CN102242569B - 工业厂房高空位换梁后抽柱扩距方法 - Google Patents
工业厂房高空位换梁后抽柱扩距方法 Download PDFInfo
- Publication number
- CN102242569B CN102242569B CN201010170730.8A CN201010170730A CN102242569B CN 102242569 B CN102242569 B CN 102242569B CN 201010170730 A CN201010170730 A CN 201010170730A CN 102242569 B CN102242569 B CN 102242569B
- Authority
- CN
- China
- Prior art keywords
- joist
- factory building
- steel column
- former
- capital
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种工业厂房高空位换梁后抽柱扩距方法,其特征在于包括以下步骤:第一步骤:在先不拆除所述厂房待拆钢筋混泥土柱的柱顶小钢柱的情况下,局部拆除所述厂房屋架托梁的上屋面,再分段拆除原屋架竖向托梁;第二步骤:按所述原屋架竖向托梁长度分两段制作新的加强型托梁;第三步骤:分段吊装新的加强型托梁,在新的加强型托梁就位后,在新的加强型托梁与厂房两侧柱子的柱顶小钢柱间采用焊接连接,然后将所述厂房待拆的柱顶小钢柱与原柱子分离;对所述厂房两侧柱子的柱顶小钢柱底部加设端板,且在所述柱顶小钢柱与竖向托梁连接部位加设加强筋板;第四步骤:在拆除原钢筋混泥土柱上的行车梁后,拆除原钢筋混泥土柱,且恢复屋面与安装新行车梁。
Description
技术领域
本发明涉及一种钢结构屋面工业厂房局部改造方法,具体地说,是一种工业厂房高空位换梁后抽柱扩距方法。
背景技术
众多屋面为钢结构的工业厂房,原设计厂房钢柱或钢筋混泥土柱柱距一般只有6m、12m,随着工厂技术改造,设备升级换代,企业利用原有厂房新增设备、扩大产能,以实现跨越式发展,原厂房局部柱距需要由6m改为12m或由12m改为24m。改造方法一般有两种方法,一种方法为先拆除屋面全部钢结构、行车梁等,拆除扩距部位钢柱或钢筋混泥土柱,再更换上大跨度行车梁、大跨度屋架托梁,最后安装上屋面钢结构系统;另一种方法为先对屋架进行支撑加固,保持屋面基本不被破坏的情况下,局部拆除屋面、行车梁等,再拆除扩距部位钢柱或钢筋混泥土柱,最后更换安装大跨度屋架托梁、大跨度行车梁、恢复屋面。在这两种方法中,前者施工周期长,会造成一定时间段的停产,对生产影响较大,后者支撑措施较多,实施过程中将使用大量的临时措施材料和大型机械,费用较高,同时,安全性较差。
因此已知的工业厂房改造方法存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种原工厂不停产进行扩大柱距改造的工业厂房高空位换梁后抽柱扩距方法。
为实现上述目的,本发明的技术解决方案是:
一种工业厂房高空位换梁后抽柱扩距方法,其特征在于包括以下步骤:
第一步骤:在先不拆除所述厂房待拆钢筋混泥土柱的柱顶小钢柱的情况下,局部拆除所述厂房屋架托梁的上屋面,再分段拆除原屋架竖向托梁;
第二步骤:按所述原屋架竖向托梁长度分两段制作新的加强型托梁;
第三步骤:分段吊装新的加强型托梁,在新的加强型托梁就位后,在新的加强型托梁与厂房两侧柱子的柱顶小钢柱间采用焊接连接,然后将所述厂房待拆的柱顶小钢柱与原柱子分离;对所述厂房两侧柱子的柱顶小钢柱底部加设端板,且对原柱顶小钢柱与竖向托梁连接部位的新的加强型托梁加设加强筋板;
第四步骤:在拆除原钢筋混泥土柱上的行车梁后,拆除原钢筋混泥土柱,且恢复屋面与安装新行车梁。
本发明的工业厂房高空位换梁后抽柱扩距方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述厂房待拆的柱子为钢筋混泥土柱,或者钢柱。
采用上述技术方案后,本发明的工业厂房高空位换梁后抽柱扩距方法具有以下优点:
1、缩短拆除、安装时间,减少停产损失;
2、减少拆除、安装机械台班,减少支撑加固措施用材料,降低施工成本;
3、减少大量高空作业,降低安全风险;
4、安装定位精准,提高施工质量。
附图说明
图1为工业厂房屋面钢结构系统示意图;
图2为图1中的1-1拆除柱子前剖面示意图;
图3为图1中的1-1拆除柱子后剖面示意图;
图4为图1中的2-2拆除柱子前剖面示意图;
图5为图1中的2-2拆除柱子后剖面示意图。
图中:1屋架,2檩条,3托架,4待拆除的柱子,,和为横向柱子,B,C和D为纵向柱子。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
现请参阅图1,图2和图4,图1为工业厂房屋面钢结构系统示意图,图2为拆除柱子前图1中的1-1视图和图4为拆除柱子前图1中的2-2视图。如图所示,一大型钢厂连铸车间厂房需拆除在柱顶设有与托梁连接的小钢柱的钢筋混泥土柱子(4),以扩大横向柱子和之间的距离,该工程需要将原厂房柱距由12m改为24m,以新增一台6流连铸机设施。
采用本发明的工业厂房高空位换梁后抽柱扩距方法,具体实施以下步骤:
第一步骤:在先不拆除所述厂房待拆钢筋混泥土柱的柱顶小钢柱的情况下,局部拆除所述厂房屋架托梁的上屋面,再分段拆除原屋架竖向托梁;
第二步骤:按所述原屋架竖向托梁长度分两段制作新的加强型托梁;
第三步骤:分段吊装新的加强型托梁,在新的加强型托梁就位后,在新的加强型托梁与厂房两侧柱子的柱顶小钢柱间采用焊接连接,然后将所述厂房待拆的柱顶小钢柱与原柱子分离;对所述厂房两侧柱子的柱顶小钢柱底部加设端板,且在所述柱顶小钢柱与竖向托梁连接部位加设加强筋板;
第四步骤:在拆除原钢筋混泥土柱上的行车梁后,拆除原钢筋混泥土柱,且恢复屋面与安装新行车梁。
图3和图5分别显示拆除原钢筋混泥土柱(4)后的视图,柱子和之间的距离由原厂房柱距由12m扩展为24m,从而保持厂房屋面在基本保持原样而不被破坏、生产不停产的情况下,完成厂房抽柱扩距的工作。
本发明的工业厂房高空位换梁后抽柱扩距方法,不仅适用于拆除厂房的钢筋混泥土柱子,而且也适用于拆除厂房的钢柱。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (2)
1.一种工业厂房高空位换梁后抽柱扩距方法,其特征在于包括以下步骤:
第一步骤:在先不拆除所述厂房待拆钢筋混泥土柱的柱顶小钢柱的情况下,局部拆除所述厂房屋架托梁的上屋面,再分段拆除原屋架竖向托梁;
第二步骤:按所述原屋架竖向托梁长度分两段制作新的加强型托梁;
第三步骤:分段吊装新的加强型托梁,在新的加强型托梁就位后,在新的加强型托梁与厂房两侧柱子的柱顶小钢柱间采用焊接连接,然后将所述厂房待拆的柱顶小钢柱与原柱子分离;对所述厂房两侧柱子的柱顶小钢柱底部加设端板,且对原柱顶小钢柱与竖向托梁连接部位的新的加强型托梁加设加强筋板;
第四步骤:在拆除原钢筋混泥土柱上的行车梁后,拆除原钢筋混泥土柱,且恢复屋面与安装新行车梁。
2.如权利要求1所述的工业厂房高空位换梁后抽柱扩距方法,其特征在于,所述厂房待拆的柱子为钢柱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010170730.8A CN102242569B (zh) | 2010-05-11 | 2010-05-11 | 工业厂房高空位换梁后抽柱扩距方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010170730.8A CN102242569B (zh) | 2010-05-11 | 2010-05-11 | 工业厂房高空位换梁后抽柱扩距方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102242569A CN102242569A (zh) | 2011-11-16 |
CN102242569B true CN102242569B (zh) | 2015-09-02 |
Family
ID=44960795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010170730.8A Active CN102242569B (zh) | 2010-05-11 | 2010-05-11 | 工业厂房高空位换梁后抽柱扩距方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102242569B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105002985A (zh) * | 2015-07-31 | 2015-10-28 | 中铁城市规划设计研究院有限公司 | 门刚抽柱托梁结构 |
CN106836848A (zh) * | 2017-01-16 | 2017-06-13 | 山东飞越钢结构工程有限公司 | 一种3d模块抽柱方法 |
CN108678411B (zh) * | 2018-06-06 | 2020-10-16 | 新兴铸管股份有限公司 | 一种厂房免拆托梁换柱方法 |
CN110453934A (zh) * | 2019-08-26 | 2019-11-15 | 攀钢集团工程技术有限公司 | 用于大型钢结构屋面厂房的拆除方法 |
CN113530292A (zh) * | 2021-07-13 | 2021-10-22 | 机械工业第六设计研究院有限公司 | 无支撑连续施工的钢框架抽柱改造加固方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1358919A (zh) * | 2002-01-18 | 2002-07-17 | 崔旭中 | 在不停产条件下厂房抬梁抽柱的方法 |
JP2005139691A (ja) * | 2003-11-06 | 2005-06-02 | Sumitomo Forestry Co Ltd | 間仕切部分における柱撤去梁補強方法及び梁補強構造 |
CN101397814A (zh) * | 2007-09-25 | 2009-04-01 | 中色科技股份有限公司 | 超大抽柱柱距处厂房屋面系统的支撑方法 |
-
2010
- 2010-05-11 CN CN201010170730.8A patent/CN102242569B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1358919A (zh) * | 2002-01-18 | 2002-07-17 | 崔旭中 | 在不停产条件下厂房抬梁抽柱的方法 |
JP2005139691A (ja) * | 2003-11-06 | 2005-06-02 | Sumitomo Forestry Co Ltd | 間仕切部分における柱撤去梁補強方法及び梁補強構造 |
CN101397814A (zh) * | 2007-09-25 | 2009-04-01 | 中色科技股份有限公司 | 超大抽柱柱距处厂房屋面系统的支撑方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102242569A (zh) | 2011-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926669B (zh) | 一种地铁车站施工方法 | |
CN104453197B (zh) | 高空大悬挑砼结构型钢支撑平台 | |
CN102943678B (zh) | 拱形地铁车站新旧建筑衔接结构及施工方法 | |
CN102242569B (zh) | 工业厂房高空位换梁后抽柱扩距方法 | |
CN104695337B (zh) | 自提升滑翻施工系统及施工方法 | |
CN102392536B (zh) | 大跨度悬空通廊式模板支撑体系施工方法 | |
CN103452350B (zh) | 装配式电子厂房及其施工方法 | |
CN106088148B (zh) | 综合管廊模板及其应用 | |
CN103452311A (zh) | 一种型钢悬挑结构支撑架的搭设方法 | |
CN104929364B (zh) | 大跨度悬挑整体叠层空腹桁架结构辅助施工方法 | |
CN104389430A (zh) | 素砼柱在后浇带支撑中的应用 | |
CN203394028U (zh) | 一种应用于抗震缝内的墙体模板系统 | |
CN204715366U (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系 | |
CN112360469A (zh) | 一种超深竖井顺作衬砌单侧支模提升模架及施工方法 | |
CN203994174U (zh) | 一种混凝土空心板预制内模及组装架 | |
CN103321154B (zh) | 一种大跨径钢桁梁整体吊装施工方法 | |
CN112963015B (zh) | 与下方既有地铁线路共线连接的隧道拆除施工方法 | |
CN102561392A (zh) | 一种支承地下室顶板上施工电梯基础的结构及其施工方法 | |
CN112160247B (zh) | 一种有限空间桥墩群空心高墩异步液压爬模施工方法 | |
CN103758343A (zh) | 钢筋混凝土楼板吊挂式施工方法及其吊挂装置 | |
CN206616765U (zh) | 大跨度无依附巨型带状桁架拉杆 | |
CN203603542U (zh) | 装配式电子厂房 | |
CN203668894U (zh) | 可快速安装的混凝土预制模板结构 | |
CN203200719U (zh) | 悬空式倒坡模板装置 | |
CN205206278U (zh) | 建筑施工用组合吊架操作平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |