CN103174166B - 一种成套整体安装的游乐设施预埋件及其安装方法 - Google Patents

一种成套整体安装的游乐设施预埋件及其安装方法 Download PDF

Info

Publication number
CN103174166B
CN103174166B CN201310101106.6A CN201310101106A CN103174166B CN 103174166 B CN103174166 B CN 103174166B CN 201310101106 A CN201310101106 A CN 201310101106A CN 103174166 B CN103174166 B CN 103174166B
Authority
CN
China
Prior art keywords
fitting
recreation facility
mould plate
nut
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310101106.6A
Other languages
English (en)
Other versions
CN103174166A (zh
Inventor
王月栋
曾昭波
赵旭
侯兆新
马晓明
徐国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Metallurgical Construction Research Institute (Shenzhen) Co., Ltd.
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201310101106.6A priority Critical patent/CN103174166B/zh
Publication of CN103174166A publication Critical patent/CN103174166A/zh
Application granted granted Critical
Publication of CN103174166B publication Critical patent/CN103174166B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种成套整体安装的游乐设施预埋件,它包括上部钢模板、下部钢模板和若干个地脚螺栓,该上部钢模板和下部钢模板平行设置,该地脚螺栓穿设于该上部钢模板和下部钢模板并分别与该上部钢模板和下部钢模板垂直;该地脚螺栓上依次设有上固定螺母、上限位螺母、下固定螺母和下限位螺母。本发明可以广泛应用于大型游乐设施钢结构的柱脚底板连接预埋,其地脚螺栓整体预埋,可以有效减少螺栓安装次数,提高安装精度和速度,避免或减少安装误差,从而减少了预埋件安装工作量,为大型游乐设施预埋件提供了一种新的选择,促进大型游乐设施预埋件的发展,具有广泛的推广前景。

Description

一种成套整体安装的游乐设施预埋件及其安装方法
技术领域
本发明属于建筑工程技术领域,特别涉及一种成套整体安装的游乐设施预埋件及其安装方法。
背景技术
随着旅游地产经济的高速发展,人们对大型游乐场的需求也越来越高。一些像过山车、激流勇进、海盗船等大型游乐设备也有很大发展。基于安全因素,这些大型游乐设备底部需要安装预埋件。对于这种大型游乐设施底部预埋件安装,目前国内主要采用的连接方法,是通过地脚螺栓在设备基础预先埋设,再与柱脚底板连接。传统预埋的方法中,每个地脚螺栓都要单独放线和定位,大型游乐设施的埋件数量多,精度要求苛刻,采用传统安装方法,定位放线工作量大,又容易产生误差,势必造成了整体安装进度缓慢的问题。要使地脚螺栓精确定位并对其安装误差进行控制,则必须进行六维控制,进而加大了施工难度。总的来说,对于高精度预埋件,采用单独地脚螺栓预埋,测量和调整难度大,容易产生误差,安装比较缓慢。
发明内容
为了克服传统预埋方法中的上述缺陷,本发明的目的在于提供一种成套整体安装的游乐设施预埋件,可以有效减少地脚螺栓安装的次数,提高安装精度和速度,避免或减少安装误差,从而减少预埋件安装工作量。
本发明的另一目的在于提供一种上述成套整体安装的游乐设施预埋件的安装方法,其安装精度高,定位简单,从而减少了安装的工作量。
为实现上述目的,本发明采用以下技术方案:
一种成套整体安装的游乐设施预埋件,它包括上部钢模板、下部钢模板和若干个地脚螺栓,该上部钢模板和下部钢模板平行设置,该地脚螺栓穿设于该上部钢模板和下部钢模板并分别与该上部钢模板和下部钢模板垂直;该地脚螺栓上依次设有上固定螺母、上限位螺母、下固定螺母和下限位螺母;
所述下部钢模板底部中央设有抗剪板板槽;该抗剪板板槽外部设有包覆层。
所述地脚螺栓底部设有锚固螺母。
所述地脚螺栓均为通长带有丝扣的锚栓。
所述包覆层为聚苯板。
所述上部钢模板、下部钢模板为方形、圆形或与游乐设施底座相对应的异型。
所述上部钢模板、下部钢模板采用Q235厚10mm的钢板,钢板上设有螺栓孔,所述地脚螺栓对应设于该螺栓孔内。
所述下固定螺母和下限位螺母与所述下部钢模板之间均设有垫片。
一种如上述的成套整体安装的游乐设施预埋件的安装方法,它包括下列步骤:
先把定位钢筋焊在所述下部钢模板上,边测量边调整定位钢筋,直到满足坐标、标高和垂直度等定位要求后,迅速把定位钢筋焊接牢固;
在焊接冷却后对所述预埋件进行复测,变形较小时进行矫正,变形较大时返工重做直到复测合格;
复测合格后,在地脚螺栓的易生锈和易污染位置包裹塑料胶带;
绑扎钢筋并浇筑混凝土,并在混凝土初凝后及时进行复测浇筑,终凝时再次进行复测矫正;
待混凝土达到设计强度后,退去所述上固定螺母,拆除所述上部钢模板,退去所述上限位螺母;退去所述下固定螺母和下限位螺母,拆除所述下部钢模板并抽取出所述抗剪板板槽。
所述定位钢筋为D25的钢筋。
本发明的优点在于:
1、本发明采用成套整体安装的地脚螺栓,将多个地脚螺栓利用钢模板预拼装组合起来,形成了一个整体式的预埋件,并且可以预先留好抗剪板板槽。
2、这种整体式的预埋件不需要采用特殊的材料,钢模板的加工,地脚螺栓的安装和连接都较为容易,利用钢模板固定整个地脚螺栓组,能整体控制好每个地脚螺栓的定位和垂直度,具有很强的调节误差的能力;同时这种整体式的预埋件能适应精度要求高的大型游乐设施的要求。
3、本发明的整体式的预埋件能实现埋件整体一次定位,有效地减少传统方法中地脚螺栓的定位次数,降低了安装和调整误差的难度,缩短工期,达到了大幅节约工程成本的效果;
4、从材料成本来讲,本发明中,钢模板和抗剪板板槽可以重复利用,等待混凝土浇筑凝固后,可以拆除钢模板和抗剪板板槽,用于相同型号的预埋件中,能有效节省材料费用。
附图说明
图1为本发明成套整体安装的游乐设施预埋件的立面图一。
图2为本发明预埋件的立面图二。
图3为本发明预埋件的剖面图。
图4为本发明预埋件的3D模型示意图。
图5为本发明预埋安装时的3D模型示意图。
图6为本发明预埋安装后的3D模型示意图。
具体实施方式
以下将以具体实施例结合附图来说明本发明的结构和所欲达到的技术效果,但所选用的实施例仅用于说明解释,并非用以限制本发明的范围。
如图1-图4所示,本发明提供一种成套整体安装的游乐设施预埋件,它包括上部钢模板1、下部钢模板2和若干个地脚螺栓3,该上部钢模板1和下部钢模板2平行设置,该地脚螺栓3穿设于该上部钢模板1和下部钢模板2并分别与该上部钢模板和下部钢模板垂直。该上部钢模板1、下部钢模板2可以为方形、圆形或与游乐设施底座相对应的异型,采用Q235厚10mm的钢板,钢板上设有螺栓孔,该地脚螺栓3对应设于该螺栓孔内。
该地脚螺栓3上依次设有上固定螺母4、上限位螺母5、下固定螺母6和下限位螺母7。进一步的,该地脚螺栓3底部设有锚固螺母8,以增强地脚螺栓3的锚固作用。该地脚螺栓3均为通长带有丝扣的锚栓,因此各螺母可以在任意位置进行调整。该下固定螺母6和下限位螺母7与该下部钢模板2之间均设有垫片。
本发明的预埋件优选在该下部钢模板2底部中央设置抗剪板板槽9,该抗剪板板槽是利用3mm的钢板焊接成一个中空的钢板槽,焊接在下部钢模板2下方正中央。为了便于脱模,该抗剪板板槽9外部设有包覆层10,如聚苯板,用塑胶带固定在抗剪板板槽外部。
本发明的成套整体安装的游乐设施预埋件的安装方法,它包括下列步骤:
先把定位钢筋11(D25的钢筋)焊在该下部钢模板2上,边测量边调整定位钢筋,直到满足坐标、标高和垂直度等定位要求后,迅速把定位钢筋11焊接牢固。在焊接冷却后对该预埋件进行复测,变形较小时进行矫正,变形较大时返工重做直到复测合格。复测合格后,在地脚螺栓的易生锈和易污染位置包裹塑料胶带。绑扎钢筋并浇筑混凝土,并在混凝土初凝后及时进行复测浇筑,终凝时再次进行复测矫正。待混凝土达到设计强度后,退去该上固定螺母4,拆除该上部钢模板,退去上限位螺母5。退去该下固定螺母6和下限位螺母7,拆除该下部钢模板2并抽取出该抗剪板板槽9。
具体而言,在测量和计算完预埋件坐标数据后,开始对预埋件地脚螺栓组进行制做钢模和拼装。传统安装方法,地脚螺栓组在安装前各个螺栓是分散的,测量定位的工作量极大,精度难以控制,而本发明采用改进措施,利用上、下部钢模板将地脚螺栓组固定,然后作为一个整体进行安装。拼装前,需对预埋件的各个材料进行全面检查,合格后方可进行拼装。若钢模板在拼装过程中发生过大的平面变形,则需校正,校正后的地脚螺栓是垂直于钢模板的。
如图5、图6所示,本发明预埋件在安装时,遵循先定位埋件,后绑扎钢筋的原则,避免因钢筋过密,造成埋件定位的困难。需要采用D25的钢筋来做斜撑加固和辅助定位,避免混凝土浇筑时发生过大的变形和位移。先把2根D25的钢筋焊在下部钢模板上,作为定位钢筋,在安装过程中,边测量边调整定位钢筋,直到满足坐标,标高和垂直度等定位要求后,迅速把定位钢筋焊接牢固。为了确保安装精度,减少焊接变形的不利影响,在焊接冷却后应对成套预埋件进行复测,变形较小时须矫正,变形较大时则必须返工重做。
复查合格后,必须对半成品保护,在必要位置包裹塑料胶带,防止生锈和避免混凝土浇筑时,污染地脚螺栓。游乐设施基础浇筑混凝土时,应注意避免振动棒触碰与预埋件相连接的钢筋,在混凝土初凝后及时进行复测浇筑,终凝时再次进行复测矫正。待混凝土达到设计强度后,可以退去上固定螺母、上限位螺母,拆除该上部钢模板,退去该下固定螺母和下限位螺母,拆除该下部钢模板并抽取出该抗剪板板槽,移交给游乐设施上部结构安装,而钢模板和抗剪板板槽可以重复利用。
本发明可以广泛应用于大型游乐设施钢结构的柱脚底板连接预埋,其地脚螺栓整体预埋,可以有效减少螺栓安装次数,提高安装精度和速度,避免或减少安装误差,从而减少了预埋件安装工作量,为大型游乐设施预埋件提供了一种新的选择,促进大型游乐设施预埋件的发展,具有广泛的推广前景。
本发明是以所述的权利要求所限定的。但基于此,本领域的普通技术人员可以做出种种显然的变化或改动,都应在本发明的主要精神和保护范围之内。

Claims (9)

1.一种成套整体安装的游乐设施预埋件,其特征在于:它包括上部钢模板、下部钢模板和若干个地脚螺栓,该上部钢模板和下部钢模板平行设置,该地脚螺栓穿设于该上部钢模板和下部钢模板并分别与该上部钢模板和下部钢模板垂直;该地脚螺栓上依次设有上固定螺母、上限位螺母、下固定螺母和下限位螺母;
所述下部钢模板底部中央设有抗剪板板槽;该抗剪板板槽外部设有包覆层。
2.根据权利要求1所述的成套整体安装的游乐设施预埋件,其特征在于:所述地脚螺栓底部设有锚固螺母。
3.根据权利要求2所述的成套整体安装的游乐设施预埋件,其特征在于:所述地脚螺栓均为通长带有丝扣的锚栓。
4.根据权利要求1所述的成套整体安装的游乐设施预埋件,其特征在于:所述包覆层为聚苯板。
5.根据权利要求1所述的成套整体安装的游乐设施预埋件,其特征在于:所述上部钢模板、下部钢模板为方形、圆形或与游乐设施底座相对应的异型。
6.根据权利要求1或5所述的成套整体安装的游乐设施预埋件,其特征在于:所述上部钢模板、下部钢模板采用Q235厚10mm的钢板,钢板上设有螺栓孔,所述地脚螺栓对应设于该螺栓孔内。
7.根据权利要求1所述的成套整体安装的游乐设施预埋件,其特征在于:所述下固定螺母和下限位螺母与所述下部钢模板之间均设有垫片。
8.一种如权利要求1-7所述的成套整体安装的游乐设施预埋件的安装方法,其特征在于:它包括下列步骤:
先把定位钢筋焊在所述下部钢模板上,边测量边调整定位钢筋,直到满足坐标、标高和垂直度等定位要求后,迅速把定位钢筋焊接牢固;
在焊接冷却后对所述预埋件进行复测,变形较小时进行矫正,变形较大时返工重做直到复测合格;
复测合格后,在地脚螺栓的易生锈和易污染位置包裹塑料胶带;
绑扎钢筋并浇筑混凝土,并在混凝土初凝后及时进行复测浇筑,终凝时再次进行复测矫正;
待混凝土达到设计强度后,退去所述上固定螺母,拆除所述上部钢模板,退去所述上限位螺母;退去所述下固定螺母和下限位螺母,拆除所述下部钢模板并抽取出所述抗剪板板槽。
9.根据权利要求8所述的成套整体安装的游乐设施预埋件的安装方法,其特征在于:所述定位钢筋为D25的钢筋。
CN201310101106.6A 2013-03-27 2013-03-27 一种成套整体安装的游乐设施预埋件及其安装方法 Expired - Fee Related CN103174166B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310101106.6A CN103174166B (zh) 2013-03-27 2013-03-27 一种成套整体安装的游乐设施预埋件及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310101106.6A CN103174166B (zh) 2013-03-27 2013-03-27 一种成套整体安装的游乐设施预埋件及其安装方法

Publications (2)

Publication Number Publication Date
CN103174166A CN103174166A (zh) 2013-06-26
CN103174166B true CN103174166B (zh) 2015-09-16

Family

ID=48634321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310101106.6A Expired - Fee Related CN103174166B (zh) 2013-03-27 2013-03-27 一种成套整体安装的游乐设施预埋件及其安装方法

Country Status (1)

Country Link
CN (1) CN103174166B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103520925A (zh) * 2013-10-12 2014-01-22 北京中冶设备研究设计总院有限公司 一种过山车立柱结构及安装方法
CN104344181B (zh) * 2014-09-16 2016-04-20 陈远祥 一种活动观测架
CN105155565B (zh) * 2015-09-30 2017-10-17 安徽马钢工程技术集团有限公司 一种基础悬吊预埋螺栓的装置和施工方法
CN110237538B (zh) * 2019-06-04 2020-08-04 中建八局第三建设有限公司 一种大型过山车安装施工方法
CN110409854A (zh) * 2019-08-30 2019-11-05 山西五建集团有限公司 一种地脚螺栓群集成组装安装模具及方法
CN110820952A (zh) * 2019-10-17 2020-02-21 九州职业技术学院 钢结构柱安装快速定位装置及施工方法
CN112663657A (zh) * 2020-06-19 2021-04-16 杨春娥 用于装配式建筑预埋件的可拆卸式定位工装
CN112663652A (zh) * 2020-06-19 2021-04-16 杨春娥 适用于装配式建筑预埋件的预埋式定位工装
CN113263294A (zh) * 2021-06-08 2021-08-17 芜湖新兴铸管有限责任公司 地脚螺栓缺陷处理方法
CN113789805B (zh) * 2021-08-03 2022-03-11 中冶建筑研究总院有限公司 过山车倒挂型预埋结构的施工方法
CN114033087A (zh) * 2021-11-02 2022-02-11 郑州祥和集团有限公司 变电站预埋件施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250881A (zh) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 座浆法施工中垫板的安装方法
CN201288329Y (zh) * 2008-10-31 2009-08-12 江苏盐城二建集团有限公司 一种超长集群地脚螺栓精密预埋的钢模具
CN201386283Y (zh) * 2009-03-30 2010-01-20 上海龙净环保科技工程有限公司 大型脱硫防腐蚀箱罐底部的基础结构
CN202644563U (zh) * 2012-04-20 2013-01-02 上海宝冶集团有限公司 小型设施预埋地脚螺栓安装装置
CN203145041U (zh) * 2013-03-27 2013-08-21 中国京冶工程技术有限公司 一种成套整体安装的游乐设施预埋件

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5813831A (ja) * 1981-07-20 1983-01-26 Ohbayashigumi Ltd 構造体の基礎据付工法
JPS59185230A (ja) * 1983-04-06 1984-10-20 Sumitomo Metal Ind Ltd 大型機械設備等の据付工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250881A (zh) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 座浆法施工中垫板的安装方法
CN201288329Y (zh) * 2008-10-31 2009-08-12 江苏盐城二建集团有限公司 一种超长集群地脚螺栓精密预埋的钢模具
CN201386283Y (zh) * 2009-03-30 2010-01-20 上海龙净环保科技工程有限公司 大型脱硫防腐蚀箱罐底部的基础结构
CN202644563U (zh) * 2012-04-20 2013-01-02 上海宝冶集团有限公司 小型设施预埋地脚螺栓安装装置
CN203145041U (zh) * 2013-03-27 2013-08-21 中国京冶工程技术有限公司 一种成套整体安装的游乐设施预埋件

Also Published As

Publication number Publication date
CN103174166A (zh) 2013-06-26

Similar Documents

Publication Publication Date Title
CN103174166B (zh) 一种成套整体安装的游乐设施预埋件及其安装方法
CN204059395U (zh) 地脚螺栓的预埋定位结构
CN107034989B (zh) 一种预制装配式建筑预制构件免支撑安装方法
CN204703182U (zh) 锚栓套架
CN202913420U (zh) 可重复使用的安装地脚螺栓的定位装置
CN201535064U (zh) 建筑用模板
CN102926538A (zh) 反力箱和反力墙的施工方法
CN105649213A (zh) 一种密集布筋区大型钢结构预埋件的施工方法
CN204343319U (zh) 索道管柱基础预埋地脚螺栓定位模具
CN103362304B (zh) 一种自锚固定位螺栓装置进行模板锚固定位的方法
CN205614822U (zh) 左右边梁共用钢筋绑扎胎具及左右边梁钢筋整体绑扎台座
CN202390753U (zh) 桥台和柱帽预埋件的固定结构
CN203145041U (zh) 一种成套整体安装的游乐设施预埋件
CN106884532A (zh) 阶梯式弧形看台现浇装饰板的模板支撑体系及构建方法
CN204551936U (zh) 一种钢外楼梯
CN204435409U (zh) 一种地脚螺栓预埋施工用定位模具
CN206646817U (zh) 阶梯式弧形看台现浇装饰板的模板支撑体系
CN203307931U (zh) 预埋件定位螺钉连接构造
CN215055273U (zh) 一种用于安装支撑牛腿预埋盒的组装式模板
CN204825665U (zh) 一种利用激光定位制作钢筋笼的装置
CN203066493U (zh) 一种柱子主筋精确施工定位模具
CN103669831B (zh) 一种变电站现浇墙体组合钢模及其施工方法
CN102220808A (zh) 框架结构降梁施工方法
CN202992543U (zh) 一种调整垫铁装置
CN202644563U (zh) 小型设施预埋地脚螺栓安装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Yuedong

Inventor after: Zeng Zhaobo

Inventor after: Zhao Xu

Inventor after: Hou Zhaoxin

Inventor after: Ma Xiaoming

Inventor after: Xu Guoqing

Inventor before: Huang Guohong

Inventor before: Zhao Xu

Inventor before: Hou Zhaoxin

Inventor before: Wang Yuedong

Inventor before: Ma Xiaoming

Inventor before: Xu Guoqing

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG GUOHONG ZHAO XU HOU ZHAOXIN WANG YUEDONG MA XIAOMING XU GUOQING TO: WANG YUEDONG CENG ZHAOBO ZHAO XU HOU ZHAOXIN MA XIAOMING XU GUOQING

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180502

Address after: 518000 the 23 floor, Kim Chi Chi Valley, 1 Tong Ling Road, Lau sin Avenue, Nanshan District, Shenzhen, Guangdong.

Co-patentee after: MCC Central Research Institute of Building and Construction Co., Ltd.

Patentee after: Metallurgical Construction Research Institute (Shenzhen) Co., Ltd.

Co-patentee after: China Jingye Engineering Technology Co., Ltd.

Address before: 100088 West Tucheng Road, Haidian District, Beijing, No. 33

Co-patentee before: MCC Central Research Institute of Building and Construction Co., Ltd.

Patentee before: China Jingye Engineering Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20200327