CN107944830A - A kind of equipment maintenance cost management method, equipment and computer-readable recording medium - Google Patents

A kind of equipment maintenance cost management method, equipment and computer-readable recording medium Download PDF

Info

Publication number
CN107944830A
CN107944830A CN201711259951.0A CN201711259951A CN107944830A CN 107944830 A CN107944830 A CN 107944830A CN 201711259951 A CN201711259951 A CN 201711259951A CN 107944830 A CN107944830 A CN 107944830A
Authority
CN
China
Prior art keywords
maintenance cost
equipment maintenance
equipment
examination
approval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711259951.0A
Other languages
Chinese (zh)
Inventor
刘彦波
石磊
蓝晓君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongyan Information Technology Co Ltd
Original Assignee
Beijing Zhongyan Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongyan Information Technology Co Ltd filed Critical Beijing Zhongyan Information Technology Co Ltd
Priority to CN201711259951.0A priority Critical patent/CN107944830A/en
Publication of CN107944830A publication Critical patent/CN107944830A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention proposes a kind of equipment maintenance cost management method, equipment and computer-readable recording medium, and this method includes:Based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost measuring and calculating;The equipment maintenance plan includes:Set all standard maintenance content in duration;Based on the measuring and calculating integrated database, according to maintenance of equipment work order, equipment maintenance cost budget is generated;The maintenance of equipment work order includes:The single corresponding standard repair content of serviceman;Obtain equipment maintenance cost clearing;The equipment maintenance cost clearing include:Standard repair clearing fee and service material clearing fee;According to preset statistical model, statistical analysis is carried out to equipment maintenance cost measuring and calculating, the equipment maintenance cost budget and/or equipment maintenance cost clearing.The present invention effectively increases the efficiency of management of equipment maintenance cost, and equipment maintenance cost caused by avoiding labor management calculates mistake.

Description

A kind of equipment maintenance cost management method, equipment and computer-readable recording medium
Technical field
The present invention relates to technical field of data administration, more particularly to a kind of equipment maintenance cost management method, equipment and calculating Machine readable storage medium storing program for executing.
Background technology
Equipment is the assets composition of enterprise-essential, is the strongest and strong embodiment of competition among enterprises, is even more enterprise's production With the main object of operating cost spending.Maintenance of equipment is the core of equipment management, on the one hand to ensure that equipment safety stablizes fortune OK, maintenance cost is on the other hand controlled as far as possible, reduce maintenance cost.Traditional equipment maintenance cost is by labor management, Through not adapting to the information processing requirement in modern times, it can not meet requirement of the enterprise operation and management to information, business administration faces The challenge of informationization.
The content of the invention
The technical problem to be solved in the present invention is a kind of, there is provided equipment maintenance cost management method, equipment and computer-readable Storage medium, overcomes the defects of equipment maintenance cost is by labor management inefficiency in the prior art.
The technical solution adopted by the present invention is a kind of equipment maintenance cost management method, including:
Based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost measuring and calculating;The equipment Maintenance project includes:Set all standard maintenance content in duration;
Based on the measuring and calculating integrated database, according to maintenance of equipment work order, equipment maintenance cost budget is generated;The equipment dimension Repairing work order includes:The single corresponding standard repair content of serviceman;
Obtain equipment maintenance cost clearing;The equipment maintenance cost clearing include:Standard repair clearing fee and service material knot Calculation expense;
According to preset statistical model, equipment maintenance cost measuring and calculating, the equipment maintenance cost budget and/or equipment are tieed up Repair expense clearing and carry out statistical analysis.
Optionally, the measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
It is described based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost measuring and calculating, bag Include:
Items the first standard repair content in equipment maintenance plan, described in the standard procedure library inquiry items Corresponding first standard procedure of first standard repair content;
According to first standard procedure, corresponding first standard of first standard procedure is inquired about in the quota store Maintenance cost;
According to first standard procedure, corresponding first maintenance of first standard procedure is inquired about in the material depot Fee of material;
The equipment maintenance cost measuring and calculating is generated, the equipment maintenance cost measuring and calculating includes:First standard procedure is corresponding First standard repair takes, and corresponding first service material of first standard procedure takes.
Optionally, the measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
It is described to be based on the measuring and calculating integrated database, according to maintenance of equipment work order, equipment maintenance cost budget is generated, including:
According to the single corresponding second standard repair content of serviceman, in the second mark described in the standard procedure library inquiry Corresponding second standard procedure of quasi- maintenance content;
According to second standard procedure, corresponding second standard of second standard procedure is inquired about in the quota store Maintenance cost;
According to second standard procedure, corresponding second maintenance of second standard procedure is inquired about in the material depot Fee of material;
The equipment maintenance cost budget is generated, the budget includes for the equipment maintenance cost:Second standard procedure is corresponding Second standard repair takes, and corresponding second service material of second standard procedure takes.
Optionally, after the equipment maintenance cost budget is generated, the method further includes:
According to preset approval process, the equipment maintenance cost budget is sent to preset examination & approval user, for described Examination & approval user examines the equipment maintenance cost budget.
Optionally, the equipment maintenance cost budget is sent to preset examination & approval according to preset approval process described After user, the method further includes:
In the case where the quantity of the examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, lead to Examination & approval user described in alarm message reminding is crossed to be examined;
And according to the date of approval of the examination & approval user, generation examination & approval list, so that the examination & approval user and/or setting use Examination & approval progress is inquired about at family.
Optionally, after the acquisition equipment maintenance cost clearing, the method further includes:
According to preset approval process, equipment maintenance cost clearing are sent to preset examination & approval user, for described Examination & approval user examines equipment maintenance cost clearing.
Optionally, equipment maintenance cost clearing are sent to preset examination & approval according to preset approval process described After user, the method further includes:
In the case where the quantity of the examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, lead to Examination & approval user described in alarm message reminding is crossed to be examined;
And according to the date of approval of the examination & approval user, generation examination & approval list, so that the examination & approval user and/or setting use Examination & approval progress is inquired about at family.
Optionally, the method further includes:
Obtain maintenance of equipment visa list;Wherein, the maintenance of equipment visa list includes:Standard repair content, standard repair Clearing fee and service material clearing fee;
The maintenance of equipment visa list is preserved to initialized data base, so that setting user inquires about institute in the database State maintenance of equipment visa list.
The present invention also provides a kind of equipment maintenance cost management equipment, the equipment maintenance cost management equipment include processor and Memory;
The processor is used to perform the equipment maintenance cost management program stored in memory, to realize that above-mentioned equipment is tieed up The step of repairing expense management method.
The present invention also provides a kind of computer-readable recording medium, the computer-readable recording medium storage have one or The multiple programs of person, one or more of programs can be performed by one or more processor, to realize that above-mentioned equipment is tieed up The step of repairing expense management method.
Using above-mentioned technical proposal, the present invention at least has following advantages:
A kind of equipment maintenance cost management method, equipment and computer-readable recording medium of the present invention, realize equipment Maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment maintenance cost clearing automatically generate and statistical analysis, effectively increase and set The efficiency of management of standby maintenance cost, equipment maintenance cost caused by avoiding labor management calculate mistake.
Brief description of the drawings
Fig. 1 is the equipment maintenance cost management method flow chart of first embodiment of the invention;
Fig. 2 is the equipment maintenance cost management method flow chart of second embodiment of the invention;
Fig. 3 is that the equipment maintenance cost management equipment of third embodiment of the invention forms structure diagram.
Embodiment
Further to illustrate the present invention to reach the technological means and effect that predetermined purpose is taken, below in conjunction with attached drawing And preferred embodiment, the present invention is described in detail as after.
First embodiment of the invention, a kind of equipment maintenance cost management method, as shown in Figure 1, including step in detail below:
Step S101, based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost is surveyed Calculate.
Wherein, equipment maintenance plan includes:Set all standard maintenance content in duration.
Optionally, step S101, including:
Measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
Items the first standard repair content in equipment maintenance plan, in every first standard of standard procedure library inquiry Repair corresponding first standard procedure of content;
According to the first standard procedure, the corresponding first standard repair expense of the first standard procedure is inquired about in quota store;
According to the first standard procedure, the corresponding first service material expense of the first standard procedure is inquired about in material depot;
Equipment maintenance cost measuring and calculating is generated, equipment maintenance cost measuring and calculating includes:Corresponding first standard repair of first standard procedure Take, and corresponding first service material of the first standard procedure takes;
Wherein, equipment maintenance plan includes:Set all standard maintenance content in duration.
In some embodiments of the invention, setting duration is not specifically limited, can is one month or one A season or 1 year or user-defined duration.
Step S102, based on measuring and calculating integrated database, according to maintenance of equipment work order, generates equipment maintenance cost budget.
Wherein, maintenance of equipment work order includes:The single corresponding standard repair content of serviceman.
Optionally, step S102, including:
Measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
According to the single corresponding second standard repair content of serviceman, in the second standard repair of standard procedure library inquiry Hold corresponding second standard procedure;
According to the second standard procedure, the corresponding second standard repair expense of the second standard procedure is inquired about in quota store;
According to the second standard procedure, the corresponding second service material expense of the second standard procedure is inquired about in material depot;
Equipment maintenance cost budget is generated, the budget includes for equipment maintenance cost:Corresponding second standard repair of second standard procedure Take, and corresponding second service material of the second standard procedure takes;
Wherein, maintenance of equipment work order includes:The single corresponding standard repair content of serviceman.
Step S103, obtains equipment maintenance cost clearing.
Wherein, equipment maintenance cost clearing include:Standard repair clearing fee and service material clearing fee.
In some embodiments of the invention, the mode for obtaining equipment maintenance cost clearing is not specifically limited, Ke Yishi Obtain and set equipment maintenance cost clearing input by user or obtain setting for other management systems generation by setting interface Standby maintenance cost is settled accounts.
Step S104, according to preset statistical model, to equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment Maintenance cost clearing carry out statistical analysis.
Optionally, step S104, including:
According to preset statistical model, equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment maintenance cost are settled accounts Statistical analysis is carried out, obtains statistic analysis result;
Statistic analysis result is presented with the chart format of setting.
In some embodiments of the invention, the chart format of setting is not specifically limited.
Optionally, step S104, including:
According to preset statistical model, equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment maintenance cost are settled accounts Statistical analysis is carried out, obtains statistic analysis result;
Statistic analysis result is stored into the database of setting, for setting user's query and statistical analysis in the database As a result.
A kind of equipment maintenance cost management method described in first embodiment of the invention, realizes equipment maintenance cost measuring and calculating, sets What standby maintenance cost budget and/or equipment maintenance cost were settled accounts automatically generate and statistical analysis, effectively increases the pipe of equipment maintenance cost Efficiency is managed, equipment maintenance cost caused by avoiding labor management calculates mistake.
Second embodiment of the invention, a kind of equipment maintenance cost management method, as shown in Fig. 2, including step in detail below:
Step S201, based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost is surveyed Calculate.
Wherein, equipment maintenance plan includes:Set all standard maintenance content in duration.
Optionally, step S201, including:
Measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
Items the first standard repair content in equipment maintenance plan, in every first standard of standard procedure library inquiry Repair corresponding first standard procedure of content;
According to the first standard procedure, the corresponding first standard repair expense of the first standard procedure is inquired about in quota store;
According to the first standard procedure, the corresponding first service material expense of the first standard procedure is inquired about in material depot;
Equipment maintenance cost measuring and calculating is generated, equipment maintenance cost measuring and calculating includes:Corresponding first standard repair of first standard procedure Take, and corresponding first service material of the first standard procedure takes;
Wherein, equipment maintenance plan includes:Set all standard maintenance content in duration.
In some embodiments of the invention, setting duration is not specifically limited, can is one month or one A season or 1 year or user-defined duration.
Step S202, based on measuring and calculating integrated database, according to maintenance of equipment work order, generates equipment maintenance cost budget.
Wherein, maintenance of equipment work order includes:The single corresponding standard repair content of serviceman.
Optionally, step S202, including:
Measuring and calculating integrated database includes:Standard procedure storehouse, quota store and material depot;
According to the single corresponding second standard repair content of serviceman, in the second standard repair of standard procedure library inquiry Hold corresponding second standard procedure;
According to the second standard procedure, the corresponding second standard repair expense of the second standard procedure is inquired about in quota store;
According to the second standard procedure, the corresponding second service material expense of the second standard procedure is inquired about in material depot;
Equipment maintenance cost budget is generated, the budget includes for equipment maintenance cost:Corresponding second standard repair of second standard procedure Take, and corresponding second service material of the second standard procedure takes;
Wherein, maintenance of equipment work order includes:The single corresponding standard repair content of serviceman.
Step S203, according to preset approval process, equipment maintenance cost budget is sent to preset examination & approval user, for Examination & approval user examines equipment maintenance cost budget.
Optionally, step S203, including:
According to preset approval process, equipment maintenance cost budget is sent to preset examination & approval user, for examining user Equipment maintenance cost budget is examined.
In the case where the quantity of examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, pass through report Alert information alert examination & approval user is examined;
And according to the date of approval of examination & approval user, generation examination & approval list, so that examination & approval user and/or setting user's inquiry examine The progress of criticizing.
Step S204, obtains equipment maintenance cost clearing.
Wherein, equipment maintenance cost clearing include:Standard repair clearing fee and service material clearing fee.
In some embodiments of the invention, the mode for obtaining equipment maintenance cost clearing is not specifically limited, Ke Yishi Obtain and set equipment maintenance cost clearing input by user or obtain setting for other management systems generation by setting interface Standby maintenance cost is settled accounts.
Step S205, according to preset approval process, equipment maintenance cost clearing are sent to preset examination & approval user, for Examination & approval user examines equipment maintenance cost clearing.
Optionally, step S205, including:
According to preset approval process, equipment maintenance cost clearing are sent to preset examination & approval user, for examining user Equipment maintenance cost clearing are examined.
In the case where the quantity of examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, pass through report Alert information alert examination & approval user is examined;
And according to the date of approval of examination & approval user, generation examination & approval list, so that examination & approval user and/or setting user's inquiry examine The progress of criticizing.
Step S206, according to preset statistical model, to equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment Maintenance cost clearing carry out statistical analysis.
Optionally, step S206, including:
According to preset statistical model, equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment maintenance cost are settled accounts Statistical analysis is carried out, obtains statistic analysis result;
Statistic analysis result is presented with the chart format of setting.
In some embodiments of the invention, the chart format of setting is not specifically limited.
Optionally, step S206, including:
According to preset statistical model, equipment maintenance cost measuring and calculating, equipment maintenance cost budget and/or equipment maintenance cost are settled accounts Statistical analysis is carried out, obtains statistic analysis result;
Statistic analysis result is stored into the database of setting, for setting user's query and statistical analysis in the database As a result.
Step S207, obtains maintenance of equipment visa list.
Wherein, maintenance of equipment visa list includes:Standard repair content, standard repair clearing fee and service material clearing fee.
Maintenance of equipment visa list is preserved to initialized data base, for setting user, query facility maintenance is signed in the database Card is single.
In some embodiments of the invention, the mode for obtaining maintenance of equipment visa list is not specifically limited, Ke Yishi Obtain and set maintenance of equipment visa list input by user or obtain setting for other management systems generation by setting interface Standby maintenance visa list.
A kind of equipment maintenance cost management method described in second embodiment of the invention, realizes equipment maintenance cost measuring and calculating, sets What standby maintenance cost budget and/or equipment maintenance cost were settled accounts automatically generate and statistical analysis, effectively increases the pipe of equipment maintenance cost Efficiency is managed, equipment maintenance cost caused by avoiding labor management calculates mistake.
Third embodiment of the invention, a kind of equipment maintenance cost management equipment, as shown in figure 3, including consisting of part:
Processor 501 and memory 502.In some embodiments of the invention, processor 501 and memory 502 can lead to Cross bus or other manner connection.
Processor 501 can be general processor, such as central processing unit (Central Processing Unit, CPU), it can also be digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (English: Application Specific Integrated Circuit, ASIC), or be arranged to implement the embodiment of the present invention One or more integrated circuits.Wherein, memory 502 is used for the executable instruction for storing the processor 501;
Memory 502, processor 501 is transferred to for store program codes, and by the program code.Memory 502 can With including volatile memory (Volatile Memory), such as random access memory (Random Access Memory, RAM);Memory 502 can also include nonvolatile memory (Non-Volatile Memory), such as read-only storage (Read-Only Memory, ROM), flash memory (Flash Memory), hard disk (Hard Disk Drive, HDD) or solid State hard disk (Solid-State Drive, SSD);Memory 502 can also include the combination of the memory of mentioned kind.
Wherein, processor 501 is used for the program code management code for calling the memory 502 to store, and performs the present invention First embodiment into second embodiment of the invention in any embodiment part or Overall Steps.
A kind of equipment maintenance cost management equipment described in third embodiment of the invention, realizes equipment maintenance cost measuring and calculating, sets What standby maintenance cost budget and/or equipment maintenance cost were settled accounts automatically generate and statistical analysis, effectively increases the pipe of equipment maintenance cost Efficiency is managed, equipment maintenance cost caused by avoiding labor management calculates mistake.
Fourth embodiment of the invention, a kind of computer-readable recording medium.
Computer-readable storage medium can be RAM memory, flash memory, ROM memory, eprom memory, EEPROM storages Device, register, hard disk, mobile hard disk, the storage medium of CD-ROM or any other form known in the art.
Computer-readable recording medium storage has one or more program, one or more program can by one or The multiple processors of person perform, with realize first embodiment of the invention into second embodiment of the invention in any embodiment part or Overall Steps.
A kind of computer-readable recording medium described in fourth embodiment of the invention, is stored with one or more journey Sequence, one or more program can be performed by one or more processor, realize equipment maintenance cost measuring and calculating, maintenance of equipment Expense budget and/or equipment maintenance cost clearing automatically generate and statistical analysis, effectively increase the efficiency of management of equipment maintenance cost, Equipment maintenance cost caused by avoiding labor management calculates mistake.
By the explanation of embodiment, should can to the present invention for reach technological means that predetermined purpose is taken and Effect is able to more go deep into and specific understanding, but appended diagram is only to provide reference and purposes of discussion, is not used for originally Invention is any limitation as.

Claims (10)

  1. A kind of 1. equipment maintenance cost management method, it is characterised in that including:
    Based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost measuring and calculating;The maintenance of equipment Plan includes:Set all standard maintenance content in duration;
    Based on the measuring and calculating integrated database, according to maintenance of equipment work order, equipment maintenance cost budget is generated;The serviceman Singly include:The single corresponding standard repair content of serviceman;
    Obtain equipment maintenance cost clearing;The equipment maintenance cost clearing include:Standard repair clearing fee and service material clearing fee;
    According to preset statistical model, to equipment maintenance cost measuring and calculating, the equipment maintenance cost budget and/or equipment maintenance cost Clearing carry out statistical analysis.
  2. 2. according to the method described in claim 1, it is characterized in that, the measuring and calculating integrated database includes:Standard procedure storehouse, determine E Ku and material depot;
    It is described based on preset measuring and calculating integrated database, according to equipment maintenance plan, generation equipment maintenance cost measuring and calculating, including:
    Items the first standard repair content in equipment maintenance plan, in standard procedure library inquiry items described first Corresponding first standard procedure of standard repair content;
    According to first standard procedure, corresponding first standard repair of first standard procedure is inquired about in the quota store Take;
    According to first standard procedure, corresponding first service material of first standard procedure is inquired about in the material depot Take;
    The equipment maintenance cost measuring and calculating is generated, the equipment maintenance cost measuring and calculating includes:First standard procedure corresponding first Standard repair takes, and corresponding first service material of first standard procedure takes.
  3. 3. according to the method described in claim 1, it is characterized in that, the measuring and calculating integrated database includes:Standard procedure storehouse, determine E Ku and material depot;
    It is described to be based on the measuring and calculating integrated database, according to maintenance of equipment work order, equipment maintenance cost budget is generated, including:
    According to the single corresponding second standard repair content of serviceman, tieed up in the second standard described in the standard procedure library inquiry Repair corresponding second standard procedure of content;
    According to second standard procedure, corresponding second standard repair of second standard procedure is inquired about in the quota store Take;
    According to second standard procedure, corresponding second service material of second standard procedure is inquired about in the material depot Take;
    The equipment maintenance cost budget is generated, the budget includes for the equipment maintenance cost:Second standard procedure corresponding second Standard repair takes, and corresponding second service material of second standard procedure takes.
  4. 4. the method according to claim 1 or 3, it is characterised in that described after the equipment maintenance cost budget is generated Method further includes:
    According to preset approval process, the equipment maintenance cost budget is sent to preset examination & approval user, for the examination & approval User examines the equipment maintenance cost budget.
  5. 5. according to the method described in claim 4, it is characterized in that, described according to preset approval process, by the equipment Maintenance cost budget is sent to preset examination & approval user, and the method further includes:
    In the case where the quantity of the examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, pass through report Examination & approval user described in alert information alert is examined;
    And according to the date of approval of the examination & approval user, generation examination & approval list, so that the examination & approval user and/or setting user look into Ask examination & approval progress.
  6. 6. according to the method described in claim 1, it is characterized in that, it is described acquisition equipment maintenance cost clearing after, the side Method further includes:
    According to preset approval process, equipment maintenance cost clearing are sent to preset examination & approval user, for the examination & approval User examines equipment maintenance cost clearing.
  7. 7. according to the method described in claim 6, it is characterized in that, described according to preset approval process, by the equipment Maintenance cost clearing are sent to preset examination & approval user, and the method further includes:
    In the case where the quantity of the examination & approval user is multiple, according to the time limit for appraisal and ratification of preset each examination & approval user, pass through report Examination & approval user described in alert information alert is examined;
    And according to the date of approval of the examination & approval user, generation examination & approval list, so that the examination & approval user and/or setting user look into Ask examination & approval progress.
  8. 8. according to the method described in claim 1, it is characterized in that, the method further includes:
    Obtain maintenance of equipment visa list;Wherein, the maintenance of equipment visa list includes:Standard repair content, standard repair clearing Take and service material clearing fee;
    The maintenance of equipment visa list is preserved to initialized data base, so that setting user inquires about described set in the database Standby maintenance visa list.
  9. 9. a kind of equipment maintenance cost management equipment, it is characterised in that the equipment maintenance cost management equipment includes processor and deposits Reservoir;
    The processor is used to perform the equipment maintenance cost management program stored in memory, to realize according to claim 1~8 Any one of equipment maintenance cost management method the step of.
  10. A kind of 10. computer-readable recording medium, it is characterised in that the computer-readable recording medium storage have one or Multiple programs, one or more of programs can be performed by one or more processor, with realize according to claim 1~ The step of equipment maintenance cost management method any one of 8.
CN201711259951.0A 2017-12-04 2017-12-04 A kind of equipment maintenance cost management method, equipment and computer-readable recording medium Pending CN107944830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711259951.0A CN107944830A (en) 2017-12-04 2017-12-04 A kind of equipment maintenance cost management method, equipment and computer-readable recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711259951.0A CN107944830A (en) 2017-12-04 2017-12-04 A kind of equipment maintenance cost management method, equipment and computer-readable recording medium

Publications (1)

Publication Number Publication Date
CN107944830A true CN107944830A (en) 2018-04-20

Family

ID=61948597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711259951.0A Pending CN107944830A (en) 2017-12-04 2017-12-04 A kind of equipment maintenance cost management method, equipment and computer-readable recording medium

Country Status (1)

Country Link
CN (1) CN107944830A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110633702A (en) * 2019-11-20 2019-12-31 江西博微新技术有限公司 Unmanned aerial vehicle-based line maintenance charge calculation method, server and storage medium
CN110889516A (en) * 2019-11-18 2020-03-17 广东卓维网络有限公司 Low-voltage service quick response visualization platform

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005215902A (en) * 2004-01-28 2005-08-11 Chugoku Electric Power Co Inc:The Information processor, budget managing method for repair construction expense, program, and recording medium
CN101246583A (en) * 2007-09-10 2008-08-20 胜利油田胜利评估咨询有限公司 Automatization system maintenance and charge reckoning method
JP2009205297A (en) * 2008-02-26 2009-09-10 Ricoh Co Ltd Development budget management device
CN102024181A (en) * 2009-09-10 2011-04-20 上海宝信软件股份有限公司 Artificial intelligence maintenance system and method
CN102915479A (en) * 2012-09-25 2013-02-06 陕西陕煤黄陵矿业有限公司 Power plant asset management system
CN103854085A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Ship maintenance management system with alarm function
CN107203838A (en) * 2017-05-03 2017-09-26 北京海顿中科技术有限公司 Equipment management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005215902A (en) * 2004-01-28 2005-08-11 Chugoku Electric Power Co Inc:The Information processor, budget managing method for repair construction expense, program, and recording medium
CN101246583A (en) * 2007-09-10 2008-08-20 胜利油田胜利评估咨询有限公司 Automatization system maintenance and charge reckoning method
JP2009205297A (en) * 2008-02-26 2009-09-10 Ricoh Co Ltd Development budget management device
CN102024181A (en) * 2009-09-10 2011-04-20 上海宝信软件股份有限公司 Artificial intelligence maintenance system and method
CN102915479A (en) * 2012-09-25 2013-02-06 陕西陕煤黄陵矿业有限公司 Power plant asset management system
CN103854085A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Ship maintenance management system with alarm function
CN107203838A (en) * 2017-05-03 2017-09-26 北京海顿中科技术有限公司 Equipment management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范宝营 等: "《现代大型煤炭企业经典管理案例(财务管理篇)》", 31 May 2016, 中国经济出版社, pages: 133 - 134 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110889516A (en) * 2019-11-18 2020-03-17 广东卓维网络有限公司 Low-voltage service quick response visualization platform
CN110633702A (en) * 2019-11-20 2019-12-31 江西博微新技术有限公司 Unmanned aerial vehicle-based line maintenance charge calculation method, server and storage medium

Similar Documents

Publication Publication Date Title
CN107025236B (en) Data processing method between clearing systems and data clearing system
KR20180006955A (en) METHOD FOR INTERACTION DATA PROCESSING AND APPARATUS USING THE SAME
CN107944830A (en) A kind of equipment maintenance cost management method, equipment and computer-readable recording medium
CN108154252A (en) Method and apparatus for estimating the flow deadline
US10282353B2 (en) Proactive duplicate identification
CN113793126B (en) Real-time dynamic monitoring method, system, terminal and storage medium for engineering cost
CN109783788A (en) Tables of data complementing method, device, computer equipment and storage medium
CN109544352A (en) Sampling observation method, apparatus, computer equipment and storage medium based on random number
CN109118047B (en) Budget data processing method and device
Chatterjee ERP failure in developing countries: A case study in India
CN107644041A (en) Declaration form settlement processing method and device
EP3671592A1 (en) Progress rate roll-up system from lower level to upper level for engineering control system of power plant construction project
CN111915256A (en) Method for constructing dispatch fence, method for recognizing remote sign-off and related equipment
Liwan et al. Materials tracking practices for inventory management in construction projects
CN106815290B (en) Method and device for determining attribution of bank card based on graph mining
JP2001282981A (en) Method and system for business reform planning
US8527326B2 (en) Determining maturity of an information technology maintenance project during a transition phase
CN114693039A (en) Abnormal express identification method and device, computer equipment and storage medium
CN109685638B (en) Audit coverage rate measuring method and device and storage medium
CN107886294A (en) A kind of hidden trouble of equipment management method, equipment and computer-readable recording medium
CN109858669A (en) A kind of arrearage based on Information Entropy stops telegram in reply and complains tendency prediction technique
Khoja et al. Supply chain sustainability development in small business: Myth or reality
US20220335385A1 (en) System and method for systematic presentation and ordering of documents based on triggers
JP2014032599A (en) Replacement suggestion support system
JP2018195103A (en) Inventory management device, inventory management method, and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420