CN102979318A - 具有滑动支座的建筑物移位和隔震就位方法 - Google Patents
具有滑动支座的建筑物移位和隔震就位方法 Download PDFInfo
- Publication number
- CN102979318A CN102979318A CN2012105526616A CN201210552661A CN102979318A CN 102979318 A CN102979318 A CN 102979318A CN 2012105526616 A CN2012105526616 A CN 2012105526616A CN 201210552661 A CN201210552661 A CN 201210552661A CN 102979318 A CN102979318 A CN 102979318A
- Authority
- CN
- China
- Prior art keywords
- displacement
- building
- slide block
- shock
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种具有滑动支座的建筑物移位和隔震就位方法,在移位建筑物的柱两侧建造移位轨道,在移位轨道上连续铺设光滑的钢板作为下滑面,钢板下滑面靠近框架柱的安装位置,即剪跨比为0.5~1.0范围内安放滑块,滑块是将聚四氟乙烯板热熔于钢支座底部,钢支座顶部通过焊接的预埋锚筋与托换梁相连;以滑块为支撑搭设托换梁模板,绑扎托换梁钢筋,浇筑托换梁混凝土;施工与移位方向相垂直的连系梁;设置一条沿移位方向的导向轨道;通过牵引或顶推设备移至就位位置;在移位建筑周边托换梁与移位轨道间设置若干橡胶支座与保留的滑块形成隔震系统。滑块固定于托换结构,保证了移动过程中剪跨比不变,受力更加合理;提高了移位建筑的抗震能力,降低了造价。
Description
技术领域
本发明涉及一种土木建筑技术,尤其是一种具有滑动支座的建筑物移位和隔震就位方法。
背景技术
目前,建筑物移位技术是将既有建筑整体移位至新址,解决了城市发展中拆迁和保留之间的矛盾,保护了有文物价值的历史建筑。建筑物移位前,需通过结构托换将上部结构与基础截断,使上部结构的荷载转移至托换结构,在托换结构与轨道之间安放行走装置(滚轴、滑块或滑车),形成可移动建筑物,然后由牵引装置移至就位位置。建筑物移到指定位置后,需要与新基础连接。
通过框架柱托换节点受力机理的研究发现,托换梁的支座(滑块)位置应设置在剪跨比(托换梁高度与支座至框架柱柱根水平距离之比)为0.5~1.0 范围内。否则剪跨比太大,托换梁弯矩越大,导致托换连梁与柱间结合面受拉破坏; 剪跨比太小,导致结合面发生剪切破坏。实际工程经常采用的滚轴支座移位行走装置,其位置随着建筑物移动而变化,剪跨比可能超出该范围,对托换结构受力产生不利影响。
传统移位就位连接方法为直接座浆或预留钢筋(预埋件)焊接。为了实现就位连接并起到隔震作用,将行走装置(滑块)与橡胶支座相结合, 形成组合支座式就位连接方式。不仅提高了移位建筑的抗震性能,又利用了行走装置降低了造价。
发明专利“一种建筑物移位的支座滑移装置”(ZL02157992.X)提出了在上、下滑面间设置减摩材料,实现建筑物移位的装置,但未提出支座安放的合理位置,也未提出就位连接时形成隔震系统的思路。
发明内容
本发明的目的是为克服上述现有技术的不足,提供一种具有滑动支座的建筑物移位和隔震就位方法,该方法保证了移动过程中剪跨比不变,与滚轴移位方式相比托换结构的受力更加合理;就位后,滑块可以不取出,与橡胶支座共同形成隔震系统,不仅提高了移位建筑的抗震能力,还降低了造价。
为实现上述目的,本发明采用下述技术方案:
一种具有滑动支座的建筑物移位和隔震就位方法,步骤如下:
1)在移位建筑物的框架柱两侧建造移位轨道,在移位轨道上连续铺设光滑的钢板作为下滑面,钢板下滑面靠近框架柱的安装位置,即剪跨比为0.5~1.0 范围内安放滑块,滑块是将聚四氟乙烯板热熔于钢支座底部,钢支座顶部通过焊接的预埋锚筋与托换梁相连;所述剪跨比为托换梁高度与钢支座至框架柱柱根水平距离之比;
2)以滑块为支撑搭设托换梁模板,绑扎托换梁钢筋,浇筑托换梁混凝土;
3)施工与移位方向相垂直的连系梁;
4)移位前截断移位建筑物框架柱与基础的连接,移位建筑物上部荷载的传递途径从截断前的通过移位建筑物的框架柱、基础传至地基,变成了通过移位建筑物的框架柱、托换梁、滑块、移位轨道传至地基;
5)为防止移位过程偏离方向,设置一条沿移位方向的导向轨道;
6)通过牵引或顶推设备移至就位位置;
7)在移位建筑周边托换梁与移位轨道间设置若干橡胶支座,为隔震建筑提供恢复力,保留滑块,与橡胶支座共同形成隔震系统。
本发明的有益效果是,本发明中的滑块位置固定于托换结构,保证了移动过程中剪跨比不变,与滚轴移位方式相比托换结构的受力更加合理;就位后,滑块可以不取出,与橡胶支座共同形成隔震系统,不仅提高了移位建筑的抗震能力,还降低了造价。隔震后,不必再对上部主体结构抗震加固,对于抗震性能差而又需要保护原有风貌的历史建筑,效益更加显著。
附图说明
图1 是移位过程中的托换梁、连系梁、滑块和移位轨道平面图;
图2 是移位过程中的托换梁、连系梁、滑块和移位轨道立面图;
图3 是滑块安放的合理范围说明图;
图4是实例中的滑块支座和导向轨道图片;
图5是实例中的滑块支座和橡胶支座组成的隔震系统图片;
图中:1——移位轨道;2——托换梁;3——连系梁;4——滑块;5——滑块安放的合理范围;6——框架柱;a——滑块支座中心至框架柱柱根水平距离;h——托换梁高度。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
如图1-3所示,具有滑动支座的建筑物移位和隔震就位方法,步骤如下:
1)在移位建筑物的框架柱6两侧建造移位轨道1,在移位轨道1上连续铺设光滑的钢板作为下滑面,钢板下滑面靠近框架柱6的安装位置,即剪跨比为0.5~1.0 范围内安放滑块4(滑块安放的合理范围5),滑块4是将聚四氟乙烯板热熔于钢支座底部,钢支座顶部通过焊接的预埋锚筋与托换梁2相连;所述剪跨比为托换梁高h度与钢支座至框架柱柱根水平a距离之比;
2)以滑块4为支撑搭设托换梁模板,绑扎托换梁钢筋,浇筑托换梁混凝土;
3)施工与移位方向相垂直的连系梁2;
4)移位前截断移位建筑物的框架柱6与基础的连接,建筑物上部荷载的传递途径从截断前的通过移位建筑物的框架柱、基础传至地基,变成了通过移位建筑物的框架柱、托换梁、滑块、移位轨道传至地基;
5)为防止移位过程偏离方向,设置一条沿移位方向的导向轨道;
6)通过牵引或顶推设备移至就位位置;
7)在移位建筑周边托换梁2与移位轨道间设置若干橡胶支座,为隔震建筑提供恢复力,保留滑块,与橡胶支座共同形成隔震系统。
如图4、图5所示是济南某二层框架结构平移试验工程,利用聚四氟乙烯板热熔于钢支座底部作为移位支座,就位后和橡胶支座组合形成隔震系统。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (1)
1.一种具有滑动支座的建筑物移位和隔震就位方法,其特征是,步骤如下:
1)在移位建筑物的框架柱两侧建造移位轨道,在移位轨道上连续铺设光滑的钢板作为下滑面,钢板下滑面靠近框架柱的安装位置,即剪跨比为0.5~1.0 范围内安放滑块,滑块是将聚四氟乙烯板热熔于钢支座底部,钢支座顶部通过焊接的预埋锚筋与托换梁相连;所述剪跨比为托换梁高度与钢支座至框架柱柱根水平距离之比;
2)以滑块为支撑搭设托换梁模板,绑扎托换梁钢筋,浇筑托换梁混凝土;
3)施工与移位方向相垂直的连系梁;
4)移位前截断移位建筑物框架柱与基础的连接,移位建筑物上部荷载的传递途径从截断前的通过移位建筑物的框架柱、基础传至地基,变成了通过移位建筑物的框架柱、托换梁、滑块、移位轨道传至地基;
5)为防止移位过程偏离方向,设置一条沿移位方向的导向轨道;
6)通过牵引或顶推设备移至就位位置;
7)在移位建筑周边托换梁与移位轨道间设置若干橡胶支座,为隔震建筑提供恢复力,保留滑块,与橡胶支座共同形成隔震系统。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210552661.6A CN102979318B (zh) | 2012-12-19 | 2012-12-19 | 具有滑动支座的建筑物移位和隔震就位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210552661.6A CN102979318B (zh) | 2012-12-19 | 2012-12-19 | 具有滑动支座的建筑物移位和隔震就位方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102979318A true CN102979318A (zh) | 2013-03-20 |
CN102979318B CN102979318B (zh) | 2015-06-10 |
Family
ID=47853640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210552661.6A Active CN102979318B (zh) | 2012-12-19 | 2012-12-19 | 具有滑动支座的建筑物移位和隔震就位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102979318B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999427A (zh) * | 2018-10-15 | 2018-12-14 | 北京建工四建工程建设有限公司 | 一种建筑物迁移就位时移动荷载的支撑结构及其施工方法 |
CN109750854A (zh) * | 2019-02-26 | 2019-05-14 | 上海先为土木工程有限公司 | 用于保护建筑物平移的滑脚移位装置 |
CN110805305A (zh) * | 2019-11-12 | 2020-02-18 | 山东建筑大学 | 一种高层建筑物爬坡移位方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1122783A (ja) * | 1997-07-07 | 1999-01-26 | Mitsubishi Heavy Ind Ltd | 免震装置 |
JP2001295496A (ja) * | 2000-04-14 | 2001-10-26 | Takenaka Komuten Co Ltd | 既存のsrc造梁に対する粘性系制震壁の取付け構造および取付け方法 |
CN2592788Y (zh) * | 2002-12-20 | 2003-12-17 | 张准胜 | 一种建筑物移位的支座滑移装置 |
CN101852032A (zh) * | 2010-06-09 | 2010-10-06 | 山东建筑大学 | 可移动隔震建筑物 |
-
2012
- 2012-12-19 CN CN201210552661.6A patent/CN102979318B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1122783A (ja) * | 1997-07-07 | 1999-01-26 | Mitsubishi Heavy Ind Ltd | 免震装置 |
JP2001295496A (ja) * | 2000-04-14 | 2001-10-26 | Takenaka Komuten Co Ltd | 既存のsrc造梁に対する粘性系制震壁の取付け構造および取付け方法 |
CN2592788Y (zh) * | 2002-12-20 | 2003-12-17 | 张准胜 | 一种建筑物移位的支座滑移装置 |
CN101852032A (zh) * | 2010-06-09 | 2010-10-06 | 山东建筑大学 | 可移动隔震建筑物 |
Non-Patent Citations (3)
Title |
---|
张鑫,王恒,夏风敏,贾留东: "考虑跨高比的柱托换节点抗剪性能的试验研究", 《山东建筑大学学报》 * |
杜健民,袁迎曙,王波,蒋建华: "框架柱托换体系抗冲剪承载力的试验研究", 《建筑技术》 * |
谭天乐,王继国,贾留东: "济南宏济堂西号整体平移及隔震改造施工", 《工业建筑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999427A (zh) * | 2018-10-15 | 2018-12-14 | 北京建工四建工程建设有限公司 | 一种建筑物迁移就位时移动荷载的支撑结构及其施工方法 |
CN108999427B (zh) * | 2018-10-15 | 2023-10-24 | 北京建工四建工程建设有限公司 | 一种建筑物迁移就位时移动荷载的支撑结构及其施工方法 |
CN109750854A (zh) * | 2019-02-26 | 2019-05-14 | 上海先为土木工程有限公司 | 用于保护建筑物平移的滑脚移位装置 |
CN109750854B (zh) * | 2019-02-26 | 2024-05-17 | 上海先为土木工程有限公司 | 用于保护建筑物平移的滑脚移位装置 |
CN110805305A (zh) * | 2019-11-12 | 2020-02-18 | 山东建筑大学 | 一种高层建筑物爬坡移位方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102979318B (zh) | 2015-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN201850498U (zh) | 水中钢栈桥 | |
CN102913000B (zh) | 建筑物移位开发利用地下空间的方法 | |
CN102108676B (zh) | 一种结合梁-钢拱组合体系拱桥施工方法 | |
CN103215894B (zh) | 移动式临时预应力张拉锚块 | |
CN103669226B (zh) | 一种跨江预应力混凝土连续梁桥箱梁0#块支架施工方法 | |
CN103103925B (zh) | 一种组合h型钢立柱式托架 | |
CN104532749A (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN101324054B (zh) | 桥梁节段梁临时墩的顶推就位施工方法 | |
CN102979318B (zh) | 具有滑动支座的建筑物移位和隔震就位方法 | |
CN105297744A (zh) | 一种大型深基坑装配式型钢支撑体系 | |
CN110847010B (zh) | 适用于大跨度桥台刚构桥的构造及施工方法 | |
CN204325821U (zh) | 中低速磁悬浮低置线路连续框架式承轨梁结构 | |
CN102418534A (zh) | 隧道中隔墙的分体式移动模架装置及其施工方法 | |
CN202705924U (zh) | 一种安装于桥跨中间的拼装平台 | |
CN204385629U (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN102979317B (zh) | 具有双向滚轴隔震支座的建筑物移位就位方法 | |
CN106285040A (zh) | 利用轨道高差实现建筑物移位转向的方法 | |
CN205369043U (zh) | 大跨径钢箱梁顶推施工用临时支撑结构 | |
CN206233656U (zh) | 钢框架厂房结构 | |
CN203654200U (zh) | 一种跨江预应力混凝土连续梁桥箱梁0#块支架 | |
CN105040810A (zh) | 适用于框支剪力墙结构逆作法施工的连接节点 | |
CN101922296A (zh) | 顶铁及利用顶铁推进箱涵的方法 | |
CN103806374A (zh) | 装配式公路钢桥整体轨道架设推送系统及架设推送工艺 | |
CN207078928U (zh) | 一种大跨度结合梁的钢箱梁提升结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |