CN102108692B - 碾压混凝土坝及其成缝方法 - Google Patents
碾压混凝土坝及其成缝方法 Download PDFInfo
- Publication number
- CN102108692B CN102108692B CN 201110000420 CN201110000420A CN102108692B CN 102108692 B CN102108692 B CN 102108692B CN 201110000420 CN201110000420 CN 201110000420 CN 201110000420 A CN201110000420 A CN 201110000420A CN 102108692 B CN102108692 B CN 102108692B
- Authority
- CN
- China
- Prior art keywords
- copper sheet
- grouting
- hole
- roller compacted
- transverse joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110000420 CN102108692B (zh) | 2011-01-04 | 2011-01-04 | 碾压混凝土坝及其成缝方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110000420 CN102108692B (zh) | 2011-01-04 | 2011-01-04 | 碾压混凝土坝及其成缝方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102108692A CN102108692A (zh) | 2011-06-29 |
CN102108692B true CN102108692B (zh) | 2012-08-01 |
Family
ID=44172964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110000420 Active CN102108692B (zh) | 2011-01-04 | 2011-01-04 | 碾压混凝土坝及其成缝方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102108692B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383398A (zh) * | 2011-10-09 | 2012-03-21 | 中国水电顾问集团西北勘测设计研究院 | 一种碾压混凝土坝诱导缝接缝灌浆排气系统及施工工艺 |
CN102590085B (zh) * | 2012-01-18 | 2013-12-25 | 清华大学 | 一种拱坝施工期横缝性态辨识方法 |
CN102677676B (zh) * | 2012-06-04 | 2014-09-24 | 中国电建集团西北勘测设计研究院有限公司 | 常态混凝土拱坝接缝灌浆槽管结合排气方法 |
CN103290808A (zh) * | 2012-08-31 | 2013-09-11 | 中国长江三峡集团公司 | 接缝灌浆系统中排气槽封口的改进新方法 |
CN103953050B (zh) * | 2014-04-14 | 2016-06-15 | 中国葛洲坝集团三峡建设工程有限公司 | 一种混凝土结合面二次灌浆装置及方法 |
CN106284211A (zh) * | 2016-07-15 | 2017-01-04 | 葛洲坝集团试验检测有限公司 | 一种提高混凝土裂缝斜孔法化学灌浆质量的方法 |
CN107894721B (zh) * | 2017-12-20 | 2023-07-18 | 清华大学 | 拱坝横缝张开时机的控制系统及方法 |
CN110206335A (zh) * | 2019-06-17 | 2019-09-06 | 董宏波 | 一种地铁车站主体结构裂缝控制修复方法 |
CN110593209B (zh) * | 2019-09-24 | 2021-01-26 | 中水北方勘测设计研究有限责任公司 | 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法 |
CN111395263B (zh) * | 2020-03-16 | 2021-11-23 | 中电建十一局工程有限公司 | 一种碾压混凝土坝体渗漏处理方法 |
CN112267344B (zh) * | 2020-10-16 | 2022-05-06 | 长沙理工大学 | 裂缝诱导件和裂缝诱导结构 |
CN114439034A (zh) * | 2020-10-30 | 2022-05-06 | 中国电建集团华东勘测设计研究院有限公司 | 用于埋置式大型振动设备地基处理的预留灌浆孔施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2270393B1 (zh) * | 1974-05-07 | 1978-12-29 | Sif Entreprise P Bachy | |
JPH09100523A (ja) * | 1995-10-09 | 1997-04-15 | Maeda Corp | 既設防波堤におけるケーソン目地の閉塞工法 |
CN1125905C (zh) * | 2001-09-07 | 2003-10-29 | 清华大学 | 碾压混凝土拱坝人工短缝结构 |
CN101560756B (zh) * | 2009-05-14 | 2011-05-04 | 中国水电顾问集团华东勘测设计研究院 | 一种碾压混凝土重力坝键槽式切缝结构及其施工方法 |
CN201962650U (zh) * | 2011-01-04 | 2011-09-07 | 中国水电顾问集团中南勘测设计研究院 | 碾压混凝土坝 |
-
2011
- 2011-01-04 CN CN 201110000420 patent/CN102108692B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102108692A (zh) | 2011-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102108692B (zh) | 碾压混凝土坝及其成缝方法 | |
CN103993615B (zh) | 一种大降深管井封堵结构及其施工方法 | |
CN202370525U (zh) | 回风立井风化基岩段井筒壁后注浆施工结构 | |
CN103526766A (zh) | 一种深基坑减压井封堵方法 | |
CN103422501A (zh) | 砂层地质中的抗浮锚杆结构及其施工方法 | |
CN108166486A (zh) | 深层埋管式预制型能源管桩及其施工工艺 | |
CN206408655U (zh) | 盖挖逆作施工的顶板侧墙结构 | |
CN204590122U (zh) | 一种带纠偏推板的成槽机液压抓斗 | |
CN104481555A (zh) | 一种穿过软弱围岩进行钻注注浆施工的方法 | |
CN204002832U (zh) | 一种盾构隧道洞门结构 | |
CN205024710U (zh) | 一种采用抗浮预应力锚索的筏板基础结构 | |
CN207904917U (zh) | 深层埋管式预制型能源管桩 | |
CN201962650U (zh) | 碾压混凝土坝 | |
CN108570982A (zh) | 一种静钻根植能量桩及其施工方法 | |
CN203855990U (zh) | 一种大降深管井封堵结构 | |
CN206646499U (zh) | 一种拉压式预应力锚索 | |
CN208363083U (zh) | 静钻根植能量桩 | |
CN206571493U (zh) | 孔口管锚固结构及孔口管 | |
CN104452788B (zh) | 尾矿库回水管道的封堵方法及装置 | |
CN106592615A (zh) | 倾斜沉井纠偏施工方法 | |
CN108978694A (zh) | 一种用于隧道内建造止水帷幕的精确制导注浆方法 | |
CN105220683B (zh) | 一种工字钢接头式地下连续墙绕流处理装置及方法 | |
CN104912057B (zh) | 地下连续墙施工方法 | |
CN204690730U (zh) | 地下连续墙骨架 | |
CN205171501U (zh) | 一种工字钢接头式地下连续墙绕流处理装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN + Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION |
|
CP03 | Change of name, title or address |
Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd. Address before: 410014, 16 camphor Road, Yuhua District, Hunan, Changsha Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp. Address after: 410014, 16 camphor Road, Yuhua District, Hunan, Changsha Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp. Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group |