CN103056690B - 一种多规格钢管端面加工快换工装 - Google Patents
一种多规格钢管端面加工快换工装 Download PDFInfo
- Publication number
- CN103056690B CN103056690B CN201210280324.6A CN201210280324A CN103056690B CN 103056690 B CN103056690 B CN 103056690B CN 201210280324 A CN201210280324 A CN 201210280324A CN 103056690 B CN103056690 B CN 103056690B
- Authority
- CN
- China
- Prior art keywords
- compressor arm
- top board
- pressing plate
- bearing base
- quick change
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jigs For Machine Tools (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210280324.6A CN103056690B (zh) | 2012-08-08 | 2012-08-08 | 一种多规格钢管端面加工快换工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210280324.6A CN103056690B (zh) | 2012-08-08 | 2012-08-08 | 一种多规格钢管端面加工快换工装 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103056690A CN103056690A (zh) | 2013-04-24 |
CN103056690B true CN103056690B (zh) | 2016-01-20 |
Family
ID=48099733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210280324.6A Active CN103056690B (zh) | 2012-08-08 | 2012-08-08 | 一种多规格钢管端面加工快换工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103056690B (zh) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103240618A (zh) * | 2013-05-10 | 2013-08-14 | 上海佩纳沙士吉打机械有限公司 | 用于地铁挂钩机械加工的夹持定位装置 |
CN104551209A (zh) * | 2013-10-16 | 2015-04-29 | 黄秀忠 | 一种铝合金型材切割固定装置 |
CN104551281B (zh) * | 2013-10-22 | 2018-03-16 | 北京实验工厂 | 无水线切割方法 |
CN103567493A (zh) * | 2013-11-23 | 2014-02-12 | 山东泰格斯精密机器有限公司 | 大型玄杆部件专用钻床 |
CN103769998A (zh) * | 2014-01-08 | 2014-05-07 | 乳山市宏远机床制造有限公司 | 一种立式双端面磨床专用上料装置 |
CN104191278B (zh) * | 2014-08-15 | 2016-09-07 | 球豹阀门有限公司 | 可调节阀体加工工装 |
CN105863886A (zh) * | 2014-09-19 | 2016-08-17 | 庄景阳 | Cg125化油器动力提升的操作方法 |
CN104440199A (zh) * | 2014-12-17 | 2015-03-25 | 重庆健杰科技有限公司 | 三角形管件夹持装置 |
CN104568414B (zh) * | 2015-01-16 | 2018-04-24 | 江苏省特种设备安全监督检验研究院 | 膨胀节试验用驱动装置 |
CN104741704B (zh) * | 2015-04-14 | 2017-09-19 | 重庆成俊工贸有限公司 | 定位式拉床送料板 |
CN104842188B (zh) * | 2015-05-20 | 2017-03-01 | 珠海格力大金精密模具有限公司 | 用于装夹带扁位圆柱形模具零件的夹具 |
CN105196083B (zh) * | 2015-09-21 | 2018-04-03 | 济南大学 | 一种用于开合螺母铣端面的新型夹具 |
CN105798643A (zh) * | 2016-04-22 | 2016-07-27 | 安徽机电职业技术学院 | 一种适用于多径宽管道固定加工的工装夹具 |
CN106424888B (zh) * | 2016-10-14 | 2018-03-09 | 江苏金淮减速机有限公司 | 加工长轴类零件内孔花键槽的卧式刨床 |
CN106392703B (zh) * | 2016-11-11 | 2018-08-28 | 四川多联实业有限公司 | 一种pvc管材可调式夹紧固定系统 |
CN106891182A (zh) * | 2017-04-26 | 2017-06-27 | 苏州市意可机电有限公司 | 一种长轴类零件加工工装 |
CN107263166A (zh) * | 2017-06-17 | 2017-10-20 | 彭波 | 多功能工件加工的紧固装置 |
CN108080995A (zh) * | 2018-01-26 | 2018-05-29 | 无锡环宇精密铸造有限公司 | 一种泵体管口中头加工用定位夹具 |
CN108568716A (zh) * | 2018-05-07 | 2018-09-25 | 安徽中鼎美达环保科技有限公司 | 一种柱状蜂窝多孔陶瓷抛光机 |
CN110842596A (zh) * | 2018-08-20 | 2020-02-28 | 张家港保税区贤德国际贸易有限公司 | 钢材切割夹具 |
CN109108338A (zh) * | 2018-09-12 | 2019-01-01 | 邹城兖矿泰德工贸有限公司 | 导向头 |
CN108942321A (zh) * | 2018-09-27 | 2018-12-07 | 天津市君治旺科技发展有限公司 | 一种机械加工夹具 |
CN109434498B (zh) * | 2018-11-13 | 2020-06-23 | 南通利联机床制造有限公司 | 一种钙锭端面切片防变形加工用固定工装 |
CN110815115A (zh) * | 2019-11-15 | 2020-02-21 | 博信矿山科技(徐州)股份有限公司 | 一种托辊快速安装装置 |
CN111774868B (zh) * | 2020-07-31 | 2024-09-27 | 中铁建电气化局集团第一工程有限公司 | 一种简统化腕臂加工用定位管和定位立柱的锯切装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1428118A (en) * | 1972-11-25 | 1976-03-17 | Clarke Chapman Ltd | Pipe tube or bar clamp |
JP3368289B2 (ja) * | 1996-06-25 | 2003-01-20 | キヤノン化成株式会社 | 円筒部材保持具と該円筒部材保持具を備えた加工装置及び加工方法 |
JP2003127010A (ja) * | 2001-10-23 | 2003-05-08 | Hokkai Seisakusho:Kk | 柱状物の把持機構 |
CN201309090Y (zh) * | 2008-11-10 | 2009-09-16 | 厦门厦顺铝箔有限公司 | 铣床加工钢管铣键槽专用夹具 |
CN202114500U (zh) * | 2011-05-31 | 2012-01-18 | 安徽应流机电股份有限公司 | 拉杆定位装夹具 |
-
2012
- 2012-08-08 CN CN201210280324.6A patent/CN103056690B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103056690A (zh) | 2013-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103056690B (zh) | 一种多规格钢管端面加工快换工装 | |
CN202752897U (zh) | 一种平行及同轴孔系加工夹具 | |
CN204321682U (zh) | 多轴攻牙机用双面攻牙夹具 | |
CN204621124U (zh) | 一种适用环形工件的分体夹持式卡盘 | |
CN203650034U (zh) | 自动夹紧夹具 | |
CN202336765U (zh) | 夹持工件的机械手结构 | |
CN203900958U (zh) | 一种同步夹 | |
CN205043621U (zh) | 一种研磨成型夹紧装置 | |
CN102896505A (zh) | 一种打孔夹具 | |
CN106092596A (zh) | 一种汽车检具结构 | |
CN103964017B (zh) | 钢带流水线用包装机器人 | |
CN102962675A (zh) | 用于片式散热器的码片组装机 | |
CN205927932U (zh) | 一种可调式v型块定位夹具 | |
CN202224959U (zh) | 可夹持多种机车梁体的夹具 | |
CN204771648U (zh) | 一种工业机器人传动轴键槽的加工夹具 | |
CN206287033U (zh) | 一种实用型自动加紧虎钳装置 | |
CN107282716A (zh) | 一种金属管折弯夹具 | |
CN201856108U (zh) | 一种用于凸轮的夹具 | |
CN205949712U (zh) | 具有抓手的传送杆及其多工位连续模物料搬运机器人 | |
CN203566376U (zh) | 一种立式加工中心用夹紧工装 | |
CN205520623U (zh) | 一种用于机械加工用快速压紧装置 | |
CN103753279A (zh) | 阶梯支承台式夹具 | |
CN203557156U (zh) | 一种自动装夹装置 | |
CN110788429A (zh) | 一种线切割气动夹具 | |
CN203622193U (zh) | 用于压缩机缸套的磨削夹具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd. Patentee after: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd. Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing Patentee before: NANJING MEISHAN METALLURGY DEVELOPMENT Co.,Ltd. Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211104 Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd. Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing Patentee before: Nanjing Baodi Meishan Industrial City Development Co.,Ltd. Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd. |
|
TR01 | Transfer of patent right |