JPS57169127A - Construction of inverted lining concrete structure - Google Patents

Construction of inverted lining concrete structure

Info

Publication number
JPS57169127A
JPS57169127A JP5291581A JP5291581A JPS57169127A JP S57169127 A JPS57169127 A JP S57169127A JP 5291581 A JP5291581 A JP 5291581A JP 5291581 A JP5291581 A JP 5291581A JP S57169127 A JPS57169127 A JP S57169127A
Authority
JP
Japan
Prior art keywords
concrete
hole
formwork
lot
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5291581A
Other languages
Japanese (ja)
Inventor
Mitsuo Tatsuno
Kenji Takagi
Hideharu Naito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP5291581A priority Critical patent/JPS57169127A/en
Publication of JPS57169127A publication Critical patent/JPS57169127A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE:To prevent the occurrence of voids in the joints of concrete by closely connecting the concrete to be placed by a method in which the bottom of a split wall is formed into a centrally heightened hump and concrete is poured through an inclined hole formed from the top of the centrally heightened mountain shape toward the inside. CONSTITUTION:The inside of an underground wall 10 is excavated, and a formwork 13 consisting of a bottom plate 11 and inside plates 12 is fabricated. Then, iron bars are arranged in the space formed by the formwork 13 and the underground wall 10 and on the periphery of pipes 15 and concrete is placed to form a split wall 16a for the first lot. Furthermore, excavation is performed, the formwork for the first lot split wall 16a is removed, the second lot formwork 13 is fabricated under the split wall 16a, and then concrete is placed. Laitance 17 goes up along the inclined face of a mountain-shaped portion 14 and gathers in the hole 15a, so that the corresponding supplement of concrete from the inside of the hole 15a is naturally made. The laitance staying on the upper part of the hole 15a is removed, concrete is supplied to fill up the hole 15a, and the placement of concrete for the second lot split wall 16b is completed.
JP5291581A 1981-04-10 1981-04-10 Construction of inverted lining concrete structure Pending JPS57169127A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5291581A JPS57169127A (en) 1981-04-10 1981-04-10 Construction of inverted lining concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5291581A JPS57169127A (en) 1981-04-10 1981-04-10 Construction of inverted lining concrete structure

Publications (1)

Publication Number Publication Date
JPS57169127A true JPS57169127A (en) 1982-10-18

Family

ID=12928119

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5291581A Pending JPS57169127A (en) 1981-04-10 1981-04-10 Construction of inverted lining concrete structure

Country Status (1)

Country Link
JP (1) JPS57169127A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561402A (en) * 2010-12-22 2012-07-11 中国二十冶集团有限公司 Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
JP2015014190A (en) * 2014-09-18 2015-01-22 大成建設株式会社 Concrete placement equipment and concrete placement method
JP2018040231A (en) * 2016-09-09 2018-03-15 鹿島建設株式会社 Concrete skeleton construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS546807A (en) * 1977-06-20 1979-01-19 Hitachi Metals Ltd Hot tool steel for dicast mold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS546807A (en) * 1977-06-20 1979-01-19 Hitachi Metals Ltd Hot tool steel for dicast mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561402A (en) * 2010-12-22 2012-07-11 中国二十冶集团有限公司 Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
JP2015014190A (en) * 2014-09-18 2015-01-22 大成建設株式会社 Concrete placement equipment and concrete placement method
JP2018040231A (en) * 2016-09-09 2018-03-15 鹿島建設株式会社 Concrete skeleton construction method

Similar Documents

Publication Publication Date Title
ES8609742A1 (en) Method of building strengthened, embanked foundation
CN109882182A (en) A kind of extra small clear distance construction method in tunnel
SU738521A3 (en) Method of building band foundation
JPS57169127A (en) Construction of inverted lining concrete structure
JPH0249896A (en) Open shield method and machine thereof
JPS57228A (en) Construction of independent foundation
JPS57169134A (en) Foundation construction work for housing using blocks and blocks therefor
JPS5530039A (en) Method for constructing underground structures
JPS5721623A (en) Treatment work for top of pile
JPS5771938A (en) Outer water-proofing work
CN221053159U (en) Device for pre-closing post-pouring belt
JPS5664028A (en) Sheathing construction work by antecedent support framework
JPS57112523A (en) Substructure of building
JPS56159419A (en) Continuous underground wall and construction thereof
SU1699214A1 (en) METHOD OF FORMATION OF VERTICAL DEVELOPMENT IN THE BOOKMARK AT LAYER EXTRACT OF USEFUL PURCHASED IN A DOWN ORDER WITH A HARD LINING
MY100521A (en) Method of building a cavity structure in an embankment.
JPS57108303A (en) Double bottom type built-up side trench work
JPS57108330A (en) Construction of underground structure
JPS6417994A (en) Method of executing underground structure
JPS6417996A (en) Method of executing underground structure
JPS5568931A (en) Construction of block piled retaining wall and block
SU756045A1 (en) Method of vertical mining in filling massif
JPH0574676B2 (en)
JPS6417995A (en) Method of executing underground structure
JPS57155423A (en) Method of construction of solidification of muddy water