CN102817323A - 一种潮汐河段双柱式墩横系梁预制安装快速施工方法 - Google Patents

一种潮汐河段双柱式墩横系梁预制安装快速施工方法 Download PDF

Info

Publication number
CN102817323A
CN102817323A CN2012103208500A CN201210320850A CN102817323A CN 102817323 A CN102817323 A CN 102817323A CN 2012103208500 A CN2012103208500 A CN 2012103208500A CN 201210320850 A CN201210320850 A CN 201210320850A CN 102817323 A CN102817323 A CN 102817323A
Authority
CN
China
Prior art keywords
straining beam
straining beams
casing
prefabricated
transverse straining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103208500A
Other languages
English (en)
Inventor
杨红
王晓芳
蔡传胜
刘屹
韩学伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co Ltd filed Critical CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co Ltd
Priority to CN2012103208500A priority Critical patent/CN102817323A/zh
Publication of CN102817323A publication Critical patent/CN102817323A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种潮汐河段双柱式墩横系梁预制安装快速施工方法,其包括以下步骤:插打护筒,施工桩基础至横系梁处;在护筒上焊接牛腿,形成横系梁的预制台;在预制平台上绑扎钢筋,完成横系梁的预制;在护筒上安装下放系统,将横系梁用手拉葫芦吊在下放系统上;拆除预制平台,并将横系梁对应部分的护筒开槽,利用手拉葫芦将横系梁下放到位;在护筒内立模,浇筑横系梁与桩的连接处。本发明的有益效果为:采用河面上预制,再下放安装的方法,与一般方法相比,该方法是在河面以上完成混凝土的浇筑,避免了在浇筑过程中河水的渗入,使得混凝土的质量得以保证,同时施工方法简单,大幅度的节省了工期,实现了良好的经济性,值得大范围的推广与应用。

Description

一种潮汐河段双柱式墩横系梁预制安装快速施工方法
技术领域
本发明涉及桥梁建造领域,尤其涉及一种潮汐河段双柱式墩横系梁预制安装快速施工方法。
背景技术
目前,在桥梁建造及养护的工程施工过程中,水中墩系梁的施工一般采用安装水下钢套箱的方法进行。安装水下钢套箱法是将预先制作好的套箱安装到位,抽水封底,在箱内绑扎钢筋,浇筑混凝土,然后拆除钢套箱。安装水下钢套箱法常用于系梁较多工作面大时,此方法在浇筑过程中,容易受到河水的侵蚀,混凝土的浇筑质量不易保证;施工工序较多、繁琐;套箱周转次数多,占用的工期比较长;投入的钢模板及其他设备较多,经济性相对较差。
发明内容
本发明的目的是提供一种潮汐河段双柱式墩横系梁预制安装快速施工方法,既可保证施工质量又能加快施工进度,可操作性强,以克服现有技术存在的浇筑过程中容易受到河水的侵蚀,混凝土的浇筑质量不易保证;施工工序较多、繁琐;套箱周转次数多,占用的工期比较长等不足。
本发明的目的通过以下技术方案来实现:
1)插打护筒,施工桩基础至横系梁处;
2)在护筒上焊接牛腿,搭设型钢平台,形成横系梁的预制台,平台位置要求设置在河面以上;
3)在预制平台上绑扎钢筋,立模板,浇筑混凝土,完成横系梁的预制;
4)待横系梁达到要求强度,在护筒上安装下放系统,将横系梁用手拉葫芦吊在下放系统上;
5)拆除预制平台,并将横系梁对应部分的护筒开槽,利用手拉葫芦将横系梁下放到位;
6)补齐护筒的开槽部分,在护筒内立模,浇筑横系梁与桩的连接处,然后继续桥墩的施工。
优选的,所述下放系统由型钢搭设而成。
本发明的有益效果为:采用河面上预制,再下放安装的方法,与一般方法相比,该方法是在河面以上完成混凝土的浇筑,避免了在浇筑过程中,河水的渗入,混凝土质量容易保证,施工方法简单,能节省工期,经济性较好。
附图说明
图1为本发明实施例中潮汐河段双柱式墩横系梁预制施工立面布置图; 
图2为本发明实施例中潮汐河段双柱式墩横系梁预制施工侧面布置图;
图3为本发明实施例中潮汐河段双柱式墩横系梁安装施工立面布置图;
图4为本发明实施例中潮汐河段双柱式墩横系梁安装施工侧面布置图。
图中:
1、护筒;2、牛腿;3、横系梁;4、预制平台;5、下放系统;6、手拉葫芦。
具体实施方式
如图1-4所示,本发明实施例所述的一种潮汐河段双柱式墩横系梁预制安装快速施工方法,包括以下步骤:
1)插打护筒1,施工桩基础至横系梁3处;
2)在护筒上焊接牛腿2,搭设型钢预制平台4,预制平台4位置要求设置在河面以上;
3)在预制平台4上绑扎钢筋,立模板,浇筑混凝土,完成横系梁3的预制;
4)待横系梁3达到要求强度,在护筒1上安装下放系统5,将横系梁3用手拉葫芦6吊在下放系统5上;
5)拆除预制平台4,并将横系梁3对应部分的护筒1开槽,利用手拉葫芦6将横系梁3下放到位;
6)补齐护筒1的开槽部分,形成封闭环境,在护筒1内立模,浇筑横系梁3与桩的连接处,然后继续桥墩下一步工序的施工。
优选的,所述下放系统由型钢搭设而成。
与一般方法相比,本发明所述的方法没有大块钢箱的安装、抽水等工艺,操作简单、方便、快捷;避免了在浇筑过程中,河水的渗入,混凝土质量容易保证,施工方法简单,能节省工期,经济性较好。
虽然以上仅描述了本发明的具体实施方式范例,但是本领域的技术人员应当理解,这些仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更或修改均落入本发明的保护范围。

Claims (3)

1.一种潮汐河段双柱式墩横系梁预制安装快速施工方法,其特征在于,包括以下步骤:
1)插打护筒(1),施工桩基础至横系梁(3)处;
2)在护筒上焊接牛腿(2),搭设型钢预制平台(4),预制平台(4)设置在河面以上;
3)在预制平台(4)上绑扎钢筋,立模板,浇筑混凝土,完成横系梁(3)的预制;
4)待横系梁(3)达到要求强度,在护筒(1)上安装下放系统(5),将横系梁(3)用手拉葫芦(6)吊在下放系统(5)上;以及
5)拆除预制平台(4),并将横系梁(3)对应部分的护筒(1)开槽,利用手拉葫芦(6)将横系梁(3)下放到位。
2.权利要求1所述的潮汐河段双柱式墩横系梁预制安装快速施工方法,其特征在于,进一步包括以下步骤:补齐护筒(1)的开槽部分,在护筒(1)内立模,浇筑横系梁(3)与桩的连接处。
3.权利要求1或2所述的潮汐河段双柱式墩横系梁预制安装快速施工方法,其特征在于:所述下放系统(5)由型钢搭设而成。
CN2012103208500A 2012-08-31 2012-08-31 一种潮汐河段双柱式墩横系梁预制安装快速施工方法 Pending CN102817323A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103208500A CN102817323A (zh) 2012-08-31 2012-08-31 一种潮汐河段双柱式墩横系梁预制安装快速施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103208500A CN102817323A (zh) 2012-08-31 2012-08-31 一种潮汐河段双柱式墩横系梁预制安装快速施工方法

Publications (1)

Publication Number Publication Date
CN102817323A true CN102817323A (zh) 2012-12-12

Family

ID=47301740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103208500A Pending CN102817323A (zh) 2012-08-31 2012-08-31 一种潮汐河段双柱式墩横系梁预制安装快速施工方法

Country Status (1)

Country Link
CN (1) CN102817323A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589748A (zh) * 2018-03-19 2018-09-28 湖南路桥建设集团有限责任公司 一种浅水水下结构物预制安装的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474571Y (zh) * 2001-04-24 2002-01-30 路桥集团第一公路工程局 一种用于双柱式桥墩水中系梁施工的悬吊钢套箱
CN101538833A (zh) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 竖向分条双壁钢围堰止水施工工法
JP4519368B2 (ja) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 コンクリート構造物およびその施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474571Y (zh) * 2001-04-24 2002-01-30 路桥集团第一公路工程局 一种用于双柱式桥墩水中系梁施工的悬吊钢套箱
JP4519368B2 (ja) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 コンクリート構造物およびその施工方法
CN101538833A (zh) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 竖向分条双壁钢围堰止水施工工法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴健: "简支桥梁水中系梁预制吊装法施工技术", 《施工技术》 *
王美宽: "京杭运河特大桥水下系梁采用轻型吊箱的方案综述", 《现代交通技术》 *
田炜等: "三台涪江大桥水中墩施工关键技术", 《第十九届全国桥梁学术会议》 *
苏培奇等: "桥梁工程中水中系梁的施工技术", 《广东土木与建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589748A (zh) * 2018-03-19 2018-09-28 湖南路桥建设集团有限责任公司 一种浅水水下结构物预制安装的方法
CN108589748B (zh) * 2018-03-19 2023-09-01 湖南路桥建设集团有限责任公司 一种浅水水下结构物预制安装的方法

Similar Documents

Publication Publication Date Title
CN102425117B (zh) 多联连续梁或多联刚构梁边跨非悬臂段的施工方法
CN101748682A (zh) 采用波形钢腹板的钢-混凝土叠合板组合梁及其施工方法
CN103938533A (zh) 简支变连续结构及其施工方法
CN103510469B (zh) 一种制造薄壁空心墩的施工方法
CN110552372A (zh) 一种叠合式的电缆工井顶板结构及其施工方法
CN110821022A (zh) 一种可以快速安装的钢结构中的全预制高强度pc楼板
CN202324606U (zh) 一种u型承力座
CN104895221B (zh) 装配式型钢约束混凝土剪力墙结构
CN105442453A (zh) 悬索桥桥塔横梁组合支架施工方法
CN102242569B (zh) 工业厂房高空位换梁后抽柱扩距方法
CN109610707B (zh) 一种预制钢梁与楼板平齐的装配结构及快速施工方法
CN103061509A (zh) 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺
CN107975064A (zh) 用于地下工程的整体预制装配式施工工艺
CN209891551U (zh) 一种钢梁与钢筋桁架楼承板组成的组合梁
CN102817323A (zh) 一种潮汐河段双柱式墩横系梁预制安装快速施工方法
CN103410172A (zh) 一种地下结构顶板后浇带封堵的施工方法
CN102936953A (zh) “大”字型劲钢结构模板施工方法
CN103290966A (zh) 一种楼板构件
CN203668894U (zh) 可快速安装的混凝土预制模板结构
CN205711786U (zh) 大断面多孔超长现浇箱涵支模体系
CN214061940U (zh) 一种带肋模构造的预制混凝土装配式结构
CN110439267A (zh) 一种应用于叠合楼板施工的铝合金模板
CN113530055A (zh) 免支模超大管井封堵结构及方法
CN104294917A (zh) 一种预制钢筋混凝土梁与钢管柱安全便捷连接结构
CN102425141B (zh) 大悬臂叠合构件的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121212