 ) ( Z 11 + Y 11 + Z 31 + Y 31 ) + Z 21 U · 31 I · 31 = Y 31 [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) + Z 31 ( Z 11 + Y 11 + Z 21 + Y 21 ) ] ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) + ( Z 31 + Y 31 ) ( Z 11 + Y 11 + Z 21 + Y 21 ) + Z 31 - - - ( 2 )
继续化简:
U · 11 I · 11 = Z 11 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 + Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 11 Y 31 + ( Z 11 Z 31 ) Y 11 Y 21 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 21 I · 21 = Z 21 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 Y 21 + ( Z 11 + Z 21 ) Y 21 Y 31 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 31 I · 31 = Z 31 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 31 + ( Z 11 + Z 31 ) Y 21 Y 31 + ( Z 21 + Z 31 ) Y 11 Y 31 ) + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 - - - ( 3 )
先对上述非线性方程组(3),利用数值计算方法计算出Y11,Y21和Y31的数值解。
再通过下列运算即可得各线路单位长度正序电容如式(4)所示。
C 11 = 1 wl 1 Im ( 1 Y 11 ) C 21 = 1 wl 2 Im ( 1 Y 21 ) C 31 = 1 wl 3 Im ( 1 Y 31 ) - - - ( 4 )
式(4)中,C11为T接线第一线路单位长度正序电容值,l1为T接线第一线路的长度,C21为T接线第二线路单位长度正序电容值,l2为T接线第二线路的长度,C31为T接线第三线路单位长度正序电容值,l3为T接线第三线路的长度,w=2πf,f为电力系统频率,单位为Hz,Im(·)为表示取相量的虚部分量。
本发明通过三种独立运行方式,测量T型输电线路首端的正序电压和正序电流数据,再利用傅里叶变化得到正序基波电压相量和正序基波电流相量,建立电压和电流之间的关系式,得到T型输电线路所有分支的正序电容参数。
与现有技术相比,本发明具有以下优点及积极效果:
1.本发明适合于所有T型输电线路正序电容参数的测量;
2.本发明所涉及的独立运行方式易于实现,方便简单。
附图说明
图1为T型输电线路正序电容参数测量接线图;
图2为基于集中参数模型的T型输电线路T形等效电路模型示意图;
图3为T型输电线路正序电容参数测量示意图。
具体实施方式
以下结合附图和实施例详细说明本发明技术方案。
实施例包括以下步骤:
步骤1,选择停电测量待测T型输电线路,所述T型输电线路由第一线路、第二线路和第三线路组成。
测量方式如下:
1)T型输电线路第二线路和第三线路末端分别三相开路,在第一线路首端加三相正序测试电压源,分别测量第一线路首端的正序电压和正序电流;
2)T型输电线路第一线路和第三线路末端分别三相开路,在第二线路首端加三相正序测试电压源,分别测量第二线路首端的正序电压和正序电流;
3)T型输电线路第一线路和第二线路末端分别三相开路,在第三线路首端加三相正序测试电压源,分别测量第三线路首端的正序电压和正序电流。
步骤2,对步骤1所得每个独立测量方式下测量得到的正序电压测量数据和正序电流测量数据,采用傅里叶算法得到该独立测量方式下首端的正序基波电压相量和正序基波电流相量;再根据三个独立测量方式下首端的正序基波电压相量和正序基波电流相量。
实施例在将步骤1中选择的三独立测量方式下的测量完成后,将各种独立测量方式下所得测量数据保存成的文件汇总到一台计算机中,在各独立测量方式下,采用傅立叶算法来得到该独立测量方式下T型输电第三线路条分支线路首端的正序基波电压相量和正序基波电流相量,然后进行正序电容参数求解。傅立叶算法为现有技术,本发明不予赘述。
实施例T型输电线路的正序电容参数求解过程如下:
列写T接线路正序电压、正序电流的关系方程:
U · 11 I · 11 = [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) Z 21 + Y 21 + Z 31 + Y 31 + Z 11 ] * Y 11 [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) Z 21 + Y 21 + Z 31 + Y 31 + Z 11 ] + Y 11 + Z 11 U · 21 I · 21 = [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) Z 11 + Y 11 + Z 31 + Y 31 + Z 21 ] * Y 21 [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) Z 11 + Y 11 + Z 31 + Y 31 + Z 21 ] + Y 21 + Z 21 U · 31 I · 31 = [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) Z 11 + Y 11 + Z 21 + Y 21 + Z 31 ] * Y 31 [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) Z 11 + Y 11 + Z 21 + Y 21 + Z 31 ] + Y 31 + Z 31 - - - ( 1 )
对(1)式去分母整理得:
U · 11 I · 11 = Y 11 [ ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) + Z 11 ( Z 21 + Y 21 + Z 31 + Y 31 ) ] ( Z 21 + Y 21 ) ( Z 31 + Y 31 ) + ( Z 11 + Y 11 ) ( Z 21 + Y 21 + Z 31 + Y 31 ) + Z 11 U · 21 I · 21 = Y 21 [ ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) + Z 21 ( Z 11 + Y 11 + Z 31 + Y 31 ) ] ( Z 11 + Y 11 ) ( Z 31 + Y 31 ) + ( Z 21 + Y 21 ) ( Z 11 + Y 11 + Z 31 + Y 31 ) + Z 21 U · 31 I · 31 = Y 31 [ ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) + Z 31 ( Z 11 + Y 11 + Z 21 + Y 21 ) ] ( Z 11 + Y 11 ) ( Z 21 + Y 21 ) + ( Z 31 + Y 31 ) ( Z 11 + Y 11 + Z 21 + Y 21 ) + Z 31 - - - ( 2 )
继续化简:
U · 11 I · 11 = Z 11 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 + Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 11 Y 31 + ( Z 11 Z 31 ) Y 11 Y 21 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 21 I · 21 = Z 21 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 Y 21 + ( Z 11 + Z 21 ) Y 21 Y 31 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 31 I · 31 = Z 31 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 31 + ( Z 11 + Z 31 ) Y 21 Y 31 + ( Z 21 + Z 31 ) Y 11 Y 31 ) + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 - - - ( 3 )
解非线性方程组(3),得到Y11,Y21,Y31的数值解。
再通过下列运算即可得各线路单位长度正序电容如式(4)所示。
C 11 = 1 wl 1 Im ( 1 Y 11 ) C 21 = 1 wl 2 Im ( 1 Y 21 ) C 31 = 1 wl 3 Im ( 1 Y 31 ) - - - ( 4 )
下面将结合实施例进一步说明本发明的应用。
为说明本发明效果起见,以不同情况下的T型输电线路为进行验证分析。
1.T型输电线路三个分支线路完全相同,包括各线路正序电容参数相同和各线路长度相同。仿真计算结果的相对误差如表1所示。
表1T型输电线路各线路长度相同、参数相同时的正序电容
Figure BDA00002931869800082
2.T型输电线路三个分支线路完全不相同,包括各线路的正序电容参数不相同和各线路长度不相同。仿真计算结果的相对误差如表2所示。
表2T接线三线路参数不同、长度不同正序电容仿真结果及误差
Figure BDA00002931869800091
从表1和表2可以看出,本发明适用于各种情况下的T型输电线路正序电容参数的测量。
本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。

Claims (2)

1.一种T型输电线路正序电容测量方法,其特征在于,测量包括以下步骤:
步骤1,选择停电测量待测T型输电线路,定义T型输电线路由第一线路、第二线路和第三线路组成;开始测量,测量方式如下:
1),T型输电线路第二线路和第三线路末端分别三相开路,在第一线路首端加三相正序测试电压源,分别测量第一线路首端的正序电压和正序电流;
2),T型输电线路第一线路和第三线路末端分别三相开路,在第二线路首端加三相正序测试电压源,分别测量第二线路首端的正序电压和正序电流;
3),T型输电线路第一线路和第二线路末端分别三相开路,在第三线路首端加三相正序测试电压源,分别测量第三线路首端的正序电压和正序电流;
步骤2,对步骤1所得每个独立测量方式下测量得到的正序电压数据和正序电流数据,采用傅里叶算法得到该独立测量方式下首端的正序基波电压相量和正序基波电流相量;再根据三个独立测量方式下首端的正序基波电压相量和正序基波电流相量,将T型输电线路三个线路的正序电容参数C11,C21,C31求解出来,并根据得到的三个线路的正序电容参数即得到三个线路的正序电容。
2.根据权利要求1所述的一种T型输电线路正序电容测量方法,其特征在于,所述步骤2中,T型输电线路三个线路的正序电容参数求解过程如下:定义每条线路正序阻抗的一半为ZN1(N=1、2、3),其值为已知量,每条线路对地电纳yN1(N=1、2、3)的倒数为YN1(N=1、2、3)来进行数学运算;
先对下述非线性方程组,利用数值计算方法计算出Y11,Y21和Y31的数值解,
U · 11 I · 11 = Z 11 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 + Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 11 Y 31 + ( Z 11 Z 31 ) Y 11 Y 21 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 21 I · 21 = Z 21 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 Y 21 + ( Z 11 + Z 21 ) Y 21 Y 31 + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31 U · 31 I · 31 = Z 31 + ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 31 + ( Z 11 + Z 31 ) Y 21 Y 31 + ( Z 21 + Z 31 ) Y 11 Y 31 ) + Y 11 Y 21 Y 31 ( Z 11 Z 21 + Z 21 Z 31 + Z 11 Z 31 ) Y 11 + ( Z 11 + Z 21 ) Y 31 + ( Z 11 + Z 31 ) Y 21 + ( Z 21 + Z 31 ) Y 11 + Y 11 Y 21 + Y 21 Y 31 + Y 11 Y 31
式中,为第一线路加压时第一线路端点处正序电压测量相量值,
Figure FDA00002931869700023
为第一线路加压时第一线路端点处正序电流测量相量值,
Figure FDA00002931869700024
为第二线路加压时第二线路端点处正序电压测量相量值,
Figure FDA00002931869700025
为第二线路加压时第二线路端点处正序电流测量相量值,
Figure FDA00002931869700026
为第三线路加压时第三线路端点处正序电压测量相量值,
Figure FDA00002931869700027
为第三线路加压时第三线路端点处正序电流测量相量值;
然后基于下述公式获得各线路单位长度正序电容:
C 11 = 1 wl 1 Im ( 1 Y 11 ) C 21 = 1 wl 2 Im ( 1 Y 21 ) C 31 = 1 wl 3 Im ( 1 Y 31 )
式中,C11为T接线第一线路单位长度正序电容值,l1为T接线第一线路的长度,C21为T接线第二线路单位长度正序电容值,l2为T接线第二线路的长度,C31为T接线第三线路单位长度正序电容值,l3为T接线第三线路的长度,w=2πf,f为电力系统频率,单位为Hz,Im(·)为表示取相量的虚部分量。
CN2013100865079A 2013-03-18 2013-03-18 一种t型输电线路正序电容测量方法 Pending CN103217585A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100865079A CN103217585A (zh) 2013-03-18 2013-03-18 一种t型输电线路正序电容测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100865079A CN103217585A (zh) 2013-03-18 2013-03-18 一种t型输电线路正序电容测量方法

Publications (1)

Publication Number Publication Date
CN103217585A true CN103217585A (zh) 2013-07-24

Family

ID=48815547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100865079A Pending CN103217585A (zh) 2013-03-18 2013-03-18 一种t型输电线路正序电容测量方法

Country Status (1)

Country Link
CN (1) CN103217585A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104007321A (zh) * 2014-06-17 2014-08-27 华北电力大学(保定) 一种无功补偿电容器组的参数在线辨识方法
CN106324347A (zh) * 2015-06-16 2017-01-11 云南电网有限责任公司玉溪供电局 T型接线输电线路工频正序阻抗测量方法
CN107153142A (zh) * 2017-05-23 2017-09-12 武汉大学 一种三相不对称t型输电线路参数测量方法
CN107870265A (zh) * 2017-05-19 2018-04-03 中国矿业大学 一种基于高精度dft的电网对地电容检测方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034117A (zh) * 2007-04-02 2007-09-12 武汉大学 输电线路工频参数测量方法及装置
CN101135709A (zh) * 2007-10-11 2008-03-05 武汉大学 一种含t型接线互感线路零序阻抗参数带电测量方法及装置
CN101419254A (zh) * 2008-12-17 2009-04-29 河南电力试验研究院 一种特高压输电线路参数测量系统及方法
CN102129009A (zh) * 2011-01-10 2011-07-20 武汉大学 基于双端测量信息的特高压输电线路正序参数测量方法
CN102323488A (zh) * 2011-05-30 2012-01-18 武汉大学 一种基于谐波分量的输电线路正序电容抗干扰测量方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034117A (zh) * 2007-04-02 2007-09-12 武汉大学 输电线路工频参数测量方法及装置
CN101135709A (zh) * 2007-10-11 2008-03-05 武汉大学 一种含t型接线互感线路零序阻抗参数带电测量方法及装置
CN101419254A (zh) * 2008-12-17 2009-04-29 河南电力试验研究院 一种特高压输电线路参数测量系统及方法
CN102129009A (zh) * 2011-01-10 2011-07-20 武汉大学 基于双端测量信息的特高压输电线路正序参数测量方法
CN102323488A (zh) * 2011-05-30 2012-01-18 武汉大学 一种基于谐波分量的输电线路正序电容抗干扰测量方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李炜等: "利用电压及电流双端测量信息的高压输电线路正序参数测量方法及应用", 《电网技术》, vol. 35, no. 4, 30 April 2011 (2011-04-30), pages 103 - 107 *
白日昶等: "高压架空输电线路工频正序参数测量方法仿真", 《电力自动化设备》, vol. 31, no. 2, 28 February 2011 (2011-02-28), pages 68 - 71 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104007321A (zh) * 2014-06-17 2014-08-27 华北电力大学(保定) 一种无功补偿电容器组的参数在线辨识方法
CN104007321B (zh) * 2014-06-17 2016-06-08 华北电力大学(保定) 一种无功补偿电容器组的参数在线辨识方法
CN106324347A (zh) * 2015-06-16 2017-01-11 云南电网有限责任公司玉溪供电局 T型接线输电线路工频正序阻抗测量方法
CN106324347B (zh) * 2015-06-16 2019-01-25 云南电网有限责任公司玉溪供电局 T型接线输电线路工频正序阻抗测量方法
CN107870265A (zh) * 2017-05-19 2018-04-03 中国矿业大学 一种基于高精度dft的电网对地电容检测方法
CN107870265B (zh) * 2017-05-19 2019-05-21 中国矿业大学 一种基于高精度dft的电网对地电容检测方法
CN107153142A (zh) * 2017-05-23 2017-09-12 武汉大学 一种三相不对称t型输电线路参数测量方法
CN107153142B (zh) * 2017-05-23 2020-01-07 武汉大学 一种三相不对称t型输电线路参数测量方法

Similar Documents

Publication Publication Date Title
CN103308823B (zh) 一种配电网单相断线不接地故障定位方法
CN103792465B (zh) 一种基于零序电压的配电网单相接地故障测距的方法
CN102129009B (zh) 基于双端测量信息的特高压输电线路正序参数测量方法
CN101505061B (zh) 一种基于时域仿真的戴维南等值参数跟踪的计算方法
CN104898021B (zh) 一种基于k‑means聚类分析的配电网故障选线方法
CN103870703B (zh) 一种基于戴维南等值参数跟踪的动态短路比计算方法
CN105137278A (zh) 基于sogi的单相变压器短路参数在线实时辨识方法
CN104020370A (zh) 基于虚拟参数变化监视的变压器内部故障诊断方法
CN103020726A (zh) 面向全pmu量测的抗差状态估计方法
CN107248736A (zh) 一种配电网线路正序参数的在线辨识方法
CN104237677B (zh) 220kV及以上电网单回输电线路零序参数在线辨识方法
CN103217585A (zh) 一种t型输电线路正序电容测量方法
CN107609802A (zh) 一种含多馈入直流的交直流混联电力系统功率/电压稳定裕度评估方法
CN104730416A (zh) 一种以电流突变量为极化量的输电线路单端测距方法
CN104865498A (zh) 基于参数辨识的消弧线圈接地系统单相接地故障测距技术
CN102788903A (zh) 一种高压输电线路三相不对称工频参数实测方法
CN103972889B (zh) 一种配电线路阻抗在线辨识方法
CN104111381A (zh) 一种35kV高压并联电力电容器组介损在线监测装置
CN106229970A (zh) 基于换流器控制特性的微电网状态估计方法
CN103675560A (zh) 一种高压直流输电系统直流侧滤波器失谐的在线辨识方法
CN104122452A (zh) 基于多次同步异频法的大型地网工频接地阻抗测量方法
CN105182187A (zh) 基于定位函数的配电网馈线相间故障测距方法
CN102735993B (zh) 一种线路保护双端测距的方法
CN105203877B (zh) 能够消除量测误差影响的单回输电线路零序参数辨识方法
CN104865452B (zh) 基于谐波分量的不换位输电线路电容抗干扰测量方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130724