CN102943696B - 北重350mw超临界高中压合缸汽轮机组暖缸工艺 - Google Patents
北重350mw超临界高中压合缸汽轮机组暖缸工艺 Download PDFInfo
- Publication number
- CN102943696B CN102943696B CN201210466072.6A CN201210466072A CN102943696B CN 102943696 B CN102943696 B CN 102943696B CN 201210466072 A CN201210466072 A CN 201210466072A CN 102943696 B CN102943696 B CN 102943696B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- pressure
- warm
- valve
- warms
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 38
- 230000002209 hydrophobic effect Effects 0.000 claims abstract description 46
- 238000010792 warming Methods 0.000 claims abstract description 6
- 238000012802 pre-warming Methods 0.000 claims abstract description 5
- 230000000694 effects Effects 0.000 claims abstract description 4
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 2
- 239000000446 fuel Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 1
- 230000008646 thermal stress Effects 0.000 description 1
Landscapes
- Control Of Turbines (AREA)
Abstract
本发明涉及一种北重350MW超临界高中压合缸汽轮机组暖缸工艺,适用于采用北重350MW超临界高中压合缸汽轮机机组发电厂在冷态启动过程的高压缸暖缸。该工艺分为两阶段,第一阶段是锅炉点火前将辅助蒸汽引入高排逆门前管道,对高压缸进行预暖;第二阶段是锅炉点火后机组提前挂闸开启主汽门、再热主汽门,增加高压缸热量传导,缩短高压缸预暖时间;同时通过对高压缸本体疏水阀门进行节流控制,增加高压缸暖缸效果。本发明是根据试验研究得出的最佳机组暖缸操作程序。能够有效的缩短机组冷态启动过程中的暖缸时间,降低机组冷态启动燃料消耗,提高机组冷态启动经济性。
Description
所属技术领域
本发明涉及一种北重350MW超临界高中压合缸汽轮机组暖缸工艺,尤其是北重350MW超临界高中压合缸汽轮机发电机组冷态启动高压缸暖缸工艺。高压缸暖缸工艺程序是适用于采用北重350MW超临界高中压合缸汽轮机机组发电厂在冷态启动过程的高压缸暖缸。
背景技术
北重350MW超临界汽轮机是在引进ALSTOM公司330MW亚临界凝汽式汽轮机基础上结合目前国内对超临界汽轮机的要求设计开发的新机型。根据该机组实际冷态启动暖缸过程,高压缸预暖时间接近20个小时,同时由于超临界直流炉特点,高压缸暖缸时间过长将使得主蒸汽温度难以控制在合理的范围内,因此如何尽快缩短高压缸暖机时间,使高压缸得到充分预暖对于减小高压转子在冷态带初负荷时与蒸汽温差过大而导致的热应力过大,延长机组使用寿命,减小机组启动能耗,提高机组经济性具有重要意义。
发明内容
针对现有技术中存在的上述不足之处,本发明提供了一种北重350MW超临界高中压合缸汽轮机组暖缸工艺。目的是减小该机组冷态启动过程中燃料消耗,降低机组启动成本,有效的缩短机组暖缸时间,提高机组冷态启动经济性。
本发明是通过以下技术方案实现的:
北重350MW超临界高中压合缸汽轮机组暖缸工艺,分为两阶段暖缸工艺程序,第一阶段是锅炉点火前,将辅助蒸汽引入高排逆止门前管道,对高压缸进行预暖;第二阶段是锅炉点火后机组提前挂闸开启,高压主汽门、中压主汽门,增加高压缸热量传导,缩短高压缸预暖时间;同时通过对高压缸本体疏水阀门进行节流控制,增加高压缸暖缸效果。
所述的第一阶段暖缸工艺程序主要在锅炉点火前进行操作,分为暖缸条件检测和一阶段暖缸工艺程序两个步骤;
步骤一:暖缸条件检测,当下列条件满足时,可以开始进行一阶段暖缸;
(1)汽轮机盘车已投入;
(2)辅助蒸汽参数满足:压力0.8~1.4Mpa,温度280~350℃;
(3)高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门在开启状态;
(4)凝汽器真空在-84Kpa以上;
(5)汽轮机未挂闸,且高压外缸下半法兰1/2壁厚处温度小于191℃;
步骤二:一阶段暖缸工艺程序操作;
(1)高排逆止门前疏水阀门手动门节流至1/5开启状态;
(2)高压内缸疏水阀门节流至1/5开启状态;
(3)高压缸通风阀门关闭;
(4)一段抽汽逆止门前疏水阀门节流至1/5开启状态;
(5)开启辅助蒸汽至高压缸暖缸阀门;
所述的第二阶段暖缸工艺程序,分为二阶段暖缸工艺程序和暖缸结束判断及操作两个步骤,具体实施步骤如下
步骤三:二阶段暖缸工艺程序:
(1)主蒸汽压力达到2Mpa以上,开启高压、中压导汽管疏水阀门至1/5处;
(2)汽轮机挂闸,开启高压主汽门、中压主汽门,开启高压缸排汽逆止门旁通倒暖阀门;
(3)当冷再参数达到0.4Mpa,360℃,机组开始冲转,机组转速升速至990rpm;
(4)机组转速维持990rpm进行中速暖机;
(5)将高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门节流至10%;
步骤四:二阶段暖缸结束判断及暖缸结束后相关操作:
(1)高压外缸下半法兰1/2壁厚处温度达到190℃,则二阶段机组暖缸结束;
(2)关闭高压缸排汽逆止门旁路倒暖阀门,关闭辅助蒸汽至高压缸暖缸阀门;
(3)全开高压缸通风阀门;
(4)完全开启高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门;
(5)完全开启高压、中压导汽管疏水阀门,高压缸暖缸结束。
下面结合附图和具体实施例对本发明所进一步详细的说明。
附图说明
图1是本发明工艺程序中第一阶段暖缸程序流程图;
图2是本发明工艺程序中第二阶段暖缸程序流程图。
具体实施方式
本发明是一种北重350MW超临界高中压合缸汽轮机组暖缸工艺,具体说是北重350MW超临界高中压合缸汽轮机发电机组冷态启动高压缸暖缸工艺,其工艺步骤分为两阶段暖缸工艺程序,具体步骤如下:
第一阶段:主要在锅炉点火前进行操作,将辅助蒸汽引入高排逆止门前管道,对高压缸进行暖缸条件检测和一阶段暖缸工艺程序两个步骤,如图1所示。
步骤一:暖缸条件检测,当下列条件满足时,可以开始进行一阶段暖缸;
(1)汽轮机盘车已投入;
(2)辅助蒸汽参数满足:压力0.8~1.4Mpa,温度280~350℃;
(3)高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门在开启状态;
(4)凝汽器真空在-84Kpa以上;
(5)汽轮机未挂闸,且高压外缸下半法兰1/2壁厚处温度小于191℃;
步骤二:一阶段暖缸工艺程序操作;
(1)高排逆止门前疏水阀门手动门节流至1/5开启状态;
(2)高压内缸疏水阀门节流至1/5开启状态;
(3)高压缸通风阀门关闭;
(4)一段抽汽逆止门前疏水阀门节流至1/5开启状态;
(5)开启辅助蒸汽至高压缸暖缸阀门;
第二阶段:分为二阶段暖缸工艺程序和暖缸结束判断及操作两个步骤,即锅炉点火后机组提前挂闸,开启高压主汽门、中压主汽门,增加高压缸热量传导,缩短高压缸预暖时间;同时通过对高压缸本体疏水阀门进行节流控制,增加高压缸暖缸效果。如图2所示,具体实施步骤如下:
步骤三:二阶段暖缸工艺程序:
(1)主蒸汽压力达到2Mpa以上,开启高压、中压导汽管疏水阀门至1/5处;
(2)汽轮机挂闸,开启高压主汽门、中压主汽门,开启高压缸排汽逆止门旁通倒暖阀门;
(3)当冷再参数达到0.4Mpa,360℃,机组开始冲转,机组转速升速至990rpm;
(4)机组转速维持990rpm进行中速暖机;
(5)将高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门节流至10%;
步骤四:二阶段暖缸结束判断及暖缸结束后相关操作:
(1)高压外缸下半法兰1/2壁厚处温度达到190℃,则二阶段机组暖缸结束;
(2)关闭高压缸排汽逆止门旁路倒暖阀门,关闭辅助蒸汽至高压缸暖缸阀门;
(3)全开高压缸通风阀门;
(4)完全开启高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门;
(5)完全开启高压、中压导汽管疏水阀门,高压缸暖缸结束。
Claims (1)
1.北重350MW超临界高中压合缸汽轮机组暖缸工艺,分为两阶段暖缸工艺程序,第一阶段是锅炉点火前,将辅助蒸汽引入高排逆止门前管道,对高压缸进行预暖;第二阶段是锅炉点火后机组提前挂闸,开启高压主汽门、中压主汽门,增加高压缸热量传导,缩短高压缸预暖时间;同时通过对高压缸本体疏水阀门进行节流控制,增加高压缸暖缸效果,其特征是:所述的第一阶段暖缸工艺程序主要在锅炉点火前进行操作,分为暖缸条件检测和一阶段暖缸工艺程序两个步骤;
步骤一:暖缸条件检测,当下列条件满足时,开始进行一阶段暖缸;
(1)汽轮机盘车已投入;
(2)辅助蒸汽参数满足:压力0.8~1.4Mpa,温度280~350℃;
(3)高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门在开启状态;
(4)凝汽器真空在-84Kpa以上;
(5)汽轮机未挂闸,且高压外缸下半法兰1/2壁厚处温度小于191℃;
步骤二:一阶段暖缸工艺程序操作;
(1)高排逆止门前疏水阀门手动门节流至1/5开启状态;
(2)高压内缸疏水阀门节流至1/5开启状态;
(3)高压缸通风阀门关闭;
(4)一段抽汽逆止门前疏水阀门节流至1/5开启状态;
(5)开启辅助蒸汽至高压缸暖缸阀门;
所述的第二阶段暖缸工艺程序,分为二阶段暖缸工艺程序和暖缸结束判断及操作两个步骤,具体实施步骤如下
步骤三:二阶段暖缸工艺程序:
(1)主蒸汽压力达到2Mpa以上,开启高压、中压导汽管疏水阀门至1/5处;
(2)汽轮机挂闸,开启高压主汽门、中压主汽门,开启高压缸排汽逆止门旁通倒暖阀门;
(3)当冷再参数达到0.4Mpa,360℃,机组开始冲转,机组转速升速至990rpm;
(4)机组转速维持990rpm进行中速暖机;
(5)将高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门节流至10%;
步骤四:二阶段暖缸结束判断及暖缸结束后相关操作:
(1)高压外缸下半法兰1/2壁厚处温度达到190℃,则二阶段机组暖缸结束;
(2)关闭高压缸排汽逆止门旁路倒暖阀门,关闭辅助蒸汽至高压缸暖缸阀门;
(3)全开高压缸通风阀门;
(4)完全开启高排逆止门前疏水阀门,高压内缸疏水阀门,一段抽汽逆止门前疏水阀门;
(5)完全开启高压、中压导汽管疏水阀门,高压缸暖缸结束。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210466072.6A CN102943696B (zh) | 2012-11-19 | 2012-11-19 | 北重350mw超临界高中压合缸汽轮机组暖缸工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210466072.6A CN102943696B (zh) | 2012-11-19 | 2012-11-19 | 北重350mw超临界高中压合缸汽轮机组暖缸工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102943696A CN102943696A (zh) | 2013-02-27 |
CN102943696B true CN102943696B (zh) | 2015-08-05 |
Family
ID=47726670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210466072.6A Active CN102943696B (zh) | 2012-11-19 | 2012-11-19 | 北重350mw超临界高中压合缸汽轮机组暖缸工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102943696B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103388496A (zh) * | 2013-06-28 | 2013-11-13 | 云南电力试验研究院(集团)有限公司电力研究院 | 一种变参数的超临界机组暖机方法 |
CN110131002B (zh) * | 2018-02-09 | 2021-08-06 | 上海明华电力科技有限公司 | 基于环保目标的亚临界机组高中压缸联合启动控制方法 |
CN109356675B (zh) * | 2018-12-13 | 2021-10-22 | 浙江医药高等专科学校 | 给水泵汽轮机自动启动控制方法 |
CN113090343B (zh) * | 2021-04-25 | 2023-03-14 | 浙江浙能兰溪发电有限责任公司 | 一种缩短汽轮机冷态启动时间的方法 |
CN113153452B (zh) * | 2021-04-26 | 2022-10-14 | 大唐湘潭发电有限责任公司 | 一种解决汽轮机组开机过程中机组振动大的方法 |
CN113586174A (zh) * | 2021-08-05 | 2021-11-02 | 北京全四维动力科技有限公司 | 暖缸阀组、汽轮机及其暖缸方法 |
CN114109527A (zh) * | 2021-11-17 | 2022-03-01 | 北京国电电力有限公司大连开发区热电厂 | 一种实现高中压联合启动的无预启阀的汽轮调节方法 |
CN115263447B (zh) * | 2022-08-02 | 2023-10-13 | 西安热工研究院有限公司 | 燃气蒸汽联合循环机组的冷态预暖控制系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5912105A (ja) * | 1982-07-12 | 1984-01-21 | Fuji Electric Co Ltd | 再熱復水式蒸気タ−ビンの起動方式 |
JPS63179102A (ja) * | 1987-01-21 | 1988-07-23 | Hitachi Ltd | 蒸気タ−ビンの暖機方法 |
JPH02294503A (ja) * | 1989-05-10 | 1990-12-05 | Hitachi Ltd | 混圧タービン高圧加減弁蒸気室暖機装置 |
US8276382B2 (en) * | 2009-03-17 | 2012-10-02 | General Electric Company | Systems and methods for pre-warming a heat recovery steam generator and associated steam lines |
CN202300550U (zh) * | 2011-11-09 | 2012-07-04 | 西安兴仪启动发电试运有限公司 | 一种高压缸预暖系统 |
-
2012
- 2012-11-19 CN CN201210466072.6A patent/CN102943696B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102943696A (zh) | 2013-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102943696B (zh) | 北重350mw超临界高中压合缸汽轮机组暖缸工艺 | |
CN109441575B (zh) | 蒸汽联合循环发电机组供热期热网系统运行的方法 | |
CN104405459B (zh) | 用于汽轮机中压缸排汽供热网的背压机做功及供热装置 | |
CN106194297A (zh) | 一种热电联供汽轮机双支路供热系统 | |
CN205957280U (zh) | 一种吸收式热泵采暖抽汽供热系统 | |
CN108343479A (zh) | 一种基于两机组的凝抽背供热系统及调节方法 | |
CN207905867U (zh) | 一种燃气发电机组的蒸汽轮机蒸汽轴封供汽系统 | |
CN113404551A (zh) | 一种燃气-蒸汽联合循环供热机组轴封供汽系统及运行方法 | |
CN108167070A (zh) | 用于船用低速柴油机增压器的独立滑油供油系统 | |
CN212457058U (zh) | 基于电厂深度调峰下的供热参数提升系统 | |
CN108167029A (zh) | 50mw等级超高温背压机回收式排汽调节旁路系统及其控制方法 | |
CN206190339U (zh) | 一种热电联供汽轮机双支路供热系统 | |
CN104847481B (zh) | 气压储能式涡轮增压装置 | |
CN102678287A (zh) | 发动机排气能量缸内回收系统及其回收方法 | |
CN110469399A (zh) | 一种液态空气和燃油双能源混合动力式发动机 | |
CN205689252U (zh) | 热压机乏汽供热节能系统 | |
CN108757163A (zh) | 一种涡轮复合内燃机余热利用装置及其控制方法 | |
CN106194284B (zh) | 一种汽轮机夹层蒸汽参数调整及运行的方法 | |
CN214303962U (zh) | 一种汽轮机组空气预暖快速启动系统 | |
CN208184797U (zh) | 一种基于两机组双抽汽的凝抽背供热系统 | |
CN102900511A (zh) | 工况自适应排气能量回收系统 | |
CN212376702U (zh) | 燃机燃气加热的蒸汽轮机旁路系统 | |
CN206267895U (zh) | 隔级调整抽汽的热电联供汽轮机 | |
CN208184798U (zh) | 一种基于两机组的凝抽背供热系统 | |
CN206889090U (zh) | 一种电子式中冷器除水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |