CN108280532A - A kind of improved power equipment asset management system and method - Google Patents
A kind of improved power equipment asset management system and method Download PDFInfo
- Publication number
- CN108280532A CN108280532A CN201710781930.9A CN201710781930A CN108280532A CN 108280532 A CN108280532 A CN 108280532A CN 201710781930 A CN201710781930 A CN 201710781930A CN 108280532 A CN108280532 A CN 108280532A
- Authority
- CN
- China
- Prior art keywords
- equipment
- cost input
- module
- data
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000004458 analytical method Methods 0.000 claims abstract description 22
- 230000010354 integration Effects 0.000 claims abstract description 8
- 238000001303 quality assessment method Methods 0.000 claims abstract description 8
- 238000007726 management method Methods 0.000 claims description 38
- 238000010835 comparative analysis Methods 0.000 claims description 21
- 238000012423 maintenance Methods 0.000 claims description 20
- 238000003066 decision tree Methods 0.000 claims description 6
- 238000007619 statistical method Methods 0.000 claims description 6
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 238000007405 data analysis Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 238000013441 quality evaluation Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 2
- 239000000178 monomer Substances 0.000 claims 1
- 230000000007 visual effect Effects 0.000 claims 1
- 230000002159 abnormal effect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 101150042248 Mgmt gene Proteins 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of improved power equipment asset management system and methods, are related to power system management field.The system include data source modules, Data Integration module, asset of equipments quality assessment modules, asset of equipments analysis module, data display module, instruction issue module.After configuration setting, it is not necessarily to artificial interference, Autonomy is managed power equipment asset life cycle, precisely analyzes, being purchased to assets and O&M carries out precisely prediction and and guides;Equipment is done and is accurately managed, cost has been saved, promotes the reasonability and accuracy of asset management.
Description
Technical field
The present invention relates to power system management field more particularly to a kind of power equipment asset management system and methods.
Background technology
Electric enterprises property complex management, device category is more, classification is miscellaneous, and equipment variations are frequent caused by being transformed, repairing.
The characteristics of due to power utility plant asset management, there are mainly two types of modes for conventional electric power equipment management method:First, management
Main line, i.e., MIS/SIS at first, these systems are to manage and control as main application, the main static pipe for focusing on equipment
The management of the Equipment Foundations attribute data of reason, including equipment account and archives etc.;Second is that overhauled as the starting point with the O&M of equipment,
The operation management for laying particular emphasis on equipment belongs to the scope of dynamic management, includes the details of recording equipment operation, inspection and failure
Deng.
However, these management system and methods shortages are effective from equipment purchase to equipment scrapping whole equipment Life cycle
Monitoring, analysis and guide the management of buying O&M.In addition, since electric power enterprise system is huge, used between different branches
Management method and system it is different, each system assets management information data is inconsistent, and enterprises, which lack, is directed to the complicated money of power grid
Data unified analysis and solution are produced, Asset Mgmt Dept is caused only to carry out assets buying and fortune from experience or reported data
Dimension so that cost increases, and waste is serious.
Invention content
In view of the deficiencies of the prior art, the object of the present invention is to provide a kind of improved power equipment asset management system and
Method is not necessarily to artificial interference after configuration setting, and Autonomy is managed power equipment asset life cycle, precisely divides
Analysis carries out precisely predicting to and guide to assets buying and O&M;Equipment is done and is accurately managed, cost has been saved, promotes assets
The reasonability and accuracy of management.
To achieve the goals above, an aspect of of the present present invention provides a kind of improved power equipment asset management system, should
System includes following module,
(1) data source modules:Device data, procurement information, contract information of acquisition etc., data source include production management
Multiple information systems that the electric system such as system, ERP system, e-commerce platform, goods and materials allotment use.
(2) Data Integration module:Using extraction, conversion, load method by multiple system database uniform formats to electricity
Force system equipment management data library.Data are monthly extracted to Data Analysis Platform using with ETL tools, and monitors file and arrives
Up to indexs such as the total number of records, file size, Data Dates in time, file total number, file, and timely early warning is set and (sends out short
Letter or mail arrive corresponding responsible person), so as to abnormal into line trace processing after early warning.In view of festivals or holidays are to data volume
It influences, also increases file record number and the year-on-year of file size, ring ratio are monitored.
(3) asset of equipments quality assessment modules:Pass through each link cost input, different operation time limit cost inputs, equipment
The various kinds of equipment cost input distributed data such as failure, record of examination and failure, cost of overhaul input carries out single devices cost
Comparative analysis is put into, is labeled to reaching the equipment for removing/scrapping threshold condition, and execute and remove/scrap, for not reaching
The assessment of next round will be entered to the equipment for removing/scrapping condition.
(4) asset of equipments analysis module:The Assets Analyst module is core of the invention module, is used for and other modules
It is connected, by the real-time acquisition to device data, distributing rationally for power system device assets is realized in the quality evaluation of assets.
By device type, the operation time limit, breaks down and complete cost input statistical analysis with dimensions such as maintenance;Existed by individual equipment
The cost input situation of different times completes the life cycle statistical analysis of equipment;It is distributed by different type cost input, it is complete
At operation and remove the cost input comparative analysis scrapped;Decision tree analysis is carried out by historical Device cost input situation, always
It bears and reaches cost input threshold condition when removing/scrap condition, short-term forecast is carried out to being up to dismounting/write-off equipment.
(5) data display module:It shows query result and visualizes analysis result, presentation device type, operation year
Limit, break down with the cost input situations of dimensions such as maintenance, the cost input distribution situation in various kinds of equipment Life cycle,
The cost input situation that single devices operating cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped,
And compare and analyze and visualize, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is provided for company
It produces management level and Auxiliary support is provided.
(6) instruction issues module:Send instructions under.
Wherein, data source modules, Data Integration module, asset of equipments quality assessment modules, data display module with set
Standby Assets Analyst module connection.
To achieve the goals above, another aspect of the present invention proposes a kind of improved power equipment assets management method,
This method comprises the following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each
The data such as link cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment is suggested executing
Operation (executing daily primary) is removed/scrapped, is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand Shen
It please be single;
Step 9:Record best dismounting/and failure time initial time (analysis show that suggestion is removed for the first time/when scrapping
Between), terminate the time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.
Description of the drawings
Fig. 1 is a kind of power equipment asset management system structural framing figure provided by the invention.
Fig. 2 is a kind of power equipment assets management method flow chart.
Specific implementation mode
Below in conjunction with drawings and examples, the present invention will be described in further detail.It should be appreciated that described herein
Specific embodiment is only used for explaining the present invention, is not intended to limit the present invention.
As shown in Figure 1, the present invention provides a kind of improved power equipment assets management method system, which includes:
(1) data source modules:Device data, procurement information, contract information of acquisition etc., data source include production management
Multiple information systems that the electric system such as system, ERP system, e-commerce platform, goods and materials allotment use.
(2) Data Integration module:Using extraction, conversion, load method by multiple system database uniform formats to electricity
Force system equipment management data library.Data are monthly extracted to Data Analysis Platform using with ETL tools, and monitors file and arrives
Up to indexs such as the total number of records, file size, Data Dates in time, file total number, file, and timely early warning is set, so as to
To abnormal into line trace processing after early warning.Influence in view of festivals or holidays to data volume also increases file record number and file
The year-on-year of size, ring ratio are monitored.
(3) asset of equipments quality assessment modules:Pass through each link cost input, different operation time limit cost inputs, equipment
The various kinds of equipment cost input distributed data such as failure, record of examination and failure, cost of overhaul input carries out single devices cost
Comparative analysis is put into, is labeled to reaching the equipment for removing/scrapping threshold condition, and execute and remove/scrap, for not reaching
The assessment of next round will be entered to the equipment for removing/scrapping condition.
(4) asset of equipments analysis module:The Assets Analyst module is core of the invention module, is used for and other modules
It is connected, by the real-time acquisition to device data, distributing rationally for power system device assets is realized in the quality evaluation of assets.
By device type, the operation time limit, breaks down and complete cost input statistical analysis with dimensions such as maintenance;Existed by individual equipment
The cost input situation of different times completes the life cycle statistical analysis of equipment;It is distributed by different type cost input, it is complete
At operation and remove the cost input comparative analysis scrapped;Decision tree analysis is carried out by historical Device cost input situation, always
It bears and reaches cost input threshold condition when removing/scrap condition, short-term forecast is carried out to being up to dismounting/write-off equipment.
(5) data display module:It shows query result and visualizes analysis result, presentation device type, operation year
Limit, break down with the cost input situations of dimensions such as maintenance, the cost input distribution situation in various kinds of equipment Life cycle,
The cost input situation that single devices operating cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped,
And compare and analyze and visualize, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is provided for company
It produces management level and Auxiliary support is provided.
(6) instruction issues module:Send instructions under.
Wherein, data source modules, Data Integration module, asset of equipments quality assessment modules, data display module with set
Standby Assets Analyst module connection.
System Utilization Procedure:
When individual equipment is up to service life, count the maintenance cost situation of the equipment, and by maintenance cost with
Purchase cost is compared, and when being more than purchase cost if there is maintenance cost, is then suggested executing and is removed/scrap;
For distinct device when areal is influenced by extreme weather, environment, equipment frequently occurs trouble hunting situation, and leads
Maintenance cost is caused rapidly to go up, speedup is much larger than same period other equipment, can show that the equipment is not suitable for continuing under the present circumstances
Operation, it is proposed that original equipment executes dismounting, and purchases the equipment suitable for such environment;
Individual equipment distance reaches service life farther out, and equipment quality problem operating cost occurs and is far above other equipment
When, original equipment, which executes, removes or requires the modes such as supplier's more exchange device.
As shown in Fig. 2, another aspect of the present invention proposes a kind of improved power equipment assets management method, this method packet
Include following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each
The data such as link cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment is suggested executing
Operation (executing daily primary) is removed/scrapped, is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand Shen
It please be single;
Step 9:Record best dismounting/and failure time initial time (analysis show that suggestion is removed for the first time/when scrapping
Between), terminate the time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.
Claims (7)
1. a kind of improved power equipment asset management system, it is characterised in that the system includes following module:Data source modules,
Data Integration module, asset of equipments quality assessment modules, asset of equipments analysis module, data display module and instruction issue mould
Block, wherein data source modules, Data Integration module, asset of equipments quality assessment modules, data display module are and asset of equipments
Analysis module connects;
Data source modules:Device data, procurement information, the contract information of acquisition;
Data Integration module:Multiple system database uniform formats to electric system are set using the method for extraction, conversion, load
Standby management database;Using data monthly being extracted to Data Analysis Platform with ETL tools, and monitor file arrival time,
The total number of records, file size, Data Date, file record number and the year-on-year of file size in file total number, file, ring ratio into
Row monitoring index, and timely early warning is set;
Asset of equipments quality assessment modules:To each link cost input, different operation time limit cost inputs, equipment fault, maintenance
Record and failure, cost of overhaul input various kinds of equipment cost input distributed data carry out single devices cost input to score
Analysis, is labeled, and execute and remove/scrap to reaching the equipment for removing/scrapping threshold condition, for not reaching dismounting/report
The equipment of useless condition will enter the assessment of next round.
Asset of equipments analysis module:The Assets Analyst module is core of the invention module, for being connected with other modules, is led to
The real-time acquisition to device data is crossed, distributing rationally for power system device assets is realized in the quality evaluation of assets;
Data display module:It shows query result and visualizes analysis result, presentation device type, occurs the operation time limit
The cost input situation of the dimensions such as failure and maintenance, the cost input distribution situation in various kinds of equipment Life cycle, monomer are set
The cost input situation that received shipment row cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped, and carry out
Comparative analysis and visual presentation, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is corporate assets management
Layer provides Auxiliary support;
(6) instruction issues module:Send instructions under.
2. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the system data comes
Source module includes production management system, ERP system, e-commerce platform, multiple information systems for using of goods and materials allotment electric system
System.
3. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst
Module by device type, operation the time limit, break down with maintenance dimension complete cost input statistical analysis.
4. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst
Module completes the life cycle statistical analysis of equipment by individual equipment in the cost input situation of different times.
5. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst
Module is distributed by different type cost input, is completed operation and is removed the cost input comparative analysis scrapped.
6. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst
Module carries out decision tree analysis by historical Device cost input situation, sums up and reaches cost input when removing/scrap condition
Threshold condition carries out short-term forecast to being up to dismounting/write-off equipment.
7. a kind of improved power equipment assets management method, this method comprises the following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each link
The data such as cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment, which is suggested executing, is torn open
Except/operation (executing daily primary) is scrapped, it is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand application
It is single;
Step 9:Record best dismounting/failure time initial time (analysis obtains suggestion dismounting/failure time for the first time), end
Only time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710781930.9A CN108280532A (en) | 2017-09-02 | 2017-09-02 | A kind of improved power equipment asset management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710781930.9A CN108280532A (en) | 2017-09-02 | 2017-09-02 | A kind of improved power equipment asset management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108280532A true CN108280532A (en) | 2018-07-13 |
Family
ID=62801178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710781930.9A Pending CN108280532A (en) | 2017-09-02 | 2017-09-02 | A kind of improved power equipment asset management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108280532A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490462A (en) * | 2019-08-21 | 2019-11-22 | 广州经信纬通信息科技有限公司 | A kind of informationization Capital operation analysis system |
CN110566969A (en) * | 2019-10-21 | 2019-12-13 | 民政部一零一研究所 | cremation equipment comprehensive monitoring and waste judging method and system |
CN110889755A (en) * | 2019-12-04 | 2020-03-17 | 江苏智谋科技有限公司 | Data storage monitoring system and method for intangible asset life cycle |
CN111832932A (en) * | 2020-07-10 | 2020-10-27 | 国网辽宁省电力有限公司电力科学研究院 | Intelligent operation and maintenance decision method and system for power distribution network |
CN113592435A (en) * | 2021-07-09 | 2021-11-02 | 华南理工大学 | Intelligent monitoring and early warning system for material supply |
CN113656470A (en) * | 2020-05-12 | 2021-11-16 | 北京市天元网络技术股份有限公司 | Asset purchase prompting method and device, electronic equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101131752A (en) * | 2007-06-01 | 2008-02-27 | 中国神华能源股份有限公司 | Equipment scrap judging method |
CN102142111A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Asset life information integrated control method and device suitable for power system |
CN103955510A (en) * | 2014-04-30 | 2014-07-30 | 广西电网公司电力科学研究院 | Massive electricity marketing data integration method uploaded by ETL cloud platform |
CN104392277A (en) * | 2014-11-13 | 2015-03-04 | 云南电网公司大理供电局 | Transformer economy service life predication method and device |
CN106779298A (en) * | 2016-11-23 | 2017-05-31 | 贵州电网有限责任公司电网规划研究中心 | The grid equipment level lifecycle management succeeding year method of cost accounting |
-
2017
- 2017-09-02 CN CN201710781930.9A patent/CN108280532A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101131752A (en) * | 2007-06-01 | 2008-02-27 | 中国神华能源股份有限公司 | Equipment scrap judging method |
CN102142111A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Asset life information integrated control method and device suitable for power system |
CN103955510A (en) * | 2014-04-30 | 2014-07-30 | 广西电网公司电力科学研究院 | Massive electricity marketing data integration method uploaded by ETL cloud platform |
CN104392277A (en) * | 2014-11-13 | 2015-03-04 | 云南电网公司大理供电局 | Transformer economy service life predication method and device |
CN106779298A (en) * | 2016-11-23 | 2017-05-31 | 贵州电网有限责任公司电网规划研究中心 | The grid equipment level lifecycle management succeeding year method of cost accounting |
Non-Patent Citations (5)
Title |
---|
张根周等: "资产全寿命智能物联平台的架构设计与应用前景研究", 《陕西电力》 * |
段成等: "一种轻量级电网实时数据ETL系统的设计与实现", 《电力系统保护与控制》 * |
田洪迅 等: ""电网资产全过程管理决策方法框架体系"", 《电力建设》 * |
许懿洋: "电力企业资产全寿命实施策略", 《黑龙江电力》 * |
赵武清等: "基于机器学习的电网设备全生命周期成本预测", 《信息系统工程》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490462A (en) * | 2019-08-21 | 2019-11-22 | 广州经信纬通信息科技有限公司 | A kind of informationization Capital operation analysis system |
CN110566969A (en) * | 2019-10-21 | 2019-12-13 | 民政部一零一研究所 | cremation equipment comprehensive monitoring and waste judging method and system |
CN110566969B (en) * | 2019-10-21 | 2021-03-26 | 民政部一零一研究所 | Cremation equipment comprehensive monitoring and waste judging method and system |
CN110889755A (en) * | 2019-12-04 | 2020-03-17 | 江苏智谋科技有限公司 | Data storage monitoring system and method for intangible asset life cycle |
CN113656470A (en) * | 2020-05-12 | 2021-11-16 | 北京市天元网络技术股份有限公司 | Asset purchase prompting method and device, electronic equipment and storage medium |
CN111832932A (en) * | 2020-07-10 | 2020-10-27 | 国网辽宁省电力有限公司电力科学研究院 | Intelligent operation and maintenance decision method and system for power distribution network |
CN113592435A (en) * | 2021-07-09 | 2021-11-02 | 华南理工大学 | Intelligent monitoring and early warning system for material supply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108280532A (en) | A kind of improved power equipment asset management system and method | |
Qingfeng et al. | Development and application of equipment maintenance and safety integrity management system | |
CN108320069B (en) | Production and manufacturing execution system | |
CN111210108B (en) | Performance management and control model of electric power material supply chain | |
CN102663537A (en) | Maintenance system of power equipment based on risk assessment | |
CN104638764A (en) | Intelligent state diagnosis and overhauling system for power distribution network equipment | |
CN110320893B (en) | Thermal power generating unit equipment maintenance method based on RCM | |
CN109858786B (en) | Electromechanical device management system based on Internet of things | |
Hahn et al. | Recommended practices for wind farm data collection and reliability assessment for O&M optimization | |
CN105967063B (en) | Maintenance platform fault analysis process system and method | |
CN111695744B (en) | Maintenance equipment demand prediction analysis system based on big data | |
CN103942726A (en) | Intelligent inspection method for condition evaluation work of power grid equipment | |
CN110852624A (en) | Intelligent manufacturing management system facing enterprise execution layer and operation method thereof | |
CN111915167A (en) | Intelligent manufacturing virtual shipyard information model construction method | |
CN107545519B (en) | Power grid enterprise operation and inspection management and control method | |
Slaichová et al. | The effect of implementing a maintenance information system on the efficiency of production facilities | |
CN112418548B (en) | Intelligent workshop management method and system based on artificial intelligence technology | |
CN111105048A (en) | Early warning method for state of power transmission and transformation Internet of things equipment | |
CN110245163A (en) | A kind of Operation of Electric Systems hidden troubles removing method | |
Baluch et al. | Measuring OEE in Malaysian palm oil mills | |
CN110738427A (en) | electric power part work quality scoring system | |
CN202795451U (en) | Asset entire life-cycle management process control application system based on topic base | |
CN115330404A (en) | System and method for electric power marketing inspection | |
Salsabila et al. | Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis: A Case Study of Shot Blast Machine | |
Shopeju et al. | A comprehensive review of thermal power plants reliability using stochastic methods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180713 |