CN102418347B - 一种深基坑内盲沟和集水井排水施工方法 - Google Patents

一种深基坑内盲沟和集水井排水施工方法 Download PDF

Info

Publication number
CN102418347B
CN102418347B CN 201110295251 CN201110295251A CN102418347B CN 102418347 B CN102418347 B CN 102418347B CN 201110295251 CN201110295251 CN 201110295251 CN 201110295251 A CN201110295251 A CN 201110295251A CN 102418347 B CN102418347 B CN 102418347B
Authority
CN
China
Prior art keywords
well
collecting well
water
sump
french drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110295251
Other languages
English (en)
Other versions
CN102418347A (zh
Inventor
唐世龙
冯云
郝卫华
白金
马聪利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN 201110295251 priority Critical patent/CN102418347B/zh
Publication of CN102418347A publication Critical patent/CN102418347A/zh
Application granted granted Critical
Publication of CN102418347B publication Critical patent/CN102418347B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种深基坑内盲沟和集水井排水的施工方法,它包括以下步骤:(1)在基坑内地势低的一侧挖盲沟,在盲沟内从下至上依次铺设石层和布;(2)在基坑内开挖多个集水井井坑;(3)用砖铺砌每一个集水井井坑的底壁并且在每一个集水井井坑内用砖围砌弧形集水井侧壁形成集水井,在集水井的顶端的收口位置安装圆套管;(4)将盲沟与集水井之间通过导管相连通;(5)从集水井井坑顶壁至彩条布部分顶面之间从下至上依次铺设垫层、防水层和防水保护层;(6)完成抽水后撤出集水井内的水泵,然后在所述的集水井内灌满砼,再将集水井上的套管用圆钢板满焊封堵并在防水保护层上浇注底板混凝土。本方法可以有效的解决地下水均流入基坑的问题。

Description

一种深基坑内盲沟和集水井排水施工方法
技术领域
本发明涉及一种深基坑内排水施工方法,尤其涉及一种深基坑内盲沟和集水井排水的施工方法。
背景技术
随着城市建设的发展,高层建筑、人防工程和地铁工程大量涌现。基坑支护的成功与否直接影响工程建设的效益与成败。地下水作为岩土体的赋存环境因素,对基坑工程的影响往往是不利的。对于地下水位较高的地区,基坑开挖中需大面积的临时性降水和止水,若对基坑中地下水处理不当,易造成基坑坍塌、地面沉降等事故。在深基坑工程的挖土与地下室施工中,要保证在“干”状态下的施工。为解决这个问题,通常采取的办法有:止水、降水与排水。止水采用止水帷幕的形式,目的是阻挡基坑外来水的渗入。降水是使地下水位保持在基坑底面0.5~1.0米以下,方便挖土与底板干作业.降水方法有轻型井点、喷射井点、电渗井点、管井井点等等;排水是将基坑范围内地表水与地下水排除,常用截水沟—集水井的方式明排水。对截水沟—集水井的施工方法很多。但是目前对于地势北高南低,北侧地表水、地下水均流入基坑,另因预应力锚索穿透止水帷幕,北侧地下水通过自由段流入基坑。而且现场北侧围护桩边与底板砖胎膜边净距太小,此处无法保证基坑明排沟排水要求。
通过检索得知已授权的专利:
1申请号为CN200820062278.1的中国专利公开了“可回收式冲击钻钢管降水井”,其中可回收式冲击钻钢管降水井管体由标准钢管段组成,标准钢管段之间通过焊接相临管壁端进行连接,标准钢管段的数量为2至4根,可回收式冲击钻钢管降水井垂直设置在地面下,降水井上端、降水井下端开放,降水井下端设置潜水泵。这项专利公开的是可回收式冲击钻钢管降水井的结构,本专利公开的是一种深基坑内盲沟和集水井排水的施工方法,与本专利所述的盲沟和集水井结构也不同。
2申请号为CN201020666433.8的中国专利公开了“防冒味集水井盖”,包括有圈体、拍门销、挡板和拍门重锤体组成。圈体是主体件,圈体的外形可以根据集水井口的形式设定,所以可以是方形,也可以是圆形的。拍门销的两端穿入并固定在圈体的内壁上,挡板的上端部设置有穿入拍门销用的通孔,挡板上端的通孔穿入并吊挂在拍门销上。挡板呈倾斜状,挡板的上端后侧面,连接设置有拍门重锤体。在拍门重锤体的下垂力作用下,挡板的下端会自动上抬,并与前面的拍门重锤体相接触。依此,在拍门重锤体的重力作用下,挡板就会与拍门重锤体相配合,将集水井口封闭,防止气味上冒。如遇有雨水下压,下压力就会克服拍门重锤体的下垂重力,使挡板的下端向下移动,也就打开了挡板,实现雨水下泄。
3申请号为CN201110002790.3的中国专利公开了“深基坑盲沟集水井降排水方法及装置”,该方法将地下室外墙外侧的积水通过截水沟集中流入地下室底板下部的盲沟管,地下室内的积水经泄水孔集中流入底板下部盲沟管,然后经盲沟管引至临时集水井,使用水泵外排。
4申请号为CN201020645284.7的中国专利公开了“一种用于基坑护壁排水施工过程中的集水井系统”,该集水井系统包括集水井本体,还包括设置在集水井本体内的至少一根降水管,以及一端设置在降水管内、另一端与水泵相连的吸水管;所述降水管的侧壁上设置有降水孔,且降水管的四周设置有滤水层。
5申请号为CN201020252346.8的中国专利公开了“双集水井地下室排水系统”,该系统包括设置于地下室附近的集水井Ⅰ和靠近市政排水管网设置的集水井Ⅱ,集水井Ⅰ的底部和集水井Ⅱ的底部通过连通管连通,集水井Ⅱ的水井壁上设置有溢水口,所述管道为倒U形PVC管,PVC管的一端设置于集水井Ⅰ的底部,另一端设置于集水井Ⅱ的底部形成连通器结构。
上述2-5项专利的排水施工方法都有一系列的优点,但是不适用于地势北高南低,北侧地表水、地下水均流入基坑,另因预应力锚索穿透止水帷幕,北侧地下水通过自由段流入基坑。而且现场北侧围护桩边与底板砖胎膜边净距太小,无法保证基坑明排沟排水要求。
发明内容
本发明的目的在于克服已有技术的不足,提供一种可以有效保证基坑排水要求的一种深基坑内盲沟和集水井排水的施工方法。
本发明的一种深基坑内盲沟和集水井排水的施工方法,它包括以下步骤:
(1)在挖好的基坑内地势低的一侧与该侧基坑侧壁平行设置挖一条盲沟,在所述的盲沟内从下至上依次铺设片石层、碎片层和彩条布;
(2)在基坑内开挖多个与所述的盲沟平行且间隔设置的集水井井坑;
(3)用砖铺砌每一个集水井井坑的底壁并且在每一个集水井井坑内用砖围砌成立面为弧形的集水井侧壁形成集水井,在所述集水井侧壁与集水井井坑侧壁之间满填碎石,同时在集水井的顶端的收口位置安装圆套管,沿所述的圆套管的圆周方向焊钢板止水环,在所述的钢板止水环的底面对称焊接至少四根钢筋,至少四根钢筋支撑设置在集水井顶壁上;
(4)将所述的盲沟与每一个集水井之间通过一根倾斜设置的导管相连通;
(5)从所述的多个集水井井坑顶壁至彩条布部分顶面之间从下至上依次铺设垫层、防水层和防水保护层;
(6)将水泵放入每一集水井,视水位情况进行抽水;
(7)完成抽水后撤出集水井内的水泵,然后在所述的集水井内灌满砼,再将集水井上的套管用圆钢板满焊封堵并在所述的防水保护层上绑扎底板钢筋,浇注底板混凝土。
采用本发明方法成本低、整体性、适用性强,稳定性好,可靠性高;可以有效的解决地势北高南低,北侧地表水、地下水均流入基坑的问题,并且可以解决因预应力锚索穿透止水帷幕,北侧地下水通过自由段流入基坑以及现场北侧围护桩边与底板砖胎膜边净距太小,无法保证基坑明排沟排水要求的问题。
附图说明
图1是采用本发明一种深基坑内盲沟和集水井排水施工方法的施工结构俯视图;
图2是图1所示的结构的纵向剖面图;
图3是在图2所示的结构的基础上浇注底板的结构示意图;
图4是图2所示的结构中的套管部分结构示意图;
图5是图4所示的套管部分的俯视图。
具体实施方式
下面结合具体的实施例,并参照附图,对本发明做进一步的说明:
如附图所示本发明的一种深基坑内盲沟和集水井排水的施工方法,它包括以下步骤:(1)在挖好的基坑内地势低的一侧与该侧基坑侧壁平行设置挖一条盲沟,在所述的盲沟内从下至上依次铺设片石层1-3、碎片层1-2和彩条布1-1;(2)在基坑内开挖多个与所述的盲沟平行且间隔设置的集水井井坑4;(3)用砖铺砌每一个集水井井坑4的底壁并且在每一个集水井井坑内用砖围砌弧形集水井侧壁4-1形成集水井,在所述的集水井的外侧壁与集水井井坑内侧壁之间满填碎石6,同时在所述的集水井的顶端的收口位置安装圆套管13,在所述的圆套管的周圈围焊钢板止水环10,在所述的钢板止水环的底面对称焊接至少四根钢筋12,所述的至少四根钢筋支撑设置在所述的集水井顶壁上;(4)将所述的盲沟1与每一个集水井4之间通过一根倾斜设置的导管2相连通;(5)从所述的多个集水井井坑顶壁至彩条布部分顶面之间从下至上依次铺设垫层7、防水层8和防水保护层9;(6)将水泵11放入每一集水井,视水位情况进行抽水;(7)完成抽水后撤出集水井内的水泵,然后在所述的集水井内灌满砼,再将集水井上的套管13用圆钢板14满焊封堵并在所述的防水保护层上绑扎底板钢筋,浇注底板混凝土5。图中3为基坑的围护桩。
实施例1
(1)在挖好的基坑内地势低的一侧与该侧基坑侧壁平行设置挖一条盲沟,在所述的盲沟内从下至上依次铺设片石层1-3、碎片层1-2和彩条布1-1;(2)在基坑内开挖多个与所述的盲沟平行且间隔设置的集水井井坑4;(3)用砖铺砌每一个集水井井坑4的底壁并且在每一个集水井井坑内用砖围砌弧形集水井侧壁4-1形成集水井,在所述的集水井的外侧壁与集水井井坑内侧壁之间满填碎石6,同时在所述的集水井的顶端的收口位置安装圆套管13,在所述的圆套管的周圈围焊钢板止水环10,在所述的钢板止水环的底面对称焊接至少四根钢筋12,所述的至少四根钢筋支撑设置在所述的集水井顶壁上;(4)将所述的盲沟1与每一个集水井4之间通过一根倾斜设置的导管2相连通;(5)从所述的多个集水井井坑顶壁至彩条布部分顶面之间从下至上依次铺设垫层7、防水层8和防水保护层9;(6)将水泵11放入每一集水井,视水位情况进行抽水;(7)完成抽水后撤出集水井内的水泵,然后在所述的集水井内灌满砼,再将集水井上的套管13用圆钢板14满焊封堵并在所述的防水保护层上绑扎底板钢筋,浇注底板混凝土5。
经测试:本系统一种深基坑内盲沟和集水井排水通畅、成本低、整体性、适用性强,稳定性好,可靠性高、有效的解决了地势北高南低,北侧地表水、地下水均流入基坑的问题,并且可以解决因预应力锚索穿透止水帷幕,北侧地下水通过自由段流入基坑以及现场北侧围护桩边与底板砖胎膜边净距太小,无法保证基坑明排沟排水要求的问题。并且实现了在深基坑工程的地下室施工中,在“干”状态下的施工。

Claims (1)

1.一种深基坑内盲沟和集水井排水的施工方法,其特征在于它包括以下步骤:
(1)在挖好的基坑内地势低的一侧与该侧基坑侧壁平行设置挖一条盲沟,在所述的盲沟内从下至上依次铺设片石层、碎片层和彩条布;
(2)在基坑内开挖多个与所述的盲沟平行且间隔设置的集水井井坑;
(3)用砖铺砌每一个集水井井坑的底壁并且在每一个集水井井坑内用砖围砌成立面为弧形的集水井侧壁形成集水井,在所述集水井侧壁与集水井井坑侧壁之间满填碎石,同时在集水井的顶端的收口位置安装圆套管,沿所述的圆套管的圆周方向焊钢板止水环,在所述的钢板止水环的底面对称焊接至少四根钢筋,至少四根钢筋支撑设置在集水井顶壁上;
(4)将所述的盲沟与每一个集水井之间通过一根倾斜设置的导管相连通并且导管在盲沟一侧高于集水井一侧;
(5)从所述的多个集水井井坑顶壁至彩条布顶面之间从下至上依次铺设垫层、防水层和防水保护层;
(6)将水泵放入每一集水井,视水位情况进行抽水;
(7)完成抽水后撤出集水井内的水泵,然后在所述的集水井内灌满砼,再将集水井上的套管用圆钢板满焊封堵并在所述的防水保护层上绑扎底板钢筋,浇注底板混凝土。
CN 201110295251 2011-09-27 2011-09-27 一种深基坑内盲沟和集水井排水施工方法 Expired - Fee Related CN102418347B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110295251 CN102418347B (zh) 2011-09-27 2011-09-27 一种深基坑内盲沟和集水井排水施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110295251 CN102418347B (zh) 2011-09-27 2011-09-27 一种深基坑内盲沟和集水井排水施工方法

Publications (2)

Publication Number Publication Date
CN102418347A CN102418347A (zh) 2012-04-18
CN102418347B true CN102418347B (zh) 2013-10-23

Family

ID=45942974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110295251 Expired - Fee Related CN102418347B (zh) 2011-09-27 2011-09-27 一种深基坑内盲沟和集水井排水施工方法

Country Status (1)

Country Link
CN (1) CN102418347B (zh)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888851A (zh) * 2012-09-29 2013-01-23 中国华冶科工集团有限公司 深水位积水坑及其施工方法
CN103410139B (zh) * 2013-08-20 2015-08-26 深圳市市政工程总公司 基坑狭窄区域回填密实方法
CN103821158B (zh) * 2014-03-21 2016-04-13 中国十九冶集团有限公司 高地下水条件下的施工开挖降排水方法
CN104005418A (zh) * 2014-06-17 2014-08-27 中铁城建集团第二工程有限公司 一种快速处理地下管涌的方法
CN104294806B (zh) * 2014-09-18 2017-01-11 中铁十二局集团有限公司 一种深基坑隔水层上方桩间水开挖引排方法
CN104358275B (zh) * 2014-11-19 2016-02-03 武汉一冶建筑安装工程有限责任公司 较深电梯井或集水井施工方法
CN105350554A (zh) * 2015-11-24 2016-02-24 北京崇建工程有限公司 一种高水位基坑降水施工方法
CN106759364B (zh) * 2016-11-28 2018-09-04 中冶建工集团有限公司 深基坑底板分步施工方法
CN109853599A (zh) * 2019-03-08 2019-06-07 中交一航局第二工程有限公司 一种严重渗水地质条件下的基坑止水施工方法
CN110241835A (zh) * 2019-05-13 2019-09-17 中建八局第二建设有限公司 基坑盲沟排水施工构造及其施工方法
CN111021384B (zh) * 2019-10-30 2021-12-28 浙江大地勘测设计有限公司 一种用于承压水头降压控制的基坑排水装置
CN112049136B (zh) * 2020-07-23 2021-12-10 温州京久基础工程有限公司 一种基坑排水装置
CN113338318B (zh) * 2021-06-03 2022-08-30 精易建工集团有限公司 一种集水明排与坑内降水井协同控制地下水系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1073380A1 (ru) * 1982-07-26 1984-02-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Шахтна главна водоотливна установка
CN101139841A (zh) * 2006-09-04 2008-03-12 洪钟堙 地下水排水装置
CN101624839A (zh) * 2008-12-22 2010-01-13 长沙理工大学 过滤渗透池综合排除下穿道路积水的方法
RU2395642C1 (ru) * 2009-04-08 2010-07-27 Сергей Михайлович Котков Способ водопонижения в подвальных помещениях жилых домов, административно-промышленных зданий и хранилищ
KR20100125973A (ko) * 2009-05-22 2010-12-01 이정주 필터 세척부를 가지는 지하수 배수장치
CN102116033A (zh) * 2011-01-07 2011-07-06 中国建筑第四工程局有限公司 深基坑盲沟集水井降排水方法及装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1073380A1 (ru) * 1982-07-26 1984-02-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Шахтна главна водоотливна установка
CN101139841A (zh) * 2006-09-04 2008-03-12 洪钟堙 地下水排水装置
CN101624839A (zh) * 2008-12-22 2010-01-13 长沙理工大学 过滤渗透池综合排除下穿道路积水的方法
RU2395642C1 (ru) * 2009-04-08 2010-07-27 Сергей Михайлович Котков Способ водопонижения в подвальных помещениях жилых домов, административно-промышленных зданий и хранилищ
KR20100125973A (ko) * 2009-05-22 2010-12-01 이정주 필터 세척부를 가지는 지하수 배수장치
CN102116033A (zh) * 2011-01-07 2011-07-06 中国建筑第四工程局有限公司 深基坑盲沟集水井降排水方法及装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
申正香.盲沟排水和集水井井点自动排水技术在景电二期泵站工程中的应用.《甘肃水利水电技术》.2008,第44卷(第01期),55-56.
盲沟排水和集水井井点自动排水技术在景电二期泵站工程中的应用;申正香;《甘肃水利水电技术》;20080325;第44卷(第01期);55-56 *

Also Published As

Publication number Publication date
CN102418347A (zh) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102418347B (zh) 一种深基坑内盲沟和集水井排水施工方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN103741714A (zh) 地下工程全盖挖逆作法施工方法
CN202247920U (zh) 一种深基坑内盲沟和集水井排水施工结构
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN212896422U (zh) 一种深基坑截排水装置
CN102433886A (zh) 一种集水井内增加降水井施工方法
CN100510281C (zh) 超大直径、超埋深度调蓄池的半逆作施工方法
CN101881181A (zh) 一种矿山采空区尾砂充填的混凝土封闭墙
CN110847199A (zh) 深基坑地下水暗埋引流施工方法
WO2023103651A1 (zh) 一种适合弱透水软土地层用的排水减压抗浮系统
CN104234089B (zh) 一种地下室防排水结合的施工方法
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN103572764A (zh) 超深人工挖孔桩护壁止水结构及其施工方法
CN106013400A (zh) 一种人行道综合管网及蓄排水系统
CN104846837B (zh) 一种明排水基坑中超深井坑的施工方法
CN104328836B (zh) 一种环保型预制双箱深孔式排水井及其施工方法
CN105544621A (zh) 一种降低堆坡建筑设计抗浮水位的建筑结构
CN112302678B (zh) 下穿建筑物浅埋隧道变形控制施工工艺
CN207484487U (zh) 用于深基坑裂隙带压止水的集水钢桶
CN208563278U (zh) 一种软土地层中大直径竖井的雨季施工结构
CN109024652A (zh) 一种富水地区桩基旋挖成孔泥浆的排放结构及其施工方法
CN204225257U (zh) 一种环保型预制双箱深孔式排水井
CN217679214U (zh) 一种建筑基础下局部加深结构
CN214143756U (zh) 一种高灵敏度土基坑支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131023

Termination date: 20170927

CF01 Termination of patent right due to non-payment of annual fee