CN102029526B - 大型机架结构 - Google Patents
大型机架结构 Download PDFInfo
- Publication number
- CN102029526B CN102029526B CN201010616010XA CN201010616010A CN102029526B CN 102029526 B CN102029526 B CN 102029526B CN 201010616010X A CN201010616010X A CN 201010616010XA CN 201010616010 A CN201010616010 A CN 201010616010A CN 102029526 B CN102029526 B CN 102029526B
- Authority
- CN
- China
- Prior art keywords
- type
- type assembly
- cross key
- pull bar
- assemblys
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本发明公开了一种重型机械行业使用的大型机架结构,其具有可承受10万吨以上载荷的特点。该大型机架结构,包括偶数个C型组合体,每个C型组合体均采用多块C型板组合形成,两C型组合体正面对接形成机架内部空间,C型组合体背面设置有将C型组合体夹紧的夹紧机构,每个C型组合体侧面设置有将C型板预紧的预紧机构。由于采用多个件组合形成本发明的大型机架结构,在制造时,该大型机架的各部件可分别制造,从而可解决大型机架制造难的技术问题;而在该大型机架结构上设置的侧机架结构,可提高整个机架的纵向刚度,尤其适合在需要承载10万吨以上的大型机架结构上推广应用。
Description
技术领域
本发明涉及一种机架,具体涉及一种重型机械行业使用的大型机架结构。
背景技术
目前,重型机械行业的一股大型机架结构,是由左右两片整体机架组成,或由左右两片预紧机架组成,或由两梁四柱预紧机架组成,或其他形式机架组成。而多采用整体机架结构,但对于要承受10万吨以上载荷的超大型机架而言,没有相应的设备来成型该整体机架,造成了超大型机架的生产空白。
发明内容
本发明所要解决的技术问题是提供一种可承受10万吨以上载荷的大型机架结构。
本发明解决其技术问题所采用的技术方案是:大型机架结构,包括偶数个C型组合体,每个C型组合体均采用多块C型板组合形成,两C型组合体正面对接形成机架内部空间,C型组合体背面设置有将C型组合体夹紧的夹紧机构,每个C型组合体侧面设置有将C型板预紧的预紧机构。
进一步的是,在正面对接的两C型组合体之间设置有上十字键梁与下十字键梁,上十字键梁设置在正面对接的两C型组合体的上部对接面处,下十字键梁设置在正面对接的两C型组合体的下部对接面处,C型板组合体正面设置有上卡槽与下卡槽,所述上十字键梁配合在上卡槽内,下十字键梁配合在下卡槽内。
作为优选技术方案,所述夹紧机构包括夹紧梁、夹紧拉杆与夹紧螺母,夹紧梁配合在各C型组合体背面的上部与下部,夹紧拉杆穿过夹紧梁,夹紧螺母螺纹连接在夹紧拉杆两端将C型组合体夹紧在夹紧梁之间。
进一步的是,在C型组合体背面上部与下部均设置有承接槽,C型组合体背面上部的夹紧梁配合在上部承接槽内,C型组合体背面下部的夹紧梁配合在下部承接槽内。
进一步的是,位于C型组合体背面上部且与上十字键梁位置对应的夹紧拉杆穿过上十字键梁。
进一步的是,在C型组合体背面设置有侧机架,所述侧机架固定连接在C型组合体背面的上部与下部夹紧梁之间。
作为优选技术方案,所述预紧机构包括设置在上部的隔梁、上预紧拉杆与上预紧螺母,设置在下部的船型梁、下预紧拉杆与下预紧螺母;隔梁设置在相邻两个C型组合体的上部侧面之间,上预紧拉杆穿过C型组合体与隔梁,上预紧螺母螺纹连接在上预紧拉杆两端,船型梁的两侧设置在相邻两个C型组合体的下部侧面之间,船型梁的两端固定连接在侧机架上,下预紧拉杆穿过C型组合体,下预紧螺母螺纹连接在下预紧拉杆两端。
进一步的是,所述C型组合体具有四个而形成两组正面对接的C型组合体,上十字键梁设置为一个并配合在两组正面对接的C型组合体的上卡槽内,下十字键梁设置为两个,每组正面对接的C型组合体的下卡槽内均配合有一个下十字键梁,所述船型梁的两侧分别固定在两个下十字键梁上。
进一步的是,每个C型组合体由五块C型板组合形成,每块C型板均采用多块钢板焊接组合形成。
本发明的有益效果是:由于采用多个件组合形成本发明的大型机架结构,在制造时,该大型机架的各部件可分别制造,从而可解决大型机架制造难的技术问题;而在该大型机架结构上设置的侧机架结构,可提高整个机架的纵向刚度(沿C型板板厚方向),尤其适合在需要承载10万吨以上的大型机架结构上推广应用。
附图说明
图1为本发明的结构示意图;
图2为图1的侧视图;
图3为图1的俯视图;
图4为C型板的结构示意图。
图中标记为:C型板1、机架内部空间2、隔梁3、夹紧梁4、夹紧拉杆5、夹紧螺母6、上预紧拉杆7、上预紧螺母8、上十字键梁9、上卡槽10、侧机架11、船型梁12、下十字键梁13、下卡槽14、下预紧拉杆15、下预紧螺母16、承接槽17。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
如图1至图4所示,本发明的大型机架结构,包括偶数个C型组合体,每个C型组合体均采用多块C型板1组合形成,两C型组合体正面对接形成机架内部空间2,C型组合体背面设置有将C型组合体夹紧的夹紧机构,每个C型组合体侧面设置有将C型板1预紧的预紧机构。在制造时,首先制造出组成该大型机架结构的各部件,然后将多个C型板1(如图4所示)组成C型组合体,并使两两C型组合体正面对接形成机架内部空间2,然后利用夹紧机构将两两正面对接的C型组合体夹紧,利用预紧机构将多个C型板1预紧为一个C型组合体,同时也将侧面相邻的两C型组合体相互预紧,在夹紧机构与预紧机构的操作完成后,即可形成一个完成的机架结构。由于采用多个件组合形成本发明的大型机架结构,在制造时,该大型机架的各部件可分别制造,从而可解决大型机架制造难的技术问题。
为提高本发明的大型机架结构的受力可靠性,在正面对接的两C型组合体之间设置有上十字键梁9与下十字键梁13,上十字键梁9设置在正面对接的两C型组合体的上部对接面处,下十字键梁13设置在正面对接的两C型组合体的下部对接面处,C型板组合体正面设置有上卡槽10与下卡槽14,所述上十字键梁9配合在上卡槽10内,下十字键梁13配合在下卡槽14内。工作过程中,上十字键梁9受力,由于设置在正面对接的两C型组合体的上部对接面处,可将力传递到整个机架结构;同样,下十字键梁13受力时,也可以将力传递到整个机架。
在以上的实施方式中,夹紧机构可采用一切可将正面对接的C型组合体夹紧的装置,如采用卡环结构等。作为优选方式,所述夹紧机构包括夹紧梁4、夹紧拉杆5与夹紧螺母6,夹紧梁4配合在各C型组合体背面的上部与下部,夹紧拉杆5穿过夹紧梁4,夹紧螺母6螺纹连接在夹紧拉杆5两端将C型组合体夹紧在夹紧梁4之间。装配时,将夹紧拉杆5穿过夹紧梁4,然后将夹紧螺母6旋紧在夹紧拉杆5上,即可将夹紧梁4夹紧在正面对接的C型组合体背面,即使得C型组合体被夹紧梁4夹紧。夹紧梁4可直接配合在C型组合体背面,作为优选方式,在C型组合体背面上部与下部均设置有承接槽17,C型组合体背面上部的夹紧梁4配合在上部承接槽17内,C型组合体背面下部的夹紧梁4配合在下部承接槽17内。则装配时,可将夹紧梁4放置到承接槽17内,方便将夹紧梁4夹紧在C型组合体外。为更好提高整个机架的承载能力,夹紧拉杆5除穿过夹紧梁4外,所述位于C型组合体背面上部且与上十字键梁9位置对应(如图3所示,中间两根夹紧拉杆5与上十字键梁9对应设置)的夹紧拉杆5还穿过上十字键梁9。使得上十字键梁9受力过程中,可更好将力传递到整个机架。
为提高整个机架的纵向刚度(沿C型板板厚方向),在C型组合体背面设置有侧机架11,所述侧机架11固定连接在C型组合体背面的上部与下部夹紧梁4之间。则机架在其上下部荷载(尤其荷偏载)时,该侧机架11可提高整个机架的刚度。
在以上的实施方式中,预紧机构可采用卡环结构或直接采用液气压缸结构等进行预紧。作为优选方式,所述预紧机构包括设置在上部的隔梁3、上预紧拉杆7与上预紧螺母8,设置在下部的船型梁12、下预紧拉杆15与下预紧螺母16;隔梁3设置在相邻两个C型组合体的上部侧面之间,上预紧拉杆7穿过C型组合体与隔梁3,上预紧螺母8螺纹连接在上预紧拉杆7两端,船型梁12的两侧设置在相邻两个C型组合体的下部侧面之间,船型梁12的两端固定连接在侧机架11上,下预紧拉杆15穿过C型组合体,下预紧螺母16螺纹连接在下预紧拉杆15两端。上预紧拉杆7两端旋紧上预紧螺母8后,即可将C型组合体的侧面压紧在隔梁3上;而下预紧拉杆15两端旋紧下预紧螺母16后,即可将C型组合体的侧面压紧在船型梁12上。另外,船型梁12的设置,可利于在船型梁12上方设置机架的下部工作台。
在以上的实施方式中,上十字键梁9与下十字键梁13均可以采用整体结构,作为优选方式,所述C型组合体具有四个而形成两组正面对接的C型组合体,上十字键梁9设置为一个并配合在两组正面对接的C型组合体的上卡槽10内,下十字键梁13设置为两个,每组正面对接的C型组合体的下卡槽14内均配合有一个下十字键梁13,所述船型梁12的两侧分别固定在两个下十字键梁13上。将上十字键梁9设置为一个整体,可利于上十字键梁9的受力,利于将力传递到整个机架结构,而下十字键梁13设置为两个,可利于船型梁12的布置。
在以上的实施方式中,每个C型组合体可以采用两块或多块C型板1组合形成,作为优选实施方式,每个C型组合体由五块C型板1组合形成,每块C型板1均采用多块钢板焊接组合形成。每块C型板1采用多块钢板焊接组合形成,可利于C型板1的加工制造,避免一次加工成型带来的制造难度。
Claims (8)
1.大型机架结构,包括偶数个C型组合体,每个C型组合体均采用多块C型板(1)组合形成,两C型组合体正面对接形成机架内部空间(2),C型组合体背面设置有将C型组合体夹紧的夹紧机构,每个C型组合体侧面设置有将C型板(1)预紧的预紧机构,其特征是:在正面对接的两C型组合体之间设置有上十字键梁(9)与下十字键梁(13),上十字键梁(9)设置在正面对接的两C型组合体的上部对接面处,下十字键梁(13)设置在正面对接的两C型组合体的下部对接面处,C型板组合体正面设置有上卡槽(10)与下卡槽(14),所述上十字键梁(9)配合在上卡槽(10)内,下十字键梁(13)配合在下卡槽(14)内。
2.如权利要求1所述的大型机架结构,其特征是:所述夹紧机构包括夹紧梁(4)、夹紧拉杆(5)与夹紧螺母(6),夹紧梁(4)配合在各C型组合体背面的上部与下部,夹紧拉杆(5)穿过夹紧梁(4),夹紧螺母(6)螺纹连接在夹紧拉杆(5)两端将C型组合体夹紧在夹紧梁(4)之间。
3.如权利要求2所述的大型机架结构,其特征是:在C型组合体背面上部与下部均设置有承接槽(17),C型组合体背面上部的夹紧梁(4)配合在上部承接槽(17)内,C型组合体背面下部的夹紧梁(4)配合在下部承接槽(17)内。
4.如权利要求2所述的大型机架结构,其特征是:位于C型组合体背面上部且与上十字键梁(9)位置对应的夹紧拉杆(5)穿过上十字键梁(9)。
5.如权利要求4所述的大型机架结构,其特征是:在C型组合体背面设置有侧机架(11),所述侧机架(11)固定连接在C型组合体背面的上部与下部夹紧梁(4)之间。
6.如权利要求5所述的大型机架结构,其特征是:所述预紧机构包括设置在上部的隔梁(3)、上预紧拉杆(7)与上预紧螺母(8),设置在下部的船型梁(12)、下预紧拉杆(15)与下预紧螺母(16);隔梁(3)设置在相邻两个C型组合体的上部侧面之间,上预紧拉杆(7)穿过C型组合体与隔梁(3),上预紧螺母(8)螺纹连接在上预紧拉杆(7)两端,船型梁(12)的两侧设置在相邻两个C型组合体的下部侧面之间,船型梁(12)的两端固定连接在侧机架(11)上,下预紧拉杆(15)穿过C型组合体,下预紧螺母(16)螺纹连接在下预紧拉杆(15)两端。
7.如权利要求6所述的大型机架结构,其特征是:所述C型组合体具有四个而形成两组正面对接的C型组合体,上十字键梁(9)设置为一个并配合在两组正面对接的C型组合体的上卡槽(10)内,下十字键梁(13)设置为两个,每组正面对接的C型组合体的下卡槽(14)内均配合有一个下十字键梁(13),所述船型梁(12)的两侧分别固定在两个下十字键梁(13)上。
8.根据权利要求1至7中任意一项权利要求所述的大型机架结构,其特征是:每个C型组合体由五块C型板(1)组合形成,每块C型板(1)均采用多块钢板焊接组合形成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010616010XA CN102029526B (zh) | 2010-12-30 | 2010-12-30 | 大型机架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010616010XA CN102029526B (zh) | 2010-12-30 | 2010-12-30 | 大型机架结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102029526A CN102029526A (zh) | 2011-04-27 |
CN102029526B true CN102029526B (zh) | 2012-07-04 |
Family
ID=43883273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010616010XA Active CN102029526B (zh) | 2010-12-30 | 2010-12-30 | 大型机架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102029526B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103008522B (zh) * | 2012-10-23 | 2014-10-22 | 中国第二重型机械集团(德阳)万信工程设备有限责任公司 | 重型压机c形板夹紧结构的二次加热精密预紧方法 |
CN103192168B (zh) * | 2013-04-17 | 2015-03-04 | 二重集团(德阳)重型装备股份有限公司 | 宽厚板立向对称焊接方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB301779A (en) * | 1927-06-21 | 1928-12-13 | Frank Humphris | Improvements in plate-frames for presses and other machines |
DE1811920U (de) * | 1960-03-05 | 1960-05-25 | Silke Dr Med Bernhard | Heftpflasterstreifen als halterung fuer fluegelkanuelen. |
GB1216149A (en) * | 1968-01-19 | 1970-12-16 | Bliss E W Co | Improved frame structure |
US4706490A (en) * | 1986-01-23 | 1987-11-17 | Press Technology Corp. | Forging press with yoke design for attaching tie-rods to crossheads |
US6742558B1 (en) * | 2003-05-14 | 2004-06-01 | Witt Family Partnership, L.P. | Router holding device |
CN1785661A (zh) * | 2005-11-29 | 2006-06-14 | 太原重型机械集团有限公司 | 横向预紧板框式液压机 |
CN201530133U (zh) * | 2009-10-11 | 2010-07-21 | 济南巨能液压机电工程有限公司 | 二万吨、三万吨大台面双缸双框架板框式液压机 |
CN201922253U (zh) * | 2010-12-30 | 2011-08-10 | 二重集团(德阳)重型装备股份有限公司 | 大型机架结构 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1811920A1 (de) * | 1968-11-30 | 1970-06-18 | Hydraulik Gmbh | Zugelemente aus Walzplatten an Pressen mit hohem Widerstandsmoment in zwei sich schneidenden Ebenen |
JPS5927680B2 (ja) * | 1975-04-30 | 1984-07-07 | 住友重機械工業株式会社 | プレスのフレ−ム |
-
2010
- 2010-12-30 CN CN201010616010XA patent/CN102029526B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB301779A (en) * | 1927-06-21 | 1928-12-13 | Frank Humphris | Improvements in plate-frames for presses and other machines |
DE1811920U (de) * | 1960-03-05 | 1960-05-25 | Silke Dr Med Bernhard | Heftpflasterstreifen als halterung fuer fluegelkanuelen. |
GB1216149A (en) * | 1968-01-19 | 1970-12-16 | Bliss E W Co | Improved frame structure |
US4706490A (en) * | 1986-01-23 | 1987-11-17 | Press Technology Corp. | Forging press with yoke design for attaching tie-rods to crossheads |
US6742558B1 (en) * | 2003-05-14 | 2004-06-01 | Witt Family Partnership, L.P. | Router holding device |
CN1785661A (zh) * | 2005-11-29 | 2006-06-14 | 太原重型机械集团有限公司 | 横向预紧板框式液压机 |
CN201530133U (zh) * | 2009-10-11 | 2010-07-21 | 济南巨能液压机电工程有限公司 | 二万吨、三万吨大台面双缸双框架板框式液压机 |
CN201922253U (zh) * | 2010-12-30 | 2011-08-10 | 二重集团(德阳)重型装备股份有限公司 | 大型机架结构 |
Non-Patent Citations (1)
Title |
---|
JP昭51-128074B 1976.11.08 |
Also Published As
Publication number | Publication date |
---|---|
CN102029526A (zh) | 2011-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104972336B (zh) | 一种配置有槽状工件夹具的机床 | |
CN201922253U (zh) | 大型机架结构 | |
CN104972338B (zh) | 一种配置槽状工件高效夹具的多自由度机床 | |
CN102029526B (zh) | 大型机架结构 | |
CN202804544U (zh) | 铝合金弯梁焊接工装 | |
CN102658388A (zh) | 多耳片类钻模翻板定位机构 | |
CN210306428U (zh) | 车架焊接组件 | |
CN206047467U (zh) | 组焊一体式箱型焊装夹具 | |
CN203125192U (zh) | 精铣钻孔攻牙夹具 | |
CN202240563U (zh) | 液压铣床多用竖式装夹具 | |
CN202539949U (zh) | 一种可调角度工作台 | |
CN206169541U (zh) | 一种钢结构组件的焊接定位装置 | |
CN207386897U (zh) | Ct设备底座单腿焊接模具 | |
CN202278348U (zh) | 一种细长箱体焊接工装结构 | |
CN201684821U (zh) | 船体外板加工水火弯板专用压力架 | |
CN104723044B (zh) | 一种用于混凝土模块的框架制作工艺 | |
CN214185882U (zh) | 一种铝合金板材t型加工件的定位焊接装置 | |
CN220554907U (zh) | 一种手柄铸件加工工装 | |
CN212858650U (zh) | 一种减速器箱体分箱加工的工装 | |
CN103962463B (zh) | 一种微冲裁设备的冲裁力卸载装置 | |
CN201389759Y (zh) | 一种等高垫件 | |
CN218137600U (zh) | 一种单根列骨架制造工装 | |
CN202639929U (zh) | 一种加工长条形板件的夹具 | |
CN109352362B (zh) | 五爪接头外圆弧面一体化车削加工装置 | |
CN210703784U (zh) | 一种气动工装夹具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180320 Address after: 618013 Deyang Pearl River West Road, Sichuan, No. 460 Patentee after: Double (Deyang) heavy equipment Co., Ltd. Address before: 618013 Deyang Pearl River West Road, Sichuan, No. 460 Patentee before: Erzhong Group (Deyang) Heavy Equipment Co., Ltd. |