CN102094456A - 一种通廊与双塔楼之间的连接方法及结构 - Google Patents

一种通廊与双塔楼之间的连接方法及结构 Download PDF

Info

Publication number
CN102094456A
CN102094456A CN200910258267XA CN200910258267A CN102094456A CN 102094456 A CN102094456 A CN 102094456A CN 200910258267X A CN200910258267X A CN 200910258267XA CN 200910258267 A CN200910258267 A CN 200910258267A CN 102094456 A CN102094456 A CN 102094456A
Authority
CN
China
Prior art keywords
vestibule
steel
corridor
building
double tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910258267XA
Other languages
English (en)
Inventor
刘丽萍
常建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN200910258267XA priority Critical patent/CN102094456A/zh
Publication of CN102094456A publication Critical patent/CN102094456A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种通廊与双塔楼之间的连接方法及结构,在双塔楼之间连接通廊时,将通廊的一端与双塔楼中的一个塔楼采用刚性连接的方式进行连接,将通廊的另一端与双塔楼中的另一个塔楼采用滚动支座的连接方式进行连接。本发明通过一种新的连接结构型式达到既保证了通廊与双塔楼结构的有效联接,从而保证通廊自身的稳定性,同时又使通廊在一定范围内可以自由变位,以避免双塔楼结构对通廊的过度约束,这样就大大减小了通廊中钢桁架构件的内力,从而可以减小其构件的尺寸和减少了钢材用量,并使整个结构的受力型式更加合理;同时还有效地避免了双塔楼结构出现更大变位时对通廊的钢结构所造成的破坏。

Description

一种通廊与双塔楼之间的连接方法及结构
技术领域
本发明涉及一种通廊与双塔楼之间的连接方法及结构,属于塔楼之间通廊连接技术领域。
背景技术
在现代建筑中,高层建筑结构经常以双塔楼的型式出现,双塔结构各成体系,同时为了便于双塔楼之间的通行,常在双塔楼结构间设置通廊与双塔楼的连接通廊的支架常采用钢结构型式,而通廊支架与双塔楼的连接型式目前采用的方法均为刚性连接型式。采用这种刚性连接的方法,虽然具有通廊与双塔楼的联接可靠的优点,但是,由于双塔楼结构体型庞大,其自身的刚度也很大,因此当采用该种刚接联接时,双塔楼结构的微小变位就会给与之连接的通廊钢结构支架带来很大的内力作用,这样钢结构支架中各构件的截面就必须做的较大,以保证足够的抵抗力,这样就势必造成了材料的浪费,同时一旦双塔楼结构出现更大的变位时还有可能对通廊的钢结构支架造成破坏。因此现有的通廊与双塔楼之间的连接方式还是不够理想。
发明内容
本发明的目的是:提供一种结构合理、使用安全可靠、既能减少通廊的钢材用量、又能提高通廊自身稳定性的通廊与双塔楼之间的连接方法及结构,从而克服现有技术的不足。
本发明是这样实现的:本发明的一种通廊与双塔楼之间的连接方法为,在双塔楼之间连接通廊时,将通廊支架底部的一端与双塔楼中的一个塔楼采用刚性连接的方式进行连接,将通廊支架底部的另一端与双塔楼中的另一个塔楼采用滚动支座的方式进行连接,并且将通廊支架上部两端都分别通过Z字型钢折板与通廊两端的塔楼连接。
用于本发明方法的一种通廊与双塔楼之间的连接结构为:包括塔楼和在两个塔楼之间连接有通廊,其通廊的支架由两榀钢桁架和连接钢梁相互连接组成,两榀钢桁架的下弦的同一端固定在同一个塔楼上,即两榀钢桁架的下弦的同一端与同一个塔楼采用刚性连接;两榀钢桁架的下弦的另一端通过滚动支座与另一个塔楼连接;在每榀钢桁架的上弦两端的部位上连接有Z字型钢折板,并且每榀钢桁架的上弦两端都通过Z字型钢折板分别与两端的塔楼连接。
上述Z字型钢折板的一端连接在与钢桁架的上弦相连接的桁架垂直支撑或系杆上。
在上述与塔楼连接的Z字型钢折板的一端上连接有型钢,在型钢的顶端固定有可埋设在塔楼中的埋件。
由于采用了上述技术方案,本发明通过一种新的连接结构型式达到既保证了通廊与双塔楼结构的有效联接,从而保证通廊自身的稳定性,同时又使通廊在一定范围内可以自由变位,以避免双塔楼结构对通廊的过度约束,这样就大大减小了通廊中钢桁架构件的内力,从而可以减小其构件的尺寸和减少了钢材用量,并使整个结构的受力型式更加合理;同时还有效地避免了双塔楼结构出现更大变位时对通廊的钢结构所造成的破坏。因此,本发明与现有技术相比,本发明不仅具有通廊的钢材用量少、通廊自身稳定性高的优点,而且还具有通廊的连接结构合理、使用安全可靠、寿命长等优点。
附图说明
图1为本发明的结构示意图;
图2为图1的俯视结构示意图;
图3为图1的A部局部放大结构示意图;
图4为图2的B部局部放大结构示意图;
图5为图4的俯视结构示意图。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明,但不作为对本发明的限制。
本发明的实施例:在建筑双塔楼之间的连接通廊时,采用本发明的一种通廊与双塔楼之间的连接方法进行连接,即将通廊支架底部的一端与双塔楼中的一个塔楼采用传统的刚性连接的方式进行连接,将通廊支架底部的另一端与双塔楼中的另一个塔楼采用滚动支座的连接方式进行连接,并且将通廊支架上部两端都分别通过Z字型钢折板与通廊两端的塔楼进行连接连接。具体实施本发明的方法时,最好采用本发明一种通廊与双塔楼之间的连接结构进行实施,如图1-4所示,即在现有的两个塔楼1之间连接通廊时,其通廊的支架由两榀钢桁架2和连接钢梁3相互连接组成,连接钢梁3水平地连接在两榀钢桁架2的下弦之间和上弦之间,钢桁架2的结构为传统结构,即由上弦、下弦和腹杆连接组成;将两榀钢桁架2的下弦的同一端按传统方式固定在同一个塔楼1上,即将两榀钢桁架2的下弦的同一端与同一个塔楼1进行刚性连接;将两榀钢桁架2的下弦的另一端通过滚动支座4与另一个塔楼1连接;在每榀钢桁架2的上弦两端的部位上连接上Z字型钢折板5,Z字型钢折板5采用厚度为8~15mm厚的钢板制作,其Z字型钢折板5的每个弯折角度一般为30~45度之间,可将Z字型钢折板5的一端连接在与钢桁架2的上弦相连接的桁架垂直支撑或系杆6上;然后将每榀钢桁架2的上弦两端都通过Z字型钢折板5分别与两端的塔楼1连接上,为了连接更加方便和可靠,在每个与塔楼1连接的Z字型钢折板5的一端上通过焊接的方式连接一个型钢7,型钢7的长度可根据钢桁架2与塔楼1主体结构间的距离进行调整,然后将型钢7的顶端焊接在埋设在塔楼1主体结构中的埋件8上即成。

Claims (3)

1.一种通廊与双塔楼之间的连接方法,其特征在于:在双塔楼之间连接通廊时,将通廊支架底部的一端与双塔楼中的一个塔楼采用刚性连接的方式进行连接,将通廊支架底部的另一端与双塔楼中的另一个塔楼采用滚动支座的方式进行连接,并且将通廊支架上部两端都分别通过Z字型钢折板与通廊两端的塔楼连接。
2.一种通廊与双塔楼之间的连接结构,包括塔楼(1)和在两个塔楼(1)之间连接有通廊,其特征在于:通廊的支架由两榀钢桁架(2)和连接钢梁(3)相互连接组成,两榀钢桁架(2)的下弦的同一端固定在同一个塔楼(1)上,即两榀钢桁架(2)的下弦的同一端与同一个塔楼(1)刚性连接;两榀钢桁架(2)的下弦的另一端通过滚动支座(4)与另一个塔楼(1)连接;在每榀钢桁架(2)的上弦两端的部位上连接有Z字型钢折板(5),并且每榀钢桁架(2)的上弦两端都通过Z字型钢折板(5)分别与两端的塔楼(1)连接。
3.根据权利要求2所述的通廊与双塔楼之间的连接结构,其特征在于:Z字型钢折板(5)的一端连接在与钢桁架(2)的上弦相连接的桁架垂直支撑或系杆(6)上。
CN200910258267XA 2009-12-14 2009-12-14 一种通廊与双塔楼之间的连接方法及结构 Pending CN102094456A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910258267XA CN102094456A (zh) 2009-12-14 2009-12-14 一种通廊与双塔楼之间的连接方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910258267XA CN102094456A (zh) 2009-12-14 2009-12-14 一种通廊与双塔楼之间的连接方法及结构

Publications (1)

Publication Number Publication Date
CN102094456A true CN102094456A (zh) 2011-06-15

Family

ID=44127705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910258267XA Pending CN102094456A (zh) 2009-12-14 2009-12-14 一种通廊与双塔楼之间的连接方法及结构

Country Status (1)

Country Link
CN (1) CN102094456A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184803A (zh) * 2011-12-27 2013-07-03 贵阳铝镁设计研究院有限公司 一种减少通廊温度应力的方法及结构
CN103437423A (zh) * 2013-08-09 2013-12-11 广州市设计院 钢桁架的可控型定量释放连接方法及连接结构
CN106567542A (zh) * 2015-10-10 2017-04-19 五冶集团上海有限公司 一种超高层双塔楼钢结构连廊组装方法
CN109603185A (zh) * 2018-12-28 2019-04-12 中国二冶集团有限公司 两精馏塔平台间的过道安装方法
CN115075379A (zh) * 2022-08-02 2022-09-20 机械工业第六设计研究院有限公司 空中连廊与两侧塔楼的连接安装方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816164Y (zh) * 2005-07-26 2006-09-13 浙江耀江建设集团股份有限公司 现浇钢筋砼空中连廊
CN201007040Y (zh) * 2007-01-18 2008-01-16 广州大学 连廊柔性连接支座
JP2009019394A (ja) * 2007-07-11 2009-01-29 Dooei Gaiso Kk 渡り通路

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816164Y (zh) * 2005-07-26 2006-09-13 浙江耀江建设集团股份有限公司 现浇钢筋砼空中连廊
CN201007040Y (zh) * 2007-01-18 2008-01-16 广州大学 连廊柔性连接支座
JP2009019394A (ja) * 2007-07-11 2009-01-29 Dooei Gaiso Kk 渡り通路

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王春光,范重,应芬芳: "北京中关村金融中心连廊结构设计", 《建筑结构》 *
蒋莼秋: "对架空连廊抗震设计的探讨", 《建筑结构》 *
郑毅敏,徐文华,王建峰,陆燕: "多塔楼连体建筑的高空连廊结构设计", 《建筑结构》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184803A (zh) * 2011-12-27 2013-07-03 贵阳铝镁设计研究院有限公司 一种减少通廊温度应力的方法及结构
CN103437423A (zh) * 2013-08-09 2013-12-11 广州市设计院 钢桁架的可控型定量释放连接方法及连接结构
CN103437423B (zh) * 2013-08-09 2017-02-08 广州市设计院 钢桁架的可控型定量释放连接方法及可控定量释放连接结构
CN106567542A (zh) * 2015-10-10 2017-04-19 五冶集团上海有限公司 一种超高层双塔楼钢结构连廊组装方法
CN106567542B (zh) * 2015-10-10 2019-01-11 五冶集团上海有限公司 一种超高层双塔楼钢结构连廊组装方法
CN109603185A (zh) * 2018-12-28 2019-04-12 中国二冶集团有限公司 两精馏塔平台间的过道安装方法
CN115075379A (zh) * 2022-08-02 2022-09-20 机械工业第六设计研究院有限公司 空中连廊与两侧塔楼的连接安装方法
CN115075379B (zh) * 2022-08-02 2023-11-17 机械工业第六设计研究院有限公司 空中连廊与两侧塔楼的连接安装方法

Similar Documents

Publication Publication Date Title
CN202248298U (zh) 型钢混凝土框架节点
CN207377121U (zh) 混凝土楼板的支模结构
CN202324340U (zh) 组合式巨型钢管桁架
CN102094456A (zh) 一种通廊与双塔楼之间的连接方法及结构
CN101392600A (zh) 桁架式钢梁加固结构
CN201116267Y (zh) 一种内爬塔吊的外挂支承装置
CN101748796B (zh) 大跨度特重型钢结构厂房结构及其设计方法
CN103015596A (zh) 可拆装式钢结构平台及其构造方法
CN101397814A (zh) 超大抽柱柱距处厂房屋面系统的支撑方法
CN202116984U (zh) 空间钢管桁架连续梁拖拉可调横撑装置
CN201588305U (zh) 一种通廊与双塔楼之间的连接结构
CN110143529B (zh) 一种变截面桁架式塔式起重机超长附着施工方法
CN203034345U (zh) 一种整体连续钢桁架的输煤栈桥
CN207177086U (zh) 一种可快速装配架设的桁架
CN204357003U (zh) 鱼腹式大跨度空腹桁架结构
CN207686133U (zh) 一种装配式桁架檩条系统
CN206616765U (zh) 大跨度无依附巨型带状桁架拉杆
CN205663282U (zh) 一种大容量轻型格构式钢柱
CN114195007A (zh) 一种半圆弧结构大梁及其制作方法
CN110469130B (zh) 管桁架梁和管桁架柱法兰盘安装模具及安装方法
CN209260529U (zh) 一种新型组合式桁梁
CN209685126U (zh) 一种钢连廊整体提升吊耳装置
CN203096595U (zh) 一种预应力钢管混凝土组合桁梁
CN201443161U (zh) 一种重工业用大跨度屋面空间管桁架结构
CN206370239U (zh) 一种桥梁结构模型装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110615