CN101956372B - 一种预应力混凝土梁式桥0号段快速施工方法 - Google Patents

一种预应力混凝土梁式桥0号段快速施工方法 Download PDF

Info

Publication number
CN101956372B
CN101956372B CN2010102983235A CN201010298323A CN101956372B CN 101956372 B CN101956372 B CN 101956372B CN 2010102983235 A CN2010102983235 A CN 2010102983235A CN 201010298323 A CN201010298323 A CN 201010298323A CN 101956372 B CN101956372 B CN 101956372B
Authority
CN
China
Prior art keywords
reinforcement
cage
bridge
section
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102983235A
Other languages
English (en)
Other versions
CN101956372A (zh
Inventor
张宇宁
胡国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Tiansheng Plotting Detection Engineering Co ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN2010102983235A priority Critical patent/CN101956372B/zh
Publication of CN101956372A publication Critical patent/CN101956372A/zh
Application granted granted Critical
Publication of CN101956372B publication Critical patent/CN101956372B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于桥梁工程中预应力混凝土连续梁和连续刚构桥施工的技术领域,具体涉及一种预应力混凝土梁式桥0号段快速施工方法,解决了现有施工方法工期较长、高空作业工序多的问题。其步骤如下:桥位处0号段支架系统和模板系统的安装过程与钢筋骨架的制作过程为平行作业,钢筋骨架制作过程在地面完成;待桥位处的0号段支架系统以及底模安装完毕后,将成型后的钢筋骨架运输至桥位处,通过起吊设备将其放至底模上;安装侧模、内模和端模;进行混凝土的浇筑、养护;拆模。本发明的有益效果:缩短作业时间、专业化程度高、劳动效率高。

Description

一种预应力混凝土梁式桥0号段快速施工方法
技术领域
本发明属于桥梁工程中预应力混凝土连续梁和连续刚构桥施工的技术领域,具体涉及一种预应力混凝土梁式桥0号段快速施工方法。
背景技术
对于预应力混凝土连续梁和连续刚构桥0号段,目前均采用桥位现浇施工。具体的方法是:在桥位处搭设支架或托架→安装模板系统→在支架或托架的模板内绑扎钢筋和安装预应力管道等→进行混凝土的浇筑和养护。该方法的缺点是:只有一个工作面,各工序必须按顺序进行施工,总工期较长;全部是高空作业,施工质量控制难度较大。因此,有必要对其进行优化和创新。
发明内容
本发明为了解决预应力混凝土梁式桥0号段施工时,工期较长、高空作业工序多的问题,提供了一种预应力混凝土梁式桥0号段快速施工方法,将常规的顺序作业法改变为平行作业法,提供了钢筋骨架的绑扎、吊装就位及混凝土浇筑等整个施工过程的工艺流程。
本发明采用如下技术方案实现:
预应力混凝土梁式桥0号段快速施工方法,其特征在于步骤如下:
(1)桥位处0号段支架系统和模板系统的安装过程与钢筋骨架的制作过程为平行作业,钢筋骨架制作过程在地面完成,成型后的钢筋骨架顶部设置有起吊用的吊点;
(2)待桥位处的0号段支架系统以及底模安装完毕后,将成型后的钢筋骨架运输至桥位处,通过起吊设备将其放至底模上;
(3)安装侧模、内模和端模;
(4)进行混凝土的浇筑、养护;
(5)拆模。
具体根据墩高和起吊设备的能力,在钢筋骨架吊装之前安装侧模或者在钢筋骨架吊装之后安装侧模。
本发明具有如下有益效果:①该流程最容易马上获得缩短作业时间的效果,与常规的施工工艺流程相比,以10米长度的梁体为例,可至少节省工期10天;②专业化程度高,将钢筋骨架制作由常规的桥位制作改为钢筋厂制作,施工环境的改变,既能提高钢筋骨架制作的质量,又能保证工人的施工安全;③劳动效率高,平行作业时可充分利用钢筋加工厂的施工场地,且不受上一个工序的制约,作业空间开阔,无高空作业等危险源,因此,可根据实际需要投入必要的人力和材料设备,极大提高了劳动效率。
附图说明
图1为本发明的工艺流程图。
图2、图3、图4、图5为钢筋骨架吊放至支架系统上的示意图(起吊设备以龙门吊为例)。
图2为成型的钢筋骨架运输至龙门吊起吊位置的示意图。
图3为成型的钢筋骨架起吊至一定的高度的示意图。
图4为成型的钢筋骨架水平移动到支架系统上方的示意图。
图5为成型的钢筋骨架垂直吊放到支架模板上的示意图。
图中:1-支架基础,2-支架系统,3-侧模,4-钢筋骨架吊送方向,5-底模,6-龙门吊基础,7-钢筋骨架运输车,8-钢筋骨架垫块,9-钢筋骨架,10-吊点,11-龙门吊,12-龙门吊吊架。
具体实施方式
结合附图对本发明的具体实施方式作进一步说明。
预应力混凝土梁式桥0号段快速施工方法,0号段支架或托架以及底模(也可包含侧模)的安装和钢筋骨架的制作为平行作业,该方法核心内容是支架安装与钢筋骨架平行作业,钢筋骨架在钢筋场内制作成型,后经过运输、起吊至桥位支架上方,然后进行混凝土的浇筑等施工。
以某大桥桥墩顶10m长的0号段主梁施工工艺流程为例:
(1)在邻近桥位处的现有钢筋加工场预留钢筋骨架制作的作业空间,保证有足够的加工、存放场地,进行工厂化分段加工制作,根据0号段全部钢筋骨架的尺寸和重量进行分段,分段的原则是:钢筋骨架成形后长度和重量不超过所选择的运输和起吊设备的能力,且钢筋骨架在吊装过程中的变形量在设计允许范围内。且钢筋骨架的制作工艺和精度要满足设计图纸和相关规范要求,在成形的钢筋骨架上焊接起吊用的吊点,吊点对称布置。
(2)待桥位处的支架系统和底模、侧模安装完毕后,将成形后的钢筋骨架运输至桥位处进行吊装,通过龙门吊将其起吊至支架模板上,龙门吊起吊过程如下:第一步将成形的钢筋骨架通过运输车将其运输到起吊的制定位置,并将吊架与钢筋骨架的吊环相连;第二步将钢筋骨架起吊至一定的高度,并将运输车移开;第三步将钢筋骨架水平移动到支架上方;第四步经测量定位后,将其落在0号段支架上,并临时固定在支架和模板上。吊装、运输和起吊过程要保证钢筋骨架的变形小于1cm,保证起吊过程钢筋骨架的整体稳定性,且钢筋骨架不能碰撞到0号段支架或托架上。
(5)安装侧模、内模和端模,侧模安装可在钢筋骨架吊装之前也可在钢筋骨架吊装之后,具体要根据墩高和起吊设备的能力。
(6)进行混凝土的浇筑、养护,其工艺要求同常规的桥梁混凝土浇筑和养护工艺。
(7)拆模,按混凝土的龄期和弹模要求确定拆模时间。

Claims (2)

1.一种预应力混凝土梁式桥0号段快速施工方法,其特征在于步骤如下:
(1)、桥位处0号段支架系统(2)和模板系统的安装过程与钢筋骨架(9)的制作过程为平行作业,钢筋骨架(9)制作过程在地面完成,成型后的钢筋骨架顶部设置有起吊用的吊点(10);
(2)、待桥位处的0号段支架系统以及底模安装完毕后,将成型后的钢筋骨架(9)运输至桥位处,通过起吊设备将其放至底模(5)上;
(3)、安装侧模(3)、内模和端模;
(4)、进行混凝土的浇筑、养护;
(5)、拆模。
2.根据权利要求1所述预应力混凝土梁式桥0号段快速施工方法,其特征在于在钢筋骨架吊装之后安装侧模替换为在钢筋骨架吊装之前安装侧模。
CN2010102983235A 2010-09-30 2010-09-30 一种预应力混凝土梁式桥0号段快速施工方法 Expired - Fee Related CN101956372B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102983235A CN101956372B (zh) 2010-09-30 2010-09-30 一种预应力混凝土梁式桥0号段快速施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102983235A CN101956372B (zh) 2010-09-30 2010-09-30 一种预应力混凝土梁式桥0号段快速施工方法

Publications (2)

Publication Number Publication Date
CN101956372A CN101956372A (zh) 2011-01-26
CN101956372B true CN101956372B (zh) 2011-12-07

Family

ID=43483944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102983235A Expired - Fee Related CN101956372B (zh) 2010-09-30 2010-09-30 一种预应力混凝土梁式桥0号段快速施工方法

Country Status (1)

Country Link
CN (1) CN101956372B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505636B (zh) * 2011-10-28 2014-09-10 中铁十六局集团有限公司 一种双薄壁墩连续刚构桥0号块施工方法
CN103184721B (zh) * 2013-01-25 2015-02-18 中铁大桥局集团第一工程有限公司 预制节段拼装pc连续箱梁逐块悬挂、胶拼线形控制方法
CN108699851B (zh) * 2018-03-30 2021-02-09 广东博智林机器人有限公司 钢筋预制加工系统
CN111139743A (zh) * 2019-12-26 2020-05-12 中铁十七局集团第三工程有限公司 提高公路梁架梁速度的方法及龙门吊的安装方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2247609C2 (de) * 1972-09-28 1974-05-30 Dyckerhoff & Widmann Ag, 8000 Muenchen Verfahren zum Herstellen eines Brückenbauwerks aus Spannbeton im abschnittsweisen freien Vorbau
CN101028726A (zh) * 2006-09-21 2007-09-05 中铁大桥局股份有限公司 短线法预制pc箱梁工艺
CN101324055A (zh) * 2008-08-06 2008-12-17 中铁大桥局股份有限公司 一种箱梁整体钢筋骨架的吊装设备及吊装方法
CN101824800B (zh) * 2010-04-28 2011-06-22 中铁三局集团有限公司 一种桥位现浇预应力混凝土连续梁的施工方法

Also Published As

Publication number Publication date
CN101956372A (zh) 2011-01-26

Similar Documents

Publication Publication Date Title
CN108019076B (zh) 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置
CN109968521A (zh) 一种装配式桥梁预制构件生产方法及工业化生产线
CN102587286A (zh) 桥梁上部结构简支变连续施工方法
CN101956372B (zh) 一种预应力混凝土梁式桥0号段快速施工方法
CN201933417U (zh) 一种适用于高铁预制箱梁的钢筋整体绑扎胎具
CN104695337A (zh) 自提升滑翻施工系统及施工方法
CN113752379B (zh) 一种采用二次张拉工艺和移动台座的混凝土t梁预制工法
CN107795122A (zh) 混凝土筒身施工装置及施工方法
CN108071124B (zh) 预制装配式地铁车站预制构件施工方法
CN202658529U (zh) 一种高速铁路原位制梁预制钢筋整体吊装入模装置
CN105196414A (zh) 预制t梁腹板钢筋胎架及预应力t梁施工方法
CN109055637B (zh) 一种高炉大修中炉壳安装的液压提升工艺
CN202164030U (zh) 整体式箱梁吊架
CN202064281U (zh) 一种滑模模架
CN102398305A (zh) 一种预制混凝土桩的生产方法
CN107447668A (zh) 一种自动提升定位变截面桥墩模板
CN111283860A (zh) 一种高速铁路装配式空心盖梁流水线生产施工方法
CN215920863U (zh) 一种高速铁路预制箱梁生产线
CN107338768B (zh) 工厂式大型渡槽施工系统及方法
CN204955097U (zh) 预制t梁腹板钢筋胎架
CN205521875U (zh) 箱梁底腹板钢筋整体成型模架
CN205170161U (zh) 一种预制梁板钢筋骨架吊具
CN113618874A (zh) 一种预制墩柱新型生产工艺
CN209890066U (zh) 一种箱梁底腹板钢筋吊装工具
CN210025766U (zh) 一种箱梁钢筋骨架制作移动胎架装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANXI SANJIANG ENGINEERING TEST CO., LTD.

Free format text: FORMER OWNER: CHINA RAILWAY THIRD ENGINEERING CO., LTD.

Effective date: 20130228

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 030001 TAIYUAN, SHAANXI PROVINCE TO: 030006 TAIYUAN, SHAANXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130228

Address after: 030006 No. 5 Xuefu street, Shanxi, Taiyuan

Patentee after: SHANXI SANJIANG ENGINEERING DETECTION Co.,Ltd.

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Patentee before: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20191223

Address after: 030073 Yingze Street 269, Yingze District, Taiyuan City, Shanxi Province

Patentee after: SHANXI TIANSHENG PLOTTING DETECTION ENGINEERING Co.,Ltd.

Address before: 030006 No. 5 Xuefu street, Shanxi, Taiyuan

Patentee before: SHANXI SANJIANG ENGINEERING DETECTION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

CF01 Termination of patent right due to non-payment of annual fee