CN103061509A - 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺 - Google Patents

以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺 Download PDF

Info

Publication number
CN103061509A
CN103061509A CN2013100034342A CN201310003434A CN103061509A CN 103061509 A CN103061509 A CN 103061509A CN 2013100034342 A CN2013100034342 A CN 2013100034342A CN 201310003434 A CN201310003434 A CN 201310003434A CN 103061509 A CN103061509 A CN 103061509A
Authority
CN
China
Prior art keywords
steel pipe
straight shape
ater
casting
stiffness steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100034342A
Other languages
English (en)
Other versions
CN103061509B (zh
Inventor
姜忠
杨建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Guanlan New Material Technology Co ltd
Original Assignee
Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzhou Jiangong Construction Group Co Ltd filed Critical Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority to CN201310003434.2A priority Critical patent/CN103061509B/zh
Publication of CN103061509A publication Critical patent/CN103061509A/zh
Application granted granted Critical
Publication of CN103061509B publication Critical patent/CN103061509B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,涉及建筑物的后浇带浇筑的施工技术。在已铺设好的梁底模板上开设两排洞口,在各洞口内穿置一根直形劲性钢管,在两排洞口下方的两排直形劲性钢管之间设置抱箍钢管,在梁底模板上进行楼层砼浇筑,待浇筑的楼层砼固化后拆除抱箍钢管,再进行后浇带砼浇筑养护,最后拆除梁底模板、拆除直形劲性钢管。本发明施工的二次支模材料费极低,大大节省了材料的租赁费用,总成本为现有施工方法的两倍左右。直形劲性钢管可以重复利用,本发明使得每个施工段之间可以相互贯通,保证了材料的有效、快速运转,大大节约了工程成本,同时也缩短了施工工期。

Description

以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺
技术领域
本发明涉及建筑施工技术领域,特别是建筑物的后浇带浇筑的施工方法。
背景技术
目前,大型商业楼后浇带设置的间距一般在40米左右,后浇带留设的位置一般为梁板三分之一跨处,也有的在设计上采用无缝设计,使得后浇带的数量大大减少,减少后浇带数量的同时,使得每段施工面积大大增加。施工单位进行商业楼施工时,往往根据后浇带的划分与伸缩缝位置进行水平流水及竖向流水分段施工,而设计上一般要求后浇带浇筑时间为两侧混凝土浇筑后90天以上或主体结构封顶后,由于施工段面积大,材料的周转问题无疑是影响工程进度与经济效益的关键问题,为保证材料的周转速度。
现行施工单位采取的一般措施是:先在预伴砼内掺入一定数量的外加剂,提高砼的早期强度,达到提前拆模;增加卸料平台的数目,加快出料与进料。大型商业楼地下室均设计成二层到四层之间,为保证采光效果,地下室部分楼层、裙房与屋面采用大型采光井进行采光,施工单位可以利用中庭的洞口配合卸料平台同时加快出料、进料。
但是,由于现场塔吊与施工电梯布置的有限性,且施工单位往往采取后浇带模板支模体系不拆除或早拆模时保留立杆不拆除,对于后浇带数目多且长度长时的情况下,材料周转时,每个施工段相互间无法利用卸料平台与中庭洞口出料与进料,大大影响了拆模、抹灰、二次结构、装饰等施工进度。
发明内容
本发明目的是为保证大型商业楼每个施工段之间能够相互进出料,解决后浇带这“一墙之隔”,提出一种以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺。
本发明技术方案包括以下步骤:
1)在已铺设好的梁底模板上开设两排洞口,每排洞口分别布置在后浇带的两侧;
2)在各洞口内穿置一根直形劲性钢管,每一根直形劲性钢管的上端设置密封面,在每根直形劲性钢管的下端以钢性垫块支撑,使各直形劲性钢管的上端面与梁底模板上平面平齐,并调整每根直形劲性钢管与地平保持垂直;
3)在两排洞口下方的两排直形劲性钢管之间设置抱箍钢管;
4)在梁底模板上进行楼层砼浇筑;
5)待浇筑的楼层砼固化后拆除抱箍钢管;
6)进行后浇带砼浇筑,并进行养护;
7)拆除梁底模板;
8)拆除直形劲性钢管。
采用本发明施工的二次支模材料费仅为现有施工方法保留不拆除的不到五分之一,大大节省了材料的租赁费用,本发明总的投入成本为现有施工方法的两倍左右。虽然一次性投入的成本很大,但本发明中使用的直形劲性钢管可以重复利用,只要利用二次以上就可以收回成本,三次以上取得的经济效益是显著的。更主要的是,本发明使得每个施工段之间可以相互贯通,保证了材料的有效、快速运转,大大节约了工程成本,同时也缩短了施工工期。
另外,对于直形劲性钢管的上端伸入进入梁底的,在拆除直形劲性钢管后留下的洞口处,以细石砼对相对于洞口的梁底进行填嵌密实。
在同一排洞口中,相邻的洞口间距不超过4m,可避免出现因间距过大而引起支撑体系失稳、变形等问题。
为了提高直形劲性钢管立向的稳定性,所述钢性垫块的高度不超过40mm。
在所述步骤2)后,采用通长的钢管分别纵横向拉通,抱住每根直形劲性钢管,以加强直形劲性钢管的稳定性。
附图说明
图1为直形劲性钢管的支撑体系图。
图2为直形劲性钢管的上端穿入梁底模板的洞口的图片。
图3为在直形劲性钢管的下端支撑钢性垫块的图片。
图4为在两排洞口下方的两排直形劲性钢管之间设置抱箍钢管的图片。
图5为拆模两排直形劲性钢管之间设置抱箍钢管的图片。
具体实施方式
一、圆柱形直形劲性钢管的准备:
    对每一根圆柱形直形劲性钢管的一端对钢板密封。
    二、施工步骤:
1、在已铺设好的梁底模板上开设两排洞口,每排洞口分列在后浇带的两侧,并控制在同一排洞口中,相邻的洞口间距不超过4m。
2、在各洞口内穿置一根直形劲性钢管(如图2所示),钢板密封的一端朝上,在每根直形劲性钢管的下端以高度不超过40mm的钢性垫块支撑(如图3所示),使各直形劲性钢管的上端面与梁底模板上平面平齐,并调整每根直形劲性钢管与地平保持垂直。
3、采用通长的钢管分别纵横向拉通,抱住每根直形劲性钢管。
4、在两排洞口下方的两排直形劲性钢管之间设置抱箍钢管,如图1所示。
5、在梁底模板上进行楼层砼浇筑。
6、待浇筑的楼层砼固化后拆除抱箍钢管,如图4所示。
7、进行后浇带砼浇筑,并进行养护。
8、拆除梁底模板,如图5所示。
9、拆除直形劲性钢管。
10、对于直形劲性钢管的上端伸入进入梁底的,在拆除直形劲性钢管后留下的洞口处,以细石砼对相对于洞口的梁底进行填嵌密实。

Claims (5)

1.以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,其特征在于包括以下步骤:
1)在已铺设好的梁底模板上开设两排洞口,每排洞口分别布置在后浇带的两侧;
2)在各洞口内穿置一根直形劲性钢管,每一根直形劲性钢管的上端设置密封面,在每根直形劲性钢管的下端以钢性垫块支撑,使各直形劲性钢管的上端面与梁底模板上平面平齐,并调整每根直形劲性钢管与地平保持垂直;
3)在两排洞口下方的两排直形劲性钢管之间设置抱箍钢管;
4)在梁底模板上进行楼层砼浇筑;
5)待浇筑的楼层砼固化后拆除抱箍钢管;
6)进行后浇带砼浇筑,并进行养护;
7)拆除梁底模板;
8)拆除直形劲性钢管。
2.根据权利要求1所述以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,其特征在于:对于直形劲性钢管的上端伸入进入梁底的,在拆除直形劲性钢管后留下的洞口处,以细石砼对相对于洞口的梁底进行填嵌密实。
3.根据权利要求1所述以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,其特征在于:在同一排洞口中,相邻的洞口间距不超过4m。
4.根据权利要求1所述以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,其特征在于:所述钢性垫块的高度不超过40mm。
5.根据权利要求1所述以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺,其特征在于:在所述步骤2)后,采用通长的钢管分别纵横向拉通,抱住每根直形劲性钢管。
CN201310003434.2A 2013-01-06 2013-01-06 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺 Active CN103061509B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310003434.2A CN103061509B (zh) 2013-01-06 2013-01-06 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310003434.2A CN103061509B (zh) 2013-01-06 2013-01-06 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺

Publications (2)

Publication Number Publication Date
CN103061509A true CN103061509A (zh) 2013-04-24
CN103061509B CN103061509B (zh) 2014-03-12

Family

ID=48104371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310003434.2A Active CN103061509B (zh) 2013-01-06 2013-01-06 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺

Country Status (1)

Country Link
CN (1) CN103061509B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603491A (zh) * 2013-11-22 2014-02-26 中冶天工集团有限公司 一种梁板后浇带模板支撑架及其搭设方法
CN104389430A (zh) * 2014-11-24 2015-03-04 中设建工集团有限公司 素砼柱在后浇带支撑中的应用
CN105544965A (zh) * 2016-01-21 2016-05-04 中建八局第三建设有限公司 一种结构小洞口二次浇筑施工装置
CN109138185A (zh) * 2018-10-29 2019-01-04 深圳大学建筑设计研究院有限公司 一种后浇带垂直施工缝构造方法
CN115217328A (zh) * 2022-07-26 2022-10-21 中国建筑第二工程局有限公司 一种后浇带周边可周转使用的支撑体系及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5038262B2 (zh) * 1971-09-30 1975-12-08
EP0646681A2 (en) * 1993-09-22 1995-04-05 Sandoz Ltd. Waterproofing of joints between concrete members
CN101871262A (zh) * 2010-06-25 2010-10-27 中天建设集团有限公司天津分公司 具有后浇带的梁板支撑体系施工方法
CN102535839A (zh) * 2010-12-29 2012-07-04 山西四建集团有限公司 钢筋混凝土后浇带两侧水平构件的四管支柱支顶方法
JP5038262B2 (ja) * 2008-08-28 2012-10-03 鹿島建設株式会社 グリーンカットずりの再利用方法およびコンクリート構造物

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5038262B2 (zh) * 1971-09-30 1975-12-08
EP0646681A2 (en) * 1993-09-22 1995-04-05 Sandoz Ltd. Waterproofing of joints between concrete members
JP5038262B2 (ja) * 2008-08-28 2012-10-03 鹿島建設株式会社 グリーンカットずりの再利用方法およびコンクリート構造物
CN101871262A (zh) * 2010-06-25 2010-10-27 中天建设集团有限公司天津分公司 具有后浇带的梁板支撑体系施工方法
CN102535839A (zh) * 2010-12-29 2012-07-04 山西四建集团有限公司 钢筋混凝土后浇带两侧水平构件的四管支柱支顶方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李殿文: "混凝土后浇带模板施工方案探讨", 《安徽建筑》, no. 5, 31 December 2006 (2006-12-31) *
赵荣生: "梁板式后浇带大直径钢管一次支顶技术探讨", 《山西建筑》, vol. 38, no. 35, 31 December 2012 (2012-12-31) *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603491A (zh) * 2013-11-22 2014-02-26 中冶天工集团有限公司 一种梁板后浇带模板支撑架及其搭设方法
CN103603491B (zh) * 2013-11-22 2016-07-06 中冶天工集团有限公司 一种梁板后浇带模板支撑架的搭设方法
CN104389430A (zh) * 2014-11-24 2015-03-04 中设建工集团有限公司 素砼柱在后浇带支撑中的应用
CN104389430B (zh) * 2014-11-24 2016-07-13 中设建工集团有限公司 素砼柱在后浇带支撑中的应用
CN105544965A (zh) * 2016-01-21 2016-05-04 中建八局第三建设有限公司 一种结构小洞口二次浇筑施工装置
CN109138185A (zh) * 2018-10-29 2019-01-04 深圳大学建筑设计研究院有限公司 一种后浇带垂直施工缝构造方法
CN115217328A (zh) * 2022-07-26 2022-10-21 中国建筑第二工程局有限公司 一种后浇带周边可周转使用的支撑体系及其施工方法

Also Published As

Publication number Publication date
CN103061509B (zh) 2014-03-12

Similar Documents

Publication Publication Date Title
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN102383628B (zh) 筒仓结构后施工减压锥的施工装置及施工方法
CN102505708B (zh) 轨道交通超大断面明挖区间隧道施工方法
CN103061509B (zh) 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺
CN105317137A (zh) 预制墙体、墙板及其施工方法以及预制墙板生产方法
CN105926444A (zh) 一种混凝土拱桥成拱方法
CN206053131U (zh) 预制楼板钢筋笼构件和楼板
CN103321421A (zh) 一种混凝土水池壁一次成型的施工方法
CN104153508B (zh) 楼板的施工结构及其施工方法
CN103306208A (zh) 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法
CN105525753A (zh) 一种构造柱与主体结构同时施工的方法及结构
CN204983662U (zh) 一种对拉螺杆与钢管排架组合单侧支模装置
CN104295003A (zh) 一种构造柱施工方法
CN103306463B (zh) 一种金属衬里混凝土风道施工方法
CN102677895B (zh) 混凝土基础台阶的吊模浇筑方法
CN103938649B (zh) 一种超高层建筑空腔基础的施工方法
CN105780992A (zh) 一种正交正放钢筋混凝土空腹夹层板楼盖施工工法
CN203022222U (zh) 砖混建筑支座整浇圈梁
CN205224332U (zh) 预制墙体和预制墙板
CN102409848A (zh) 一种轻质密肋楼板和轻质密肋楼盖的施工成型方法
CN104088473A (zh) 用于托换承重墙的施工结构及施工方法
CN207110214U (zh) 一种预制内填充混凝土墙板
CN103194982B (zh) 桥梁边跨现浇段短悬臂支架施工方法
CN204715764U (zh) 一种构造柱与主体结构同时施工的结构
CN204418691U (zh) 一种用于现浇竖向构件与水平构件连接处混凝土拦截装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220601

Address after: No. 14, Gongnong Road, Jiangdu District, Yangzhou, Jiangsu 225200

Patentee after: Yangzhou Jiangdu Xiannv Infrastructure Construction Co.,Ltd.

Address before: No. 55 Pujiang Road, Jiangdu District, Yangzhou, Jiangsu 225212

Patentee before: JIANGSU YANGZHOU JIANGONG CONSTRUCTION GROUP Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction technology of post cast strip casting with steel pipe support system

Effective date of registration: 20221206

Granted publication date: 20140312

Pledgee: Jiangsu Zijin Rural Commercial Bank Co.,Ltd. Jiangdu sub branch

Pledgor: Yangzhou Jiangdu Xiannv Infrastructure Construction Co.,Ltd.

Registration number: Y2022980025234

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231206

Address after: Room 330, Xingchuang Tiandi, No. 1468 Wenchang East Road, Xiannu Town, Jiangdu District, Yangzhou City, Jiangsu Province, 225200

Patentee after: Jiangsu Guanlan New Material Technology Co.,Ltd.

Address before: No. 14, Gongnong Road, Jiangdu District, Yangzhou, Jiangsu 225200

Patentee before: Yangzhou Jiangdu Xiannv Infrastructure Construction Co.,Ltd.