CN102487620A - Ecological comprehensive treatment technology for coast reclamation dredger fill - Google Patents
Ecological comprehensive treatment technology for coast reclamation dredger fill Download PDFInfo
- Publication number
- CN102487620A CN102487620A CN2011103592017A CN201110359201A CN102487620A CN 102487620 A CN102487620 A CN 102487620A CN 2011103592017 A CN2011103592017 A CN 2011103592017A CN 201110359201 A CN201110359201 A CN 201110359201A CN 102487620 A CN102487620 A CN 102487620A
- Authority
- CN
- China
- Prior art keywords
- trickle
- fill
- soil
- french drain
- barged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Soil Working Implements (AREA)
Abstract
An ecological comprehensive treatment technology for coast reclamation dredger fill is disclosed, which comprises the following steps of: performing grooving and soil turning on the land needing to be reformed, and dividing the groove into a plurality of parallel sections at first; digging a main water-sprinkling blind ditch on the bottom of the groove along a depth direction, and connecting the main water-sprinkling blind ditch with a municipal water-draining well or water-draining ditch; digging a branch water-sprinkling blind ditch intersected with the main water-sprinkling blind ditch on the bottom of each section; filling ballast bags; paving an anticorrosive material among the branch water-sprinkling blind ditches; paving a water-sprinkling layer on the bottom of the groove, covering an anti-mud-seepage film, and paving an anti-lateral-seepage film; backfilling the mixed soil obtained after uniformly blending the groove soil turned out with blending substances; disposing a plurality of small square furrows on the levelled ground, drilling a plurality of sand holes on the small square furrows, and connecting the sand holes with the water-sprinkling layer; then irrigating; and finally applying an acidic improved fertilizer on the surface of the land, performing rotary tillage and blending. The ecological comprehensive treatment technology for coast reclamation dredger fill has the advantages of being capable of efficiently protecting cultivated land resource, simple and convenient in construction, low in investment cost, and capable of utilizing natural falling water for saving lots of fresh water resource.
Description
(1) technical field:
The present invention relates to a kind of coastal soil improvement method, especially a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing.
(2) background technology:
Now solve the marine solonchak original soil basically and improved a difficult problem of doing greening; But the greening of newly enclosing extra large barged-in fill then is " global problem " of generally acknowledging in the world, because of the soil of new hydraulic reclamation not only salt content be higher than general marine solonchak, the interior water content of the soil body is higher simultaneously; It is a kind of soil body that does not form soil; Not only muddy, not penetrating, and the content of organic matter in the soil is extremely low, and " on the spot " condition of plant growing can only be provided.Therefore the difficulty of improvement is very large.
This technology has solved this " global problem " just, adopts and does not change planting soil to barged-in fill improvement and greening, has effectively protected cultivated land resource and ecotope, has promoted the sustainable development of resource and environment.
(3) summary of the invention:
The objective of the invention is to design a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing, it can solve the deficiency that prior art exists, easy construction, and cost of investment is low; Can utilize natural rainfall, practice thrift a large amount of freshwater resources.
Technical scheme of the present invention: a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing is characterized in that it may further comprise the steps:
(1) at first slots and dig, groove is divided into some locations that are parallel to each other along the depth direction of groove in the soil of needs transformation;
(2) dig along the depth direction in the bottom of groove and establish at least one main trickle french drain, main trickle french drain links to each other with municipal drainage well or drain ditch;
(3) dig in the bottom in each location and establish at least one trickle french drain that intersect with main trickle french drain;
(4) in a main trickle french drain and a trickle french drain, fill quarrel stone bag;
(5) between every trickle french drain, lay anti-corrosion material;
(6) lay the trickle layer in the bottom of groove, and cover anti-mud in the above and ooze film; And the good anti-side in shop, soil contact place with not improvement in improvement is oozed film;
(7) with the groove routed up soil with mix the composite soil after thing evenly mixes, be backfilling in the groove;
(8) on smooth good ground, make some little side's furrow, and on little side's furrow, beat some husky holes, husky hole and trickle layer join, and fill coarse sand or grain of rice stone in the husky hole; Water then;
(9) after the soil watered, execute acid improvement again on the surface, soil of being transformed fertile, carries out rotary tillage and mix.
The location width that is parallel to each other in the said step (1) is 10-20m.
In the said step (2) each bar master trickle french drain be spaced apart 100-200m, the specification of every main trickle french drain is 30*30cm.
Each bar props up the 3-6m that is spaced apart of trickle french drain in the said step (3), and the specification of every trickle french drain is 20*20cm.
Said main trickle french drain all has certain gradient with a trickle french drain.
The diameter of quarrel stone bag is 20-30cm in the said step (4), length 3m; The contact place of adjacent two quarrel stone bags is with a block length 0.9-1.3m, and the woven cloth of wide 30cm encases, and treats that ballast bag laying finishing back increases some ballasts in the not enough part of interface ballast, wraps with the woven cloth that sets in advance then that is:.
Anti-corrosion material in the said step (5) is an anti-rot plastic cloth.
Trickle layer in the said step (6) is little aggregate chips, and thickness is 3-5cm.
Mixing thing in the said step (7) is rice husk, crushing straw, wild vegetation, ashes, various plant species shell or house refuse, is that 20% ratio mixes according to volume ratio.
On smooth good ground, making some little side's furrow in the said step (8) is: the little side's furrow of every 5m*5m; Saidly on little side's furrow, beat some husky holes and be: whenever in every furrow make a call to a husky hole at a distance from 1m, the diameter in husky hole is 4-8cm.
Fill coarse sand or grain of rice stone in the said step (8) in the husky hole extremely apart from ground 30cm.
Said step (8) adopts disposable continuous pouring, and every square meter water consumption finally makes soil salt content reach below 0.3% at 0.6~0.8t.
Executing the fertile thickness of acid improvement on the surface, soil of being transformed in the said step (9) is 8-10cm; The degree of depth that said rotary tillage mixes is 30cm.
After said step (9) land reclamation finishes, carry out plant planting: plant pit is dug in the place needs plantation plant; Beat the trickle hole that direct and underground trickle layer links to each other at the center of plant pit; Shop coarse sand at the bottom of plant pit; Be placed on center position at the bottom of the plant pit to tree then, fill out coarse sand at the native ball and the position, space of hole wall then, the hole soil that digs out with plant pit is again carried out dash furrow low bank between fields around plant pit, carry out the big flood pouring, till irrigating.
The diameter of said plant pit is 10 times of the trunk diameters of plant, and native ball is 8 times of the trunk diameters of plant.
The trickle bore dia that said and underground trickle layer links to each other is 10cm; Fill coarse sand or grain of rice stone in the hole; The thickness of shop coarse sand is 10-15cm at the bottom of the said plant pit.
Superiority of the present invention and good effect: 1, do not change improvement and the greening that planting soil carries out barged-in fill, the resource of effectively protecting farmland; 2, easy construction, cost of investment is low; 3, high-intensity manual intervention makes barged-in fill within short-term, become the planting soil that satisfies plant growing condition; 4, can utilize natural rainfall, practice thrift a large amount of freshwater resources.
(4) description of drawings:
Fig. 1 is the related a kind of sketch map that groove in the extra large barged-in fill ecology synthesis improvement technology is divided into some locations that are parallel to each other that encloses of the present invention.
Fig. 2 is the related a kind of profile that encloses a location in the extra large barged-in fill ecology synthesis improvement technology of the present invention.
Fig. 3 is the related a kind of distribution schematic diagram that encloses a main trickle french drain in the extra large barged-in fill ecology synthesis improvement technology and a trickle french drain of the present invention.
Fig. 4 is the related a kind of sketch map that encloses a main trickle french drain in the extra large barged-in fill ecology synthesis improvement technology and a trickle french drain of the present invention.
Fig. 5 is the related a kind of sketch map that encloses a trickle french drain in a location in the extra large barged-in fill ecology synthesis improvement technology of the present invention.
Fig. 6 is the related a kind of sketch map that encloses quarrel stone bag in the extra large barged-in fill ecology synthesis improvement technology of the present invention.
Fig. 7 is the related a kind of connection sketch map that encloses quarrel stone bag in the extra large barged-in fill ecology synthesis improvement technology of the present invention.
Fig. 8 a kind ofly encloses extra large barged-in fill ecology synthesis and administers the set up defences sketch map of rotten material of technological middle berth for the present invention is related.
Fig. 9 is the related a kind of cutaway view of laying the trickle layer in the extra large barged-in fill ecology synthesis improvement technology that encloses of the present invention.
Figure 10 is related a kind of soil of groove in the extra large barged-in fill ecology synthesis improvement technology and the cutaway view that mixes after the thing backfill of enclosing of the present invention.
Figure 11 is the related a kind of sketch map of on little side's furrow, beating some husky holes in the extra large barged-in fill ecology synthesis improvement technology that encloses of the present invention.
Figure 12 is the related a kind of sketch map that encloses husky hole in the extra large barged-in fill ecology synthesis improvement technology of the present invention.
Figure 13 is the related a kind of cutaway view after acid improvement fertilizer is executed on the surface, soil of being transformed in the extra large barged-in fill ecology synthesis improvement technology that encloses of the present invention.
Figure 14 carries out the cutaway view that rotary tillage mixes for related a kind of the enclosing in the extra large barged-in fill ecology synthesis improvement technology of the present invention after acid improvement fertilizer is executed on the surface, soil of being transformed.
Figure 15 is the related a kind of cutaway view behind the plantation plant in the extra large barged-in fill ecology synthesis improvement technology that encloses of the present invention.
Wherein, 1 is main trickle french drain, and 2 are a trickle french drain, and 3 is the municipal drainage well, and 4 is anti-rot plastic cloth; 5 is the trickle layer, and 6 for anti-mud oozes film, and 7 are quarrel stone bag, and 8 is composite soil, 9 side's of being furrow; 10 is husky hole, and 11 is that acid improvement is fertile, and 12 is native ball, and 13 is dash furrow low banks between fields, and 14 is coarse sand; 15 is the trickle hole, and 16 is plant, and 17 is woven cloth, and 18 is that anti-side is oozed film, and 19 is the location.
(5) embodiment:
Embodiment 1: a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing is characterized in that it may further comprise the steps:
(1) at first slots and dig, groove is divided into some locations that are parallel to each other 19 along the depth direction of groove in the soil of needs transformation; (seeing Fig. 1, Fig. 2)
(2) dig along the depth direction in the bottom of groove and establish at least one main trickle french drain 1, main trickle french drain 1 links to each other with municipal drainage well 3; (see figure 3)
(3) dig in the bottom in each location and establish at least one trickle french drain 2 that intersect with main trickle french drain 1; (seeing Fig. 3, Fig. 4, Fig. 5)
(4) in a main trickle french drain 1 and a trickle french drain 2, fill quarrel stone bag 7; (seeing Fig. 6, Fig. 7)
(5) between every trickle french drain 2, lay anti-corrosion material; (see figure 8)
(6) lay trickle layer 5 in the bottom of groove, and cover anti-mud in the above and ooze film 6; And the good anti-side in shop, soil contact place with not improvement in improvement is oozed film 18; (see figure 9)
(7) with the groove routed up soil with mix the composite soil 8 after thing evenly mixes, be backfilling in the groove; (see figure 10)
(8) on smooth good ground, make some little side's furrow 9, and on little side's furrow 9, beat some husky holes 10, husky hole 10 joins with trickle layer 5, fills coarse sand in the husky hole 10; Water then; (seeing Figure 11, Figure 12)
(9) after the soil waters, execute acid improvement fertilizer 11 again on the surface, soil of being transformed, carry out rotary tillage and mix.(seeing Figure 13, Figure 14)
In the said step (2) each bar master trickle french drain 1 be spaced apart 100m, the specification of every main trickle french drain 1 is 30*30cm.(see figure 3)
Each bar props up the 6m that is spaced apart of trickle french drain 2 in the said step (3), and the specification of every trickle french drain 2 is 20*20cm.(see figure 3)
Said main trickle french drain 1 all has certain gradient with a trickle french drain 2.
The diameter of quarrel stone bag 7 is 20cm in the said step (4), length 3m; The contact place of adjacent two quarrel stone bags 7 is with a block length 1m, and the woven cloth 17 of wide 30cm encases, and treats that ballast bag laying finishing back increases some ballasts in the not enough part of interface ballast, wraps with the woven cloth 17 that sets in advance then that is:.(seeing Fig. 6, Fig. 7)
Anti-corrosion material in the said step (5) is an anti-rot plastic cloth 4.(see figure 8)
Mixing thing in the said step (7) is rice husk or crushing straw, is that 20% ratio mixes according to volume ratio.
On smooth good ground, making some little side's furrow 9 in the said step (8) is: the little side's furrow 9 of every 5m*5m; Saidly on little side's furrow 9, beat some husky holes and be: whenever in every furrow make a call to a husky hole at a distance from 1m, the diameter in husky hole is 4cm.(seeing Figure 11)
Fill coarse sand extremely apart from ground 30cm in the husky hole 10 in the said step (8).(seeing Figure 12)
Said step (8) adopts disposable continuous pouring, and every square meter water consumption finally makes soil salt content reach below 0.3% at 0.6~0.8t.
Said step (9) is executed acid improvement fertile 11 on the surface, soil of being transformed thickness is 8cm; The degree of depth that said rotary tillage mixes is 30cm.(seeing Figure 13, Figure 14)
After said step (9) land reclamation finishes, carry out plant and plant for 16 kinds: plant pit is dug in the place needs plantation plant 16; Beat the trickle hole 15 that direct and underground trickle layer 5 links to each other at the center of plant pit; Shop coarse sand 14 at the bottom of plant pit; Be placed on center position at the bottom of the plant pit to tree then, fill out coarse sand 14 at the native ball 12 and the position, space of hole wall then, the hole soil that digs out with plant pit is again carried out dash furrow low bank between fields 13 around plant pit, carry out the big flood pouring, till irrigating.(seeing Figure 15)
The diameter of said plant pit is 10 times of the trunk diameters of plant 16,8 times of the trunk diameters that native ball 12 is plants 16.
Embodiment 2: a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing is characterized in that it may further comprise the steps:
(1) at first slots and dig, groove is divided into some locations that are parallel to each other 19 along the depth direction of groove in the soil of needs transformation; (seeing Fig. 1, Fig. 2)
(2) dig along the depth direction in the bottom of groove and establish at least one main trickle french drain 1, main trickle french drain 1 links to each other with municipal drainage well 3; (see figure 3)
(3) dig in the bottom in each location and establish at least one trickle french drain 2 that intersect with main trickle french drain 1; (seeing Fig. 3, Fig. 4, Fig. 5)
(4) in a main trickle french drain 1 and a trickle french drain 2, fill quarrel stone bag 7; (seeing Fig. 6, Fig. 7)
(5) between every trickle french drain 2, lay anti-corrosion material; (see figure 8)
(6) lay trickle layer 5 in the bottom of groove, and cover anti-mud in the above and ooze film 6; And the good anti-side in shop, soil contact place with not improvement in improvement is oozed film 18; (see figure 9)
(7) with the groove routed up soil with mix the composite soil 8 after thing evenly mixes, be backfilling in the groove; (see figure 10)
(8) on smooth good ground, make some little side's furrow 9, and on little side's furrow 9, beat some husky holes 10, husky hole 10 joins with trickle layer 5, fills grain of rice stone in the husky hole 10; Water then; (seeing Figure 11, Figure 12)
(9) after the soil waters, execute acid improvement fertilizer 11 again on the surface, soil of being transformed, carry out rotary tillage and mix.(seeing Figure 13, Figure 14)
In the said step (2) each bar master trickle french drain 1 be spaced apart 200m, the specification of every main trickle french drain 1 is 30*30cm.
Each bar props up the 6m that is spaced apart of trickle french drain 2 in the said step (3), and the specification of every trickle french drain 2 is 20*20cm.
Said main trickle french drain 1 all has certain gradient with a trickle french drain 2.
The diameter of quarrel stone bag 7 is 30cm in the said step (4), length 3m; The contact place of adjacent two quarrel stone bags 7 is with a block length 1.3m, and the woven cloth 17 of wide 30cm encases, and treats that ballast bag laying finishing back increases some ballasts in the not enough part of interface ballast, wraps with the woven cloth 17 that sets in advance then that is:.
Anti-corrosion material in the said step (5) is an anti-rot plastic cloth 4.
Mixing thing in the said step (7) is house refuse, is that 20% ratio mixes according to volume ratio.
On smooth good ground, making some little side's furrow 9 in the said step (8) is: the little side's furrow 9 of every 5m*5m; Saidly on little side's furrow 9, beat some husky holes and be: whenever in every furrow make a call to a husky hole at a distance from 1m, the diameter in husky hole is 8cm.
Fill coarse sand extremely apart from ground 30cm in the husky hole 10 in the said step (8).(seeing Figure 12)
Said step (8) adopts disposable continuous pouring, and every square meter water consumption finally makes soil salt content reach below 0.3% at 0.6~0.8t.
Said step (9) is executed acid improvement fertile 11 on the surface, soil of being transformed thickness is 10cm; The degree of depth that said rotary tillage mixes is 30cm.(seeing Figure 13, Figure 14)
After said step (9) land reclamation finishes, carry out plant and plant for 16 kinds: plant pit is dug in the place needs plantation plant 16; Beat the trickle hole 15 that direct and underground trickle layer 5 links to each other at the center of plant pit; Shop coarse sand 14 at the bottom of plant pit; Be placed on center position at the bottom of the plant pit to tree then, fill out coarse sand 14 at the native ball 12 and the position, space of hole wall then, the hole soil that digs out with plant pit is again carried out dash furrow low bank between fields 13 around plant pit, carry out the big flood pouring, till irrigating.(seeing Figure 15)
The diameter of said plant pit is 10 times of the trunk diameters of plant 16,8 times of the trunk diameters that native ball 12 is plants 16.
Embodiment 3: a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing is characterized in that it may further comprise the steps:
(1) at first slots and dig, groove is divided into some locations that are parallel to each other 19 along the depth direction of groove in the soil of needs transformation; (seeing Fig. 1, Fig. 2)
(2) dig along the depth direction in the bottom of groove and establish at least one main trickle french drain 1, main trickle french drain 1 links to each other with municipal drainage well 3; (see figure 3)
(3) dig in the bottom in each location and establish at least one trickle french drain 2 that intersect with main trickle french drain 1; (seeing Fig. 3, Fig. 4, Fig. 5)
(4) in a main trickle french drain 1 and a trickle french drain 2, fill quarrel stone bag 7; (seeing Fig. 6, Fig. 7)
(5) between every trickle french drain 2, lay anti-corrosion material; (see figure 8)
(6) lay trickle layer 5 in the bottom of groove, and cover anti-mud in the above and ooze film 6; And the good anti-side in shop, soil contact place with not improvement in improvement is oozed film 18; (see figure 9)
(7) with the groove routed up soil with mix the composite soil 8 after thing evenly mixes, be backfilling in the groove; (see figure 10)
(8) on smooth good ground, make some little side's furrow 9, and on little side's furrow 9, beat some husky holes 10, husky hole 10 joins with trickle layer 5, fills coarse sand or grain of rice stone in the husky hole 10; Water then; (seeing Figure 11, Figure 12)
(9) after the soil waters, execute acid improvement fertilizer 11 again on the surface, soil of being transformed, carry out rotary tillage and mix.(seeing Figure 13, Figure 14)
In the said step (2) each bar master trickle french drain 1 be spaced apart 150m, the specification of every main trickle french drain 1 is 30*30cm.
Each bar props up the 5m that is spaced apart of trickle french drain 2 in the said step (3), and the specification of every trickle french drain 2 is 20*20cm.
Said main trickle french drain 1 all has certain gradient with a trickle french drain 2.
The diameter of quarrel stone bag 7 is 25cm in the said step (4), length 3m; The contact place of adjacent two quarrel stone bags 7 is with a block length 1.2m, and the woven cloth 17 of wide 30cm encases, and treats that ballast bag laying finishing back increases some ballasts in the not enough part of interface ballast, wraps with the woven cloth 17 that sets in advance then that is:.
Anti-corrosion material in the said step (5) is an anti-rot plastic cloth 4.
Mixing thing in the said step (7) is ashes, is that 20% ratio mixes according to volume ratio.
On smooth good ground, making some little side's furrow 9 in the said step (8) is: the little side's furrow 9 of every 5m*5m; Saidly on little side's furrow 9, beat some husky holes and be: whenever in every furrow make a call to a husky hole at a distance from 1m, the diameter in husky hole is 6cm.
Fill coarse sand extremely apart from ground 30cm in the husky hole 10 in the said step (8).(seeing Figure 12)
Said step (8) adopts disposable continuous pouring, and every square meter water consumption finally makes soil salt content reach below 0.3% at 0.6~0.8t.
Said step (9) is executed acid improvement fertile 11 on the surface, soil of being transformed thickness is 9cm; The degree of depth that said rotary tillage mixes is 30cm.(seeing Figure 13, Figure 14)
After said step (9) land reclamation finishes, carry out plant and plant for 16 kinds: plant pit is dug in the place needs plantation plant 16; Beat the trickle hole 15 that direct and underground trickle layer 5 links to each other at the center of plant pit; Shop coarse sand 14 at the bottom of plant pit; Be placed on center position at the bottom of the plant pit to tree then, fill out coarse sand 14 at the native ball 12 and the position, space of hole wall then, the hole soil that digs out with plant pit is again carried out dash furrow low bank between fields 13 around plant pit, carry out the big flood pouring, till irrigating.(seeing Figure 15)
The diameter of said plant pit is 10 times of the trunk diameters of plant 16,8 times of the trunk diameters that native ball 12 is plants 16.
Claims (10)
1. one kind is enclosed extra large barged-in fill ecology synthesis improvement technology, it is characterized in that it may further comprise the steps:
(1) at first slots and dig, groove is divided into some locations that are parallel to each other along the depth direction of groove in the soil of needs transformation;
(2) dig along the depth direction in the bottom of groove and establish at least one main trickle french drain, main trickle french drain links to each other with municipal drainage well or drain ditch;
(3) dig in the bottom in each location and establish at least one trickle french drain that intersect with main trickle french drain;
(4) in a main trickle french drain and a trickle french drain, fill quarrel stone bag;
(5) between every trickle french drain, lay anti-corrosion material;
(6) lay the trickle layer in the bottom of groove, and cover anti-mud in the above and ooze film; And the good anti-side in shop, soil contact place with not improvement in improvement is oozed film;
(7) with the groove routed up soil with mix the composite soil after thing evenly mixes, be backfilling in the groove;
(8) on smooth good ground, make some little side's furrow, and on little side's furrow, beat some husky holes, husky hole and trickle layer join, and fill coarse sand or grain of rice stone in the husky hole; Water then;
(9) after the soil watered, execute acid improvement again on the surface, soil of being transformed fertile, carries out rotary tillage and mix.
2. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that the location width that is parallel to each other in the said step (1) is 10-20m; In the said step (2) each bar master trickle french drain be spaced apart 100-200m, the specification of every main trickle french drain is 30*30cm; Each bar props up the 3-6m that is spaced apart of trickle french drain in the said step (3), and the specification of every trickle french drain is 20*20cm; Said main trickle french drain all has certain gradient with a trickle french drain.
3. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that the diameter of quarrel stone bag in the said step (4) is 20-30cm, length 3m; The contact place of adjacent two quarrel stone bags is with a block length 0.9-1.3m, and the woven cloth of wide 30cm encases, and treats that ballast bag laying finishing back increases some ballasts in the not enough part of interface ballast, wraps with the woven cloth that sets in advance then that is:.
4. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that the anti-corrosion material in the said step (5) is an anti-rot plastic cloth.
5. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that the trickle layer in the said step (6) is little aggregate chips, thickness is 3-5cm.
6. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1; It is characterized in that mixing in the said step (7) thing is rice husk, crushing straw, wild vegetation, ashes, various plant species shell or house refuse, is that 20% ratio mixes according to volume ratio.
7. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that on smooth good ground, making in the said step (8) some little side's furrow and be: the little side's furrow of every 5m*5m; Saidly on little side's furrow, beat some husky holes and be: whenever in every furrow make a call to a husky hole at a distance from 1m, the diameter in husky hole is 4-8cm; Fill coarse sand or grain of rice stone in the said step (8) in the husky hole extremely apart from ground 30cm.Said step (8) adopts disposable continuous pouring, and every square meter water consumption finally makes soil salt content reach below 0.3% at 0.6~0.8t.
8. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that executing the fertile thickness of acid improvement on the surface, soil of being transformed in the said step (9) is 8-10cm; The degree of depth that said rotary tillage mixes is 30cm.
9. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 1, it is characterized in that said step (9) land reclamation finishes after, carry out plant planting: plant pit is dug in the place needs plantation plant; Beat the trickle hole that direct and underground trickle layer links to each other at the center of plant pit; Shop coarse sand at the bottom of plant pit; Be placed on center position at the bottom of the plant pit to tree then, fill out coarse sand at the native ball and the position, space of hole wall then, the hole soil that digs out with plant pit is again carried out dash furrow low bank between fields around plant pit, carry out the big flood pouring, till irrigating.
10. according to the said a kind of extra large barged-in fill ecology synthesis improvement technology of enclosing of claim 9, the diameter that it is characterized in that said plant pit is 10 times of the trunk diameters of plant, and native ball is 8 times of the trunk diameters of plant; The trickle bore dia that said and underground trickle layer links to each other is 10cm; Fill coarse sand or grain of rice stone in the hole; The thickness of shop coarse sand is 10-15cm at the bottom of the said plant pit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103592017A CN102487620A (en) | 2011-11-11 | 2011-11-11 | Ecological comprehensive treatment technology for coast reclamation dredger fill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103592017A CN102487620A (en) | 2011-11-11 | 2011-11-11 | Ecological comprehensive treatment technology for coast reclamation dredger fill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102487620A true CN102487620A (en) | 2012-06-13 |
Family
ID=46179539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103592017A Pending CN102487620A (en) | 2011-11-11 | 2011-11-11 | Ecological comprehensive treatment technology for coast reclamation dredger fill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102487620A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103262689A (en) * | 2013-05-27 | 2013-08-28 | 天津天一景观规划设计有限公司 | Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill |
CN104652365A (en) * | 2013-11-20 | 2015-05-27 | 天津港海湾园林绿化有限公司 | Muddy tidal flats fast afforestation technology for land reclamation epeirogenic area |
CN105638015A (en) * | 2015-12-31 | 2016-06-08 | 华东师范大学 | Method for recovering intertidal zone salt marsh wetland |
CN110214493A (en) * | 2019-04-15 | 2019-09-10 | 中国矿业大学 | A kind of improve arranges stratum re-construction method in the opencut that soil moisture content quickly applies fertilizer |
CN111557213A (en) * | 2020-06-05 | 2020-08-21 | 中交天津航道局有限公司 | Construction method of soil leaching protection structure suitable for sand reclamation by blowing and filling |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1754414A (en) * | 2005-09-03 | 2006-04-05 | 林廷勇 | Method for cultivating plants for sand-fixation , water-keeping and desert afforestation |
CN101073807A (en) * | 2007-06-27 | 2007-11-21 | 刘太祥 | Comprehensive improvement for salt farm field soil and vegetative cover |
CN101849454A (en) * | 2009-10-30 | 2010-10-06 | 刘洪庆 | Biological synthesis improvement method of salt-alkali shoaly land |
-
2011
- 2011-11-11 CN CN2011103592017A patent/CN102487620A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1754414A (en) * | 2005-09-03 | 2006-04-05 | 林廷勇 | Method for cultivating plants for sand-fixation , water-keeping and desert afforestation |
CN101073807A (en) * | 2007-06-27 | 2007-11-21 | 刘太祥 | Comprehensive improvement for salt farm field soil and vegetative cover |
CN101849454A (en) * | 2009-10-30 | 2010-10-06 | 刘洪庆 | Biological synthesis improvement method of salt-alkali shoaly land |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103262689A (en) * | 2013-05-27 | 2013-08-28 | 天津天一景观规划设计有限公司 | Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill |
CN104652365A (en) * | 2013-11-20 | 2015-05-27 | 天津港海湾园林绿化有限公司 | Muddy tidal flats fast afforestation technology for land reclamation epeirogenic area |
CN105638015A (en) * | 2015-12-31 | 2016-06-08 | 华东师范大学 | Method for recovering intertidal zone salt marsh wetland |
CN110214493A (en) * | 2019-04-15 | 2019-09-10 | 中国矿业大学 | A kind of improve arranges stratum re-construction method in the opencut that soil moisture content quickly applies fertilizer |
CN111557213A (en) * | 2020-06-05 | 2020-08-21 | 中交天津航道局有限公司 | Construction method of soil leaching protection structure suitable for sand reclamation by blowing and filling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103181258B (en) | Saline-alkali soil improvement method | |
CN100355511C (en) | Water-saving type salina physics-chemistry-biology comprehensive improvement and vegetation construction technique | |
CN105519274B (en) | A kind of integrated approach of extensive coastal new Climacteric symptoms farmland ecology exploitation | |
CN103262689B (en) | Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill | |
CN104094693B (en) | A kind of greening method of beach saline land staged control salt discharge | |
CN101849454B (en) | Biological synthesis improvement method of salt-alkali shoaly land | |
CN102273335B (en) | Treatment and utilization method of muddy seashore saline soil | |
CN103141176A (en) | Method for improving saline soil in excavated grooves of border trees in coastal region | |
CN103329658A (en) | Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area | |
CN108076719A (en) | A kind of engineering improvement on heavy salinized ground of haftplatte and ecological planting and establishing method | |
CN103392404A (en) | Method for directly planting macrophanerophyte in natural soil of coast silt severe saline-alkali soil | |
CN103039147A (en) | Reclamation method for sunk paddy field caused by mining in mountainous regions | |
CN104521363A (en) | Reclamation method for rural residence lands on coastal saline land region | |
CN102696300A (en) | Method for water seepage, salt discharge and afforestation of low-humidity saline and alkaline beach and application of method | |
CN104412748A (en) | Technological method for eliminating salts in blind drain in saline-alkali soil | |
CN102487620A (en) | Ecological comprehensive treatment technology for coast reclamation dredger fill | |
CN101336593A (en) | Method for constructing ecology garden landscape compound structures to improve salt-affected soil | |
CN107646225A (en) | A kind of method of heavy saline-alkali area at seashore original soil furnished equipments | |
CN103688617A (en) | Method for renovating desolated rocky beach through alien earth | |
CN103797991A (en) | Granite mine slash ecological green returning technology | |
CN106068754B (en) | The method of flour sand Muddy Bottoms strand tidal flat revegetation | |
CN108812166A (en) | A kind of fish-scale pit preparations for afforestation method | |
CN102612883B (en) | Saline discharge and alkali reduction concealed conduit device for saline-alkali soil | |
CN105706555A (en) | Saline-alkali soil greening engineering original soil improvement structure and construction method thereof | |
CN202455773U (en) | Concealed conduit device for discharging salt and reducing alkali on saline-alkali land |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120613 |