JPS57155423A - Method of construction of solidification of muddy water - Google Patents

Method of construction of solidification of muddy water

Info

Publication number
JPS57155423A
JPS57155423A JP4079581A JP4079581A JPS57155423A JP S57155423 A JPS57155423 A JP S57155423A JP 4079581 A JP4079581 A JP 4079581A JP 4079581 A JP4079581 A JP 4079581A JP S57155423 A JPS57155423 A JP S57155423A
Authority
JP
Japan
Prior art keywords
muddy water
hole
section
tremie pipe
hole bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4079581A
Other languages
Japanese (ja)
Other versions
JPS6238486B2 (en
Inventor
Daizo Kida
Yuji Saito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ohbayashi Gumi Ltd
Obayashi Gumi Ltd
Original Assignee
Ohbayashi Gumi Ltd
Obayashi Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ohbayashi Gumi Ltd, Obayashi Gumi Ltd filed Critical Ohbayashi Gumi Ltd
Priority to JP4079581A priority Critical patent/JPS57155423A/en
Publication of JPS57155423A publication Critical patent/JPS57155423A/en
Publication of JPS6238486B2 publication Critical patent/JPS6238486B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

PURPOSE:To conduct economical execution while forming stratiform cured bodies, strength thereof becomes larger successively toward a hole bottom, by compounding a stabilizing liquid so that low strength is obtained in an upper section and high strength toward a lower section when solidifying the stabilizing liquid in a ditch hole. CONSTITUTION:A tremie pipe 2 is inserted up to the bottom of the ditch hole 1 excavated by using non-curing muddy water 3, selft-curing muddy water 4 for low strength is inserted first through the tremie pipe 2, and the muddy water 3 is moved upward and replaced with the muddy water 4. Self-curing muddy water 5 for high strength is inserted to the hole bottom section through the tremie pipe 2, the muddy water 4, 3 are shifted upward under conditions that they are left as they are, and the hole bottom section is replaced with the muddy water 5. Lastly, mortar or concrete 6 is inserted to the hole bottom section through the tremie pipe 2, the hole bottom section is replaced, and the ditch hole section is foot-protected.
JP4079581A 1981-03-20 1981-03-20 Method of construction of solidification of muddy water Granted JPS57155423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4079581A JPS57155423A (en) 1981-03-20 1981-03-20 Method of construction of solidification of muddy water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4079581A JPS57155423A (en) 1981-03-20 1981-03-20 Method of construction of solidification of muddy water

Publications (2)

Publication Number Publication Date
JPS57155423A true JPS57155423A (en) 1982-09-25
JPS6238486B2 JPS6238486B2 (en) 1987-08-18

Family

ID=12590546

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4079581A Granted JPS57155423A (en) 1981-03-20 1981-03-20 Method of construction of solidification of muddy water

Country Status (1)

Country Link
JP (1) JPS57155423A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60105707A (en) * 1983-11-14 1985-06-11 Taisei Corp Construction method for cut-off wall
JPS61290120A (en) * 1985-06-17 1986-12-20 Ohbayashigumi Ltd Construction work of underground continuous wall or in-situ pile
JP2003041576A (en) * 2001-07-31 2003-02-13 Ohbayashi Corp Composite underground continuous wall and construction method of the wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5149507A (en) * 1974-10-28 1976-04-28 Kumagai Gumi Co Ltd
JPS5161119A (en) * 1974-10-26 1976-05-27 Kumagai Gumi Co Ltd
JPS543322A (en) * 1977-06-09 1979-01-11 Mitsui Constr Method of constructing underground structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5161119A (en) * 1974-10-26 1976-05-27 Kumagai Gumi Co Ltd
JPS5149507A (en) * 1974-10-28 1976-04-28 Kumagai Gumi Co Ltd
JPS543322A (en) * 1977-06-09 1979-01-11 Mitsui Constr Method of constructing underground structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60105707A (en) * 1983-11-14 1985-06-11 Taisei Corp Construction method for cut-off wall
JPH0258405B2 (en) * 1983-11-14 1990-12-07 Taisei Corp
JPS61290120A (en) * 1985-06-17 1986-12-20 Ohbayashigumi Ltd Construction work of underground continuous wall or in-situ pile
JP2003041576A (en) * 2001-07-31 2003-02-13 Ohbayashi Corp Composite underground continuous wall and construction method of the wall
JP4576768B2 (en) * 2001-07-31 2010-11-10 株式会社大林組 Composite type underground continuous wall and construction method of the same wall

Also Published As

Publication number Publication date
JPS6238486B2 (en) 1987-08-18

Similar Documents

Publication Publication Date Title
JPS57155423A (en) Method of construction of solidification of muddy water
JPS5781530A (en) Placement work of underwater concrete and form therefor
JPS5598520A (en) Composite grouting method
JPS5771923A (en) Construction work of continuous underground wall
JPS53140798A (en) Precast concrete block and method of building structure thereby
JPS5536548A (en) Construction method for prefabricated concrete retaining-wall and stay rod member
JPS5295577A (en) Solidifying treatment of al elecrolysis waste material
JPS56135625A (en) Construction of underwater structure
JPS5552424A (en) Method of installing underground continuous wall constructing standard pile
CN205475280U (en) Interim dock entrance cofferdam structure convenient to resume
JPS5729725A (en) Pouring method for ground and device thereof
JPS56159419A (en) Continuous underground wall and construction thereof
JPS5774427A (en) Construction method for underground continuous wall
JPS56119013A (en) Hollow fill-type dam
JPS55161117A (en) Constructing method for underground continuous wall by precast concrete member
JPS54128486A (en) Excavation method using stabilizing fluid in engineering fundamental work
JPS5761111A (en) Reduction of extra-banking concrete for head of pile driven in situ
JPS5592426A (en) Construction method employing free slope frame
JPS5585717A (en) Forming method for cut-off membrane to side of cavity of excavated reservoir
JPS5634818A (en) H-section steel sheet pile
JPS5568931A (en) Construction of block piled retaining wall and block
JPS57108321A (en) Construction of foundation for building and structure
JPS5327994A (en) Method of constructing large floating vessel assembly in use of prestressed concrete blocks
JPS5592421A (en) Multi-pouring pipe device and ground pouring method adopting the said device
JPS57155424A (en) Executing method for underground outer wall