CN103015718A CN2012104939819A CN201210493981A CN103015718A CN 103015718 A CN103015718 A CN 103015718A CN 2012104939819 A CN2012104939819 A CN 2012104939819A CN 201210493981 A CN201210493981 A CN 201210493981A CN 103015718 A CN103015718 A CN 103015718A
Authority
CN
China
Prior art keywords
shaped
storey
concrete pump
iron
waist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104939819A
Other languages
English (en)
Inventor
尹俊峰
陈钧颐
朱玉
朱春林
印辉
陶桂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Original Assignee
TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd filed Critical TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority to CN2012104939819A priority Critical patent/CN103015718A/zh
Publication of CN103015718A publication Critical patent/CN103015718A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本发明涉及一种混凝土泵穿越楼层型钢固定支架,包括两只工字钢,工字钢外侧的下腿板上设有至少两个腰型孔,工字钢经螺栓穿接腰型孔固定连接于楼层上;工字钢的腰板上均设有至少两只腰型螺栓孔,两个工字钢对称设置且其相对内侧的上、下腿板上均设有弧形开口,两个工字钢经螺栓栓接腰型螺栓孔呈弧形开口夹紧混凝土泵管状态。由两个经螺栓连接的工字钢组成,在浇筑楼层时,预留泵管孔,泵管孔四周预埋L型螺杆,混凝土楼层浇筑完成后,泵管穿过泵管孔,工字钢经L型螺杆与楼层连接固定,两工字钢经螺栓压紧泵管,本固定支架将泵管与层面紧固连接,泵管不容易产生震动,设备不容易损坏;本固定支架安装拆卸方面,成本低廉,易于实现。

Description

一种混凝土泵穿越楼层型钢固定支架
技术领域
本发明涉及一种固定支架,特别是一种混凝土泵穿越楼层型钢固定支架。
背景技术
在高层或超限高层建筑中,固定混凝土泵垂直输送管一般是穿过各楼层送到施工操作层面,由于混凝土具有巨大的主动压力,混凝土泵管产生巨大的震动,震动对楼板会形成巨大的冲击载荷,并对混凝土泵管造成损害,降低其使用寿命。因此,施工中需要对混凝土泵管进行固定,常用固定方法有两种:一是将泵管附着于墙侧面固定支架上,另一种是在楼板面上或管道井上,留设孔洞,竖管穿越楼板后用木塞和钢管支架进行固定,前者的缺陷是不利于竖向模板的支设和拆除,管口接头法兰操作面小;后者缺陷是竖管垂直荷载及输送震动荷载大,木塞固定不牢固,直接影响板面结构受力。
发明内容
为了克服现有技术存在的不足,本发明提供了一种结构简单、装卸方便、固定混凝土泵输送管稳定、牢靠的混凝土泵穿越楼层型钢固定支架。
为了达到上述目的,本发明采用的技术方案是:一种混凝土泵穿越楼层型钢固定支架,其特征在于:包括两个对称的工字钢,工字钢的下腿板上设有至少两个腰型孔,工字钢经螺栓穿接腰型孔固定连接于楼层上;工字钢的腰板上均设有至少两只腰型螺栓孔,两个工字钢对称设置且其相对的上、下腿板上均设有弧形开口,两个工字钢经螺栓栓接腰型螺栓孔呈弧形开口夹紧混凝土泵管状态。
进一步地,所述弧形开口内径与混凝土泵管内径相同。
再进一步地,所述工字钢上、下腿板的弧形开口间焊接一弧形板,弧形板的内径与弧形开口内径重合。
本发明由两个经螺栓连接的工字钢组成,在浇筑楼层时,预留泵管孔,泵管孔四周预埋L型螺杆,混凝土楼层浇筑完成后,泵管穿过泵管孔,工字钢经L型螺杆与楼层连接固定,两工字钢经螺栓压紧泵管,本固定支架将泵管与层面紧固连接,泵管不容易产生震动,设备不容易损坏;本固定支架安装拆卸方面,成本低廉,易于实现。
本发明结构简单,安装方便,成本低廉,易于推广,具有很好的经济效益和社会效益。
附图说明
图1是本发明的结构示意图;
图2是图1的仰视图;
图3是本发明的使用状态图。
图中:工字钢1,弧形板2,螺栓3,腰型螺栓孔4,腿板5,腰板6,楼层7,泵管8,腰型孔9,弧形开口10,L型螺杆11。
具体实施方式
下面结合附图对本发明作进一步描述。
图1、2所示,一种混凝土泵穿越楼层型钢固定支架,包括两个对称的工字钢1,工字钢的腰板6设有至少两个腰型螺栓孔4,腰型孔上穿接有连接工字钢的螺栓3,工字钢的下腿板5上设有两个腰型孔9,工字钢一侧的上、下腿板上设有开口向工字钢外侧的与泵管8内径重合的弧形开口10,工字钢上、下腿板的弧形开口10之间焊接一弧形板2,弧形板的内径与弧形开口内径重合。
图3所示,浇筑楼层7时,预留泵管8的输送孔,输送孔四周预埋4根L型螺杆11,楼层浇筑完毕,泵管穿过输送孔,L型螺杆穿过工字钢1下腿的腰型孔9,工字钢经L型螺杆与楼层连接固定,调节两工字钢位置相互对称使工字钢的弧形开口10贴靠泵管8,工字钢的腰板5穿接螺栓3拉紧紧两工字钢与泵轴的,泵管经本固定支架与楼层紧固连接。

Claims (3)

1.一种混凝土泵穿越楼层型钢固定支架,其特征在于:包括两只工字钢,工字钢外侧的下腿板上设有至少两个腰型孔,工字钢经螺栓穿接腰型孔固定连接于楼层上;工字钢的腰板上均设有至少两只腰型螺栓孔,两个工字钢对称设置且其相对内侧的上、下腿板上均设有弧形开口,两个工字钢经螺栓栓接腰型螺栓孔呈弧形开口夹紧混凝土泵管状态。
2.根据权利要求1或2所述的一种混凝土泵穿越楼层型钢固定支架,其特征是:所述弧形开口内径与混凝土泵管内径相同。
3.根据权利要求1所述的一种混凝土泵穿越楼层型钢固定支架,其特征是:所述工字钢上、下腿板的弧形开口间焊接一弧形板,弧形板的内径与弧形开口内径重合。
CN2012104939819A 2012-11-28 2012-11-28 一种混凝土泵穿越楼层型钢固定支架 Pending CN103015718A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104939819A CN103015718A (zh) 2012-11-28 2012-11-28 一种混凝土泵穿越楼层型钢固定支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104939819A CN103015718A (zh) 2012-11-28 2012-11-28 一种混凝土泵穿越楼层型钢固定支架

Publications (1)

Publication Number Publication Date
CN103015718A true CN103015718A (zh) 2013-04-03

Family

ID=47964775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104939819A Pending CN103015718A (zh) 2012-11-28 2012-11-28 一种混凝土泵穿越楼层型钢固定支架

Country Status (1)

Country Link
CN (1) CN103015718A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878698A (zh) * 2015-06-09 2015-09-02 中国五冶集团有限公司 具有伸缩筒结构的柱浇筑远端固定系统
CN106286991A (zh) * 2016-08-09 2017-01-04 江苏南通二建集团有限公司 一种定型化混凝土输送泵管固定方法
CN109115618A (zh) * 2018-07-12 2019-01-01 中国水利水电科学研究院 一种用于扁平形橡胶囊制品承压能力的测试装置及测试方法
CN109237130A (zh) * 2018-11-23 2019-01-18 上海宝冶集团南京建筑有限公司 一种可循环使用的固定混凝土泵管

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3809350A (en) * 1972-08-14 1974-05-07 B Lane Vent mounting device
DE102005019648A1 (de) * 2005-04-26 2006-11-02 Putzmeister Ag Steigleitung für die Förderung von Dickstoffen
US20070227527A1 (en) * 2006-04-01 2007-10-04 Kopp John G Break-apart assembly for supporting an exhaust flue and providing a cumbustible materials top and a fire stop
CN201165757Y (zh) * 2008-03-12 2008-12-17 杜明清 泵送混凝土拌合物输送管道减震防串动支架
CN102563216A (zh) * 2011-12-29 2012-07-11 大连益多管道有限公司 一种立管固定支架
CN203010022U (zh) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 一种混凝土泵穿越楼层型钢固定支架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3809350A (en) * 1972-08-14 1974-05-07 B Lane Vent mounting device
DE102005019648A1 (de) * 2005-04-26 2006-11-02 Putzmeister Ag Steigleitung für die Förderung von Dickstoffen
US20070227527A1 (en) * 2006-04-01 2007-10-04 Kopp John G Break-apart assembly for supporting an exhaust flue and providing a cumbustible materials top and a fire stop
CN201165757Y (zh) * 2008-03-12 2008-12-17 杜明清 泵送混凝土拌合物输送管道减震防串动支架
CN102563216A (zh) * 2011-12-29 2012-07-11 大连益多管道有限公司 一种立管固定支架
CN203010022U (zh) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 一种混凝土泵穿越楼层型钢固定支架

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878698A (zh) * 2015-06-09 2015-09-02 中国五冶集团有限公司 具有伸缩筒结构的柱浇筑远端固定系统
CN104878698B (zh) * 2015-06-09 2017-02-22 中国五冶集团有限公司 具有伸缩筒结构的柱浇筑远端固定系统
CN106286991A (zh) * 2016-08-09 2017-01-04 江苏南通二建集团有限公司 一种定型化混凝土输送泵管固定方法
CN109115618A (zh) * 2018-07-12 2019-01-01 中国水利水电科学研究院 一种用于扁平形橡胶囊制品承压能力的测试装置及测试方法
CN109237130A (zh) * 2018-11-23 2019-01-18 上海宝冶集团南京建筑有限公司 一种可循环使用的固定混凝土泵管

Similar Documents

Publication Publication Date Title
CN202577934U (zh) 一种脚手架与建筑物的丝扣连墙件
CN202780348U (zh) 筒体组对防焊接变形的可拆卸式加固装置
CN103015718A (zh) 一种混凝土泵穿越楼层型钢固定支架
CN206174138U (zh) 一种适用于钢结构房屋外挂墙板与主体结构的连接构造
CN106836836B (zh) 一种燃煤发电厂烟气脱硫塔改造二次液压顶升安装方法
CN104444758A (zh) 一种吊耳及其使用方法
CN203010022U (zh) 一种混凝土泵穿越楼层型钢固定支架
CN204324677U (zh) 一种可拆卸板式吊耳
CN203008379U (zh) 一种混凝土泵管固定支架
CN202324626U (zh) 简易轻型的模板支架
CN201908429U (zh) 装配整体式建筑悬挑卸料平台
CN207280853U (zh) 大口径球墨铸铁管连续试压装置
KR101349722B1 (ko) 교량용 선배수관 시공방법
CN205975635U (zh) 基坑支撑结构
CN104863283A (zh) 钢管纤维混凝土支撑
CN103486335A (zh) 一种用于超高层施工混凝土泵输管的固定方法
CN201713940U (zh) 一种钢柱脚结构
CN104314354A (zh) 高压电塔基座
CN207827724U (zh) 一种用于内爬式塔吊的钢牛腿结构
CN204592635U (zh) 一种带桩体安装孔模具的法兰
CN203684694U (zh) 一种可将布料机安装在电梯井内的连接装置
CN205421317U (zh) 装配式基础安装调整器
CN206002317U (zh) 一种发动机试验台架减振基础平台
CN105019556A (zh) 辅助高层钢梁快速吊装的搭接结构及其应用
CN215925648U (zh) 钢混组合塔节段临时吊点装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403