CN103164815A - 电力管理装置、电力管理方法和需求通知装置 - Google Patents
电力管理装置、电力管理方法和需求通知装置 Download PDFInfo
- Publication number
- CN103164815A CN103164815A CN2012104409600A CN201210440960A CN103164815A CN 103164815 A CN103164815 A CN 103164815A CN 2012104409600 A CN2012104409600 A CN 2012104409600A CN 201210440960 A CN201210440960 A CN 201210440960A CN 103164815 A CN103164815 A CN 103164815A
- Authority
- CN
- China
- Prior art keywords
- demand
- power
- electricity needs
- demander
- electric power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011-245413 | 2011-11-09 | ||
| JP2011245413A JP5899830B2 (ja) | 2011-11-09 | 2011-11-09 | 電力管理装置、電力管理方法およびデマンド通知装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN103164815A true CN103164815A (zh) | 2013-06-19 |
Family
ID=48224260
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012104409600A Pending CN103164815A (zh) | 2011-11-09 | 2012-11-02 | 电力管理装置、电力管理方法和需求通知装置 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US9577472B2 (enExample) |
| JP (1) | JP5899830B2 (enExample) |
| CN (1) | CN103164815A (enExample) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107924540A (zh) * | 2016-02-25 | 2018-04-17 | 欧姆龙株式会社 | 电力交易匹配系统、电力交易匹配方法及电力交易匹配程序 |
| CN114595859A (zh) * | 2020-12-03 | 2022-06-07 | 丰田自动车株式会社 | 信息处理方法、信息处理装置以及存储介质 |
Families Citing this family (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5874311B2 (ja) * | 2011-10-24 | 2016-03-02 | ソニー株式会社 | 電力需要予測装置、電力需要予測方法および電力需要予測システム |
| JP2013165448A (ja) | 2012-02-13 | 2013-08-22 | Sony Corp | 機器管理装置及び機器管理方法 |
| US10447035B2 (en) * | 2013-02-27 | 2019-10-15 | Hitachi, Ltd. | Electric power creation control system and method |
| WO2014192119A1 (ja) * | 2013-05-30 | 2014-12-04 | 東芝三菱電機産業システム株式会社 | 電力管理装置 |
| JP5796041B2 (ja) * | 2013-07-11 | 2015-10-21 | 大和ハウス工業株式会社 | 電力管理装置及び電力管理方法 |
| JP5830061B2 (ja) * | 2013-07-11 | 2015-12-09 | 大和ハウス工業株式会社 | 電力管理システム及び電力管理方法 |
| JP2015022443A (ja) * | 2013-07-17 | 2015-02-02 | 富士電機株式会社 | 発注支援システム |
| FR3023043B1 (fr) * | 2014-06-27 | 2016-07-29 | Winslim | Procede de gestion de puissance dans une installation electrique et installation electrique |
| JP2016032334A (ja) * | 2014-07-28 | 2016-03-07 | 株式会社Nttファシリティーズ | 電力管理装置および電力管理方法 |
| JP6459336B2 (ja) | 2014-09-19 | 2019-01-30 | パナソニックIpマネジメント株式会社 | 空気情報管理装置 |
| WO2016084282A1 (ja) * | 2014-11-27 | 2016-06-02 | 日本電気株式会社 | 電力調整装置、電力流通システム、電力調整方法及びプログラムが格納された非一時的なコンピュータ可読媒体 |
| JP6316500B2 (ja) * | 2015-03-09 | 2018-04-25 | 株式会社日立製作所 | 電力系統安定化システム |
| WO2016170666A1 (ja) * | 2015-04-24 | 2016-10-27 | 株式会社日立製作所 | 電力系統安定化システム及び方法 |
| JP6610059B2 (ja) * | 2015-07-29 | 2019-11-27 | 富士電機株式会社 | 電力需要誘導装置 |
| JP6658064B2 (ja) * | 2016-02-19 | 2020-03-04 | 住友電気工業株式会社 | 電力管理装置および電力管理プログラム |
| JP6804248B2 (ja) * | 2016-09-23 | 2020-12-23 | 大和ハウス工業株式会社 | 電力消費調整システム及び電力消費調整方法 |
| JP6742213B2 (ja) * | 2016-09-30 | 2020-08-19 | 大和ハウス工業株式会社 | 電力需要管理システム、電力需要管理方法及び電力需要管理プログラム |
| JP2019061596A (ja) * | 2017-09-28 | 2019-04-18 | 株式会社日立製作所 | 需要制御装置および方法 |
| JP2022090423A (ja) * | 2020-12-07 | 2022-06-17 | 東芝エネルギーシステムズ株式会社 | 電力予測装置、及び電力予測方法 |
| JP7067651B1 (ja) | 2021-03-22 | 2022-05-16 | 株式会社リコー | 制御サーバ、消費制御装置、取引システム、通信方法、及びプログラム |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1585953A (zh) * | 2001-09-13 | 2005-02-23 | Abb股份有限公司 | 计算电力需求的方法和系统 |
| CN101627515A (zh) * | 2007-03-09 | 2010-01-13 | 三洋电机株式会社 | 需求控制系统、需求控制器、需求程序以及需求控制方法 |
| US20100138065A1 (en) * | 2009-02-11 | 2010-06-03 | Taft Jeffrey D | Method and system for reducing feeder circuit loss using demand response |
| US20100292856A1 (en) * | 2009-05-15 | 2010-11-18 | Lincoln Mamoru Fujita | Method and system for managing a load demand on an electrical grid |
| CN101897097A (zh) * | 2007-11-12 | 2010-11-24 | Eon咨询(专有)有限公司 | 需求侧电负载管理方法以及相关的装置及系统 |
Family Cites Families (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4916328A (en) * | 1988-12-08 | 1990-04-10 | Honeywell Inc. | Add/shed load control using anticipatory processes |
| JPH0518995A (ja) | 1991-07-15 | 1993-01-26 | Tokyo Electric Power Co Inc:The | 電力総需要量予測装置 |
| JP2002135976A (ja) * | 2000-10-26 | 2002-05-10 | Mitsubishi Electric Corp | 負荷平準化システム及び負荷平準化方法 |
| JP2003309929A (ja) * | 2002-04-12 | 2003-10-31 | Toshiba It Solution Corp | 電力サービスシステム及び電力サービス用サーバ |
| JP2006277174A (ja) * | 2005-03-29 | 2006-10-12 | Tokyo Electric Power Co Inc:The | ピーク電力制御システム、プログラム、方法、住宅電力制御装置 |
| JP4584056B2 (ja) * | 2005-07-08 | 2010-11-17 | 株式会社日立製作所 | 電力需給予測・制御システム |
| JP4786296B2 (ja) * | 2005-10-27 | 2011-10-05 | 中国電力株式会社 | 電力負荷平準化システム |
| WO2008086114A2 (en) * | 2007-01-03 | 2008-07-17 | Gridpoint, Inc. | Utility console for controlling energy resources |
| JP2008295193A (ja) * | 2007-05-24 | 2008-12-04 | Nippon Telegr & Teleph Corp <Ntt> | 電力デマンド制御装置、システム、および方法 |
| JP5255462B2 (ja) * | 2009-01-13 | 2013-08-07 | 株式会社日立製作所 | 電力需給運用管理サーバ、および電力需給運用管理システム |
| EP2387776A4 (en) * | 2009-01-14 | 2013-03-20 | Integral Analytics Inc | OPTIMIZED MICROGRID ENERGY UTILIZATION AND DISTRIBUTION |
| US8706650B2 (en) * | 2009-01-14 | 2014-04-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
| US8494685B2 (en) * | 2009-04-27 | 2013-07-23 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
| US20110202467A1 (en) * | 2010-01-19 | 2011-08-18 | Hilber Del A | Automated load control and dispatch system and method |
| EP2348596B1 (en) * | 2010-01-25 | 2021-09-08 | Accenture Global Services Limited | Analytics for consumer power consumption |
| EP2365416A1 (en) * | 2010-02-02 | 2011-09-14 | Samsung Electronics Co., Ltd. | Method and apparatus for controlling operations of devices based on information about power consumption of the devices |
| US20110258018A1 (en) * | 2010-04-19 | 2011-10-20 | General Electric Company | System and method for scheduling demand response events in a network |
| JP2012094077A (ja) * | 2010-10-28 | 2012-05-17 | Toshiba Corp | 家庭用エネルギー管理システム |
| US9171256B2 (en) * | 2010-12-17 | 2015-10-27 | ABA Research Ltd. | Systems and methods for predicting customer compliance with demand response requests |
| US8712595B2 (en) * | 2011-01-18 | 2014-04-29 | General Electric Company | Dynamic load profiling in a power network |
| US20120253532A1 (en) * | 2011-03-30 | 2012-10-04 | General Electric Company | Systems and methods for forecasting electrical load |
| US20120316688A1 (en) * | 2011-06-08 | 2012-12-13 | Alstom Grid | Coordinating energy management systems and intelligent electrical distribution grid control systems |
| US20130030583A1 (en) * | 2011-07-29 | 2013-01-31 | Owen James E | Non-binding consumer premises energy forecast sharing in energy management system |
| US8972071B2 (en) * | 2011-10-27 | 2015-03-03 | General Electric Company | Systems and methods to predict a reduction of energy consumption |
-
2011
- 2011-11-09 JP JP2011245413A patent/JP5899830B2/ja active Active
-
2012
- 2012-11-02 CN CN2012104409600A patent/CN103164815A/zh active Pending
- 2012-11-02 US US13/667,447 patent/US9577472B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1585953A (zh) * | 2001-09-13 | 2005-02-23 | Abb股份有限公司 | 计算电力需求的方法和系统 |
| CN101627515A (zh) * | 2007-03-09 | 2010-01-13 | 三洋电机株式会社 | 需求控制系统、需求控制器、需求程序以及需求控制方法 |
| CN101897097A (zh) * | 2007-11-12 | 2010-11-24 | Eon咨询(专有)有限公司 | 需求侧电负载管理方法以及相关的装置及系统 |
| US20100138065A1 (en) * | 2009-02-11 | 2010-06-03 | Taft Jeffrey D | Method and system for reducing feeder circuit loss using demand response |
| US20100292856A1 (en) * | 2009-05-15 | 2010-11-18 | Lincoln Mamoru Fujita | Method and system for managing a load demand on an electrical grid |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107924540A (zh) * | 2016-02-25 | 2018-04-17 | 欧姆龙株式会社 | 电力交易匹配系统、电力交易匹配方法及电力交易匹配程序 |
| CN114595859A (zh) * | 2020-12-03 | 2022-06-07 | 丰田自动车株式会社 | 信息处理方法、信息处理装置以及存储介质 |
| CN114595859B (zh) * | 2020-12-03 | 2025-07-25 | 丰田自动车株式会社 | 信息处理方法、信息处理装置以及存储介质 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5899830B2 (ja) | 2016-04-06 |
| JP2013102637A (ja) | 2013-05-23 |
| US20130116842A1 (en) | 2013-05-09 |
| US9577472B2 (en) | 2017-02-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103164815A (zh) | 电力管理装置、电力管理方法和需求通知装置 | |
| JP5857646B2 (ja) | 電力管理装置、電力管理方法およびデマンド通知装置 | |
| US9880578B2 (en) | Power demand forecast device, method and system and power failure detection system | |
| JP5899640B2 (ja) | 電力管理装置、電力管理方法および電力管理システム | |
| Mattern et al. | ICT for green: how computers can help us to conserve energy | |
| JP4945077B2 (ja) | 蓄電設備管理システム | |
| US7953519B2 (en) | Energy usage monitoring and balancing method and system | |
| KR101768186B1 (ko) | 에너지 관리 시스템 및 방법 | |
| US6983210B2 (en) | Energy management system, energy management method, and unit for providing information on energy-saving recommended equipment | |
| US9588145B2 (en) | Electric power management apparatus and electric power management method | |
| US20130041852A1 (en) | Customizable dynamic resource regulating devices and methods | |
| CN101873009A (zh) | 家庭智能用电监控系统 | |
| JP4841657B2 (ja) | 機器管理システムおよび機器管理方法 | |
| CN106575422A (zh) | 能量管理系统和方法 | |
| AU2018264006A1 (en) | Activity management device, activity management system, and activity management method | |
| JP6697080B2 (ja) | 電力管理装置、電力管理方法及び電力管理システム | |
| JP2016154036A (ja) | 行動管理装置、行動管理方法およびプログラム | |
| JP2017037459A (ja) | 電力情報管理装置、電力情報管理方法および電力情報管理プログラム | |
| JP2010134964A (ja) | 蓄電設備管理システム | |
| JP2016081101A (ja) | 行動管理装置、行動管理方法およびプログラム | |
| JP5688484B1 (ja) | 電力管理システム、プログラム及び電力管理方法 | |
| Kester et al. | Smart metering guide | |
| JP2017201847A (ja) | 施設側装置、電力管理装置、電力管理システム、電力管理方法および電力管理プログラム |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130619 |
|
| RJ01 | Rejection of invention patent application after publication |