CN102561402A - 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法 - Google Patents

盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法 Download PDF

Info

Publication number
CN102561402A
CN102561402A CN2010105991549A CN201010599154A CN102561402A CN 102561402 A CN102561402 A CN 102561402A CN 2010105991549 A CN2010105991549 A CN 2010105991549A CN 201010599154 A CN201010599154 A CN 201010599154A CN 102561402 A CN102561402 A CN 102561402A
Authority
CN
China
Prior art keywords
concrete
constuction joint
construction
top board
construction joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105991549A
Other languages
English (en)
Other versions
CN102561402B (zh
Inventor
尹亚鸿
陈振兴
蔡小雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201010599154.9A priority Critical patent/CN102561402B/zh
Publication of CN102561402A publication Critical patent/CN102561402A/zh
Application granted granted Critical
Publication of CN102561402B publication Critical patent/CN102561402B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及地下人防施工。一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,它包括下列步骤:顶板施工步骤,顶板与侧墙的施工缝留成内侧比外侧高的斜坡面;再在顶板与侧墙连接处从地面插入浇筑侧墙混凝土的浇灌孔;施工缝表面处理步骤,施工缝表面进行凿毛处理,并通长设置注浆管的遇水膨胀条;施工缝以下侧墙施工步骤,侧墙施工高度至距施工缝0.5-1米处;混凝土施工步骤,进行侧墙混凝土浇筑七日后采用比地下室浇筑所用混凝土强度高一个等级的干硬性膨胀混凝土;压力灌浆步骤:混凝土强度达到设计强度后,对带注浆管的遇水膨胀条进行压力灌浆。本发明能保证施工缝部位混凝土填充密实无空隙。

Description

盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法
技术领域
本发明涉及地下人防施工,尤其涉及盖挖逆作法的单建式地下人防工程施工方法。
背景技术
目前,国内一些城市为了增加其人防面积,在城市的交通中心、商业密集区域已有道路下建设单建式地下人防工程,平时作商业店铺用,战时作防空洞用,这种单建式地下人防工程施工时,为了尽快恢复地面交通,往往采用盖挖逆作法施工,先施工柱、顶板(盖),做好道路,恢复地面交通后,再自上而下暗挖,施工地下人防的墙、底板,主体结构受力构件是由上向下施工,顶板与侧墙之间的施工缝属于自下向上接施工缝(结构正作法的水平施工缝为自上向下接施工缝),这种自下向上接施工缝的常规施工方法为:墙顶部的模板做成喇叭形,混凝土从墙侧面喇叭形顶部入模和振捣,混凝土硬化后可凿去喇叭口处多浇的混凝土,施工缝处设置遇水膨胀条。盖挖逆作法施工时,内部操作空间较小,而且混凝土从喇叭形顶部入模属高处作业,混凝土输送难度大,往往会导致混凝土灌不满,密实性不好。
发明内容
本发明旨在解决上述问题,提供一种盖挖逆作法的单建式地下人防顶板与墙施工缝的处理方法。本发明能保证施工缝部位混凝土填充密实无空隙。
为解决上述问题,本发明是这样实现的: 
本发明一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,它包括下列步骤:
顶板施工步骤,先施工顶板,其与侧墙的施工缝留至从顶板底面往下不小于50cm的侧墙处,施工缝留成内侧比外侧高的斜坡面; 
再在顶板与侧墙连接处从地面插入浇筑侧墙混凝土的浇灌孔,采用钢管作为浇灌孔为,间距1~1.5米,钢管穿墙部位焊钢止水环,钢管两端临时封堵,钢管底部位于斜坡面的最高处;
施工缝表面处理步骤,施工缝表面进行凿毛处理,采用风镐凿出白槎,并通长设置注浆管的遇水膨胀条,钢筋采用钢丝刷清理干净; 
施工缝以下侧墙施工步骤,侧墙施工高度至距施工缝0.5-1米处;
混凝土施工步骤
先进行侧墙混凝土浇筑,七日后采用比地下室浇筑所用混凝土强度高一个等级的干硬性膨胀混凝土,对施工缝浇筑,从预留的浇灌孔送入,采用小型振捣棒从墙侧面喇叭形口振捣,混凝土浇灌至溢满喇叭口停止浇灌,另外浇灌孔也必须用混凝土灌实。
压力灌浆步骤:混凝土强度达到设计强度后,对带注浆管的遇水膨胀条进行压力灌浆,消除施工缝处的缝隙。
所述的一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,所述顶板施工步骤中,所述斜坡面向外倾斜15度。
所述的一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,所述混凝土施工步骤中,所述喇叭口多浇的混凝土在其强度达到75%后凿除。
通过施工工艺的改进施工方法:在顶板施工时,在顶板与侧墙连接处预留浇筑侧墙混凝土的浇灌孔,浇灌孔为DN100钢管,间距1~1.5米并且将施工缝处设置的遇水膨胀条改为带注浆管的遇水膨胀条,使用压力灌浆消除施工缝处的缝隙。从而保证了施工缝部位混凝土密实无空隙。
附图说明
下面结合具体实施方式对本发明作进一步的说明:
图1为发明示意图。
具体实施方式
如图1所示,本发明一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,它包括下列步骤:
⑴、顶板施工
先施工顶板1,其与侧墙2的施工缝留至从顶板底面往下不小于50cm的侧墙处,施工缝留成内侧比外侧高的斜坡面,斜坡面向外倾斜15度。
在顶板与侧墙连接处从地面插入浇筑侧墙混凝土的浇灌孔3,浇灌孔3为DN100钢管,间距1~1.5米,钢管穿墙部位焊钢止水环,钢管两端临时封堵,钢管底部位于斜坡面的最高处。
⑵、施工缝表面处理
施工缝表面进行凿毛处理,采用风镐凿出白槎,并通长设置带注浆管的遇水膨胀条4,钢筋必须采用钢丝刷清理干净。
⑶、施工缝以下侧墙施工
从侧墙施工缝处往下0.5-1m(常见550mm、750mm)高范围的侧墙先不施工,施工该高度范围以下的侧墙,为后续步骤预留空间;
⑷、施工缝处混凝土施工
施工缝处混凝土(55cm高范围的侧墙)在55cm高范围以下的侧墙混凝土浇筑7d后开始施工,以防止混凝土自然收缩。此处混凝土应采用比地下室混凝土强度高一个等级的干硬性膨胀混凝土。
混凝土从预留的浇灌孔送入,采用小型振捣棒从墙侧面喇叭形口振捣,当混凝土浇灌至溢满喇叭口时,才可停止浇灌。喇叭口多浇的混凝土在其强度达到75%后凿除。另外浇灌孔也必须用混凝土灌实。
⑸、压力灌浆
混凝土强度达到设计强度后,对带注浆管的遇水膨胀条4进行压力灌浆,消除施工缝处的缝隙。

Claims (3)

1.一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,其特征在于,它包括下列步骤:
顶板施工步骤,先施工顶板,其与侧墙的施工缝留至从顶板底面往下不小于50cm的侧墙处,施工缝留成内侧比外侧高的斜坡面; 
再在顶板与侧墙连接处从地面插入浇筑侧墙混凝土的浇灌孔,采用钢管作为浇灌孔为,间距1~1.5米,钢管穿墙部位焊钢止水环,钢管两端临时封堵,钢管底部位于斜坡面的最高处;
施工缝表面处理步骤,施工缝表面进行凿毛处理,采用风镐凿出白槎,并通长设置注浆管的遇水膨胀条,钢筋采用钢丝刷清理干净; 
施工缝以下侧墙施工步骤,侧墙施工高度至距施工缝0.5-1米处;
混凝土施工步骤,
先进行侧墙混凝土浇筑,七日后采用比地下室浇筑所用混凝土强度高一个等级的干硬性膨胀混凝土,对施工缝浇筑,从预留的浇灌孔送入,采用小型振捣棒从墙侧面喇叭形口振捣,混凝土浇灌至溢满喇叭口停止浇灌,另外浇灌孔也必须用混凝土灌实;
压力灌浆步骤:混凝土强度达到设计强度后,对带注浆管的遇水膨胀条进行压力灌浆,消除施工缝处的缝隙。
2.根据权利要求1所述的一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,其特征在于,所述顶板施工步骤中,所述斜坡面向外倾斜15度。
3.根据权利要求1所述的一种盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法,其特征在于,所述混凝土施工步骤中,所述喇叭口多浇的混凝土在其强度达到75%后凿除。
CN201010599154.9A 2010-12-22 2010-12-22 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法 Active CN102561402B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010599154.9A CN102561402B (zh) 2010-12-22 2010-12-22 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010599154.9A CN102561402B (zh) 2010-12-22 2010-12-22 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法

Publications (2)

Publication Number Publication Date
CN102561402A true CN102561402A (zh) 2012-07-11
CN102561402B CN102561402B (zh) 2014-06-25

Family

ID=46407881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010599154.9A Active CN102561402B (zh) 2010-12-22 2010-12-22 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法

Country Status (1)

Country Link
CN (1) CN102561402B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334771A (zh) * 2013-07-09 2013-10-02 中铁十四局集团有限公司 暗挖逆作法侧墙与中板、拱顶接头处的混凝土浇筑方法
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN105464146A (zh) * 2014-09-11 2016-04-06 中建四局第一建筑工程有限公司 一种地下室外墙新旧断面注浆止水施工装置及施工方法
CN106836564A (zh) * 2017-01-03 2017-06-13 深圳大学 一种地下车站内隔承重墙模板支护方法
CN110593914A (zh) * 2019-09-19 2019-12-20 北京市政建设集团有限责任公司 一种暗挖地铁车站侧墙防水逆作缝的施工方法
CN110670632A (zh) * 2019-10-06 2020-01-10 湖北工业大学 一种地下结构逆作法侧墙水平施工缝的施工方法
CN111636483A (zh) * 2020-05-08 2020-09-08 中铁隧道集团二处有限公司 一种逆做混凝土结构缝隙防水装置以及施工方法
CN113700037A (zh) * 2021-09-07 2021-11-26 浙江交工地下工程有限公司 逆作法地下超厚侧墙浇筑施工装置及其方法
CN114934544A (zh) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 一种用于盖挖逆作边墙施工方法
CN115478566A (zh) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 一种盖挖逆做侧墙施工缝防水节点构造

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57169127A (en) * 1981-04-10 1982-10-18 Penta Ocean Constr Co Ltd Construction of inverted lining concrete structure
JPS6213613A (ja) * 1985-07-12 1987-01-22 Taisei Corp スラリ−の蒔出し方法およびスラリ−の蒔出しに使用する蒔出し装置
KR20010019079A (ko) * 1999-08-24 2001-03-15 박정진 간이 역타설 옹벽 축조용 프리캐스트 강말뚝
CN1563612A (zh) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 地下结构半逆作法反向连接施工方法
CN101353896A (zh) * 2008-06-25 2009-01-28 江苏江都建设工程有限公司 超大直径、超埋深度调蓄池的半逆作施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57169127A (en) * 1981-04-10 1982-10-18 Penta Ocean Constr Co Ltd Construction of inverted lining concrete structure
JPS6213613A (ja) * 1985-07-12 1987-01-22 Taisei Corp スラリ−の蒔出し方法およびスラリ−の蒔出しに使用する蒔出し装置
KR20010019079A (ko) * 1999-08-24 2001-03-15 박정진 간이 역타설 옹벽 축조용 프리캐스트 강말뚝
CN1563612A (zh) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 地下结构半逆作法反向连接施工方法
CN101353896A (zh) * 2008-06-25 2009-01-28 江苏江都建设工程有限公司 超大直径、超埋深度调蓄池的半逆作施工方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334771A (zh) * 2013-07-09 2013-10-02 中铁十四局集团有限公司 暗挖逆作法侧墙与中板、拱顶接头处的混凝土浇筑方法
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN103741714B (zh) * 2013-12-09 2016-09-14 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN105464146A (zh) * 2014-09-11 2016-04-06 中建四局第一建筑工程有限公司 一种地下室外墙新旧断面注浆止水施工装置及施工方法
CN106836564B (zh) * 2017-01-03 2020-04-14 深圳大学 一种地下车站内隔承重墙模板支护方法
CN106836564A (zh) * 2017-01-03 2017-06-13 深圳大学 一种地下车站内隔承重墙模板支护方法
CN110593914A (zh) * 2019-09-19 2019-12-20 北京市政建设集团有限责任公司 一种暗挖地铁车站侧墙防水逆作缝的施工方法
CN110670632A (zh) * 2019-10-06 2020-01-10 湖北工业大学 一种地下结构逆作法侧墙水平施工缝的施工方法
CN111636483A (zh) * 2020-05-08 2020-09-08 中铁隧道集团二处有限公司 一种逆做混凝土结构缝隙防水装置以及施工方法
CN113700037A (zh) * 2021-09-07 2021-11-26 浙江交工地下工程有限公司 逆作法地下超厚侧墙浇筑施工装置及其方法
CN114934544A (zh) * 2022-07-25 2022-08-23 中国建筑第六工程局有限公司 一种用于盖挖逆作边墙施工方法
CN114934544B (zh) * 2022-07-25 2022-11-04 中国建筑第六工程局有限公司 一种用于盖挖逆作边墙施工方法
CN115478566A (zh) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 一种盖挖逆做侧墙施工缝防水节点构造

Also Published As

Publication number Publication date
CN102561402B (zh) 2014-06-25

Similar Documents

Publication Publication Date Title
CN102561402B (zh) 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法
CN102418347B (zh) 一种深基坑内盲沟和集水井排水施工方法
CN104404983B (zh) 一种用于顶管施工的骑马井装置及其施工方法
CN103821219A (zh) 顶管施工改型检查井施工方法
CN107542115A (zh) 地下工程防水结构及其施工方法
CN210216254U (zh) 一种混凝土护栏结构
CN206298900U (zh) 一种地下连续墙预埋式钢围檩堵头体系
CN113073656B (zh) 一种支护桩桩间土防护结构及其施工方法
CN212294736U (zh) 过河管道抗浮结构
CN206173947U (zh) 地下连续墙易破除桩头
CN206015717U (zh) 软土地基的地下综合管廊
CN110117959B (zh) 一种临近江河基坑支护施工方法
CN107326932A (zh) 一种地下车库的准半逆作施工方法
CN111636483A (zh) 一种逆做混凝土结构缝隙防水装置以及施工方法
CN103334771A (zh) 暗挖逆作法侧墙与中板、拱顶接头处的混凝土浇筑方法
CN104963364A (zh) 盖挖逆作法结构板下侧墙施工缝的处理方法
CN105926665A (zh) 一种预制大型砌块装配式混凝土排水管道基座及其施工方法
CN106007503A (zh) 一种建筑垃圾桩的施工方法
CN114263219A (zh) 一种用于地下工程的底板后浇带超前止水结构以及施工方法
CN102926403A (zh) 盖挖法顶板施工方法
CN208782449U (zh) 一种电缆排管
CN209509556U (zh) 托换无地下室建筑地下空间增层的施工结构
CN102677660B (zh) 快速成桩的方法及利用该方法快速搭建城市立交桥的方法
CN202247856U (zh) 地基处理用取土圆环桩及地下基础
CN206829176U (zh) 一种预制大型砌块装配式塑料排水管道基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yin Yahong

Inventor after: Chen Zhenxing

Inventor after: Zhou Haisha

Inventor before: Yin Yahong

Inventor before: Chen Zhenxing

Inventor before: Cai Xiaoyu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YIN YAHONG CHEN ZHENXING CAI XIAOYU TO: YIN YAHONG CHEN ZHENXING ZHOU HAISHA