CN110821022A - 一种可以快速安装的钢结构中的全预制高强度pc楼板 - Google Patents
一种可以快速安装的钢结构中的全预制高强度pc楼板 Download PDFInfo
- Publication number
- CN110821022A CN110821022A CN201911187749.0A CN201911187749A CN110821022A CN 110821022 A CN110821022 A CN 110821022A CN 201911187749 A CN201911187749 A CN 201911187749A CN 110821022 A CN110821022 A CN 110821022A
- Authority
- CN
- China
- Prior art keywords
- floor
- steel
- strength
- prefabricated high
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/023—Separate connecting devices for prefabricated floor-slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/14—Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/48—Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
Abstract
本发明提供了一种可以快速安装的钢结构中的全预制高强度PC楼板,包括全预制高强度PC楼板、以及钢框架,全预制高强度PC楼板中预埋有水电管线,钢框架的前后两侧的钢梁上焊接有多个栓钉,全预制高强度PC楼板的前后两侧贯穿有孔洞,将全预制高强度PC楼板吊装于钢框架的钢梁上之后,栓钉对应置于孔洞中,并采用高强度水泥浆封堵。本发明的有益效果在于:1、本发明的楼板采用全预制高强度PC楼板,该楼板区别于传统的钢筋桁架楼板,无需现场浇筑混凝土。2、本发明的钢框架、楼板均可在工厂预制完成,施工时避免搭设脚手架和支模,实现了快速施工,大大节约了施工时间。3、楼板内预埋有水电等管线,无需后期水电预埋,便于后期使用和操作。
Description
【技术领域】
本发明涉及建筑结构领域,尤其涉及一种可以快速安装的钢结构中的全预制高强度PC 楼板。
【背景技术】
在建筑工程结构中,钢梁与预制楼板的连接方法至关重要,直接关系着空间利用、施工进度和工程造价。现阶段我国装配式梁板连接方式大多是将板通过不同的方式搭在梁的上方,进而完成楼盖体系的施工,这种连接方法多存在大量的现场支模、搭设脚手架等,容易影响施工质量并导致施工进度迟缓。
【发明内容】
为了克服现有技术中存在上述的不足,本发明提供一种施工质量好、施工方便的可以快速安装的钢结构中的全预制高强度PC楼板。
本发明解决其技术问题的技术方案是:一种可以快速安装的钢结构中的全预制高强度 PC楼板,包括全预制高强度PC楼板、以及位于该全预制高强度PC楼板的下方的钢框架,所述全预制高强度PC楼板中预埋有水电管线,所述钢框架的前后两侧的钢梁上焊接有多个栓钉,所述全预制高强度PC楼板的前后两侧贯穿有与所述栓钉相对的孔洞,将所述全预制高强度PC楼板吊装于所述钢框架的钢梁上之后,所述栓钉对应置于所述孔洞中,并采用高强度水泥浆封堵。
作为优选,所述钢框架的前后两侧的钢梁的中部之间连接有中间钢梁,所述中间钢梁的两侧各有一个所述全预制高强度PC楼板,两个所述全预制高强度PC楼板之间设有多个栓钉并采用高强度混凝土封堵,多个所述栓钉焊接在所述中间钢梁上。
作为优选,所述钢框架的钢柱、钢梁、以及中间钢梁的截面均呈工字型。
本发明的有益效果在于:1、本发明的楼板采用全预制高强度PC楼板,该楼板区别于传统的钢筋桁架楼板,无需现场浇筑混凝土。2、本发明的钢框架、楼板均可在工厂预制完成,施工时只需现场拼装并浇筑少量混凝土即可完成,避免了搭设脚手架和支模,实现了快速施工,大大节约了施工时间。3、本发明的楼板在预制时已经在其内预埋有水电等管线,无需后期水电预埋,便于后期使用和操作。
【附图说明】
图1是本发明的立体图。
图2是本发明的内部示意图。
【具体实施方式】
下面结合附图和具体实施方式对本发明作进一步详细说明。
参照图1、图2,一种可以快速安装的钢结构中的全预制高强度PC楼板,包括全预制高强度PC楼板1、以及位于该全预制高强度PC楼板的下方的钢框架,钢框架一般由钢柱 2及钢梁3组成,所述全预制高强度PC楼板中预埋有水电管线,所述钢框架的前后两侧的钢梁3上焊接有多个栓钉4,所述全预制高强度PC楼板的前后两侧贯穿有与所述栓钉相对的孔洞5,将所述全预制高强度PC楼板1吊装于所述钢框架的钢梁3上之后,所述栓钉4 对应置于所述孔洞5中,并采用高强度水泥浆封堵。本发明的楼板采用全预制高强度PC 楼板,该楼板区别于传统的钢筋桁架楼板,无需现场浇筑混凝土,本发明的钢框架、楼板均可在工厂预制完成,施工时只需现场拼装并浇筑少量混凝土即可完成,避免了搭设脚手架和支模,实现了快速施工,大大节约了施工时间。本发明的楼板在预制时已经在其内预埋有水电等管线,无需后期水电预埋,便于后期使用和操作。
作为优选,所述钢框架的前后两侧的钢梁3的中部之间连接有中间钢梁6,所述中间钢梁的两侧各有一个所述全预制高强度PC楼板1,两个所述全预制高强度PC楼板1之间设有多个栓钉4并采用高强度混凝土封堵,多个所述栓钉4焊接在所述中间钢梁6上。中间钢梁6具有加强作用,也方便两个全预制高强度PC楼板1的拼接,这样可以减小全预制高强度PC楼板的规格,制作方便。
作为优选,所述钢框架的钢柱2、钢梁3、以及中间钢梁6的截面均呈工字型,结构更加可靠。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (3)
1.一种可以快速安装的钢结构中的全预制高强度PC楼板,其特征在于:包括全预制高强度PC楼板、以及位于该全预制高强度PC楼板的下方的钢框架,所述全预制高强度PC楼板中预埋有水电管线,所述钢框架的前后两侧的钢梁上焊接有多个栓钉,所述全预制高强度PC楼板的前后两侧贯穿有与所述栓钉相对的孔洞,将所述全预制高强度PC楼板吊装于所述钢框架的钢梁上之后,所述栓钉对应置于所述孔洞中,并采用高强度水泥浆封堵。
2.根据权利要求1所述的可以快速安装的钢结构中的全预制高强度PC楼板,其特征在于:所述钢框架的前后两侧的钢梁的中部之间连接有中间钢梁,所述中间钢梁的两侧各有一个所述全预制高强度PC楼板,两个所述全预制高强度PC楼板之间设有多个栓钉并采用高强度混凝土封堵,多个所述栓钉焊接在所述中间钢梁上。
3.根据权利要求2所述的可以快速安装的钢结构中的全预制高强度PC楼板,其特征在于:所述钢框架的钢柱、钢梁、以及中间钢梁的截面均呈工字型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911187749.0A CN110821022A (zh) | 2019-11-28 | 2019-11-28 | 一种可以快速安装的钢结构中的全预制高强度pc楼板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911187749.0A CN110821022A (zh) | 2019-11-28 | 2019-11-28 | 一种可以快速安装的钢结构中的全预制高强度pc楼板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110821022A true CN110821022A (zh) | 2020-02-21 |
Family
ID=69542472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911187749.0A Pending CN110821022A (zh) | 2019-11-28 | 2019-11-28 | 一种可以快速安装的钢结构中的全预制高强度pc楼板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110821022A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411722A (zh) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | 适用于装配体系的预制叠合梁板 |
CN111411724A (zh) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | 一种钢梁-混凝土叠合楼板组合装配体系 |
CN111733886A (zh) * | 2020-05-16 | 2020-10-02 | 江苏瑞沃建设集团有限公司 | 一种盖挖法铺盖体系施工方法 |
CN111794422A (zh) * | 2020-07-10 | 2020-10-20 | 无锡市亨利富建设发展有限公司 | 一种全预制高强度pc楼板与钢梁快速安装结构 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1012415B1 (en) * | 1997-04-20 | 2005-01-12 | WEGLER, George | Arrangement at wall support |
CN101787760A (zh) * | 2010-02-26 | 2010-07-28 | 张吉华 | 钢筋砼预制楼板 |
KR20110023990A (ko) * | 2009-09-01 | 2011-03-09 | (주)유창플러스 | 조립식 건축물의 바닥 시공방법 |
CN103498525A (zh) * | 2013-09-25 | 2014-01-08 | 张跃 | 预装有管线的楼板 |
CN105297978A (zh) * | 2015-11-18 | 2016-02-03 | 湖南大学 | 一种采用栓钉连接的预制装配式钢-混凝土组合梁 |
CN205242773U (zh) * | 2015-11-18 | 2016-05-18 | 湖南大学 | 一种采用栓钉连接的预制装配式钢-混凝土组合梁 |
CN205387770U (zh) * | 2015-12-31 | 2016-07-20 | 浙江绿筑建筑系统集成有限公司 | 应用于预制装配式钢结构建筑的预制楼板连接件 |
US20160319541A1 (en) * | 2015-05-01 | 2016-11-03 | Elastic Potential, S.L. | Constructive system and method of construction thereof |
CN206457973U (zh) * | 2016-11-11 | 2017-09-01 | 浙江绿筑集成科技有限公司 | 预制局部叠合楼板 |
-
2019
- 2019-11-28 CN CN201911187749.0A patent/CN110821022A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1012415B1 (en) * | 1997-04-20 | 2005-01-12 | WEGLER, George | Arrangement at wall support |
KR20110023990A (ko) * | 2009-09-01 | 2011-03-09 | (주)유창플러스 | 조립식 건축물의 바닥 시공방법 |
CN101787760A (zh) * | 2010-02-26 | 2010-07-28 | 张吉华 | 钢筋砼预制楼板 |
CN103498525A (zh) * | 2013-09-25 | 2014-01-08 | 张跃 | 预装有管线的楼板 |
US20160319541A1 (en) * | 2015-05-01 | 2016-11-03 | Elastic Potential, S.L. | Constructive system and method of construction thereof |
CN105297978A (zh) * | 2015-11-18 | 2016-02-03 | 湖南大学 | 一种采用栓钉连接的预制装配式钢-混凝土组合梁 |
CN205242773U (zh) * | 2015-11-18 | 2016-05-18 | 湖南大学 | 一种采用栓钉连接的预制装配式钢-混凝土组合梁 |
CN205387770U (zh) * | 2015-12-31 | 2016-07-20 | 浙江绿筑建筑系统集成有限公司 | 应用于预制装配式钢结构建筑的预制楼板连接件 |
CN206457973U (zh) * | 2016-11-11 | 2017-09-01 | 浙江绿筑集成科技有限公司 | 预制局部叠合楼板 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411722A (zh) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | 适用于装配体系的预制叠合梁板 |
CN111411724A (zh) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | 一种钢梁-混凝土叠合楼板组合装配体系 |
CN111733886A (zh) * | 2020-05-16 | 2020-10-02 | 江苏瑞沃建设集团有限公司 | 一种盖挖法铺盖体系施工方法 |
CN111794422A (zh) * | 2020-07-10 | 2020-10-20 | 无锡市亨利富建设发展有限公司 | 一种全预制高强度pc楼板与钢梁快速安装结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110821022A (zh) | 一种可以快速安装的钢结构中的全预制高强度pc楼板 | |
CN110331668B (zh) | 一种无背索斜拉桥双向倾斜v型桥塔施工方法 | |
CN103850363B (zh) | 预制通孔装配式钢筋混凝土剪力墙的施工方法 | |
CN101768916A (zh) | 下翼缘改进型波形钢腹板组合箱梁及其施工方法 | |
CN104790522A (zh) | 预制装配式型钢混凝土柱-钢梁框架结构体系及施工方法 | |
CN109680835B (zh) | 一种自承式预制混凝土墙板、混凝土墙、结构体系及工法 | |
CN111576619A (zh) | 高强混凝土后浇的装配式框架体系生产方法 | |
CN113136943B (zh) | 钢管混凝土柱和混凝土梁的连接节点 | |
CN202925721U (zh) | 一种预制装配叠合板式混凝土剪力墙结构 | |
CN114319977B (zh) | 一种钢管混凝土排柱式连接预制剪力墙结构及施工方法 | |
CN106592777B (zh) | 装配式钢-混结合梁柱节点结构及其实施方法 | |
CN108582465A (zh) | 后浇雨篷、预制钢筋混凝土框架梁及后浇雨篷制造方法 | |
CN109267585B (zh) | 装配式棱台型基础和柱结构及装配方法 | |
CN103122691A (zh) | 塔吊标准节支承高空支模钢平台结构及施工方法 | |
CN216130338U (zh) | 一种主次梁连接节点 | |
CN212656384U (zh) | 高强混凝土连接件、高强混凝土后浇的装配式框架体系及支撑架 | |
CN110424534B (zh) | 一种预制装配式无筋混凝土框架及其施工方法 | |
CN110878522B (zh) | 主塔下横梁施工体系及施工方法 | |
CN109610707B (zh) | 一种预制钢梁与楼板平齐的装配结构及快速施工方法 | |
CN109457814B (zh) | 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法 | |
CN110439267A (zh) | 一种应用于叠合楼板施工的铝合金模板 | |
CN112922227B (zh) | 一种装配式混凝土主梁与次梁节点及其施工方法 | |
CN215053928U (zh) | 钢管混凝土柱和混凝土梁的连接节点 | |
CN104453013A (zh) | 预制墙体构件以及装配式钢筋混凝土剪力墙 | |
CN204703350U (zh) | 一种装配式组合楼板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200221 |