CN108280532A - A kind of improved power equipment asset management system and method - Google Patents

A kind of improved power equipment asset management system and method Download PDF

Info

Publication number
CN108280532A
CN108280532A CN201710781930.9A CN201710781930A CN108280532A CN 108280532 A CN108280532 A CN 108280532A CN 201710781930 A CN201710781930 A CN 201710781930A CN 108280532 A CN108280532 A CN 108280532A
Authority
CN
China
Prior art keywords
equipment
cost input
module
data
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710781930.9A
Other languages
Chinese (zh)
Inventor
赵永彬
郭志彤
李钊
陈龙
郭昆亚
乔林
刘鹏宇
曹智
王彦伟
杨华飞
赵希超
胡小磊
耿洪碧
曹国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Nanjing NARI Group Corp
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Nanjing NARI Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd, Nanjing NARI Group Corp filed Critical State Grid Corp of China SGCC
Priority to CN201710781930.9A priority Critical patent/CN108280532A/en
Publication of CN108280532A publication Critical patent/CN108280532A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of improved power equipment asset management system and methods, are related to power system management field.The system include data source modules, Data Integration module, asset of equipments quality assessment modules, asset of equipments analysis module, data display module, instruction issue module.After configuration setting, it is not necessarily to artificial interference, Autonomy is managed power equipment asset life cycle, precisely analyzes, being purchased to assets and O&M carries out precisely prediction and and guides;Equipment is done and is accurately managed, cost has been saved, promotes the reasonability and accuracy of asset management.

Description

A kind of improved power equipment asset management system and method
Technical field
The present invention relates to power system management field more particularly to a kind of power equipment asset management system and methods.
Background technology
Electric enterprises property complex management, device category is more, classification is miscellaneous, and equipment variations are frequent caused by being transformed, repairing. The characteristics of due to power utility plant asset management, there are mainly two types of modes for conventional electric power equipment management method:First, management Main line, i.e., MIS/SIS at first, these systems are to manage and control as main application, the main static pipe for focusing on equipment The management of the Equipment Foundations attribute data of reason, including equipment account and archives etc.;Second is that overhauled as the starting point with the O&M of equipment, The operation management for laying particular emphasis on equipment belongs to the scope of dynamic management, includes the details of recording equipment operation, inspection and failure Deng.
However, these management system and methods shortages are effective from equipment purchase to equipment scrapping whole equipment Life cycle Monitoring, analysis and guide the management of buying O&M.In addition, since electric power enterprise system is huge, used between different branches Management method and system it is different, each system assets management information data is inconsistent, and enterprises, which lack, is directed to the complicated money of power grid Data unified analysis and solution are produced, Asset Mgmt Dept is caused only to carry out assets buying and fortune from experience or reported data Dimension so that cost increases, and waste is serious.
Invention content
In view of the deficiencies of the prior art, the object of the present invention is to provide a kind of improved power equipment asset management system and Method is not necessarily to artificial interference after configuration setting, and Autonomy is managed power equipment asset life cycle, precisely divides Analysis carries out precisely predicting to and guide to assets buying and O&M;Equipment is done and is accurately managed, cost has been saved, promotes assets The reasonability and accuracy of management.
To achieve the goals above, an aspect of of the present present invention provides a kind of improved power equipment asset management system, should System includes following module,
(1) data source modules:Device data, procurement information, contract information of acquisition etc., data source include production management Multiple information systems that the electric system such as system, ERP system, e-commerce platform, goods and materials allotment use.
(2) Data Integration module:Using extraction, conversion, load method by multiple system database uniform formats to electricity Force system equipment management data library.Data are monthly extracted to Data Analysis Platform using with ETL tools, and monitors file and arrives Up to indexs such as the total number of records, file size, Data Dates in time, file total number, file, and timely early warning is set and (sends out short Letter or mail arrive corresponding responsible person), so as to abnormal into line trace processing after early warning.In view of festivals or holidays are to data volume It influences, also increases file record number and the year-on-year of file size, ring ratio are monitored.
(3) asset of equipments quality assessment modules:Pass through each link cost input, different operation time limit cost inputs, equipment The various kinds of equipment cost input distributed data such as failure, record of examination and failure, cost of overhaul input carries out single devices cost Comparative analysis is put into, is labeled to reaching the equipment for removing/scrapping threshold condition, and execute and remove/scrap, for not reaching The assessment of next round will be entered to the equipment for removing/scrapping condition.
(4) asset of equipments analysis module:The Assets Analyst module is core of the invention module, is used for and other modules It is connected, by the real-time acquisition to device data, distributing rationally for power system device assets is realized in the quality evaluation of assets. By device type, the operation time limit, breaks down and complete cost input statistical analysis with dimensions such as maintenance;Existed by individual equipment The cost input situation of different times completes the life cycle statistical analysis of equipment;It is distributed by different type cost input, it is complete At operation and remove the cost input comparative analysis scrapped;Decision tree analysis is carried out by historical Device cost input situation, always It bears and reaches cost input threshold condition when removing/scrap condition, short-term forecast is carried out to being up to dismounting/write-off equipment.
(5) data display module:It shows query result and visualizes analysis result, presentation device type, operation year Limit, break down with the cost input situations of dimensions such as maintenance, the cost input distribution situation in various kinds of equipment Life cycle, The cost input situation that single devices operating cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped, And compare and analyze and visualize, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is provided for company It produces management level and Auxiliary support is provided.
(6) instruction issues module:Send instructions under.
Wherein, data source modules, Data Integration module, asset of equipments quality assessment modules, data display module with set Standby Assets Analyst module connection.
To achieve the goals above, another aspect of the present invention proposes a kind of improved power equipment assets management method, This method comprises the following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each The data such as link cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment is suggested executing Operation (executing daily primary) is removed/scrapped, is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand Shen It please be single;
Step 9:Record best dismounting/and failure time initial time (analysis show that suggestion is removed for the first time/when scrapping Between), terminate the time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.
Description of the drawings
Fig. 1 is a kind of power equipment asset management system structural framing figure provided by the invention.
Fig. 2 is a kind of power equipment assets management method flow chart.
Specific implementation mode
Below in conjunction with drawings and examples, the present invention will be described in further detail.It should be appreciated that described herein Specific embodiment is only used for explaining the present invention, is not intended to limit the present invention.
As shown in Figure 1, the present invention provides a kind of improved power equipment assets management method system, which includes:
(1) data source modules:Device data, procurement information, contract information of acquisition etc., data source include production management Multiple information systems that the electric system such as system, ERP system, e-commerce platform, goods and materials allotment use.
(2) Data Integration module:Using extraction, conversion, load method by multiple system database uniform formats to electricity Force system equipment management data library.Data are monthly extracted to Data Analysis Platform using with ETL tools, and monitors file and arrives Up to indexs such as the total number of records, file size, Data Dates in time, file total number, file, and timely early warning is set, so as to To abnormal into line trace processing after early warning.Influence in view of festivals or holidays to data volume also increases file record number and file The year-on-year of size, ring ratio are monitored.
(3) asset of equipments quality assessment modules:Pass through each link cost input, different operation time limit cost inputs, equipment The various kinds of equipment cost input distributed data such as failure, record of examination and failure, cost of overhaul input carries out single devices cost Comparative analysis is put into, is labeled to reaching the equipment for removing/scrapping threshold condition, and execute and remove/scrap, for not reaching The assessment of next round will be entered to the equipment for removing/scrapping condition.
(4) asset of equipments analysis module:The Assets Analyst module is core of the invention module, is used for and other modules It is connected, by the real-time acquisition to device data, distributing rationally for power system device assets is realized in the quality evaluation of assets. By device type, the operation time limit, breaks down and complete cost input statistical analysis with dimensions such as maintenance;Existed by individual equipment The cost input situation of different times completes the life cycle statistical analysis of equipment;It is distributed by different type cost input, it is complete At operation and remove the cost input comparative analysis scrapped;Decision tree analysis is carried out by historical Device cost input situation, always It bears and reaches cost input threshold condition when removing/scrap condition, short-term forecast is carried out to being up to dismounting/write-off equipment.
(5) data display module:It shows query result and visualizes analysis result, presentation device type, operation year Limit, break down with the cost input situations of dimensions such as maintenance, the cost input distribution situation in various kinds of equipment Life cycle, The cost input situation that single devices operating cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped, And compare and analyze and visualize, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is provided for company It produces management level and Auxiliary support is provided.
(6) instruction issues module:Send instructions under.
Wherein, data source modules, Data Integration module, asset of equipments quality assessment modules, data display module with set Standby Assets Analyst module connection.
System Utilization Procedure:
When individual equipment is up to service life, count the maintenance cost situation of the equipment, and by maintenance cost with Purchase cost is compared, and when being more than purchase cost if there is maintenance cost, is then suggested executing and is removed/scrap;
For distinct device when areal is influenced by extreme weather, environment, equipment frequently occurs trouble hunting situation, and leads Maintenance cost is caused rapidly to go up, speedup is much larger than same period other equipment, can show that the equipment is not suitable for continuing under the present circumstances Operation, it is proposed that original equipment executes dismounting, and purchases the equipment suitable for such environment;
Individual equipment distance reaches service life farther out, and equipment quality problem operating cost occurs and is far above other equipment When, original equipment, which executes, removes or requires the modes such as supplier's more exchange device.
As shown in Fig. 2, another aspect of the present invention proposes a kind of improved power equipment assets management method, this method packet Include following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each The data such as link cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment is suggested executing Operation (executing daily primary) is removed/scrapped, is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand Shen It please be single;
Step 9:Record best dismounting/and failure time initial time (analysis show that suggestion is removed for the first time/when scrapping Between), terminate the time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.

Claims (7)

1. a kind of improved power equipment asset management system, it is characterised in that the system includes following module:Data source modules, Data Integration module, asset of equipments quality assessment modules, asset of equipments analysis module, data display module and instruction issue mould Block, wherein data source modules, Data Integration module, asset of equipments quality assessment modules, data display module are and asset of equipments Analysis module connects;
Data source modules:Device data, procurement information, the contract information of acquisition;
Data Integration module:Multiple system database uniform formats to electric system are set using the method for extraction, conversion, load Standby management database;Using data monthly being extracted to Data Analysis Platform with ETL tools, and monitor file arrival time, The total number of records, file size, Data Date, file record number and the year-on-year of file size in file total number, file, ring ratio into Row monitoring index, and timely early warning is set;
Asset of equipments quality assessment modules:To each link cost input, different operation time limit cost inputs, equipment fault, maintenance Record and failure, cost of overhaul input various kinds of equipment cost input distributed data carry out single devices cost input to score Analysis, is labeled, and execute and remove/scrap to reaching the equipment for removing/scrapping threshold condition, for not reaching dismounting/report The equipment of useless condition will enter the assessment of next round.
Asset of equipments analysis module:The Assets Analyst module is core of the invention module, for being connected with other modules, is led to The real-time acquisition to device data is crossed, distributing rationally for power system device assets is realized in the quality evaluation of assets;
Data display module:It shows query result and visualizes analysis result, presentation device type, occurs the operation time limit The cost input situation of the dimensions such as failure and maintenance, the cost input distribution situation in various kinds of equipment Life cycle, monomer are set The cost input situation that received shipment row cost input situation, the lower operation of different type cost input distribution and dismounting are scrapped, and carry out Comparative analysis and visual presentation, and be monthly directed to and reach the equipment for removing/scrapping condition and predicted, it is corporate assets management Layer provides Auxiliary support;
(6) instruction issues module:Send instructions under.
2. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the system data comes Source module includes production management system, ERP system, e-commerce platform, multiple information systems for using of goods and materials allotment electric system System.
3. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst Module by device type, operation the time limit, break down with maintenance dimension complete cost input statistical analysis.
4. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst Module completes the life cycle statistical analysis of equipment by individual equipment in the cost input situation of different times.
5. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst Module is distributed by different type cost input, is completed operation and is removed the cost input comparative analysis scrapped.
6. a kind of improved power equipment asset management system as described in claim 1, which is characterized in that the Assets Analyst Module carries out decision tree analysis by historical Device cost input situation, sums up and reaches cost input when removing/scrap condition Threshold condition carries out short-term forecast to being up to dismounting/write-off equipment.
7. a kind of improved power equipment assets management method, this method comprises the following steps:
Step 1:Obtain equipment-related data, including Equipment Foundations information, plant maintenance record, equipment fault record, each link The data such as cost input;
Step 2:Cost input situation of the comparative analysis different type equipment needed for links;
Step 3:Cost input situation of the comparative analysis different type equipment in the different operation time limits;
Step 4:Cost input situation of the comparative analysis distinct device type when breaking down, overhauling;
Step 5:Cost input distribution in comparative analysis various kinds of equipment Life cycle;
Step 6:Comparative analysis single devices operating cost puts into situation;
Step 7:It is distributed in conjunction with different type cost input, comparison continues to run with and remove the cost input situation scrapped;
Step 8:Using decision tree analysis method, in conjunction with maintenance cost and purchase cost, whether analytical judgment, which is suggested executing, is torn open Except/operation (executing daily primary) is scrapped, it is marked to suggesting that operation equipment is scrapped in execution, while generating procurement demand application It is single;
Step 9:Record best dismounting/failure time initial time (analysis obtains suggestion dismounting/failure time for the first time), end Only time (obtaining suggestion dismounting/failure time for the last time);
Step 10:O&M maintenance teams and groups of base, which execute, removes/scraps.
CN201710781930.9A 2017-09-02 2017-09-02 A kind of improved power equipment asset management system and method Pending CN108280532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710781930.9A CN108280532A (en) 2017-09-02 2017-09-02 A kind of improved power equipment asset management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710781930.9A CN108280532A (en) 2017-09-02 2017-09-02 A kind of improved power equipment asset management system and method

Publications (1)

Publication Number Publication Date
CN108280532A true CN108280532A (en) 2018-07-13

Family

ID=62801178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710781930.9A Pending CN108280532A (en) 2017-09-02 2017-09-02 A kind of improved power equipment asset management system and method

Country Status (1)

Country Link
CN (1) CN108280532A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490462A (en) * 2019-08-21 2019-11-22 广州经信纬通信息科技有限公司 A kind of informationization Capital operation analysis system
CN110566969A (en) * 2019-10-21 2019-12-13 民政部一零一研究所 cremation equipment comprehensive monitoring and waste judging method and system
CN110889755A (en) * 2019-12-04 2020-03-17 江苏智谋科技有限公司 Data storage monitoring system and method for intangible asset life cycle
CN111832932A (en) * 2020-07-10 2020-10-27 国网辽宁省电力有限公司电力科学研究院 Intelligent operation and maintenance decision method and system for power distribution network
CN113592435A (en) * 2021-07-09 2021-11-02 华南理工大学 Intelligent monitoring and early warning system for material supply
CN113656470A (en) * 2020-05-12 2021-11-16 北京市天元网络技术股份有限公司 Asset purchase prompting method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101131752A (en) * 2007-06-01 2008-02-27 中国神华能源股份有限公司 Equipment scrap judging method
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
CN103955510A (en) * 2014-04-30 2014-07-30 广西电网公司电力科学研究院 Massive electricity marketing data integration method uploaded by ETL cloud platform
CN104392277A (en) * 2014-11-13 2015-03-04 云南电网公司大理供电局 Transformer economy service life predication method and device
CN106779298A (en) * 2016-11-23 2017-05-31 贵州电网有限责任公司电网规划研究中心 The grid equipment level lifecycle management succeeding year method of cost accounting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101131752A (en) * 2007-06-01 2008-02-27 中国神华能源股份有限公司 Equipment scrap judging method
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
CN103955510A (en) * 2014-04-30 2014-07-30 广西电网公司电力科学研究院 Massive electricity marketing data integration method uploaded by ETL cloud platform
CN104392277A (en) * 2014-11-13 2015-03-04 云南电网公司大理供电局 Transformer economy service life predication method and device
CN106779298A (en) * 2016-11-23 2017-05-31 贵州电网有限责任公司电网规划研究中心 The grid equipment level lifecycle management succeeding year method of cost accounting

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
张根周等: "资产全寿命智能物联平台的架构设计与应用前景研究", 《陕西电力》 *
段成等: "一种轻量级电网实时数据ETL系统的设计与实现", 《电力系统保护与控制》 *
田洪迅 等: ""电网资产全过程管理决策方法框架体系"", 《电力建设》 *
许懿洋: "电力企业资产全寿命实施策略", 《黑龙江电力》 *
赵武清等: "基于机器学习的电网设备全生命周期成本预测", 《信息系统工程》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490462A (en) * 2019-08-21 2019-11-22 广州经信纬通信息科技有限公司 A kind of informationization Capital operation analysis system
CN110566969A (en) * 2019-10-21 2019-12-13 民政部一零一研究所 cremation equipment comprehensive monitoring and waste judging method and system
CN110566969B (en) * 2019-10-21 2021-03-26 民政部一零一研究所 Cremation equipment comprehensive monitoring and waste judging method and system
CN110889755A (en) * 2019-12-04 2020-03-17 江苏智谋科技有限公司 Data storage monitoring system and method for intangible asset life cycle
CN113656470A (en) * 2020-05-12 2021-11-16 北京市天元网络技术股份有限公司 Asset purchase prompting method and device, electronic equipment and storage medium
CN111832932A (en) * 2020-07-10 2020-10-27 国网辽宁省电力有限公司电力科学研究院 Intelligent operation and maintenance decision method and system for power distribution network
CN113592435A (en) * 2021-07-09 2021-11-02 华南理工大学 Intelligent monitoring and early warning system for material supply

Similar Documents

Publication Publication Date Title
CN108280532A (en) A kind of improved power equipment asset management system and method
Qingfeng et al. Development and application of equipment maintenance and safety integrity management system
CN108320069B (en) Production and manufacturing execution system
CN111210108B (en) Performance management and control model of electric power material supply chain
CN102663537A (en) Maintenance system of power equipment based on risk assessment
CN104638764A (en) Intelligent state diagnosis and overhauling system for power distribution network equipment
CN110320893B (en) Thermal power generating unit equipment maintenance method based on RCM
CN109858786B (en) Electromechanical device management system based on Internet of things
Hahn et al. Recommended practices for wind farm data collection and reliability assessment for O&M optimization
CN105967063B (en) Maintenance platform fault analysis process system and method
CN111695744B (en) Maintenance equipment demand prediction analysis system based on big data
CN103942726A (en) Intelligent inspection method for condition evaluation work of power grid equipment
CN110852624A (en) Intelligent manufacturing management system facing enterprise execution layer and operation method thereof
CN111915167A (en) Intelligent manufacturing virtual shipyard information model construction method
CN107545519B (en) Power grid enterprise operation and inspection management and control method
Slaichová et al. The effect of implementing a maintenance information system on the efficiency of production facilities
CN112418548B (en) Intelligent workshop management method and system based on artificial intelligence technology
CN111105048A (en) Early warning method for state of power transmission and transformation Internet of things equipment
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
Baluch et al. Measuring OEE in Malaysian palm oil mills
CN110738427A (en) electric power part work quality scoring system
CN202795451U (en) Asset entire life-cycle management process control application system based on topic base
CN115330404A (en) System and method for electric power marketing inspection
Salsabila et al. Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis: A Case Study of Shot Blast Machine
Shopeju et al. A comprehensive review of thermal power plants reliability using stochastic methods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713