CN201116267Y - 一种内爬塔吊的外挂支承装置 - Google Patents
一种内爬塔吊的外挂支承装置 Download PDFInfo
- Publication number
- CN201116267Y CN201116267Y CNU2007200755149U CN200720075514U CN201116267Y CN 201116267 Y CN201116267 Y CN 201116267Y CN U2007200755149 U CNU2007200755149 U CN U2007200755149U CN 200720075514 U CN200720075514 U CN 200720075514U CN 201116267 Y CN201116267 Y CN 201116267Y
- Authority
- CN
- China
- Prior art keywords
- core tube
- tower crane
- building core
- climbing tower
- bearer frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 3
- 239000002184 metal Substances 0.000 abstract 2
- 230000002457 bidirectional effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型涉及一种内爬塔吊的外挂支承装置。其特征在于:在建筑物核心筒的外表面上安装有两根垂直外伸承重梁的支承框架,支承框架由连接建筑物核心筒外侧的斜拉杆连接外侧端点,支承框架两侧用水平杆连接建筑物核心筒,保持水平方向稳定,在建筑物核心筒的外表面上的支承框架至少有两组,内爬塔吊的底座连接在下面的支承框架上,上面的支承框架扶持内爬塔吊。斜拉杆由若干节钢带构成,两节钢带之间由连接板及销轴连接。支承框架由双向铰装置连接建筑物核心筒外侧,本实用新型的优点是使内爬塔吊能随着建筑物的高度的增加逐渐升高,并且可以不管建筑物核心筒平面尺寸大小,依靠建筑物核心筒的外壁即可满足塔吊的安装和爬升空间的需要。
Description
技术领域
本实用新型涉及一种内爬塔吊的支承结构,特别是一种内爬塔吊的外挂支承装置。
背景技术
目前一般框筒结构的超高层建筑物,其塔吊多采用内爬形式,布置在建筑物内部,而且大多借用电梯井,这样能够绕回转轴线回转很大的角度,工作覆盖面积大,而且能随着建筑物的高度的增加逐渐升高。但是根据现代城市建设的需要,一些建筑物核心筒的平面尺寸较小,不能够满足塔吊的安装和爬升空间的需要。如果勉强布置进去,则可能会影响核心筒的完整性和正常施工。
发明内容
本实用新型的目的是解决现有技术中因建筑物核心筒的平面尺寸较小,塔吊无法在核心筒内安装和爬升的问题,提供一种内爬塔吊的外挂支承装置。本实用新型设计一种内爬塔吊的外挂支承装置,其特征在于:在建筑物核心筒的外表面上安装有两根垂直外伸承重梁的支承框架,支承框架由连接建筑物核心筒外侧的斜拉杆连接外侧端点,支承框架两侧用水平杆连接建筑物核心筒,保持水平方向稳定,在建筑物核心筒的外表面上的支承框架至少有两组,内爬塔吊的底座连接在下面的支承框架上,上面的支承框架扶持内爬塔吊。斜拉杆由若干节钢带构成,两节钢带之间由连接板及销轴连接。支承框架由双向铰装置连接建筑物核心筒外侧,双向铰装置由竖销座、竖销轴、十字销座和横销孔构成,竖销座焊接在建筑物核心筒外壁上,竖销座上下板上有销孔,在销孔中由竖销轴连接放置在上下板之间的十字销座,竖销轴位于十字销座的轴孔内,十字销座上有横销孔,支承框架由轴销连接横销孔。在建筑物核心筒的外表面上的支承框架可以有三组。本实用新型的优点是使内爬塔吊能随着建筑物的高度的增加逐渐升高,并且可以不管建筑物核心筒平面尺寸大小,依靠建筑物核心筒的外壁即可满足塔吊的安装和爬升空间的需要。
附图说明
附图1为本实用新型的结构示意图,
附图2为本实用新型图1的俯视结构示意图,
附图3为本实用新型的斜拉条连接示意图,
附图4为本实用新型的双向铰结构,
下面结合附图和实施例对本实用新型作详细说明,
具体实施方式
图中,在建筑物核心筒1的外表面上安装有两根垂直外伸承重梁2的支承框架3,支承框架3由连接建筑物核心筒1外侧的斜拉杆4连接外侧端点,支承框架3两侧用水平杆5连接建筑物核心筒1,保持水平方向稳定,在建筑物核心筒1的外表面上的支承框架3至少有两组,内爬塔吊6的底座连接在下面的支承框架3上,上面的支承框架3扶持内爬塔吊6。斜拉杆4由若干节钢带7构成,两节钢带7之间由连接板8及销轴9连接。支承框架3由双向铰装置10连接建筑物核心筒1外侧,双向铰装置10由竖销座11、竖销轴12、十字销座13和横销孔14构成,竖销座11焊接在建筑物核心筒1外壁上,竖销座11上下板上有销孔15,在销孔15中由竖销轴12连接放置在上下板之间的十字销座13,竖销轴12位于十字销座13的轴孔16内,十字销座13上有横销孔14,支承框架3由轴销17连接横销孔14。在建筑物核心筒1的外表面上的支承框架3可以有三组。
支承框架3由两根垂直外伸承重梁2组成,承重梁2的一端是连在建筑物核心筒1的混凝土筒上的,一端被斜拉杆4拉住。由于支承框架3的承重梁2与建筑物核心筒1的混凝土连接端会产成两个方向的较大的弯矩,这样将影响混凝土的受力,考虑在这个连接点上添加一个双向铰装置10。双向铰装置10能将两个方向的部分弯矩释放掉,从而改善核心筒和主梁根部的受力。通过轴销17与承重梁2连接,这样的结构通过轴销17将固接结构变成了铰接结构改善了节点的受力情况。
如内爬塔吊6仅是安装在建筑物核心筒1外壁上,可以只安装两组支承框架3,并别安装所需的斜拉条4和水平杆5就可以完成吊装工作,而当内爬塔吊6需要爬升时,必须要同时安装好三组支承框架3及其斜拉条4和水平杆5,最下面一组作为初始的内爬塔吊6的底部支承,中间的作为内爬后的底座支承,而最上面的一组作为扶持内爬塔吊6在爬升及以后的稳定。
Claims (4)
1、一种内爬塔吊的外挂支承装置,其特征在于:在建筑物核心筒的外表面上安装有两根垂直外伸承重梁的支承框架,支承框架由连接建筑物核心筒外侧的斜拉杆连接外侧端点,支承框架两侧用水平杆连接建筑物核心筒,在建筑物核心筒的外表面上的支承框架至少有两组,内爬塔吊的底座连接在下面的支承框架上,上面的支承框架扶持内爬塔吊。
2、按权利要求1所述的一种内爬塔吊的外挂支承装置,其特征在于:斜拉杆由若干节钢带构成,两节钢带之间由连接板及销轴连接。
3、按权利要求1所述的一种内爬塔吊的外挂支承装置,其特征在于:支承框架由双向铰装置连接建筑物核心筒外侧,双向铰装置由竖销座、竖销轴、十字销座和横销孔构成,竖销座焊接在建筑物核心筒外壁上,竖销座上下板上有销孔,在销孔中由竖销轴连接放置在上下板之间的十字销座,竖销轴位于十字销座的轴孔内,十字销座上有横销孔,支承框架由轴销连接横销孔。
4、按权利要求1所述的一种内爬塔吊的外挂支承装置,其特征在于:在建筑物核心筒的外表面上的支承框架可以有三组。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200755149U CN201116267Y (zh) | 2007-10-17 | 2007-10-17 | 一种内爬塔吊的外挂支承装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200755149U CN201116267Y (zh) | 2007-10-17 | 2007-10-17 | 一种内爬塔吊的外挂支承装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201116267Y true CN201116267Y (zh) | 2008-09-17 |
Family
ID=39990841
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2007200755149U Expired - Fee Related CN201116267Y (zh) | 2007-10-17 | 2007-10-17 | 一种内爬塔吊的外挂支承装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201116267Y (zh) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102431906A (zh) * | 2010-09-29 | 2012-05-02 | 上海市机械施工有限公司 | 自适应塔吊外挂爬升支承结构 |
| CN102787720A (zh) * | 2011-05-20 | 2012-11-21 | 上海庞源机械租赁股份有限公司 | 一种外附内装的塔式起重机固定结构 |
| CN103935908A (zh) * | 2014-03-31 | 2014-07-23 | 浙江海洋学院 | 起重船 |
| CN105923554A (zh) * | 2016-05-10 | 2016-09-07 | 朱德仲 | 一种工业塔机交错轴联接器 |
| CN106219419A (zh) * | 2016-09-19 | 2016-12-14 | 中国建筑第八工程局有限公司 | 超高层建筑大型动臂塔吊原位由内爬转换为外挂施工方法 |
| CN107298391A (zh) * | 2017-08-15 | 2017-10-27 | 中国建筑第八工程局有限公司 | 塔吊附墙结构及其施工方法 |
| CN110116966A (zh) * | 2019-06-18 | 2019-08-13 | 上海建工四建集团有限公司 | 一种动臂塔机爬升梁装置及其使用方法 |
| CN112010203A (zh) * | 2020-08-11 | 2020-12-01 | 新昌县南明街道益华机械厂 | 一种塔式起重机的稳定防晃动装置 |
-
2007
- 2007-10-17 CN CNU2007200755149U patent/CN201116267Y/zh not_active Expired - Fee Related
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102431906A (zh) * | 2010-09-29 | 2012-05-02 | 上海市机械施工有限公司 | 自适应塔吊外挂爬升支承结构 |
| CN102787720A (zh) * | 2011-05-20 | 2012-11-21 | 上海庞源机械租赁股份有限公司 | 一种外附内装的塔式起重机固定结构 |
| CN103935908A (zh) * | 2014-03-31 | 2014-07-23 | 浙江海洋学院 | 起重船 |
| CN103935908B (zh) * | 2014-03-31 | 2017-05-24 | 浙江海洋学院 | 起重船 |
| CN105923554A (zh) * | 2016-05-10 | 2016-09-07 | 朱德仲 | 一种工业塔机交错轴联接器 |
| CN106219419A (zh) * | 2016-09-19 | 2016-12-14 | 中国建筑第八工程局有限公司 | 超高层建筑大型动臂塔吊原位由内爬转换为外挂施工方法 |
| CN106219419B (zh) * | 2016-09-19 | 2018-02-06 | 中国建筑第八工程局有限公司 | 超高层建筑大型动臂塔吊原位由内爬转换为外挂施工方法 |
| CN107298391A (zh) * | 2017-08-15 | 2017-10-27 | 中国建筑第八工程局有限公司 | 塔吊附墙结构及其施工方法 |
| CN107298391B (zh) * | 2017-08-15 | 2019-06-14 | 中国建筑第八工程局有限公司 | 塔吊附墙结构及其施工方法 |
| CN110116966A (zh) * | 2019-06-18 | 2019-08-13 | 上海建工四建集团有限公司 | 一种动臂塔机爬升梁装置及其使用方法 |
| CN112010203A (zh) * | 2020-08-11 | 2020-12-01 | 新昌县南明街道益华机械厂 | 一种塔式起重机的稳定防晃动装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201116267Y (zh) | 一种内爬塔吊的外挂支承装置 | |
| CN103243654B (zh) | 斜拉桥钢锚梁的安装方法及所使用的拼装胎架和索塔安装平台 | |
| CN201176728Y (zh) | 拉索自立塔体和机房一体化通信铁塔 | |
| CN101633483B (zh) | 一种钢结构网架整体提升装置 | |
| CN205531399U (zh) | 一种高位钢桁架分段安装临时支撑架 | |
| CN112323978B (zh) | 一种转角悬挑结构及建筑结构 | |
| CN221810709U (zh) | 一种吊篮外墙施工装置 | |
| CN204624885U (zh) | 一种升降机的标准节支撑底盘 | |
| CN209353366U (zh) | 塔吊基础转换件 | |
| CN218912360U (zh) | 地下室加固结构 | |
| CN218092205U (zh) | 一种地下室顶板液压回顶装置 | |
| CN217732445U (zh) | 一种依附于不等高混凝土柱的双吊点提升支架 | |
| CN216444913U (zh) | 一种传力于既有柱且设置在楼板间的塔吊结构 | |
| CN217378583U (zh) | 具有主塔塔柱横撑功能的横梁支架结构 | |
| CN216007760U (zh) | 一种无配重超高吊篮悬挂装置 | |
| CN112520602B (zh) | 一种新型超长桁架式塔机附着装置 | |
| CN109797964A (zh) | 一种集成塔吊的顶升平台系统 | |
| CN210946527U (zh) | 复合型装配式桥梁悬臂施工托架 | |
| CN115535878A (zh) | 超高层建筑大型动臂塔吊原位由外挂转换为内爬施工方法 | |
| CN102535693B (zh) | 幕墙柱安装方法及安装装置 | |
| CN221972936U (zh) | 一种适用于钢结构大跨度高空悬挑施工操作台 | |
| CN223397287U (zh) | 一种超薄高强混凝土集成卫生间吊装的吊装梁装置 | |
| CN218149652U (zh) | 一种用于高空悬挑结构的悬挑型钢支模架 | |
| CN215594989U (zh) | 用于梁板上方超重结构预拼装的支撑胎架 | |
| CN222922723U (zh) | 一种施工电梯非标附着结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080917 Termination date: 20161017 |