CN102108692A - 碾压混凝土坝及其成缝方法 - Google Patents

碾压混凝土坝及其成缝方法 Download PDF

Info

Publication number
CN102108692A
CN102108692A CN 201110000420 CN201110000420A CN102108692A CN 102108692 A CN102108692 A CN 102108692A CN 201110000420 CN201110000420 CN 201110000420 CN 201110000420 A CN201110000420 A CN 201110000420A CN 102108692 A CN102108692 A CN 102108692A
Authority
CN
China
Prior art keywords
copper sheet
roller compacted
compacted concrete
grouting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110000420
Other languages
English (en)
Other versions
CN102108692B (zh
Inventor
冯树荣
潘江洋
张永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN 201110000420 priority Critical patent/CN102108692B/zh
Publication of CN102108692A publication Critical patent/CN102108692A/zh
Application granted granted Critical
Publication of CN102108692B publication Critical patent/CN102108692B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种碾压混凝土坝及其成缝方法,它按照常规施工工艺浇筑碾压混凝土,将竖向止浆铜片随着碾压层面的上升一起上引,上引一个升层后,在混凝土间歇期时钻诱导孔;在诱导孔内设置灌浆管路;然后在灌浆管路上方设置水平止浆铜片和竖向止浆铜片,并重复以上工序,待碾压混凝土温度下降至稳定温度后,通过灌浆管路对横缝进行灌浆,以形成传递压力和剪力的碾压混凝土横缝缝面。本发明不需要吊装设备,仓面施工简单方便,且横缝缝面能传递压力和剪力,对仓面大规模碾压混凝土的施工基本没有影响,特别适用于水利水电行业各坝段之间横缝需要传递压力或剪力的碾压混凝土坝体的成缝和碾压混凝土拱坝的成缝。

Description

碾压混凝土坝及其成缝方法
技术领域
本发明涉及一种碾压混凝土坝及其成缝方法,特别是适用于水利水电行业各坝段之间横缝需要传递压力或剪力的碾压混凝土坝体及其成缝方法,该方法也可适用于碾压混凝土拱坝的成缝。 
背景技术
一般情况下,碾压混凝土坝成缝方法有切缝、预制模板成缝两种基本的方法,早期还有过诱导孔成缝的方法。 
切缝方法一般在一个坯层碾压混凝土碾压完成后,沿着横缝用切缝机直接把该坯层混凝土沿缝切开,切缝的同时在缝内充填彩条布或锌铁皮或直接在缝内放置干砂隔缝。此种分缝方法施工方便,适用于大坝坝段之间完全独立受力,不需要相互传递压力或剪力的碾压混凝土大坝,一般较多的用于碾压混凝土重力坝。 
预制模板成缝一般适用于需要横缝传递压力或剪力的碾压混凝土,采用预制模板成缝又分为两种方法,一种为横缝两侧混凝土分为先后浇块,预制模板为常规模板,先浇块完成浇筑后,拆下预制模板,该模板可重复使用,该种成缝方式和常态混凝土完全相同,不大适用于通仓碾压混凝土的施工;另外一种为采用预制混凝土块模板,该模板分为左右两块,两块预制混凝土模板凸凹相嵌,将该模板沿横缝固定在仓面内,然后在两侧同时浇筑碾压混凝土,预制混凝土模板也一同被浇入混凝土内。该种分缝方法适用于碾压混凝土缝面需要传递压力和剪力的横缝,一般碾压混凝土拱坝使用较多。 
碾压混凝土早期还曾有过诱导孔成缝的方法,该种成缝方法在混凝土碾压后由人工打钎或风钻钻进形成,成孔后孔内填塞干砂,以免上层碾压施工时,混凝土堵塞诱导孔,该种诱导孔内填砂的成缝方式现在基本很少使用。 
在现有需要考虑横缝之间传递压力及剪力的碾压混凝土坝成缝方式中,基本采用预制混凝土块成缝的方法,但此类预制混凝土块重约0.2t,比较笨重,人工无法搬用,需要专门的吊装设备在现场安装就位,现场施工较为繁琐,而且每隔0.3m高的坯层均需码放混凝土预制块,对现场仓面内碾压混凝土的运输、平仓、碾压等工序影响较大。 
发明内容
本发明要解决的技术问题是:针对现有技术的缺陷,而提供一种即能简单易行,方便施工,又能使横缝缝面传递压力和剪力的碾压混凝土坝及其成缝方法。 
为解决上述问题,本发明所采用的技术方案是:一种碾压混凝土坝成缝方法,其特点是,包括在仓面内沿横缝临水侧设置的诱导短缝,在仓面上沿着横缝诱导孔施工的多个诱导孔,预埋在仓面上由水平止浆铜片和竖向止浆铜片所形成的呈封闭状的横缝灌浆灌区,以及设置在诱导孔内的具有进浆和排气功能、能进行循环灌浆的灌浆管路;按照常规施工工艺浇筑碾压混凝土,将竖向止浆铜片随着碾压层面的上升一起上引,上引一个升层后,在混凝土间歇期时钻诱导孔;在诱导孔内设置灌浆管路;然后在灌浆管路上方设置水平止浆铜片和竖向止浆铜片,并重复以上工序,待碾压混凝土温度下降至稳定温度后,通过灌浆管路对横缝进行灌浆,以形成传递压力和剪力的碾压混凝土横缝缝面。 
在诱导孔内插入带有进浆和排气功能、能够进行循环灌浆的灌浆管,以保证在横缝张开之后对横缝进行灌浆,形成能够传递压力和剪力的横缝缝面。 
所述灌浆管路的结构优选为,在诱导孔内插入灌浆系统套管,并封堵灌浆套管与诱导孔之间的空隙;在灌浆系统套管内插入进浆支管,并封堵进浆支管与套管之间的空隙;将进浆支管通过三通与一进浆主管连通,将灌浆套管附带的回浆支管通过三通与一回浆主管连通。 
进一步地,所述水平止浆铜片和竖向止浆铜片设置在进浆主管之上竖向止浆.竖向止浆0.5m处。 
本发明的进一步改进为,所述水平止浆铜片沿横缝预埋在仓面内,所述竖向止浆铜片与该水平止浆铜片呈“丁”形布置,且相邻两个竖向止浆铜片间距为25m-35m,优选为30m,竖向止浆铜片在碾压混凝土浇筑时一直上引,并与下一个仓面内的水平止浆铜片形成一个完整的横缝灌浆灌区。 
进一步地,所述诱导孔的直径为86mm-96mm,优选为91mm相邻两诱导孔中心间距为0.65m-0.85m,优选为0.75m,以形成邮票孔效应,来保证大坝沿着预定的横缝张开。 
所述诱导短缝由沥青衫板完全隔开。 
进一步地,本发明所述的碾压混凝土坝包括在仓面内沿横缝临水侧设置的诱导短缝,在仓面上沿着横缝诱导孔施工的多个诱导孔,预埋在仓面上由水平止浆铜片和竖向止浆铜片所形成的呈封闭状的横缝灌浆灌区,以及设置在诱导孔内的具有进浆和排气功能、能进行循环灌浆的灌浆管路;所述诱导孔内设置有灌浆管路,在灌浆管路上方设置有水平止浆铜片和竖向止浆铜片,通过灌浆管路对横缝进行灌浆,形成一个传递压力和剪力的碾压混凝土横缝缝面。 
与现有技术对比,本发明操作方便,结构简单,不需要吊装设备,仓面施工简单方便,且横缝缝面能传递压力和剪力,对仓面大规模碾压混凝土的施工基本没有影响。 
附图说明
以下结合附图和实施例对本发明做进一步的阐述。 
图1是本发明所述碾压混凝土竖向止浆铜片示意图; 
图2是本发明所述碾压混凝土水平止浆铜片示意图;
图3是本发明所述诱导孔灌浆管路布置示意图;
图4是本发明所述碾压混凝土坝一种实施例的结构示意图。
在图中: 
1-横缝;           2-诱导孔;      5-进浆主管;
6-回浆主管;       7-三通;        8-橡胶堵头;
9-出浆主管;       10-沥青杉板;   14-套管;
15-止浆铜片。
在图中: 
1-横缝;           2-诱导孔;      5-进浆主管;
6-回浆主管;       7-三通;        8-橡胶堵头;
9-出浆主管;       10-沥青杉板;   14-套管;
15-止浆铜片。
具体实施方式
如图1和2所示,沿横缝1施工的诱导孔2间距为0.75m,孔径φ91;沿横缝1水平铺设的水平止浆铜片及竖向止浆铜片厚0.6mm,铜片鼻子厚4cm,内置沥青麻丝;完整的一个横缝1灌区大约长30m左右,高10m左右;进浆主管5和回浆主管6直径均优选为50mm,进浆支管和回浆支管直径优选为33mm,进浆支管距诱导孔孔底不大于0.2m;灌浆系统套管14插入混凝土仓面以下0.5m,套管14与混凝土诱导孔之间采用棉纱堵塞,以免漏浆;进浆支管插入套管14内,进浆主管5与套管14的管壁空隙采用橡胶堵头8进行封闭。 
如图3和4所示,本发明的施工工序为:在大坝横缝1临水侧设置止浆铜片15,止浆铜片15上游采用闭孔泡沫板隔缝,止水下游采用沥青杉板10隔缝;在基础混凝土仓面顺横缝1设置水平止浆铜片,每隔30m设置与水平止浆铜片呈“丁”型设置的竖向止浆铜片;按照常规施工工艺浇筑碾压混凝土,将竖向止浆铜片随着碾压层面的上升一起上引;碾压混凝土上升10m,大约一个升层后,在混凝土间歇期在仓面内沿横缝1每隔0.75m垂直钻φ91诱导孔形成诱导孔2;在诱导孔2内插入灌浆系统套管14,并用棉纱堵塞灌浆套管14与诱导孔之间的空隙;在灌浆系统套管14内插入进浆支管,支管与套管14之间空隙采用橡胶堵头8进行封堵;将所有的进浆支管设三通7连接到进浆主管5,将灌浆套管14附带的回浆支管设三通7连接到回浆主管6;在进浆主管5之上0.5m处设置水平止浆铜片和竖向止浆铜片,重复以上工序;待碾压混凝土温度下降至稳定温度后,用进浆主管5对横缝1进行灌浆,以形成传递压力和剪力的碾压混凝土横缝1缝面。混凝土段的深度根据钻孔处碾压混凝土厚度确定。 
本发明的碾压混凝土坝及其成缝方法已用于向家坝水电站大坝碾压混凝土,该大坝坝高162m。 

Claims (10)

1.一种碾压混凝土坝成缝方法,其特征是,包括在仓面内沿横缝(1)临水侧设置的诱导短缝,在仓面上沿着横缝(1)诱导孔施工的多个诱导孔(2),预埋在仓面上由水平止浆铜片和竖向止浆铜片所形成的呈封闭状的横缝(1)灌浆灌区,以及设置在诱导孔(2)内的具有进浆和排气功能、能进行循环灌浆的灌浆管路;按照常规施工工艺浇筑碾压混凝土,将竖向止浆铜片随着碾压层面的上升一起上引,上引一个升层后,在混凝土间歇期时钻诱导孔(2);在诱导孔(2)内设置灌浆管路;然后在灌浆管路上方设置水平止浆铜片和竖向止浆铜片,并重复以上工序,待碾压混凝土温度下降至稳定温度后,通过灌浆管路对横缝(1)进行灌浆,以形成传递压力和剪力的碾压混凝土横缝(1)缝面。
2.根据权利要求1所述的碾压混凝土坝成缝方法,其特征是,所述灌浆管路的结构为,在诱导孔(2)内插入灌浆系统套管(14),并封堵灌浆套管(14)与诱导孔(2)之间的空隙;在灌浆系统套管(14)内插入进浆支管,并封堵进浆支管与套管(14)之间的空隙;将进浆支管通过三通(7)与一进浆主管(5)连通,将灌浆套管(14)附带的回浆支管通过三通(7)与一回浆主管(6)连通。
3.根据权利要求2所述的碾压混凝土坝成缝方法,其特征是,所述水平止浆铜片和竖向止浆铜片设置在进浆主管(5)之上0.5m处。
4.根据权利要求1所述的碾压混凝土坝成缝方法,其特征是,所述水平止浆铜片沿横缝(1)预埋在仓面内,所述竖向止浆铜片与该水平止浆铜片呈“丁”形布置,且相邻两个竖向止浆铜片间距为25m-35m,竖向止浆铜片在碾压混凝土浇筑时一直上引,并与下一个仓面内的水平止浆铜片形成一个完整的横缝(1)灌浆灌区。
5.根据权利要求1所述的碾压混凝土坝成缝方法,其特征是,所述诱导孔(2)的直径为86mm-96mm,相邻两诱导孔(2)中心间距为0.65m-0.85m。
6.根据权利要求1所述的碾压混凝土坝成缝方法,其特征是,所述诱导短缝由沥青衫板(10)完全隔开。
7.根据权利要求4所述的碾压混凝土坝成缝方法,其特征是,所述相邻两个竖向止浆铜片间距为30m。
8.根据权利要求5所述的碾压混凝土坝成缝方法,其特征是,所述诱导孔(2)的直径为91mm,相邻两诱导孔(2)中心间距为0.75m。
9.根据权利要求1-4之一所述的碾压混凝土坝成缝方法,其特征是,所述水平止浆铜片及竖向止浆铜片厚0.6mm,铜片鼻子厚4cm,内置沥青麻丝。
10.一种碾压混凝土坝,其特征是,包括在仓面内沿横缝(1)临水侧设置的诱导短缝,在仓面上沿着横缝(1)诱导孔施工的多个诱导孔(2),预埋在仓面上由水平止浆铜片和竖向止浆铜片所形成的呈封闭状的横缝(1)灌浆灌区,以及设置在诱导孔(2)内的具有进浆和排气功能、能进行循环灌浆的灌浆管路;所述诱导孔(2)内设置有灌浆管路,在灌浆管路上方设置有水平止浆铜片和竖向止浆铜片,通过灌浆管路对横缝(1)进行灌浆,形成一个传递压力和剪力的碾压混凝土横缝(1)缝面。
CN 201110000420 2011-01-04 2011-01-04 碾压混凝土坝及其成缝方法 Active CN102108692B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110000420 CN102108692B (zh) 2011-01-04 2011-01-04 碾压混凝土坝及其成缝方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110000420 CN102108692B (zh) 2011-01-04 2011-01-04 碾压混凝土坝及其成缝方法

Publications (2)

Publication Number Publication Date
CN102108692A true CN102108692A (zh) 2011-06-29
CN102108692B CN102108692B (zh) 2012-08-01

Family

ID=44172964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110000420 Active CN102108692B (zh) 2011-01-04 2011-01-04 碾压混凝土坝及其成缝方法

Country Status (1)

Country Link
CN (1) CN102108692B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383398A (zh) * 2011-10-09 2012-03-21 中国水电顾问集团西北勘测设计研究院 一种碾压混凝土坝诱导缝接缝灌浆排气系统及施工工艺
CN102590085A (zh) * 2012-01-18 2012-07-18 清华大学 一种拱坝施工期横缝性态辨识方法
CN102677676A (zh) * 2012-06-04 2012-09-19 中国水电顾问集团西北勘测设计研究院 常态混凝土拱坝接缝灌浆槽管结合排气技术
CN103290808A (zh) * 2012-08-31 2013-09-11 中国长江三峡集团公司 接缝灌浆系统中排气槽封口的改进新方法
CN103953050A (zh) * 2014-04-14 2014-07-30 中国葛洲坝集团三峡建设工程有限公司 一种混凝土结合面二次灌浆装置及方法
CN106284211A (zh) * 2016-07-15 2017-01-04 葛洲坝集团试验检测有限公司 一种提高混凝土裂缝斜孔法化学灌浆质量的方法
CN107894721A (zh) * 2017-12-20 2018-04-10 清华大学 拱坝横缝张开时机的控制系统及方法
CN110206335A (zh) * 2019-06-17 2019-09-06 董宏波 一种地铁车站主体结构裂缝控制修复方法
CN110593209A (zh) * 2019-09-24 2019-12-20 中水北方勘测设计研究有限责任公司 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法
CN111395263A (zh) * 2020-03-16 2020-07-10 中电建十一局工程有限公司 一种碾压混凝土坝体渗漏处理方法
CN112267344A (zh) * 2020-10-16 2021-01-26 长沙理工大学 裂缝诱导件和裂缝诱导结构
CN114439034A (zh) * 2020-10-30 2022-05-06 中国电建集团华东勘测设计研究院有限公司 用于埋置式大型振动设备地基处理的预留灌浆孔施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2519517A1 (de) * 1974-05-07 1975-11-20 Sif Entreprise Verfahren zur abdichtung zwischen den vorgefertigten platten einer im boden angeordneten wand, und vorrichtung zur durchfuehrung des verfahrens
JPH09100523A (ja) * 1995-10-09 1997-04-15 Maeda Corp 既設防波堤におけるケーソン目地の閉塞工法
CN1336466A (zh) * 2001-09-07 2002-02-20 清华大学 碾压混凝土拱坝人工短缝结构
CN101560756A (zh) * 2009-05-14 2009-10-21 中国水电顾问集团华东勘测设计研究院 一种碾压混凝土重力坝键槽式切缝结构及其施工方法
CN201962650U (zh) * 2011-01-04 2011-09-07 中国水电顾问集团中南勘测设计研究院 碾压混凝土坝

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2519517A1 (de) * 1974-05-07 1975-11-20 Sif Entreprise Verfahren zur abdichtung zwischen den vorgefertigten platten einer im boden angeordneten wand, und vorrichtung zur durchfuehrung des verfahrens
JPH09100523A (ja) * 1995-10-09 1997-04-15 Maeda Corp 既設防波堤におけるケーソン目地の閉塞工法
CN1336466A (zh) * 2001-09-07 2002-02-20 清华大学 碾压混凝土拱坝人工短缝结构
CN101560756A (zh) * 2009-05-14 2009-10-21 中国水电顾问集团华东勘测设计研究院 一种碾压混凝土重力坝键槽式切缝结构及其施工方法
CN201962650U (zh) * 2011-01-04 2011-09-07 中国水电顾问集团中南勘测设计研究院 碾压混凝土坝

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383398A (zh) * 2011-10-09 2012-03-21 中国水电顾问集团西北勘测设计研究院 一种碾压混凝土坝诱导缝接缝灌浆排气系统及施工工艺
CN102590085A (zh) * 2012-01-18 2012-07-18 清华大学 一种拱坝施工期横缝性态辨识方法
CN102677676A (zh) * 2012-06-04 2012-09-19 中国水电顾问集团西北勘测设计研究院 常态混凝土拱坝接缝灌浆槽管结合排气技术
CN102677676B (zh) * 2012-06-04 2014-09-24 中国电建集团西北勘测设计研究院有限公司 常态混凝土拱坝接缝灌浆槽管结合排气方法
CN103290808A (zh) * 2012-08-31 2013-09-11 中国长江三峡集团公司 接缝灌浆系统中排气槽封口的改进新方法
CN103953050A (zh) * 2014-04-14 2014-07-30 中国葛洲坝集团三峡建设工程有限公司 一种混凝土结合面二次灌浆装置及方法
CN106284211A (zh) * 2016-07-15 2017-01-04 葛洲坝集团试验检测有限公司 一种提高混凝土裂缝斜孔法化学灌浆质量的方法
CN107894721A (zh) * 2017-12-20 2018-04-10 清华大学 拱坝横缝张开时机的控制系统及方法
CN110206335A (zh) * 2019-06-17 2019-09-06 董宏波 一种地铁车站主体结构裂缝控制修复方法
CN110593209A (zh) * 2019-09-24 2019-12-20 中水北方勘测设计研究有限责任公司 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法
CN110593209B (zh) * 2019-09-24 2021-01-26 中水北方勘测设计研究有限责任公司 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法
CN111395263A (zh) * 2020-03-16 2020-07-10 中电建十一局工程有限公司 一种碾压混凝土坝体渗漏处理方法
CN111395263B (zh) * 2020-03-16 2021-11-23 中电建十一局工程有限公司 一种碾压混凝土坝体渗漏处理方法
CN112267344A (zh) * 2020-10-16 2021-01-26 长沙理工大学 裂缝诱导件和裂缝诱导结构
CN114439034A (zh) * 2020-10-30 2022-05-06 中国电建集团华东勘测设计研究院有限公司 用于埋置式大型振动设备地基处理的预留灌浆孔施工方法

Also Published As

Publication number Publication date
CN102108692B (zh) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102108692B (zh) 碾压混凝土坝及其成缝方法
CN103993615B (zh) 一种大降深管井封堵结构及其施工方法
CN103422501A (zh) 砂层地质中的抗浮锚杆结构及其施工方法
CN103526766A (zh) 一种深基坑减压井封堵方法
CN103790592A (zh) 一种端头土体加固系统和方法
CN206408655U (zh) 盖挖逆作施工的顶板侧墙结构
CN204185845U (zh) 一种防水桩板墙支护结构
CN204590122U (zh) 一种带纠偏推板的成槽机液压抓斗
CN202466644U (zh) 一种型钢混凝土柱式接头
CN104481555A (zh) 一种穿过软弱围岩进行钻注注浆施工的方法
CN108316950A (zh) 隧道拱顶混凝土带模回填注浆系统及其注浆方法
CN204326059U (zh) 一种软土地层地下连续墙混凝土灌注施工结构
CN201962650U (zh) 碾压混凝土坝
CN108570982A (zh) 一种静钻根植能量桩及其施工方法
CN104790380B (zh) 地下连续墙骨架
CN204690730U (zh) 地下连续墙骨架
CN108978694A (zh) 一种用于隧道内建造止水帷幕的精确制导注浆方法
CN204691255U (zh) 地下连续墙
CN205171501U (zh) 一种工字钢接头式地下连续墙绕流处理装置
CN104912057B (zh) 地下连续墙施工方法
CN104452788B (zh) 尾矿库回水管道的封堵方法及装置
CN109538823B (zh) 一种双管错位交替顶进的施工方法
CN202416875U (zh) 异型结构大体积砼浇筑用施工装置
CN206571493U (zh) 孔口管锚固结构及孔口管
CN203066077U (zh) 一种用于涌水孔灌浆封闭的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014, 16 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address after: 410014, 16 camphor Road, Yuhua District, Hunan, Changsha

Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group