CN102383443B - 基坑支护桩与地下室外墙之间的连接结构及施工方法 - Google Patents
基坑支护桩与地下室外墙之间的连接结构及施工方法 Download PDFInfo
- Publication number
- CN102383443B CN102383443B CN201110382418XA CN201110382418A CN102383443B CN 102383443 B CN102383443 B CN 102383443B CN 201110382418X A CN201110382418X A CN 201110382418XA CN 201110382418 A CN201110382418 A CN 201110382418A CN 102383443 B CN102383443 B CN 102383443B
- Authority
- CN
- China
- Prior art keywords
- concrete
- basement
- wall
- bracket
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382418XA CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382418XA CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102383443A CN102383443A (zh) | 2012-03-21 |
CN102383443B true CN102383443B (zh) | 2013-11-27 |
Family
ID=45823244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110382418XA Expired - Fee Related CN102383443B (zh) | 2011-11-28 | 2011-11-28 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102383443B (zh) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102943492A (zh) * | 2012-11-26 | 2013-02-27 | 中铁第四勘察设计院集团有限公司 | 一种明挖隧道抗浮结构 |
CN104060614B (zh) * | 2013-03-20 | 2016-03-30 | 中国二十冶集团有限公司 | 一种先筑冠梁的支护桩施工方法 |
CN104032750A (zh) * | 2014-05-28 | 2014-09-10 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑短边的支护结构 |
CN103967022A (zh) * | 2014-05-28 | 2014-08-06 | 德清鑫德机械有限公司 | 一种用于长条矩形基坑长边的支护装置 |
CN104762991B (zh) * | 2015-04-09 | 2016-09-07 | 济南轨道交通集团有限公司 | 一种围护桩与地下结构主体梁的连接结构及连接方法 |
CN105040729B (zh) * | 2015-06-29 | 2017-04-19 | 上海市基础工程集团有限公司 | 逆作基坑中围护灌注桩与地下室结构顶板连接处理方法 |
CN105350576B (zh) * | 2015-11-18 | 2017-12-08 | 杭州江润科技有限公司 | 地下室变高差衔接段斜向底板施工方法 |
CN105544560B (zh) * | 2016-02-03 | 2017-07-21 | 华侨大学 | 一种用于异型双排桩的梁式连接节点 |
CN106168035A (zh) * | 2016-08-17 | 2016-11-30 | 广州地铁设计研究院有限公司 | 局部装配式地下结构及地下结构的局部装配式施工方法 |
CN107090850A (zh) * | 2017-06-27 | 2017-08-25 | 中铁第四勘察设计院集团有限公司 | 一种地铁出入口敞口段侧向刚度增强结构 |
CN107574925B (zh) * | 2017-08-21 | 2022-12-23 | 中铁第四勘察设计院集团有限公司 | 地铁车站主体与大跨附属底板并梁连接结构 |
CN107386299A (zh) * | 2017-08-21 | 2017-11-24 | 中国二十冶集团有限公司 | 基坑支撑混凝土施工方法 |
CN111778998A (zh) * | 2020-08-03 | 2020-10-16 | 中建八局第三建设有限公司 | 异形冠梁兼压顶梁结构及其施工方法 |
CN111980076B (zh) * | 2020-09-16 | 2025-02-18 | 北京市政建设集团有限责任公司 | 一种隧道基坑底板抗浮固定结构及施工工艺 |
CN112252333A (zh) * | 2020-10-16 | 2021-01-22 | 浙江大东吴集团建设有限公司 | 一种用于逆作法支撑梁的安装设备及其安装方法 |
CN112900445A (zh) * | 2021-01-15 | 2021-06-04 | 广西建工集团冶金建设有限公司 | 一种地下钢筋混凝土结构的外墙施工方法 |
CN113089644A (zh) * | 2021-04-16 | 2021-07-09 | 四川能投建工集团水利水电工程有限公司 | 基坑支护桩与地下室外墙之间的连接结构及施工方法 |
CN114960780A (zh) * | 2022-07-18 | 2022-08-30 | 中铁建安工程设计院有限公司 | 一种地下工程后浇梁抗浮结构及施工工艺 |
CN116043910A (zh) * | 2022-12-12 | 2023-05-02 | 中国建筑第四工程局有限公司 | 多层地下室分期施工支护桩共用与地下室连接施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117800A (zh) * | 2007-08-22 | 2008-02-06 | 浙江大学 | 一种地下工程中一桩三用的方法 |
KR20110096339A (ko) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | 피에이치씨파일로 구성된 흙막이벽을 이용한 건물 지하층 구조체의 시공방법 |
CN202347534U (zh) * | 2011-11-28 | 2012-07-25 | 大荣建设集团有限公司 | 基坑支护桩与地下室外墙之间的传力结构 |
-
2011
- 2011-11-28 CN CN201110382418XA patent/CN102383443B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117800A (zh) * | 2007-08-22 | 2008-02-06 | 浙江大学 | 一种地下工程中一桩三用的方法 |
KR20110096339A (ko) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | 피에이치씨파일로 구성된 흙막이벽을 이용한 건물 지하층 구조체의 시공방법 |
CN202347534U (zh) * | 2011-11-28 | 2012-07-25 | 大荣建设集团有限公司 | 基坑支护桩与地下室外墙之间的传力结构 |
Non-Patent Citations (2)
Title |
---|
"一桩三用"及半逆作法在地下结构中的应用;陈大路;《浙江建筑》;20050831;第22卷(第4期);36-38 * |
陈大路."一桩三用"及半逆作法在地下结构中的应用.《浙江建筑》.2005,第22卷(第4期), |
Also Published As
Publication number | Publication date |
---|---|
CN102383443A (zh) | 2012-03-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383443B (zh) | 基坑支护桩与地下室外墙之间的连接结构及施工方法 | |
CN105735325B (zh) | 一种集约化的永久支护装配式地下室结构体系及施工方法 | |
CN108005401A (zh) | 一种既有框架结构隔震加固的柱的托换方法 | |
CN201546227U (zh) | 用于支撑基坑围护桩墙和地下室结构外墙的钢支撑梁 | |
CN204343339U (zh) | 一种临时支撑柱防水底板 | |
CN106836240B (zh) | 地下室环形支撑支护施工方法 | |
CN202347534U (zh) | 基坑支护桩与地下室外墙之间的传力结构 | |
CN105421477A (zh) | 一种塔吊基础的施工方法 | |
CN106638544A (zh) | 寒冷地区超大型钢筋混凝土生物氧化池的防渗抗裂施工方法 | |
CN112575886A (zh) | 低、多层全预制装配式混凝土结构及设计生产安装方法 | |
CN105040810B (zh) | 适用于框支剪力墙结构逆作法施工的连接节点 | |
CN105735352A (zh) | 一种基于基坑支护桩的地下室外墙装配式结构及施工方法 | |
CN106193644A (zh) | 带筏板基础建筑物的地下室改造结构 | |
CN211143050U (zh) | 预制柱与墙板的注浆式地下连续墙 | |
CN106836632B (zh) | 一种梁、楼板和预制墙板的连接结构 | |
CN205502069U (zh) | 一种基于基坑支护桩的地下室外墙装配式结构 | |
CN105133740A (zh) | 应用于村镇建筑的隔震构造及其施工方法 | |
CN205636750U (zh) | 一种集约化的永久支护装配式地下室结构体系 | |
CN211815253U (zh) | 一种路堑坡脚梁板式加固结构 | |
CN214143657U (zh) | 一种干式连接的装配式格栅地下连续墙 | |
CN212223970U (zh) | 预制盖板后浇带止水临时封闭结构 | |
CN210122735U (zh) | 一种基于外凸式翼脚板的地下结构抗浮体系 | |
CN106939586A (zh) | 一种混凝土面板堆石坝的面板结构 | |
CN207392221U (zh) | 一种钢板屋的地基结构 | |
CN207538511U (zh) | 一种钢结构别墅 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20140219 Granted publication date: 20131127 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20140310 Granted publication date: 20131127 |
|
RINS | Preservation of patent right or utility model and its discharge | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210409 Address after: 315192 No. 285 Zhonggongmiao Road, Zhonggongmiao Street, Yinzhou District, Ningbo City, Zhejiang Province Patentee after: DARONG CONSTRUCTION GROUP Co.,Ltd. Patentee after: Zhonghe Huafeng Construction Group Co.,Ltd. Address before: No.285 Zhonggongmiao Road, Yinzhou Central District, Ningbo City, Zhejiang Province Patentee before: DARONG CONSTRUCTION GROUP Co.,Ltd. Patentee before: HUAFENG CONSTRUCTION Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131127 Termination date: 20211128 |