- CN109886435A CN109886435A CN201910132804.XA CN201910132804A CN109886435A CN 109886435 A CN109886435 A CN 109886435A CN 201910132804 A CN201910132804 A CN 201910132804A CN 109886435 A CN109886435 A CN 109886435A
- Authority
- CN
- China
- Prior art keywords
- target device
- work order
- maintenance plan
- target
- engineering project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Abstract
This application discloses a kind of processing method and system of overhaul of the equipments information.This method comprises: determining the current status data of target device;Maintenance plan in the case where status data meets the first preset condition, according to the historical data generation target device that target device stores in historical time;In the case where maintenance plan meets the second preset condition, the corresponding target work order of multiple engineering projects is generated according to maintenance plan;After the corresponding engineering project of target work order is finished, the executive condition according to engineering project determines the visa list of engineering project;The maintenance plan of target device, target work order and visa list are bound and stored.By the application, solve in the related technology that EAM management and ERP management software are in functions of the equipments and management process design aspect, the problem of being unable to satisfy the regulatory requirement of mechanical discipline administrative staff.
Description
Technical field
This application involves facility information processing technology fields, in particular to a kind of processing side of overhaul of the equipments information
Method and system.
Background technique
At present solve asset intensive enterprise asset management main software system have EAM (enterprise asset management),
ERP-PM module etc..The management mode of these software systems is all based on Unit account of plant, workform management, although work can be set
Stream, but the main purpose of system function design is to have ignored the enterprise such as equipment management fining, strongly professional using finance as core
Industry key element of interest, while being also missing from the setting of function and process, can not be from truly meeting
The regulatory requirement of mechanical discipline administrative staff.
Existing traditional EAM management and ERP management software, main purpose are using finance as core, for equipment management
Strongly professional, feature that business is complicated in the process consider and insufficient, function and process design is relatively easy or even missing.
For the management of EAM in the related technology and ERP management software in functions of the equipments and management process design aspect, Wu Faman
The problem of regulatory requirement of sufficient mechanical discipline administrative staff, currently no effective solution has been proposed.
Summary of the invention
The application provides a kind of processing method and system of overhaul of the equipments information, is believed with solving overhaul of the equipments in the related technology
The processing method and system of breath.
According to the one aspect of the application, a kind of processing method of overhaul of the equipments information is provided.This method comprises: determining
The current status data of target device;In the case where the status data meets the first preset condition, set according to the target
The standby historical data stored in historical time generates the maintenance plan of the target device, wherein the historical data includes
History maintenance plan, history target work order, history visa list;In the case where the maintenance plan meets the second preset condition,
The corresponding target work order of multiple engineering projects is generated according to the maintenance plan, wherein the engineering project is described for overhauling
Target device, the target work order include at least: the purpose project amount of the engineering project and the purpose project amount are corresponding
Estimated cost;Execution feelings after the corresponding engineering project of the target work order is finished, according to the engineering project
Condition determines the visa list of the engineering project, wherein the visa list includes at least: the Practical Project amount of the engineering project and
The corresponding actual cost of the Practical Project amount;By the maintenance plan of the target device, the target work order and the label
The single binding storage of card.
Optionally, in the case where the status data meets the first preset condition, according to the target device in history
The maintenance plan that the historical data of time memory storage generates the target device includes: status information according to the target device
Determine whether the target device breaks down;It breaks down in the target device, and the failure has conditions to release
In the case of, the historical data stored in historical time according to the target device generates the maintenance plan of the target device;
In the case where the target device breaks down and the failure does not have conditions to release, the target device is supervised
Control processing.
Optionally, in the case where the target device breaks down and the failure has conditions to release, according to described in
The maintenance plan that the historical data that target device stores in historical time generates the target device includes: to have in the failure
In the case where standby first conditions to release, the historical data stored in historical time according to the target device generates the target
The maintenance plan of equipment, wherein after generating the maintenance plan, then continue to execute and meet second in advance in the maintenance plan
If in the case where condition, the step of generating multiple engineering projects corresponding target work order according to the maintenance plan;In the event
Hinder in the case where having the second conditions to release, described in the historical data generation stored in historical time according to the target device
Second work order of target device, wherein after the corresponding engineering project of second work order is finished, then execute storage institute
The step of stating the second work order of target device.
Optionally, it in the case where the maintenance plan meets the second preset condition, is generated according to the maintenance plan more
The corresponding target work order of a engineering project includes: in the case where the maintenance plan is by examination & approval, according to the maintenance plan
Determine multiple engineering projects;Many types according to the engineering project determine the purpose project amount of the engineering project and described
The preset cost of purpose project amount;According to the purpose project amount of the engineering project and the preset cost of the purpose project amount,
Generate the corresponding target work order of the engineering project.
Optionally, it in the case where the maintenance plan meets the second preset condition, is generated according to the maintenance plan more
The corresponding target work order of a engineering project includes: in the case where the maintenance plan is by examination & approval, according to the maintenance plan
Determine multiple engineering projects and the corresponding construction object of the engineering project;In the corresponding construction object of the engineering project
When for outer committee's object, the first work order of the engineering project is generated according to the maintenance plan, wherein generating first work
After list, then continue to execute after the corresponding engineering project of the target work order is finished, according to the engineering project
Executive condition determines the step of the visa list of the target device;It is non-outer committee pair in the corresponding construction object of the engineering project
As when, the second work order of the engineering project is generated according to the maintenance plan, wherein be finished it in second work order
Afterwards, then the step of executing the maintenance plan for storing the target device, second work order.
Optionally, after the corresponding engineering project of the target work order is finished, according to holding for the engineering project
Market condition determines that the visa list of the engineering project includes: executive condition determination and each institute according to each engineering project
State the corresponding sub- visa list of engineering project;In the case where multiple sub- visa lists meet third preset condition, according to multiple
The sub- visa list determines the visa list of the engineering project, wherein the third preset condition is the sub- visa single pass-through
Examination & approval.
Optionally, the maintenance plan of the target device, the target work order and the visa list are bound into storage packet
It includes: determining the unique encodings information of the target device, and obtain the facility information of the target device, wherein is described to set
Standby information includes at least one of: the model of the target device, the title of the target device, the target device position
It sets, the fault data of the technical parameter of the target device, the target device;Unique encodings according to the target device are believed
The facility information of the target device, the maintenance plan, the target work order and the visa list are bound and are stored by breath.
Optionally, the method also includes: receive mobile terminal send querying condition, and according to the querying condition to
The mobile terminal sends target information corresponding with the querying condition, wherein the target information include it is following arbitrarily it
One: maintenance plan, target work order, visa list;Or/and send approval information to the mobile terminal, and receive it is described it is mobile eventually
Hold the approval results corresponding with the approval information sent, wherein the approval information corresponds to following one of any: inspection
Repair plan, target work order, visa list.
According to the another aspect of the application, a kind of processing system of overhaul of the equipments information is provided.The system includes: defect
Malfunctioning module, for determining whether the current status data of target device, and the determining target device break down,
In, whether the target device breaks down is determined by the status information of the target device;Maintenance plan module, in institute
It states in the case that target device breaks down, determines the maintenance plan of the target device, wherein the maintenance of the target device
Plan is determined by the historical data that the target device stores in historical time, wherein the historical data includes history inspection
Repair plan, history target work order, history visa list;Target work order module, for meeting the second default item in the maintenance plan
In the case where part, determine multiple for overhauling the corresponding target work order of engineering project of the target device, wherein the target
Work order is determined by the maintenance plan, wherein the target work order includes at least: the purpose project amount of the engineering project, with
And the corresponding estimated cost of the purpose project amount;Visa single module, for being held in the corresponding engineering project of the target work order
After row finishes, the visa list of the engineering project is determined, wherein the visa list is true by the executive condition of the engineering project
It is fixed, wherein the visa list includes at least: the Practical Project amount of the engineering project and the corresponding reality of the Practical Project amount
Expense;Equipment files module, for binding the maintenance plan for storing the target device, the target work order and the label
Card is single.
Optionally, the system also includes specialized management modules, for determining the corresponding profession pipe of the target device
Reason demand, first movement end module for the querying condition of transmission, and receive target information corresponding with the querying condition,
Wherein, the target information includes following one of any: maintenance plan, target work order, visa list;Second mobile end module, is used
In receiving approval information, and send corresponding with approval information approval results, wherein the approval information correspond to
It is one of any down: maintenance plan, target work order, visa list.
The processing method of overhaul of the equipments information provided by the embodiments of the present application, by determining the current status number of target device
According to;In the case where the status data meets the first preset condition, stored in historical time according to the target device
Historical data generates the maintenance plan of the target device, wherein the historical data includes history maintenance plan, history target
Work order, history visa list;In the case where the maintenance plan meets the second preset condition, generated according to the maintenance plan more
The corresponding target work order of a engineering project, wherein the engineering project is for overhauling the target device, and the target work order is extremely
It less include: the purpose project amount and the corresponding estimated cost of the purpose project amount of the engineering project;In the target work
After single corresponding engineering project is finished, the executive condition according to the engineering project determines the visa of the engineering project
It is single, wherein the visa list includes at least: the Practical Project amount of the engineering project and the corresponding reality of the Practical Project amount
Expense;The maintenance plan of the target device, the target work order and the visa list are bound and stored, solves correlation
EAM management and ERP management software are unable to satisfy mechanical discipline administrator in functions of the equipments and management process design aspect in technology
The problem of regulatory requirement of member.
That is, passing through the corresponding target work order of maintenance plan, multiple engineering projects of the generation target device, Yi Jigong
The corresponding visa list of journey project, solve traditional software plan sth. ahead, the afunction of subsequent visa.It further, will be above-mentioned
Maintenance plan, target work order and visa list are saved, and accumulation historical data purpose has been reached, so that being subsequently generated maintenance
It can maintenance plan, target work order and the realization of visa list based on historical storage when plan, target work order and visa list
Science efficiently assesses maintenance maintenance measurement, with the mesh for reaching raising plan accuracy rate, reaching equipment refinement management
, and then realize the target purpose for effectively managing and gradually reducing enterprise's maintenance maintenance cost.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, the schematic reality of the application
Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is the flow chart according to the processing method of overhaul of the equipments information provided by the embodiments of the present application;
Fig. 2 is according to a kind of approval process of the dynamic mechanical discipline of optional monthly plan-provided by the embodiments of the present application
Schematic diagram;
Fig. 3 is according to a kind of approval process of optional monthly plan-vehicle maintenance profession provided by the embodiments of the present application
Schematic diagram;
Fig. 4 is according to a kind of operation flow of the processing method of optional overhaul of the equipments information provided by the embodiments of the present application
Schematic diagram;
Fig. 5 is the schematic diagram according to the processing system of overhaul of the equipments information provided by the embodiments of the present application;And
Fig. 6 is according to a kind of schematic diagram of the processing system of optional overhaul of the equipments information provided by the embodiments of the present application.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection
It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool
Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units
Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear
Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
According to an embodiment of the present application, a kind of processing method of overhaul of the equipments information is provided.
Fig. 1 is the flow chart according to the processing method of the overhaul of the equipments information of the embodiment of the present application.As shown in Figure 1, the party
Method the following steps are included:
Step S102 determines the current status data of target device.
Step S104, in the case where status data meets the first preset condition, according to target device in historical time
The historical data of storage generates the maintenance plan of target device, wherein historical data includes history maintenance plan, history target work
Single, history visa list.
Step S106 generates multiple engineerings according to maintenance plan in the case where maintenance plan meets the second preset condition
The corresponding target work order of project, wherein engineering project is for overhauling target device, and target work order includes at least: engineering project
Purpose project amount and the corresponding estimated cost of purpose project amount.
Step S108, the executive condition after the corresponding engineering project of target work order is finished, according to engineering project
Determine the visa list of engineering project, wherein visa list includes at least: the Practical Project amount and Practical Project amount of engineering project are corresponding
Actual cost.
The maintenance plan of target device, target work order and visa list are bound and are stored by step S110.
The processing method of overhaul of the equipments information provided by the embodiments of the present application, by determining the current status number of target device
According to;In the case where status data meets the first preset condition, the historical data that is stored in historical time according to target device
Generate the maintenance plan of target device, wherein historical data includes history maintenance plan, history target work order, history visa list;
In the case where maintenance plan meets the second preset condition, the corresponding target work of multiple engineering projects is generated according to maintenance plan
It is single, wherein engineering project is for overhauling target device, and target work order includes at least: the purpose project amount and mesh of engineering project
Mark the corresponding estimated cost of project amount;After the corresponding engineering project of target work order is finished, according to holding for engineering project
Market condition determines the visa list of engineering project, wherein visa list includes at least: the Practical Project amount and Practical Project of engineering project
Measure corresponding actual cost;The maintenance plan of target device, target work order and visa list are bound and stored, solves correlation
EAM management and ERP management software are unable to satisfy mechanical discipline administrator in functions of the equipments and management process design aspect in technology
The problem of regulatory requirement of member.
That is, passing through the corresponding target work order of maintenance plan, multiple engineering projects and engineering item that generate target device
The corresponding visa list of mesh, solve traditional software plan sth. ahead, the afunction of subsequent visa.Further, by above-mentioned maintenance
Plan, target work order and visa list are saved, and accumulation historical data purpose has been reached, so that being subsequently generated maintenance meter
Draw, target work order and when visa list can maintenance plan, target work order and visa list realization section based on historical storage
It learns, efficiently maintenance maintenance measurement is assessed, with the mesh for reaching raising plan accuracy rate, reaching equipment refinement management
, and then realize the purpose for effectively managing and gradually reducing enterprise's maintenance maintenance cost.
It should be understood that being examined in the processing method of overhaul of the equipments information provided by the embodiments of the present application by generating
The plan of repairing determines target work order according to maintenance plan, and then determines according to the real-time condition of the corresponding engineering project of target work order
Visa list finally completely stores above-mentioned maintenance plan, target work order, visa list, makes reference for next maintenance plan, shape
At complete equipment closed loop management process, the processing for constantly promoting overhaul of the equipments information provided by the embodiments of the present application is realized
The reliability of method.
Optionally, in the processing method of overhaul of the equipments information provided by the embodiments of the present application, meet the in status data
Maintenance meter in the case where one preset condition, according to the historical data generation target device that target device stores in historical time
Draw includes: to determine whether target device breaks down according to the status information of target device;It breaks down in target device, and therefore
Inspection in the case that barrier has conditions to release, according to the historical data generation target device that target device stores in historical time
The plan of repairing;In the case where target device breaks down and failure does not have conditions to release, place is monitored to target device
Reason.
In an optional example, the status data of target device can be with are as follows: operating parameter when target device is run,
The product parameters that target device generates.
In another optional example, the status information according to target device determines whether target device breaks down also
It may include: to determine whether target device breaks down or defect according to the status information of target device, wherein failure is target
The damage of equipment, i.e. target device are changing into irregular operating by operating normally, and defect is the missing of this body structure of target device,
I.e. target device is just unable to operate normally originally.
In another optional example, judging whether the failure of target device has conditions to release can be with are as follows: judges mesh
Whether the failure of marking device can also enable target device operate normally to a certain extent, if target device is to a certain extent still
It can operate normally, then it is assumed that the failure of target device does not have conditions to release, for example, the target product that target device produces exists
There is the deviation of ± 0.01mm on radius, and technological standards receive the deviation of the target product ± 0.5mm on a radius, at this point,
Then indicate that there are failures for target device, but the failure does not have conditions to release.
In another optional example, maintenance plan type can be divided into according to schedule: general overhaul plan, monthly maintenance
Plan, repairing plan, technological transformation plan, small changes small leather plan, Control of Hidden plan, managerial promotion plan etc. at ad hoc inspection and repair plan.
In addition, maintenance plan can be divided into according to many types in another optional example: drive apparatus, standing
Equipment, electrical equipment, automatic instrument(s)/telecommunications, Civil Specialities, heat insulating and corrosion, fire fighting device maintenance, vehicle maintenance, special equipment
The professions such as inspection, press and open holes leak stopping.
It should be understood that above-mentioned carry out fining division according to many types and plan type for maintenance plan, realize
The technical effect of the fine-grained management of each target device, i.e., different target devices in varied situations, according to professional class
Type and plan type determine maintenance plan the most suitable.In addition, the maintenance plan of different plan types and different majors type
Corresponding approval process is also different, has reached the technical effect for further realizing the fine-grained management of each target device.
For example, Fig. 2 is the schematic diagram for the approval process that monthly plan-moves mechanical discipline, Fig. 3 is monthly plan-vehicle
The schematic diagram of the approval process of Maintenance Specialty, as shown in Figures 2 and 3, even if being identical plan type, in different professions
In the case where type, corresponding approval process is also and different.
For example, needing to generate target work order according to maintenance plan, at this point, then foundation after maintenance plan generation
Approval process prompts corresponding responsible person that maintenance plan is converted to target work order;After the generation of target work order, then eliminate to phase
The prompting of responsible person is answered, and the corresponding responsible person other according to approval process prompt carries out an acceptance inspection to target work order to form label
Card is single;After the verifying of target work order, then the prompting to corresponding responsible person is eliminated, and other respective negative is prompted according to approval process
The check and acceptance result that people is blamed according to target work order works out visa, and after visa submission audit, establishment visa reminds automatic elimination, and presses
It is reminded step by step according to approval node, realizes seamless connection.
It should be noted that just being carried out to target device in the case where the failure of target device does not have conditions to release
Whether failure of the monitoring for moment monitoring objective equipment has conditions to release, to prevent the failure of target device from gradually increasing,
Cause the failure of target device undiscovered when having conditions to release, so that the target product defect that the target device of failure generates
It is larger not to be available, the case where resulting in waste of resources.
In addition, break down in the processing method of overhaul of the equipments information provided by the embodiments of the present application in target device,
And in the case that failure has conditions to release, the historical data stored in historical time according to target device generates target device
Maintenance plan further include: in the case where failure has the first conditions to release, stored in historical time according to target device
Historical data generate target device maintenance plan, wherein after generating maintenance plan, then continue to execute in maintenance plan
In the case where meeting the second preset condition, the step of generating multiple engineering projects corresponding target work order according to maintenance plan;?
In the case that failure has the second conditions to release, the historical data generation target stored in historical time according to target device is set
The second standby work order, wherein after the corresponding engineering project of the second work order is finished, then execute the of storage target device
The step of two work orders.
In an alternative embodiment, the failure of target device have the first conditions to release can be with are as follows: target device
Failure needs that external team is entrusted to repair;The failure of target device has the second conditions to release can be with are as follows: target device
Failure can both have been handled in internal team or guarantor waybill position, without commission to external team, wherein protecting waybill position is
Sign the unit of long-term contract.
It should be understood that belonging to long-term frame since the second work order is internal team or the work order for protecting the execution of waybill position
The range of frame contract does not need so that second work order does not need to carry out settlement process according to the corresponding work of the second work order
Journey item purpose executive condition determines its corresponding visa list, therefore, only carries out storing step to the second work order.
Optionally, in the processing method of overhaul of the equipments information provided by the embodiments of the present application, meet the in maintenance plan
In the case where two preset conditions, generating the corresponding target work order of multiple engineering projects according to maintenance plan includes: in maintenance plan
In the case where by examination & approval, multiple engineering projects are determined according to maintenance plan;Many types according to engineering project determine engineering
The purpose project amount of project and the preset cost of purpose project amount;Purpose project amount and purpose project amount according to engineering project
Preset cost generates the corresponding target work order of engineering project.
In an optional example, after maintenance plan generation, method further include: the professional class according to maintenance plan
Type and plan type determine the corresponding approval process of the maintenance plan, and the maintenance plan is sent to target according to the approval process
At approval object, and target approval object is prompted to examine the maintenance plan, wherein if after maintenance plan is by examination & approval, foundation
The maintenance plan generates corresponding target work order.
For example, for press and open holes leak stopping profession, refine to leakage position, leak stopping mode, outer diameter, medium,
Operating pressure, operation temperature, quantity, unit, specific works content etc.;Scaffold profession refine to scaffold type, sets up portion
Position, parameter, unit, quantity, specific works content etc..In addition, effective monovalent information of each equipment, each project amount according to
The different of project profession carry out effectively dividing storage.
For example, in coal oil field, by quota information, coal system main in " petrochemical industry maintenance engineering norm for detailed estimates "
Oiling work inspection dimension construction supplement ration and effective monovalent information of all kinds of framework contracts etc. are deposited according to the difference of project profession
Storage.
Above content can be arbitrarily had access in the corresponding target work order of generation engineering project based on above content, so as to
Generate accurately target work order.
Optionally, in the processing method of overhaul of the equipments information provided by the embodiments of the present application, meet the in maintenance plan
In the case where two preset conditions, generating the corresponding target work order of multiple engineering projects according to maintenance plan includes: in maintenance plan
In the case where by examination & approval, multiple engineering projects and the corresponding construction object of engineering project are determined according to maintenance plan;In work
When the corresponding construction object of journey project is outer committee's object, the first work order of engineering project is generated according to maintenance plan, wherein in life
It after the first work order, then continues to execute after the corresponding engineering project of target work order is finished, according to engineering project
Executive condition determines the step of the visa list of target device;When the corresponding construction object of engineering project is non-outer committee's object, according to
The second work order of engineering project is generated according to maintenance plan, wherein after the second work order is finished, then executes storage target and set
The step of standby maintenance plan, the second work order.
In an optional example, non-outer committee's object can be with are as follows: interior tissue protects waybill position, wherein protects waybill position
To sign the long-term unit for protecting fortune contract.
It should be understood that after its examination, being needed according to engineering project since the first work order belongs to outer committee's project
The step of corresponding practical executive condition carries out visa and settles accounts;And the second work order does not need then to be settled accounts, because it is
Belong in the scope of long-term contract, for example, the second work order belongs within the scope of annual framework contract.In addition, this draw work order
It is divided into the measure of the first work order and the second work order, further embodies the purpose of equipment refinement management.
In an optional example, multiple engineering projects are determined according to maintenance plan, wherein multiple engineering projects are drawn
Minute mark will definitely be for Engineering Speciality and unit in charge of construction.For example, the same Engineering Speciality, and the same unit in charge of construction is under the jurisdiction of one
Engineering project.
Optionally, corresponding in target work order in the processing method of overhaul of the equipments information provided by the embodiments of the present application
After engineering project is finished, the executive condition according to engineering project determines that the visa list of engineering project includes: according to each
The executive condition of engineering project determines sub- visa list corresponding with each engineering project;It is default to meet third in multiple sub- visa lists
In the case where condition, the visa list of engineering project is determined according to multiple sub- visa lists, wherein third preset condition is sub- visa list
Pass through examination & approval.
In an optional example, after the corresponding engineering project of target work order is finished, each engineering project
Corresponding unit in charge of construction is then according to the project amount of engineering project actually occurred, according to many types and engineering item of engineering project
Purpose process determines the corresponding sub- visa list of engineering project, and carries out revising perfect processing to sub- visa list.Hereafter, continue
According to the corresponding approval process of maintenance plan, multiple sub- visa lists are sent at target approval object, if sub- visa Dan Weitong
In the case where crossing examination & approval, then further to not carrying out improving revision by the sub- visa list of examination & approval, up to passing through examination & approval;If sub
Visa Dan Jun then determines the corresponding final visa list of engineering project according to multiple sub- visa lists by examination & approval.
It should be understood that visa list/sub- visa singly improve revision during, can leave a trace.That is, visa
Single and sub- visa list can retain all modification traces.
In an optional example, audits and examine by multilayer, it is determined that the corresponding final visa list of engineering project,
Namely the Practical Project amount of engineering project and the corresponding practical expense of Practical Project amount has been determined, at this point, as unit of visa list by
Grade is fed back in actually closing the account under corresponding maintenance plan.In addition, and feeding back to phase step by step as unit of target work order
In budget engineering cost under the maintenance plan answered.
Hereafter, for same equipment when working out maintenance plan, the history maintenance plan of the equipment is transferred automatically, it is same with this
When, corresponding budget engineering cost can be seen simultaneously and is actually closed the account, and then forms effectively comparison, reached amendment and improved
The accuracy of estimated cost.
To sum up, it is be combined with each other by maintenance plan, target work order, visa list, forms the complete closed loop management stream of one
Journey.To visa list since maintenance plan source, for construction work amount, overhaul of the equipments information provided by the embodiments of the present application
Processing method is required in conjunction with the specialized management of the actual features in corresponding field, management objectives, basic demand and construction norm, by work
The concrete engineering amount of sequence is finely divided according to 21 professions, and takes the design of configurableization, such as press and open holes leak stopping is special
Industry has refine to leakage position, leak stopping mode, outer diameter, medium, operating pressure, operation temperature, quantity, unit, specific works
Content etc.;Scaffold profession refine to scaffold type, sets up position, parameter, unit, quantity, specific works content etc..This
Outside, by the industry maintenance engineering norm for detailed estimates information in corresponding field, the inspection dimension construction supplement ration of corresponding field industry and all kinds of
Effective monovalent information of framework contract etc. is directly stored according to the different of project profession, plan to mention journalist person, examination & approval role at different levels,
Project cost supervisor etc. can a key have access to, checking maintenance plan, work order implement, budget and balance formed PDCA (plan, execute, check,
Adjustment) benign cycle, the above Four processes not instead of operation it is primary terminate, progress in cycles a, circulation is over,
Solve the problems, such as, an open question enters next circulation, and such staged rises, plan mentions report and expense estimate will
More and more accurate, equipment refinement management level will be continuously improved, and effectively manage to realize and gradually reduce enterprise's checking maintenance
The purpose of cost.
Optionally, in the processing method of overhaul of the equipments information provided by the embodiments of the present application, by the maintenance of target device
Plan, target work order and the binding storage of visa list comprise determining that the unique encodings information of target device, and obtain target
The facility information of equipment, wherein facility information includes at least one of: model, the title of target device, mesh of target device
The position of marking device, the technical parameter of target device, target device fault data;Unique encodings according to target device are believed
The facility information of target device, maintenance plan, target work order and visa list are bound and are stored by breath.
That is, in the processing method of overhaul of the equipments information provided by the embodiments of the present application, in addition to by the inspection of target device
Plan, target work order and the binding storage of visa list are repaired, the basic information of target device can also be stored, wherein target device
Basic information may include the model of target device, the title of target device, the position of target device, target device technology
The fault data of parameter, target device.
In addition, the processing method of overhaul of the equipments information provided by the embodiments of the present application can also store: the event of target device
Hinder information, hidden danger information.
It should be understood that the relevant data of target device are associated storage, then it can achieve effectively statistics target
Maintenance of equipment cost, and form complete equipment files can convenient for equipment management personnel by having access to the archives of target device
It is next step accident analysis, lectotype selection, maintenance decision etc. to inquire the complete resume of the target device as consulting case
The technical effect that important data are supported is provided.
In order to improve overhaul of the equipments efficiency, optionally, in the processing side of overhaul of the equipments information provided by the embodiments of the present application
In method, method further include: receive the querying condition that mobile terminal is sent, and send and inquire to mobile terminal according to querying condition
The corresponding target information of condition, wherein target information includes following one of any: maintenance plan, target work order, visa list;Or/
With, transmission approval information to mobile terminal, and receive the approval results corresponding with approval information of mobile terminal transmission, wherein
Approval information corresponds to following one of any: maintenance plan, target work order, visa list.
For example, the processing method of overhaul of the equipments information provided by the embodiments of the present application is supported in conjunction with wechat, is carried out
The function that mobile examination & approval are consulted.
It should be understood that by being interacted with mobile terminal, and then reached the limitation for getting rid of the end PC, effectively mention
The high working efficiency of equipment management personnel.
It explains below with reference to another embodiment to the present invention.
1) it after, defect or failure occur for discovery target device, is reported for the defect or failure of the target device;
2), the defect or failure of such as target device have conditions to release, and the defect of the target device or failure are internal
What tissue or guarantor waybill position were capable of handling, then switch to protect fortune work order, wherein protect defect or event after the completion of fortune work order is constructed and checked and accepted
Barrier is eliminated;
3), the defect or failure of such as target device have conditions to release, and the defect of the target device or failure are desirable
Outside organization's processing, then switch to monthly or ad hoc inspection and repair plan according to the actual situation, plan need to be through managerial personnel at different levels
And person liable's audit.
4) after the approval, by aggregate plan, supervisor issues engineering project to, monthly/Contingency plans.
5), after engineering project publication, equipment person liable can be generated target work order and unit in charge of construction arranged to construct,
In, different units in charge of construction and different project professions correspond to different target work orders, i.e., same unit in charge of construction and identical entry
Mesh profession is an independent work order.
6) it, after the completion of target work order is constructed, is carried out an acceptance inspection by project leader, after the completion of examination, system automatically generated
Visa list.
7), outer committee's unit need to supplement or revise visa list according to actual construction work amount and submit audit.
8) it, after the audit of visa list, is printed by special messenger as clearing foundation.
9), the practical settlement amounts of visa write back visa list again, and step by step feedback summary to corresponding maintenance plan,
In, it planned budget expense and actually closes the account and to form effective comparison.
10), maintenance plan, target work order, visa list charge to equipment files, calculate maintenance of equipment cost.
11), proposing the similar planned maintenance of report again will actually close the account as planned budget according to history maintenance plan
Expense.
That is, as shown in figure 4, the processing method of overhaul of the equipments information passes through equipment files, potential faults management, maintenance meter
Draw management, workform management, visa menu manager core business module between organic business association and efficient process approving and forwarding, shape
At the complete closed-loop device management process for integrating specialized and fine-grained management.
It should be noted that in a preferred embodiment, the processing method of above equipment service information can be applied
In petrochemical industry, specially coal oil chemical field, wherein the processing method of overhaul of the equipments information provided in this embodiment
It can be with quota information main in " petrochemical industry maintenance engineering norm for detailed estimates ", coal oil chemical industry inspection dimension construction supplement ration
And effective monovalent information of all kinds of framework contracts etc. combines, and improves the equipment refinement management of coal oil chemical field conscientiously
It is horizontal.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions
It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not
The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of processing systems of overhaul of the equipments information, it should be noted that the application is real
The processing system for applying the overhaul of the equipments information of example can be used for executing provided by the embodiment of the present application for overhaul of the equipments information
Processing method.The processing system of overhaul of the equipments information provided by the embodiments of the present application is introduced below.
Fig. 5 is the schematic diagram according to the processing system of the overhaul of the equipments information of the embodiment of the present application.As shown in figure 5, this is
System includes: defect malfunctioning module 51, maintenance plan module 53, target work order module 55, visa single module 57, equipment files module
59。
Defect malfunctioning module 51, for determining whether the current status data of target device, and determining target device are sent out
Raw failure, wherein whether target device breaks down is determined by the status information of target device;
Maintenance plan module 53, for determining the maintenance plan of target device in the case where target device breaks down,
Wherein, the maintenance plan of target device is determined by the historical data that target device stores in historical time, wherein historical data
Including history maintenance plan, history target work order, history visa list;
Target work order module 55, it is multiple for examining for determining in the case where maintenance plan meets the second preset condition
Repair the corresponding target work order of engineering project of target device, wherein target work order is determined by maintenance plan, wherein target work order
It includes at least: the purpose project amount and the corresponding estimated cost of purpose project amount of engineering project;
Visa single module 57, for determining engineering project after the corresponding engineering project of target work order is finished
Visa list, wherein visa list is determined by the executive condition of engineering project, wherein visa list includes at least: the reality of engineering project
Project amount and the corresponding actual cost of Practical Project amount;
Equipment files module 59, for binding maintenance plan, target work order and the visa list of storage target device.
The processing system of overhaul of the equipments information provided by the embodiments of the present application, defect malfunctioning module 51, for determining target
The current status data of equipment, and determine whether target device breaks down, wherein whether target device breaks down by mesh
The status information of marking device determines;Maintenance plan module 53, for determining that target is set in the case where target device breaks down
Standby maintenance plan, wherein the maintenance plan of target device determines by the historical data that target device stores in historical time,
Wherein, historical data includes history maintenance plan, history target work order, history visa list;Target work order module 55, for examining
In the case that the plan of repairing meets the second preset condition, determine multiple for overhauling the corresponding target work of engineering project of target device
It is single, wherein target work order is determined by maintenance plan, wherein target work order includes at least: the purpose project amount of engineering project, with
And the corresponding estimated cost of purpose project amount;Visa single module 57, for being finished in the corresponding engineering project of target work order
Later, the visa list of engineering project is determined, wherein visa list is determined by the executive condition of engineering project, wherein visa list is at least
It include: the Practical Project amount and the corresponding actual cost of Practical Project amount of engineering project;Equipment files module 59 is deposited for binding
Maintenance plan, target work order and the visa list for storing up target device solve EAM management and ERP management software in the related technology
In functions of the equipments and management process design aspect, the problem of being unable to satisfy the regulatory requirement of mechanical discipline administrative staff.
That is, passing through the corresponding target work order of maintenance plan, multiple engineering projects and engineering item that generate target device
The corresponding visa list of mesh, solve traditional software plan sth. ahead, the afunction of subsequent visa.Further, by above-mentioned maintenance
Plan, target work order and visa list are saved, and accumulation historical data purpose has been reached, so that being subsequently generated maintenance meter
Draw, target work order and when visa list can maintenance plan, target work order and visa list realization section based on historical storage
It learns, efficiently maintenance maintenance measurement is assessed, with the mesh for reaching raising plan accuracy rate, reaching equipment refinement management
, and then realize the target purpose for effectively managing and gradually reducing enterprise's maintenance maintenance cost.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, system further include: specialized
Management module, for determining the corresponding specialized management demand of target device;First movement end module, the inquiry item for transmission
Part, and receive corresponding with querying condition target information, wherein target information include it is following one of arbitrarily: maintenance plan, target
Work order, visa list;Second mobile end module, for receiving approval information, and sends approval results corresponding with approval information,
In, approval information corresponds to following one of any: maintenance plan, target work order, visa list.
As an optional example, specialized management module, for being managed to special equipment, for example, pressure is held
The establishment examination & approval of the inspection plans such as device, pressure pipeline, inspection plan export etc.;For example, the preventive trial management of electrical equipment
Etc. contents.Wherein, which is the effective efficiency supplement carried out respectively according to the demand of mechanical discipline management.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, maintenance plan module 53 is used
In in the case where target device breaks down and failure has conditions to release, stored in historical time according to target device
Historical data generate target device maintenance plan.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, defect malfunctioning module 51 is used
In in the case where target device breaks down and failure does not have conditions to release, processing is monitored to target device.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, maintenance plan module 53 is used
In in the case where failure has the first conditions to release, the historical data stored in historical time according to target device generates mesh
The maintenance plan of marking device, wherein after generating maintenance plan, then continue to execute and meet the second preset condition in maintenance plan
In the case where, the step of generating multiple engineering projects corresponding target work order according to maintenance plan.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, target work order module 55 is used
In in the case where failure has the second conditions to release, the historical data stored in historical time according to target device generates mesh
Second work order of marking device, wherein after the corresponding engineering project of the second work order is finished, then execute storage target device
The second work order the step of.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, target work order module 55 is used
In in the case where maintenance plan is by examination & approval, multiple engineering projects are determined according to maintenance plan;Profession according to engineering project
Type determines the purpose project amount of engineering project and the preset cost of purpose project amount;According to engineering project purpose project amount and
The preset cost of purpose project amount generates the corresponding target work order of engineering project.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, target work order module 55 is used
In in the case where maintenance plan is by examination & approval, determine that multiple engineering projects and engineering project are corresponding according to maintenance plan
Construction object;When the corresponding construction object of engineering project is outer committee's object, the first of engineering project is generated according to maintenance plan
Work order, wherein after generating the first work order, then continue to execute after the corresponding engineering project of target work order is finished,
Executive condition according to engineering project determines the step of the visa list of target device;It is non-in the corresponding construction object of engineering project
When outer committee's object, the second work order of engineering project is generated according to maintenance plan, wherein after the second work order is finished, then
The step of executing maintenance plan, the second work order of storage target device.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, visa single module 57 is used for
Executive condition according to each engineering project determines sub- visa list corresponding with each engineering project;Meet in multiple sub- visa lists
In the case where third preset condition, the visa list of engineering project is determined according to multiple sub- visa lists, wherein third preset condition is
Sub- visa single pass-through examination & approval.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, equipment files module 59 is used
In the unique encodings information for determining target device, and obtain the facility information of target device, wherein facility information includes following
At least one: the model of target device, the title of target device, the position of target device, the technical parameter of target device, target
The fault data of equipment;According to the unique encodings information of target device, by the facility information of target device, maintenance plan, target
Work order and the binding storage of visa list.
Optionally, in the processing system of overhaul of the equipments information provided by the embodiments of the present application, as shown in fig. 6, the system
It further include statement management module, wherein the statement management module, for being managed to various data forms.
To sum up, the main innovation of the processing system of overhaul of the equipments information provided by the embodiments of the present application is equipment management essence
Efficient process configuration design is researched and developed and simplified to the whole closed loop function of ZOOM analysis.It is compared with the traditional method, the application is implemented
The processing system for the overhaul of the equipments information that example provides is configured by reasonable process relies on equipment files, accident defect management, inspection
Repair the nucleus modules such as planning management, workform management, visa menu manager, mechanical discipline management, on Functional Design with " petroleum
Industrial and commercial bank's industry maintenance engineering norm for detailed estimates " in main quota information, coal oil chemical industry inspection dimension construction supplement ration and each class framework close
Same effective monovalent information combines, and the overall equipment management efficiency and planned budget expense accuracy rate of enterprise will be mentioned further
Height, while will preferably serve the Comprehensive Budget Management of enterprise, and can effectively manage and gradually reduce enterprise's checking maintenance at
This, process configuration and design are upper interrelated, form reasonable, complete, efficient equipment closed loop management process.
That is, actual features, management objectives and the basic demand of this system combination coal oil industry, using equipment files as base
Plinth is served as theme with maintenance plan and checking maintenance work order and visa menu manager, adheres to and simplify efficient management philosophy, pay close attention to and set
Standby specialized and fine-grained management, to further improve equipment operational reliability, reduce Total Cost Ownership, also gradually
Become relied on during the production and operation of coal oil enterprise simplify efficient overall equipment management informatization platform.
The processing system of overhaul of the equipments information includes processor and memory, drawbacks described above malfunctioning module 51, maintenance plan
Module 53, target work order module 55, visa single module 57, equipment files module 59 etc. are stored in memory as program unit
In, above procedure unit stored in memory is executed by processor to realize corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set one
Or more, by adjusting kernel parameter come it is scientific, efficiently to maintenance maintenance measurement assess, it is accurate to reach raising plan
Rate achievees the purpose that equipment refinement management.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/
Or the forms such as Nonvolatile memory, if read-only memory (ROM) or flash memory (flash RAM), memory include that at least one is deposited
Store up chip.
The embodiment of the invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor
The processing method of existing overhaul of the equipments information.
The embodiment of the invention provides a kind of processor, processor is for running program, wherein executes and sets when program is run
The processing method of standby service information.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can
The program run on a processor, processor perform the steps of the current status data of determining target device when executing program;
In the case where status data meets the first preset condition, the historical data stored in historical time according to target device is generated
The maintenance plan of target device, wherein historical data includes history maintenance plan, history target work order, history visa list;It is examining
In the case that the plan of repairing meets the second preset condition, the corresponding target work order of multiple engineering projects is generated according to maintenance plan,
In, engineering project is for overhauling target device, and target work order includes at least: the purpose project amount and target work of engineering project
The corresponding estimated cost of journey amount;Execution feelings after the corresponding engineering project of target work order is finished, according to engineering project
Condition determines the visa list of engineering project, wherein visa list includes at least: the Practical Project amount and Practical Project amount pair of engineering project
The actual cost answered;The maintenance plan of target device, target work order and visa list are bound and stored.
Optionally, in the case where status data meets the first preset condition, according to target device in historical time memory
The maintenance plan of the historical data generation target device of storage includes: whether the status information of foundation target device determines target device
It breaks down;In the case where target device breaks down and failure has conditions to release, according to target device in historical time
The historical data of interior storage generates the maintenance plan of target device;It breaks down in target device, and failure does not have elimination item
In the case where part, processing is monitored to target device.
Optionally, it in the case where target device breaks down and failure has conditions to release, is being gone through according to target device
It includes: to have the case where the first conditions to release in failure that the historical data of history time memory storage, which generates the maintenance plan of target device,
Under, the maintenance plan according to the historical data generation target device that target device stores in historical time, wherein examined generating
After repairing plan, then continues to execute in the case where maintenance plan meets the second preset condition, generated according to maintenance plan multiple
The step of engineering project corresponding target work order;In the case where failure has the second conditions to release, gone through according to target device
The historical data of history time memory storage generates the second work order of target device, wherein holds in the corresponding engineering project of the second work order
The step of going after finishing, then executing the second work order of storage target device.
Optionally, in the case where maintenance plan meets the second preset condition, multiple engineering items are generated according to maintenance plan
The corresponding target work order of mesh includes: to determine multiple engineering projects according to maintenance plan in the case where maintenance plan is by examination & approval;
Many types according to engineering project determine the purpose project amount of engineering project and the preset cost of purpose project amount;According to engineering
The purpose project amount of project and the preset cost of purpose project amount generate the corresponding target work order of engineering project.
Optionally, in the case where maintenance plan meets the second preset condition, multiple engineering items are generated according to maintenance plan
The corresponding target work order of mesh includes: to determine multiple engineering projects according to maintenance plan in the case where maintenance plan is by examination & approval,
And the corresponding construction object of engineering project;When the corresponding construction object of engineering project is outer committee's object, according to maintenance plan
Generate the first work order of engineering project, wherein after generating the first work order, then continue to execute engineering corresponding in target work order
After the project implementation finishes, the executive condition according to engineering project determines the step of the visa list of target device;In engineering project
When corresponding construction object is non-outer committee's object, the second work order of engineering project is generated according to maintenance plan, wherein in the second work
After being singly finished, then execute storage target device maintenance plan, the second work order the step of.
Optionally, after the corresponding engineering project of target work order is finished, the executive condition according to engineering project is true
The visa list for determining engineering project includes: to determine corresponding with each engineering project sub- label according to the executive condition of each engineering project
Card is single;In the case where multiple sub- visa lists meet third preset condition, the label of engineering project are determined according to multiple sub- visa lists
Card is single, wherein third preset condition is the examination & approval of sub- visa single pass-through.
Optionally, the binding storage of the maintenance plan of target device, target work order and visa list is comprised determining that into target
The unique encodings information of equipment, and obtain the facility information of target device, wherein facility information includes at least one of:
The event of the model, the title of target device, the position of target device, the technical parameter of target device, target device of target device
Hinder data;According to target device unique encodings information, by the facility information of target device, maintenance plan, target work order and
The binding storage of visa list.
Optionally, method further include: receive the querying condition that mobile terminal is sent, and according to querying condition to mobile terminal
Send corresponding with querying condition target information, wherein target information include it is following one of arbitrarily: maintenance plan, target work order,
Visa list;Or/and approval information is sent to mobile terminal, and receive the examination & approval corresponding with approval information of mobile terminal transmission
As a result, wherein approval information corresponds to following one of any: maintenance plan, target work order, visa list.Equipment herein
It can be server, PC, PAD, mobile phone etc..
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just
The program of beginningization there are as below methods step: the current status data of target device is determined;Meet the first default item in status data
Maintenance plan in the case where part, according to the historical data generation target device that target device stores in historical time, wherein
Historical data includes history maintenance plan, history target work order, history visa list;Meet the second preset condition in maintenance plan
In the case of, the corresponding target work order of multiple engineering projects is generated according to maintenance plan, wherein engineering project is set for overhauling target
Standby, target work order includes at least: the purpose project amount and the corresponding estimated cost of purpose project amount of engineering project;In target
After the corresponding engineering project of work order is finished, the executive condition according to engineering project determines the visa list of engineering project,
In, visa list includes at least: the Practical Project amount and the corresponding actual cost of Practical Project amount of engineering project;By target device
Maintenance plan, target work order and the binding storage of visa list.
Optionally, in the case where status data meets the first preset condition, according to target device in historical time memory
The maintenance plan of the historical data generation target device of storage includes: whether the status information of foundation target device determines target device
It breaks down;In the case where target device breaks down and failure has conditions to release, according to target device in historical time
The historical data of interior storage generates the maintenance plan of target device;It breaks down in target device, and failure does not have elimination item
In the case where part, processing is monitored to target device.
Optionally, it in the case where target device breaks down and failure has conditions to release, is being gone through according to target device
It includes: to have the case where the first conditions to release in failure that the historical data of history time memory storage, which generates the maintenance plan of target device,
Under, the maintenance plan according to the historical data generation target device that target device stores in historical time, wherein examined generating
After repairing plan, then continues to execute in the case where maintenance plan meets the second preset condition, generated according to maintenance plan multiple
The step of engineering project corresponding target work order;In the case where failure has the second conditions to release, gone through according to target device
The historical data of history time memory storage generates the second work order of target device, wherein holds in the corresponding engineering project of the second work order
The step of going after finishing, then executing the second work order of storage target device.
Optionally, in the case where maintenance plan meets the second preset condition, multiple engineering items are generated according to maintenance plan
The corresponding target work order of mesh includes: to determine multiple engineering projects according to maintenance plan in the case where maintenance plan is by examination & approval;
Many types according to engineering project determine the purpose project amount of engineering project and the preset cost of purpose project amount;According to engineering
The purpose project amount of project and the preset cost of purpose project amount generate the corresponding target work order of engineering project.
Optionally, in the case where maintenance plan meets the second preset condition, multiple engineering items are generated according to maintenance plan
The corresponding target work order of mesh includes: to determine multiple engineering projects according to maintenance plan in the case where maintenance plan is by examination & approval,
And the corresponding construction object of engineering project;When the corresponding construction object of engineering project is outer committee's object, according to maintenance plan
Generate the first work order of engineering project, wherein after generating the first work order, then continue to execute engineering corresponding in target work order
After the project implementation finishes, the executive condition according to engineering project determines the step of the visa list of target device;In engineering project
When corresponding construction object is non-outer committee's object, the second work order of engineering project is generated according to maintenance plan, wherein in the second work
After being singly finished, then execute storage target device maintenance plan, the second work order the step of.
Optionally, after the corresponding engineering project of target work order is finished, the executive condition according to engineering project is true
The visa list for determining engineering project includes: to determine corresponding with each engineering project sub- label according to the executive condition of each engineering project
Card is single;In the case where multiple sub- visa lists meet third preset condition, the label of engineering project are determined according to multiple sub- visa lists
Card is single, wherein third preset condition is the examination & approval of sub- visa single pass-through.
Optionally, the binding storage of the maintenance plan of target device, target work order and visa list is comprised determining that into target
The unique encodings information of equipment, and obtain the facility information of target device, wherein facility information includes at least one of:
The event of the model, the title of target device, the position of target device, the technical parameter of target device, target device of target device
Hinder data;According to target device unique encodings information, by the facility information of target device, maintenance plan, target work order and
The binding storage of visa list.
Optionally, method further include: receive the querying condition that mobile terminal is sent, and according to querying condition to mobile terminal
Send corresponding with querying condition target information, wherein target information include it is following one of arbitrarily: maintenance plan, target work order,
Visa list;Or/and approval information is sent to mobile terminal, and receive the examination & approval corresponding with approval information of mobile terminal transmission
As a result, wherein approval information corresponds to following one of any: maintenance plan, target work order, visa list.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The system for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of system, the instruction system realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/
Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie
The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM),
Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices
Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates
Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability
It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap
Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element
There is also other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can provide as method, system or computer program product.
Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application
Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code
The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
Formula.
The above is only embodiments herein, are not intended to limit this application.To those skilled in the art,
Various changes and changes are possible in this application.It is all within the spirit and principles of the present application made by any modification, equivalent replacement,
Improve etc., it should be included within the scope of the claims of this application.
Claims (12)
1. a kind of processing method of overhaul of the equipments information characterized by comprising
Determine the current status data of target device;
In the case where the status data meets the first preset condition, stored in historical time according to the target device
Historical data generates the maintenance plan of the target device, wherein the historical data includes history maintenance plan, history target
Work order, history visa list;
In the case where the maintenance plan meets the second preset condition, multiple engineering projects pair are generated according to the maintenance plan
The target work order answered, wherein for overhauling the target device, the target work order includes at least the engineering project: described
The purpose project amount of engineering project and the corresponding estimated cost of the purpose project amount;
After the corresponding engineering project of the target work order is finished, the executive condition according to the engineering project determines institute
State the visa list of engineering project, wherein the visa list includes at least: the Practical Project amount and the reality of the engineering project
The corresponding actual cost of project amount;
The maintenance plan of the target device, the target work order and the visa list are bound and stored.
2. the method according to claim 1, wherein the case where the status data meets the first preset condition
Under, the maintenance plan that the historical data stored in historical time according to the target device generates the target device includes:
Status information according to the target device determines whether the target device breaks down;
In the case where the target device breaks down and the failure has conditions to release, exist according to the target device
The historical data stored in historical time generates the maintenance plan of the target device;
In the case where the target device breaks down and the failure does not have conditions to release, to the target device into
Row monitoring processing.
3. according to the method described in claim 2, it is characterized in that, break down in the target device, and the failure has
In the case where standby conditions to release, the historical data stored in historical time according to the target device generates the target device
Maintenance plan include:
In the case where the failure has the first conditions to release, the history that is stored in historical time according to the target device
Data generate the maintenance plan of the target device, wherein after generating the maintenance plan, then continue to execute in the inspection
In the case that the plan of repairing meets the second preset condition, the corresponding target work order of multiple engineering projects is generated according to the maintenance plan
The step of;
In the case where the failure has the second conditions to release, the history that is stored in historical time according to the target device
Data generate the second work order of the target device, wherein after the corresponding engineering project of second work order is finished,
The step of then executing the second work order for storing the target device.
4. the method according to claim 1, wherein the case where the maintenance plan meets the second preset condition
Under, generating the corresponding target work order of multiple engineering projects according to the maintenance plan includes:
In the case where the maintenance plan is by examination & approval, multiple engineering projects are determined according to the maintenance plan;
Many types according to the engineering project determine the purpose project amount and the purpose project amount of the engineering project
Preset cost;
According to the purpose project amount of the engineering project and the preset cost of the purpose project amount, the engineering project pair is generated
The target work order answered.
5. the method according to claim 1, wherein the case where the maintenance plan meets the second preset condition
Under, generating the corresponding target work order of multiple engineering projects according to the maintenance plan includes:
In the case where the maintenance plan is by examination & approval, multiple engineering projects and described are determined according to the maintenance plan
The corresponding construction object of engineering project;
When the corresponding construction object of the engineering project is outer committee's object, the engineering project is generated according to the maintenance plan
The first work order, wherein after generating first work order, then continue to execute engineering project corresponding in the target work order
After being finished, the executive condition according to the engineering project determines the step of the visa list of the target device;
When the corresponding construction object of the engineering project is non-outer committee's object, the engineering item is generated according to the maintenance plan
The second work order of purpose, wherein after second work order is finished, then execute the maintenance meter for storing the target device
Draw, second work order the step of.
6. the method according to claim 1, wherein being finished in the corresponding engineering project of the target work order
Later, the executive condition according to the engineering project determines that the visa list of the engineering project includes:
The determining sub- visa list corresponding with each engineering project of executive condition according to each engineering project;
In the case where multiple sub- visa lists meet third preset condition, the work is determined according to multiple sub- visa lists
Journey item purpose visa list, wherein the third preset condition is the sub- visa single pass-through examination & approval.
7. the method according to claim 1, wherein by the maintenance plan of the target device, the target work
The single and described visa list binding, which stores, includes:
It determines the unique encodings information of the target device, and obtains the facility information of the target device, wherein is described to set
Standby information includes at least one of: the model of the target device, the title of the target device, the target device position
It sets, the fault data of the technical parameter of the target device, the target device;
According to the unique encodings information of the target device, by the facility information of the target device, maintenance plan, described
Target work order and visa list binding storage.
8. the method according to claim 1, wherein the method also includes:
The querying condition that mobile terminal is sent is received, and is sent and the inquiry according to the querying condition to the mobile terminal
The corresponding target information of condition, wherein the target information includes following one of any: maintenance plan, target work order, visa
It is single;Or/and
Approval information is sent to the mobile terminal, and receive that the mobile terminal sends corresponding with the approval information examines
Batch result, wherein the approval information corresponds to following one of any: maintenance plan, target work order, visa list.
9. a kind of processing system of overhaul of the equipments information characterized by comprising
Defect malfunctioning module, for determining whether the current status data of target device, and the determining target device occur
Failure, wherein whether the target device breaks down is determined by the status information of the target device;
Maintenance plan module, for determining the maintenance meter of the target device in the case where the target device breaks down
It draws, wherein the maintenance plan of the target device determines by the historical data that the target device stores in historical time,
In, the historical data includes history maintenance plan, history target work order, history visa list;
Target work order module, it is multiple for overhauling for determining in the case where the maintenance plan meets the second preset condition
The corresponding target work order of the engineering project of the target device, wherein the target work order determines by the maintenance plan,
In, the target work order includes at least: the purpose project amount of the engineering project and the corresponding budget of the purpose project amount
Expense;
Visa single module, for determining the engineering project after the corresponding engineering project of the target work order is finished
Visa list, wherein the visa list is determined by the executive condition of the engineering project, wherein the visa list includes at least:
The Practical Project amount of the engineering project and the corresponding actual cost of the Practical Project amount;
Equipment files module, for binding the maintenance plan for storing the target device, the target work order and the visa
It is single.
10. system according to claim 9, which is characterized in that the system also includes:
Specialized management module, for determining the corresponding specialized management demand of the target device;
First movement end module for the querying condition of transmission, and receives target information corresponding with the querying condition,
In, the target information includes following one of any: maintenance plan, target work order, visa list;
Second mobile end module, for receiving approval information, and sends approval results corresponding with the approval information, wherein
The approval information corresponds to following one of any: maintenance plan, target work order, visa list.
11. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution
Benefit require any one of 1 to 8 described in overhaul of the equipments information management method.
12. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run
Benefit require any one of 1 to 8 described in overhaul of the equipments information management method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910132804.XA CN109886435A (en) | 2019-02-21 | 2019-02-21 | The processing method and system of overhaul of the equipments information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910132804.XA CN109886435A (en) | 2019-02-21 | 2019-02-21 | The processing method and system of overhaul of the equipments information |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109886435A true CN109886435A (en) | 2019-06-14 |
Family
ID=66928895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910132804.XA Pending CN109886435A (en) | 2019-02-21 | 2019-02-21 | The processing method and system of overhaul of the equipments information |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109886435A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112308244A (en) * | 2020-10-21 | 2021-02-02 | 岭东核电有限公司 | Nuclear power station maintenance license management and control method and device, storage medium and terminal equipment |
CN112785101A (en) * | 2019-11-06 | 2021-05-11 | 中国石油化工股份有限公司 | Memory, oil refining chemical equipment defect disposal method, device and equipment |
CN115660618A (en) * | 2022-10-31 | 2023-01-31 | 东方合智数据科技(广东)有限责任公司 | Maintenance flow optimization method based on corrugated paper equipment and related equipment |
CN115719221A (en) * | 2022-11-22 | 2023-02-28 | 北京思维实创科技有限公司 | Vehicle bogie overhauling method, system, terminal equipment and storage medium |
CN116502873A (en) * | 2023-06-27 | 2023-07-28 | 广东电网有限责任公司梅州供电局 | External commission construction management method and system for power distribution network, electronic equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102142112A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Data processing method for equipment overhauling cost |
CN102915479A (en) * | 2012-09-25 | 2013-02-06 | 陕西陕煤黄陵矿业有限公司 | Power plant asset management system |
CN107203838A (en) * | 2017-05-03 | 2017-09-26 | 北京海顿中科技术有限公司 | Equipment management system |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
-
2019
- 2019-02-21 CN CN201910132804.XA patent/CN109886435A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102142112A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Data processing method for equipment overhauling cost |
CN102915479A (en) * | 2012-09-25 | 2013-02-06 | 陕西陕煤黄陵矿业有限公司 | Power plant asset management system |
CN107203838A (en) * | 2017-05-03 | 2017-09-26 | 北京海顿中科技术有限公司 | Equipment management system |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112785101A (en) * | 2019-11-06 | 2021-05-11 | 中国石油化工股份有限公司 | Memory, oil refining chemical equipment defect disposal method, device and equipment |
CN112308244A (en) * | 2020-10-21 | 2021-02-02 | 岭东核电有限公司 | Nuclear power station maintenance license management and control method and device, storage medium and terminal equipment |
CN115660618A (en) * | 2022-10-31 | 2023-01-31 | 东方合智数据科技(广东)有限责任公司 | Maintenance flow optimization method based on corrugated paper equipment and related equipment |
CN115660618B (en) * | 2022-10-31 | 2023-10-03 | 东方合智数据科技(广东)有限责任公司 | Maintenance flow optimization method based on corrugated paper equipment and related equipment |
CN115719221A (en) * | 2022-11-22 | 2023-02-28 | 北京思维实创科技有限公司 | Vehicle bogie overhauling method, system, terminal equipment and storage medium |
CN115719221B (en) * | 2022-11-22 | 2023-09-19 | 北京思维实创科技有限公司 | Method, system, terminal equipment and storage medium for overhauling bogie of vehicle |
CN116502873A (en) * | 2023-06-27 | 2023-07-28 | 广东电网有限责任公司梅州供电局 | External commission construction management method and system for power distribution network, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109886435A (en) | The processing method and system of overhaul of the equipments information | |
US8606548B2 (en) | Energy facility control system | |
Srinivasan et al. | An approach to value-based infrastructure asset management | |
Long | ITIL® 2011 at a Glance | |
Teixeira et al. | Extending the decision-making capabilities in remanufacturing service contracts by using symbiotic simulation | |
Lukinskiy et al. | A probabilistic approach to information management of order fulfilment reliability with the help of perfect-order analytics | |
Lee et al. | Sensor-integrated hybrid blockchain system for supply chain coordination in volumetric modular construction | |
Kans et al. | Modular-based framework of key performance indicators regulating maintenance contracts | |
Hey | Turnaround Management for the Oil, Gas, and Process Industries: A Project Management Approach | |
Hooper et al. | Whole-life infrastructure asset management: good practice guide for civil infrastructure | |
Newton | Managing project risk | |
US20190050767A1 (en) | Means for strategically managing an equipment of a physical network infrastructure | |
Cesar et al. | Technological obsolescence management: monitoring electrical equipment and automation systems | |
Yousefi-Babadi et al. | Capacitated Sustainable Resilient Closed-Loop Supply Chain Network Design: A Heuristics Algorithm | |
Sinha et al. | Complete it solution for Enterprise Asset Management (EAM) in Indian power Utility business | |
Pozin | The principles of life cycle supporting system for mission-critical systems | |
Velmurugan et al. | Asset Maintenance Management in Industry | |
El Souri et al. | An investigation into the management of design for manufacturing knowledge in an aerospace company | |
Velmurugan et al. | Asset Maintenance in Operations-Intensive Organizations | |
Evbuomwan | A Tale of Two Utility Companies-Towards an Enterprise Asset Management (EAM) Transformation Assessment | |
Haider | Information and operational technologies governance framework for engineering asset management | |
Fekete et al. | Aligning Multilateral Development Banks’ Operations with the Paris Agreement’s Mitigation Objectives | |
Park et al. | Design and prototype development of dynamic supply chain supporting (DSCS) system in connected smart factory environment: focusing on architecture and data model | |
Sarferaz | Process of Acquire to Decommission | |
Alijanzadeh et al. | Optimization Of Maintenance In Supply Chain Process And Risk-Based Critical Failure Situations (Case study: Iranian Oil Pipeline And Telecommunication Company, North District) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190614 |
|
RJ01 | Rejection of invention patent application after publication |