CN102915479A - Power plant asset management system - Google Patents
Power plant asset management system Download PDFInfo
- Publication number
- CN102915479A CN102915479A CN2012103615704A CN201210361570A CN102915479A CN 102915479 A CN102915479 A CN 102915479A CN 2012103615704 A CN2012103615704 A CN 2012103615704A CN 201210361570 A CN201210361570 A CN 201210361570A CN 102915479 A CN102915479 A CN 102915479A
- Authority
- CN
- China
- Prior art keywords
- equipment
- management
- maintenance
- management module
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a power plant asset management system, which is of a modularization structure and comprises an equipment database, a defect management module, a worksheet management module, a spot-check management module, wherein the equipment database is used for storing basic information, repairing history and cost information of the equipment; the defect management module is used providing data source to the analysis and counting of the system by data accumulation in daily defect treatment processes; the worksheet management module is used for effectively controlling the progress of maintaining work of the equipment, tracing the worksheet state, gathering repairing and maintaining task costs, analyzing and comparing actual cost and budgetary; the spot-check management module is used for coordinating and executing the power plant repairing policy optimization and implementation of equipment state detection items, and performing state repairing and operating management to the equipment; the system also comprises equipment maintaining management and operating management. The power plant asset management system runs on at least one computer; the computer at least comprises a control software application for controlling, maintaining and updating system function and information stored in a data storage device.
Description
Technical field
The present invention relates to a kind of asset management system, be specifically related to a kind of Enterprise Assets Management System in Power Plants.
Background technology
Along with the gradually expansion of power plant's scale, the corresponding expansion of the scale of investment of its equipment.At present, traditional asset management pattern, i.e. manual management pattern are much still adopted in power plant's asset management.
The shortcoming of tradition asset management pattern is to fail complete asset management information is integrated, thereby can't allow the asset management personnel grasp immediately the operating position of equipment and reduced the availability of equipment; In addition, when increasing electric power factory equipment, the also conformability of relative reduce asset management information, thereby easily increase the asset management personnel in the difficulty of following the trail of and safeguarding, therefore, the asset management personnel are rather wasted time and energy and inefficent in management, also can increase maintenance cost simultaneously.
Summary of the invention
The purpose of this invention is to provide a kind of Enterprise Assets Management System in Power Plants, can make the management information of the more efficiently grasp assets of enterprise, solved the lower problem of traditional asset management pattern device availability.
The technical solution adopted in the present invention is that a kind of Enterprise Assets Management System in Power Plants adopts modular construction, comprises device databases, is used for essential information, maintenance history, operating position and the cost information of memory device; The workform management module, by Request For Work, the single cost of worksheet and worker gathers, and the process of ACU maintenance work is followed the tracks of the single state of worker, gathers maintenance, maintenance task cost, carries out the analysis of real cost and budget relatively; The defect management module adopts workflow to drive, and provides Data Source by the data accumulation in the daily defect processing process for analysis, the statistics of system; The spot check administration module is used for cooperating, implementing power plant's Strategies of Maintenance optimization and Condition Detection project implementation, and equipment is carried out state repair based on condition of component and operational management.
Also comprise equipment maintenance and management, by apparatus for establishing preventive maintenance and maintenance plan, trace analysis, equipment purchase and equipment stock control are carried out in equipment failure; Preventive maintenance refers to by the generation that the corresponding maintenance criterion of device definition is prevented incipient fault, prevents that fault from repeating and the equipment management work to breaking down and processing.
Also comprise operational management, the operations staff of auxiliary power plant accepts dispatch command, arrange generation schedule, read relevant data by real-time data acquisition system, make personnel and equipment that good scheduling of production be arranged, and adopt regular working management, equipment deficiency ladder of management, make generating set be in good running status.
This Enterprise Assets Management System in Power Plants moves at least one computing machine, and described computing machine has at least a control software application with control, maintenance and upgrades information and the systemic-function that exists in the data storage device.
The invention has the beneficial effects as follows, the present invention can effectively integrate asset management information, makes the asset management personnel in time grasp the operating position of equipment, thereby improves the availability of equipment; While can make the asset management personnel that equipment is in time followed the trail of and safeguard, thereby reduces the maintenance cost of equipment.
Description of drawings
Fig. 1 is the process flow diagram of Enterprise Assets Management System in Power Plants of the present invention.
Embodiment
The present invention is described in detail below in conjunction with description of drawings and embodiment.
A kind of Enterprise Assets Management System in Power Plants referring to accompanying drawing 1, adopts modular construction, comprises
1) device databases is for essential information, maintenance history, operating position and the cost information of memory device.
Device databases comprises equipment Foundations management and the management of equipment account, and the equipment Foundations management is the general frame of setting up power plant's armamentarium from equipment, device location and device type three-dimensional perspective; Equipment account supervisory packet is drawn together the Back ground Information machine account, the specifications parameter machine account, the standby redundancy machine account, upkeep operation standard machine account, maintaining standard and periodical repair standard machine account, sequenced detection standard and spot check historical data machine account, fault history machine account, overhaul historical machine account, cost of overhaul machine account and equipment are installed historical account.
The Back ground Information machine account is used for the supplier information of recording unit, device location and device type, canonical parameter, and the grading record, installed date, original price is bought the date, corresponding buying numbering, corresponding maintenance department, maintenance teams and groups and spot check person's information.
The specifications parameter machine account is used for specifications parameter item and the parameter value of recording unit, device location, device type.
The standby redundancy machine account is used for the standby redundancy inventory of apparatus for establishing, device location and device type, calls in easily needed standby redundancy in planning service work and overhauling project.
The maintenance activity that upkeep operation standard machine account often will carry out for equipment, device location, device type is formulated to standardized upkeep operation bag.
Maintaining standard and periodical repair standard machine account, the user is according to distinct device, device location and device type, and formulating time-based or event is trigger condition maintaining, upkeep operation standard machine account.
The parameter of sequenced detection standard and spot check historical data machine account comprises point inspection equipments, spot check parts, some check point, spot check project, some overhaul period and spot check person's information, and can receive separately spot check historical data table by each spot check item chain.
The fault history machine account is for the fault category that once occured on query facility position or the equipment and the time of various faults.
Overhaul historical machine account single for the check man who was occured on query facility position and the device history.
Cost of overhaul machine account is used for the total cost of overhaul of query facility position and lower floor's device location.
Equipment is installed historical machine account and is used for the equipment ﹠ installation time that device location that query facility once installed and set-up time or a certain position were once installed.
2) workform management module, by Request For Work, the single cost of worksheet and worker gathers, and the process of ACU maintenance work is followed the tracks of the single state of worker, gathers maintenance, maintenance task cost, carries out the analysis of real cost and budget relatively.
The workform management module comprises that the worker singly works out, the worker is single carry out and the single statistics of worker with analyze, the single establishment of worker comprise manually directly set up the worker single, eliminate that defective generates that the worker is single, the periodical repair project generates that the worker is single, the maintaining task generates worker's list and the spot check data exception generates worker's list.
The single execution of carrying out by workflow engine standard, promotion and monitoring worker list of worker arranges the exhaustive division that multiple working procedure is described work simultaneously, and every procedure can be divided into a plurality of concrete operation tasks.
The single statistics of worker with analyze the goods and materials that are used for budget that the maintenance, repair engineering is related to and generation, artificial, resource and other expenses and carry out tracing management, and automatically be updated to described Unit account of plant management.
3) defect management module adopts workflow to drive, and provides Data Source by the data accumulation in the daily defect processing process for analysis, the statistics of system.
The defect management module comprises defective registration, defect processing, defective examination and defect statistics and examination.
The defective registration is to the Back ground Information of equipment, and day-to-day operation operational circumstances and the overhauling project of equipment are registered.
Defect statistics and examination with classification of defects, are used for assessing the frequency of fault generation according to the registration of described defective and maintenance report, weak link, and the reason of scope and damage is in order to improve maintenance policy.
4) spot check administration module is used for cooperating, implementing power plant's Strategies of Maintenance optimization and Condition Detection project implementation, and equipment is carried out repair based on condition of component and operational management.
5) equipment maintenance and management by apparatus for establishing preventive maintenance and maintenance plan, carries out trace analysis, equipment purchase and equipment stock control to equipment failure; Preventive maintenance refers to by the generation that the corresponding maintenance criterion of device definition is prevented incipient fault, prevents that fault from repeating and the equipment management work to breaking down and processing.
6) operational management, the operations staff of auxiliary power plant accepts dispatch command, arrange generation schedule, read relevant data by real-time data acquisition system, make personnel and equipment that good scheduling of production be arranged, and adopt regular working management, equipment deficiency ladder of management, make generating set be in good running status.
This Enterprise Assets Management System in Power Plants moves at least one computing machine, and described computing machine has at least a control software application with control, maintenance and upgrades information and the systemic-function that exists in the data storage device.
The present invention can effectively integrate asset management information, makes the asset management personnel in time grasp the operating position of equipment, thereby improves the availability of equipment; While can make the asset management personnel that equipment is in time followed the trail of and safeguard, thereby reduces the maintenance cost of equipment.
Claims (4)
1. an Enterprise Assets Management System in Power Plants adopts modular construction, it is characterized in that, comprising:
Device databases, for the essential information of memory device, maintenance is historical, cost information;
The defect management module adopts workflow to drive, and provides Data Source by the data accumulation in the daily defect processing process for analysis, the statistics of system;
The workform management module, by Request For Work, the single cost of worksheet and worker gathers, and the process of ACU maintenance work is followed the tracks of the single state of worker, gathers maintenance, maintenance task cost, carries out the analysis of real cost and budget relatively;
The spot check administration module is used for cooperating, implementing power plant's Strategies of Maintenance optimization and Condition Detection project implementation, and equipment is carried out repair based on condition of component and operational management.
2. Enterprise Assets Management System in Power Plants according to claim 1 is characterized in that, also comprises equipment maintenance and management, by apparatus for establishing preventive maintenance and maintenance plan, trace analysis, equipment purchase and equipment stock control is carried out in equipment failure; Preventive maintenance refers to by the generation that the corresponding maintenance criterion of device definition is prevented incipient fault, prevents that fault from repeating and the equipment management work to breaking down and processing.
3. Enterprise Assets Management System in Power Plants according to claim 1 and 2, it is characterized in that, also comprise operational management, the operations staff of auxiliary power plant accepts dispatch command, arrange generation schedule, read relevant data by real-time data acquisition system, make personnel and equipment that good scheduling of production be arranged, and adopt regular working management, equipment deficiency ladder of management, make generating set be in good running status.
4. Enterprise Assets Management System in Power Plants according to claim 3, it is characterized in that, this Enterprise Assets Management System in Power Plants moves at least one computing machine, and described computing machine has at least a control software application with control, maintenance and upgrades information and the systemic-function that exists in the data storage device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103615704A CN102915479A (en) | 2012-09-25 | 2012-09-25 | Power plant asset management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103615704A CN102915479A (en) | 2012-09-25 | 2012-09-25 | Power plant asset management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102915479A true CN102915479A (en) | 2013-02-06 |
Family
ID=47613836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012103615704A Pending CN102915479A (en) | 2012-09-25 | 2012-09-25 | Power plant asset management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102915479A (en) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104424533A (en) * | 2013-09-10 | 2015-03-18 | 北京市燃气集团有限责任公司 | Equipment management system |
CN104766149A (en) * | 2014-01-06 | 2015-07-08 | 东典科技股份有限公司 | System and method for point inspection equipment and providing early warning |
CN104850095A (en) * | 2015-03-16 | 2015-08-19 | 国家电网公司 | Comprehensive automatic measurement and control defect-eliminating guidance system |
CN104850943A (en) * | 2015-05-04 | 2015-08-19 | 中国铁路总公司 | Health management-based enterprise asset management system |
CN104951905A (en) * | 2015-07-16 | 2015-09-30 | 中国神华能源股份有限公司 | Equipment dynamic ledger management system |
CN104950724A (en) * | 2015-06-18 | 2015-09-30 | 李朝阳 | Maintenance system and method of automated instrument and control equipment |
CN105117985A (en) * | 2015-09-11 | 2015-12-02 | 中国石油化工股份有限公司 | Systematization method for equipment defect management for oil refining enterprises |
CN105474252A (en) * | 2014-05-09 | 2016-04-06 | 株式会社日立系统 | Asset management system and asset management method |
CN105528442A (en) * | 2015-12-23 | 2016-04-27 | 本钢板材股份有限公司 | Bridge crane electromotor duty-cycle operation database management system and application method thereof |
CN107203838A (en) * | 2017-05-03 | 2017-09-26 | 北京海顿中科技术有限公司 | Equipment management system |
CN107330574A (en) * | 2017-05-03 | 2017-11-07 | 北京海顿中科技术有限公司 | A kind of equipment and the statistical analysis platform and method of maintenance |
CN107944830A (en) * | 2017-12-04 | 2018-04-20 | 北京中燕信息技术有限公司 | A kind of equipment maintenance cost management method, equipment and computer-readable recording medium |
CN108369719A (en) * | 2015-10-28 | 2018-08-03 | 京瓷株式会社 | Equipment management system and device management method |
CN108427994A (en) * | 2018-02-27 | 2018-08-21 | 鞍山市新安杰系统集成有限公司 | A kind of equipment management system based on TnPM |
CN108985581A (en) * | 2018-06-27 | 2018-12-11 | 浙江智飨科技有限公司 | A kind of goods and material handling method and cloud platform |
CN109886435A (en) * | 2019-02-21 | 2019-06-14 | 国家能源投资集团有限责任公司 | The processing method and system of overhaul of the equipments information |
CN110348583A (en) * | 2019-06-13 | 2019-10-18 | 河南大学 | A kind of unit maintenance progress dynamic management-control method |
CN110502605A (en) * | 2019-08-27 | 2019-11-26 | 深圳供电局有限公司 | Electric power asset LCC cost accumulation system based on artificial intelligence technology |
CN112434838A (en) * | 2019-08-22 | 2021-03-02 | 核动力运行研究所 | Isolation deduction model and evaluation method |
CN112633531A (en) * | 2020-12-26 | 2021-04-09 | 北京中恒博瑞数字电力科技有限公司 | Wind power plant operation maintenance system |
CN113191608A (en) * | 2021-04-22 | 2021-07-30 | 杭州卓智力创信息技术有限公司 | Nuclear power equipment operation cycle management system |
CN113762919A (en) * | 2021-08-05 | 2021-12-07 | 海澜智云科技有限公司 | Power plant equipment management platform system and equipment management method |
CN114596667A (en) * | 2022-03-08 | 2022-06-07 | 北京物资学院 | Data sharing method, system and computer storage medium |
CN114662812A (en) * | 2020-12-22 | 2022-06-24 | 中核核电运行管理有限公司 | Automatic scheduling method for daily pre-maintenance projects of nuclear power plant |
-
2012
- 2012-09-25 CN CN2012103615704A patent/CN102915479A/en active Pending
Non-Patent Citations (1)
Title |
---|
李磊: ""基于EAM管理思想的研究与软件实现"", 《中国优秀博硕士学位论文全文数据库(硕士) 信息科技辑》 * |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104424533A (en) * | 2013-09-10 | 2015-03-18 | 北京市燃气集团有限责任公司 | Equipment management system |
CN104766149A (en) * | 2014-01-06 | 2015-07-08 | 东典科技股份有限公司 | System and method for point inspection equipment and providing early warning |
CN105474252A (en) * | 2014-05-09 | 2016-04-06 | 株式会社日立系统 | Asset management system and asset management method |
CN104850095A (en) * | 2015-03-16 | 2015-08-19 | 国家电网公司 | Comprehensive automatic measurement and control defect-eliminating guidance system |
CN104850943A (en) * | 2015-05-04 | 2015-08-19 | 中国铁路总公司 | Health management-based enterprise asset management system |
CN104950724A (en) * | 2015-06-18 | 2015-09-30 | 李朝阳 | Maintenance system and method of automated instrument and control equipment |
CN104951905A (en) * | 2015-07-16 | 2015-09-30 | 中国神华能源股份有限公司 | Equipment dynamic ledger management system |
CN105117985A (en) * | 2015-09-11 | 2015-12-02 | 中国石油化工股份有限公司 | Systematization method for equipment defect management for oil refining enterprises |
CN108369719A (en) * | 2015-10-28 | 2018-08-03 | 京瓷株式会社 | Equipment management system and device management method |
CN108369719B (en) * | 2015-10-28 | 2022-07-22 | 京瓷株式会社 | Device management system and device management method |
CN105528442A (en) * | 2015-12-23 | 2016-04-27 | 本钢板材股份有限公司 | Bridge crane electromotor duty-cycle operation database management system and application method thereof |
CN107203838A (en) * | 2017-05-03 | 2017-09-26 | 北京海顿中科技术有限公司 | Equipment management system |
CN107330574A (en) * | 2017-05-03 | 2017-11-07 | 北京海顿中科技术有限公司 | A kind of equipment and the statistical analysis platform and method of maintenance |
CN107944830A (en) * | 2017-12-04 | 2018-04-20 | 北京中燕信息技术有限公司 | A kind of equipment maintenance cost management method, equipment and computer-readable recording medium |
CN108427994A (en) * | 2018-02-27 | 2018-08-21 | 鞍山市新安杰系统集成有限公司 | A kind of equipment management system based on TnPM |
CN108985581A (en) * | 2018-06-27 | 2018-12-11 | 浙江智飨科技有限公司 | A kind of goods and material handling method and cloud platform |
CN109886435A (en) * | 2019-02-21 | 2019-06-14 | 国家能源投资集团有限责任公司 | The processing method and system of overhaul of the equipments information |
CN110348583A (en) * | 2019-06-13 | 2019-10-18 | 河南大学 | A kind of unit maintenance progress dynamic management-control method |
CN112434838A (en) * | 2019-08-22 | 2021-03-02 | 核动力运行研究所 | Isolation deduction model and evaluation method |
CN112434838B (en) * | 2019-08-22 | 2023-07-18 | 核动力运行研究所 | Isolation deduction model and evaluation method |
CN110502605A (en) * | 2019-08-27 | 2019-11-26 | 深圳供电局有限公司 | Electric power asset LCC cost accumulation system based on artificial intelligence technology |
CN110502605B (en) * | 2019-08-27 | 2021-07-27 | 深圳供电局有限公司 | Electric power asset LCC cost collection system based on artificial intelligence technology |
CN114662812A (en) * | 2020-12-22 | 2022-06-24 | 中核核电运行管理有限公司 | Automatic scheduling method for daily pre-maintenance projects of nuclear power plant |
CN112633531A (en) * | 2020-12-26 | 2021-04-09 | 北京中恒博瑞数字电力科技有限公司 | Wind power plant operation maintenance system |
CN113191608A (en) * | 2021-04-22 | 2021-07-30 | 杭州卓智力创信息技术有限公司 | Nuclear power equipment operation cycle management system |
CN113762919A (en) * | 2021-08-05 | 2021-12-07 | 海澜智云科技有限公司 | Power plant equipment management platform system and equipment management method |
CN114596667A (en) * | 2022-03-08 | 2022-06-07 | 北京物资学院 | Data sharing method, system and computer storage medium |
CN114596667B (en) * | 2022-03-08 | 2023-08-11 | 北京物资学院 | Data sharing method, system and computer storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102915479A (en) | Power plant asset management system | |
CN108320069B (en) | Production and manufacturing execution system | |
Nurprihatin et al. | Total productive maintenance policy to increase effectiveness and maintenance performance using overall equipment effectiveness | |
Mostafa et al. | Lean maintenance roadmap | |
CN108614526B (en) | Reconfigurable production process management system | |
Fore et al. | Improvement of overall equipment effectiveness through total productive maintenance | |
CN105824300A (en) | Heavy type intelligent factory system based on IoT (Internet of Things) technology and digital management technology | |
Younus et al. | MES development and significant applications in manufacturing-A review | |
CN110705814A (en) | MES system based on intelligent manufacturing management | |
CN110428148A (en) | A kind of equipment maintenance intelligent management system | |
CN110852624A (en) | Intelligent manufacturing management system facing enterprise execution layer and operation method thereof | |
Schneider et al. | A cyber-physical failure management system for smart factories | |
CN108427994A (en) | A kind of equipment management system based on TnPM | |
CN112462702A (en) | Intelligent monitoring and intelligent scheduling system based on industrial internet | |
CN108280532A (en) | A kind of improved power equipment asset management system and method | |
CN107545519B (en) | Power grid enterprise operation and inspection management and control method | |
Hassan et al. | Effect of applying lean maintenance in oil and gas fields | |
Biały et al. | Computer systems supporting the management of machines/equipment in hard coal mines. Case study | |
CN112418548B (en) | Intelligent workshop management method and system based on artificial intelligence technology | |
Sharma et al. | TPM Implementation inPiston Manufacturing Industry for OEE | |
Wan et al. | Knowledge management for maintenance, repair and service of manufacturing system | |
Liu et al. | The application of digital flexible intelligent manufacturing system in machine manufacturing industry | |
CN107341630B (en) | Equipment obsolete spare part management system and method | |
Arsakulasooriya et al. | Applicability of lean maintenance in commercial high-rise buildings: A case study in Sri Lanka | |
Huo et al. | CMMS based reliability centered maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130206 |