JPS57169127A - Construction of inverted lining concrete structure - Google Patents
Construction of inverted lining concrete structureInfo
- Publication number
- JPS57169127A JPS57169127A JP5291581A JP5291581A JPS57169127A JP S57169127 A JPS57169127 A JP S57169127A JP 5291581 A JP5291581 A JP 5291581A JP 5291581 A JP5291581 A JP 5291581A JP S57169127 A JPS57169127 A JP S57169127A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- hole
- formwork
- lot
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
PURPOSE:To prevent the occurrence of voids in the joints of concrete by closely connecting the concrete to be placed by a method in which the bottom of a split wall is formed into a centrally heightened hump and concrete is poured through an inclined hole formed from the top of the centrally heightened mountain shape toward the inside. CONSTITUTION:The inside of an underground wall 10 is excavated, and a formwork 13 consisting of a bottom plate 11 and inside plates 12 is fabricated. Then, iron bars are arranged in the space formed by the formwork 13 and the underground wall 10 and on the periphery of pipes 15 and concrete is placed to form a split wall 16a for the first lot. Furthermore, excavation is performed, the formwork for the first lot split wall 16a is removed, the second lot formwork 13 is fabricated under the split wall 16a, and then concrete is placed. Laitance 17 goes up along the inclined face of a mountain-shaped portion 14 and gathers in the hole 15a, so that the corresponding supplement of concrete from the inside of the hole 15a is naturally made. The laitance staying on the upper part of the hole 15a is removed, concrete is supplied to fill up the hole 15a, and the placement of concrete for the second lot split wall 16b is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5291581A JPS57169127A (en) | 1981-04-10 | 1981-04-10 | Construction of inverted lining concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5291581A JPS57169127A (en) | 1981-04-10 | 1981-04-10 | Construction of inverted lining concrete structure |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS57169127A true JPS57169127A (en) | 1982-10-18 |
Family
ID=12928119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5291581A Pending JPS57169127A (en) | 1981-04-10 | 1981-04-10 | Construction of inverted lining concrete structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS57169127A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561402A (en) * | 2010-12-22 | 2012-07-11 | 中国二十冶集团有限公司 | Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method |
JP2015014190A (en) * | 2014-09-18 | 2015-01-22 | 大成建設株式会社 | Concrete placement equipment and concrete placement method |
JP2018040231A (en) * | 2016-09-09 | 2018-03-15 | 鹿島建設株式会社 | Concrete skeleton construction method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS546807A (en) * | 1977-06-20 | 1979-01-19 | Hitachi Metals Ltd | Hot tool steel for dicast mold |
-
1981
- 1981-04-10 JP JP5291581A patent/JPS57169127A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS546807A (en) * | 1977-06-20 | 1979-01-19 | Hitachi Metals Ltd | Hot tool steel for dicast mold |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561402A (en) * | 2010-12-22 | 2012-07-11 | 中国二十冶集团有限公司 | Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method |
JP2015014190A (en) * | 2014-09-18 | 2015-01-22 | 大成建設株式会社 | Concrete placement equipment and concrete placement method |
JP2018040231A (en) * | 2016-09-09 | 2018-03-15 | 鹿島建設株式会社 | Concrete skeleton construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES8609742A1 (en) | Method of building strengthened, embanked foundation | |
CN109882182A (en) | A kind of extra small clear distance construction method in tunnel | |
SU738521A3 (en) | Method of building band foundation | |
JPS57169127A (en) | Construction of inverted lining concrete structure | |
JPH0249896A (en) | Open shield method and machine thereof | |
JPS57228A (en) | Construction of independent foundation | |
JPS57169134A (en) | Foundation construction work for housing using blocks and blocks therefor | |
JPS5530039A (en) | Method for constructing underground structures | |
JPS5721623A (en) | Treatment work for top of pile | |
JPS5771938A (en) | Outer water-proofing work | |
CN221053159U (en) | Device for pre-closing post-pouring belt | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPS57112523A (en) | Substructure of building | |
JPS56159419A (en) | Continuous underground wall and construction thereof | |
SU1699214A1 (en) | METHOD OF FORMATION OF VERTICAL DEVELOPMENT IN THE BOOKMARK AT LAYER EXTRACT OF USEFUL PURCHASED IN A DOWN ORDER WITH A HARD LINING | |
MY100521A (en) | Method of building a cavity structure in an embankment. | |
JPS57108303A (en) | Double bottom type built-up side trench work | |
JPS57108330A (en) | Construction of underground structure | |
JPS6417994A (en) | Method of executing underground structure | |
JPS6417996A (en) | Method of executing underground structure | |
JPS5568931A (en) | Construction of block piled retaining wall and block | |
SU756045A1 (en) | Method of vertical mining in filling massif | |
JPH0574676B2 (en) | ||
JPS6417995A (en) | Method of executing underground structure | |
JPS57155423A (en) | Method of construction of solidification of muddy water |