CN102383443A - 基坑支护桩与地下室外墙之间的连接结构及施工方法 - Google Patents
基坑支护桩与地下室外墙之间的连接结构及施工方法 Download PDFInfo
- Publication number
- CN102383443A CN102383443A CN201110382418XA CN201110382418A CN102383443A CN 102383443 A CN102383443 A CN 102383443A CN 201110382418X A CN201110382418X A CN 201110382418XA CN 201110382418 A CN201110382418 A CN 201110382418A CN 102383443 A CN102383443 A CN 102383443A
- Authority
- CN
- China
- Prior art keywords
- concrete
- basement
- wall
- bracket
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 230000008093 supporting effect Effects 0.000 claims description 41
- 210000003205 muscle Anatomy 0.000 claims description 20
- 210000002435 tendon Anatomy 0.000 claims description 18
- 230000015271 coagulation Effects 0.000 claims description 14
- 238000005345 coagulation Methods 0.000 claims description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 14
- 239000002689 soil Substances 0.000 claims description 14
- 239000012530 fluid Substances 0.000 claims description 9
- 238000009415 formwork Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 4
- YTAHJIFKAKIKAV-XNMGPUDCSA-N [(1R)-3-morpholin-4-yl-1-phenylpropyl] N-[(3S)-2-oxo-5-phenyl-1,3-dihydro-1,4-benzodiazepin-3-yl]carbamate Chemical compound O=C1[C@H](N=C(C2=C(N1)C=CC=C2)C1=CC=CC=C1)NC(O[C@H](CCN1CCOCC1)C1=CC=CC=C1)=O YTAHJIFKAKIKAV-XNMGPUDCSA-N 0.000 claims description 2
- 239000002699 waste material Substances 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000007667 floating Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000001976 improved effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382418XA CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382418XA CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102383443A true CN102383443A (zh) | 2012-03-21 |
CN102383443B CN102383443B (zh) | 2013-11-27 |
Family
ID=45823244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110382418XA Expired - Fee Related CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102383443B (zh) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102943492A (zh) * | 2012-11-26 | 2013-02-27 | 中铁第四勘察设计院集团有限公司 | 一种明挖隧道抗浮结构 |
CN103967022A (zh) * | 2014-05-28 | 2014-08-06 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑长边的支护装置 |
CN104032750A (zh) * | 2014-05-28 | 2014-09-10 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑短边的支护结构 |
CN104060614A (zh) * | 2013-03-20 | 2014-09-24 | 中国二十冶集团有限公司 | 一种先筑冠梁的支护桩施工方法 |
CN104762991A (zh) * | 2015-04-09 | 2015-07-08 | 济南轨道交通集团有限公司 | 一种围护桩与地下结构主体梁的连接结构及连接方法 |
CN105040729A (zh) * | 2015-06-29 | 2015-11-11 | 上海市基础工程集团有限公司 | 逆作基坑中围护灌注桩与地下室结构顶板连接处理方法 |
CN105350576A (zh) * | 2015-11-18 | 2016-02-24 | 杭州江润科技有限公司 | 地下室变高差衔接段斜向底板施工方法 |
CN105544560A (zh) * | 2016-02-03 | 2016-05-04 | 华侨大学 | 一种用于异型双排桩的梁式连接节点 |
CN106168035A (zh) * | 2016-08-17 | 2016-11-30 | 广州地铁设计研究院有限公司 | 局部装配式地下结构及地下结构的局部装配式施工方法 |
CN107090850A (zh) * | 2017-06-27 | 2017-08-25 | 中铁第四勘察设计院集团有限公司 | 一种地铁出入口敞口段侧向刚度增强结构 |
CN107386299A (zh) * | 2017-08-21 | 2017-11-24 | 中国二十冶集团有限公司 | 基坑支撑混凝土施工方法 |
CN107574925A (zh) * | 2017-08-21 | 2018-01-12 | 中铁第四勘察设计院集团有限公司 | 地铁车站主体与大跨附属底板并梁连接结构 |
CN111778998A (zh) * | 2020-08-03 | 2020-10-16 | 中建八局第三建设有限公司 | 异形冠梁兼压顶梁结构及其施工方法 |
CN111980076A (zh) * | 2020-09-16 | 2020-11-24 | 北京市政建设集团有限责任公司 | 一种隧道基坑底板抗浮固定结构及施工工艺 |
CN112252333A (zh) * | 2020-10-16 | 2021-01-22 | 浙江大东吴集团建设有限公司 | 一种用于逆作法支撑梁的安装设备及其安装方法 |
CN112900445A (zh) * | 2021-01-15 | 2021-06-04 | 广西建工集团冶金建设有限公司 | 一种地下钢筋混凝土结构的外墙施工方法 |
CN113089644A (zh) * | 2021-04-16 | 2021-07-09 | 四川能投建工集团水利水电工程有限公司 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
CN114960780A (zh) * | 2022-07-18 | 2022-08-30 | 中铁建安工程设计院有限公司 | 一种地下工程后浇梁抗浮结构及施工工艺 |
CN116043910A (zh) * | 2022-12-12 | 2023-05-02 | 中国建筑第四工程局有限公司 | 多层地下室分期施工支护桩共用与地下室连接施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117800A (zh) * | 2007-08-22 | 2008-02-06 | 浙江大学 | 一种地下工程中一桩三用的方法 |
KR20110096339A (ko) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | 피에이치씨파일로 구성된 흙막이벽을 이용한 건물 지하층 구조체의 시공방법 |
CN202347534U (zh) * | 2011-11-28 | 2012-07-25 | 大荣建设集团有限公司 | 基坑支护桩与地下室外墙之间的传力结构 |
-
2011
- 2011-11-28 CN CN201110382418XA patent/CN102383443B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117800A (zh) * | 2007-08-22 | 2008-02-06 | 浙江大学 | 一种地下工程中一桩三用的方法 |
KR20110096339A (ko) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | 피에이치씨파일로 구성된 흙막이벽을 이용한 건물 지하층 구조체의 시공방법 |
CN202347534U (zh) * | 2011-11-28 | 2012-07-25 | 大荣建设集团有限公司 | 基坑支护桩与地下室外墙之间的传力结构 |
Non-Patent Citations (2)
Title |
---|
《浙江建筑》 20050831 陈大路 "一桩三用"及半逆作法在地下结构中的应用 第22卷, 第4期 * |
陈大路: ""一桩三用"及半逆作法在地下结构中的应用", 《浙江建筑》, vol. 22, no. 4, 31 August 2005 (2005-08-31) * |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102943492A (zh) * | 2012-11-26 | 2013-02-27 | 中铁第四勘察设计院集团有限公司 | 一种明挖隧道抗浮结构 |
CN104060614A (zh) * | 2013-03-20 | 2014-09-24 | 中国二十冶集团有限公司 | 一种先筑冠梁的支护桩施工方法 |
CN104060614B (zh) * | 2013-03-20 | 2016-03-30 | 中国二十冶集团有限公司 | 一种先筑冠梁的支护桩施工方法 |
CN103967022A (zh) * | 2014-05-28 | 2014-08-06 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑长边的支护装置 |
CN104032750A (zh) * | 2014-05-28 | 2014-09-10 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑短边的支护结构 |
CN104762991A (zh) * | 2015-04-09 | 2015-07-08 | 济南轨道交通集团有限公司 | 一种围护桩与地下结构主体梁的连接结构及连接方法 |
CN104762991B (zh) * | 2015-04-09 | 2016-09-07 | 济南轨道交通集团有限公司 | 一种围护桩与地下结构主体梁的连接结构及连接方法 |
CN105040729A (zh) * | 2015-06-29 | 2015-11-11 | 上海市基础工程集团有限公司 | 逆作基坑中围护灌注桩与地下室结构顶板连接处理方法 |
CN105040729B (zh) * | 2015-06-29 | 2017-04-19 | 上海市基础工程集团有限公司 | 逆作基坑中围护灌注桩与地下室结构顶板连接处理方法 |
CN105350576B (zh) * | 2015-11-18 | 2017-12-08 | 杭州江润科技有限公司 | 地下室变高差衔接段斜向底板施工方法 |
CN105350576A (zh) * | 2015-11-18 | 2016-02-24 | 杭州江润科技有限公司 | 地下室变高差衔接段斜向底板施工方法 |
CN105544560A (zh) * | 2016-02-03 | 2016-05-04 | 华侨大学 | 一种用于异型双排桩的梁式连接节点 |
CN106168035A (zh) * | 2016-08-17 | 2016-11-30 | 广州地铁设计研究院有限公司 | 局部装配式地下结构及地下结构的局部装配式施工方法 |
CN107090850A (zh) * | 2017-06-27 | 2017-08-25 | 中铁第四勘察设计院集团有限公司 | 一种地铁出入口敞口段侧向刚度增强结构 |
CN107386299A (zh) * | 2017-08-21 | 2017-11-24 | 中国二十冶集团有限公司 | 基坑支撑混凝土施工方法 |
CN107574925A (zh) * | 2017-08-21 | 2018-01-12 | 中铁第四勘察设计院集团有限公司 | 地铁车站主体与大跨附属底板并梁连接结构 |
CN111778998A (zh) * | 2020-08-03 | 2020-10-16 | 中建八局第三建设有限公司 | 异形冠梁兼压顶梁结构及其施工方法 |
CN111980076A (zh) * | 2020-09-16 | 2020-11-24 | 北京市政建设集团有限责任公司 | 一种隧道基坑底板抗浮固定结构及施工工艺 |
CN112252333A (zh) * | 2020-10-16 | 2021-01-22 | 浙江大东吴集团建设有限公司 | 一种用于逆作法支撑梁的安装设备及其安装方法 |
CN112900445A (zh) * | 2021-01-15 | 2021-06-04 | 广西建工集团冶金建设有限公司 | 一种地下钢筋混凝土结构的外墙施工方法 |
CN113089644A (zh) * | 2021-04-16 | 2021-07-09 | 四川能投建工集团水利水电工程有限公司 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
CN114960780A (zh) * | 2022-07-18 | 2022-08-30 | 中铁建安工程设计院有限公司 | 一种地下工程后浇梁抗浮结构及施工工艺 |
CN116043910A (zh) * | 2022-12-12 | 2023-05-02 | 中国建筑第四工程局有限公司 | 多层地下室分期施工支护桩共用与地下室连接施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102383443B (zh) | 2013-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383443B (zh) | 基坑支护桩与地下室外墙之间的连接结构及施工方法 | |
CN105735325B (zh) | 一种集约化的永久支护装配式地下室结构体系及施工方法 | |
CN107313517B (zh) | 叠合墙与中间层叠合楼板连接节点 | |
CN105350573B (zh) | 一种逆作法施工中楼板施工方法 | |
CN104895089B (zh) | 地下室楼板与支护桩共同工作的永久支护体系的施工方法 | |
CN204343339U (zh) | 一种临时支撑柱防水底板 | |
CN104818728A (zh) | 一种地下室楼板与支护桩共同工作的永久支护体系 | |
CN103161176B (zh) | 主楼连体车库内塔吊基础施工方法 | |
CN112127356A (zh) | 一种干式连接的装配式格栅地下连续墙 | |
CN202347534U (zh) | 基坑支护桩与地下室外墙之间的传力结构 | |
CN112575886A (zh) | 低、多层全预制装配式混凝土结构及设计生产安装方法 | |
CN105421477A (zh) | 一种塔吊基础的施工方法 | |
CN108331367A (zh) | 筏板基础的地下室改造结构 | |
CN207934054U (zh) | 一种预制装配式筏板基础 | |
CN110821021A (zh) | 一种可以快速安装楼板 | |
KR101808833B1 (ko) | 전단보강재를 사용한 층고절감형 지하층의 기초바닥구조 및 시공방법 | |
CN104047381A (zh) | 装配整体式少筋混凝土剪力墙结构 | |
CN210122735U (zh) | 一种基于外凸式翼脚板的地下结构抗浮体系 | |
CN210163936U (zh) | 桩涵整体装配式钢骨混凝土综合管廊 | |
CN207392221U (zh) | 一种钢板屋的地基结构 | |
CN105442616A (zh) | 深基坑支护施工中淤泥质土层基坑底板换撑方法 | |
CN221218874U (zh) | 高大承台的一体式模板结构 | |
CN215253420U (zh) | 一种装配式框架建筑 | |
CN217000063U (zh) | 一种模块式排水检查井 | |
CN217758715U (zh) | 一种带抗浮措施的地下连续墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20140219 Granted publication date: 20131127 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20140310 Granted publication date: 20131127 |
|
RINS | Preservation of patent right or utility model and its discharge | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210409 Address after: 315192 No. 285 Zhonggongmiao Road, Zhonggongmiao Street, Yinzhou District, Ningbo City, Zhejiang Province Patentee after: DARONG CONSTRUCTION GROUP Co.,Ltd. Patentee after: Zhonghe Huafeng Construction Group Co.,Ltd. Address before: No.285 Zhonggongmiao Road, Yinzhou Central District, Ningbo City, Zhejiang Province Patentee before: DARONG CONSTRUCTION GROUP Co.,Ltd. Patentee before: HUAFENG CONSTRUCTION Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131127 Termination date: 20211128 |