CN101906858A - Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board - Google Patents

Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board Download PDF

Info

Publication number
CN101906858A
CN101906858A CN2009100523963A CN200910052396A CN101906858A CN 101906858 A CN101906858 A CN 101906858A CN 2009100523963 A CN2009100523963 A CN 2009100523963A CN 200910052396 A CN200910052396 A CN 200910052396A CN 101906858 A CN101906858 A CN 101906858A
Authority
CN
China
Prior art keywords
grc
plate
artistic
polyline
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100523963A
Other languages
Chinese (zh)
Other versions
CN101906858B (en
Inventor
王辉平
邓惠根
王利雄
刘淳
葛倩华
陈帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Construction Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Decoration Engineering Co Ltd filed Critical Shanghai Construction Decoration Engineering Co Ltd
Priority to CN2009100523963A priority Critical patent/CN101906858B/en
Publication of CN101906858A publication Critical patent/CN101906858A/en
Application granted granted Critical
Publication of CN101906858B publication Critical patent/CN101906858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a seamless installation process for a polyline artistic GRC (Glass-fiber Reinforced Composite) board. The installation process is used for installing a GRC board of a building. The process comprises the following steps of: (1) placing a partitioning line and translating and leading a vertical reference line to the operating surface; (2) installing an embedded part and a rigid framework; (3) splicing the GRC board; and (4) plugging a splicing seam. The seamless installation process for a polyline artistic GRC board, which is obtained according to the technical scheme, can favorably realize the polyline seamless installation of the artistic GRC board on various buildings.

Description

Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
Technical field:
The present invention relates to the mounting method of GRC plate in a kind of construction work, particularly a kind ofly can on various buildings, carry out the seamless mounting method of multi-line section art GRC plate.
Background technology:
Glass fibre reinforced composion (GRC), be to make to strengthen material with alkali-resistant glass fibre, the aluminium sulfate low alkalinity cement is agglutination material and mixes the suitable formation base material that gathers materials, by lightweight, high-strength and high ductility, the multifunctional novel inorganic composite materials that production technology is made such as spraying, slurry is poured into a mould, extruded, flows to formwork erection.
Utilize tens products such as lightweight inner partition wall plate, warming plate, side fascia, outer decoration series goods, rack roofing plate, ventilation stack, silo, monolithic roofing of GRC developing material to be widely applied in the fields such as construction work, civil engineering, agriculture and animal husbandry fishery.The development of GRC material and products thereof has not only been made outstanding contributions for the decorations of the reform of Chinese materials for wall, building energy conservation, building, has also obtained significant progress at aspects such as fundamental research, variety of raw material and performance, goods exploitation, production technology level, product qualities simultaneously.Because characteristics such as the GRC material has comparatively desirable physical and mechanical property and product is easy to moulding and manufacturing, model change is fast, market capacity is big and compliance is strong, GRC industry life and vigor are abrim also being stepped into the Chaoyang industry.
The GRC material has also brought certain problem when being widely used.For example construction work utilizes the GRC plate to decorate when installing, and existing mounting process can not be realized the seamless installation of GRC plate, because the particularity of bridge construction, existing mounting process more can't be realized the seamless installation of bridge continuous span multi-line section art GRC plate.This is undoubtedly mortal wound for construction work, it influences the overall appearance of whole bridge; Because can't seamlessly install between the GRC plate, the quality that this will influence whole bridge engineering causes engineering to check and accept.Designing a kind of method of carrying out the seamless installation of GRC plate on the bridge that can be implemented in is the problem that presses for solution at present.
Summary of the invention:
The present invention is directed to the existing defective of GRC plate mounting process in the existing building engineering, can realize the seamless installation technology of bridge continuous span multi-line section art GRC plate and provide a kind of.
In order to achieve the above object, the technical solution used in the present invention is as follows:
Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board, this mounting process is used for various buildings are carried out the installation of GRC plate, and it may further comprise the steps:
(1) puts vertical, the horizontal piecemeal line of GRC plate well at building surface to be decorated, be embedded part and GRC plate installing and locating;
(2) determine good piecemeal line installation embedded part and firm framework according to step (1);
(3) determine that according to step (1) good piecemeal line and facade reference line employing dry hanging article divide row from bottom to top splicing installation by horizontal piecemeal line, install every row's installation post-grouting to two sides splicing among every row;
(4) splicing seams between the GRC plate that splicing is finished to step (3) carries out shutoff.
Vertical, horizontal piecemeal line in the described step (1) uses coordinate method to emit at building surface to be decorated according to GRC plate block diagram.
Described step also need be provided with the facade reference line in (1), and it is horizontal vertically flat to decorate facade itself with control GRC plate; This facade reference line moves on the operating surface by hanging vertical line.
The position that is provided with of the embedded part in the described step (2) determined by embedded part figure and on-the-spot piecemeal line, and four jiaos of each embedded part are fixed on the concrete surface by expansion bolt, and erection sequence is launched to both sides by middle span centre portion simultaneously; Described firm framework is prefabricated by joint earlier, is welded on the embedded part by the piecemeal line position again.
In the described step (3), before the GRC plate is installed, on the building bonding surface, uses concrete interface agent to do whitewashing and handle, make GRC plate grouting physical efficiency and fabric structure body reliable connection.
Adopt the dry hanging article splicing that the GRC plate is installed in the described step (3), in four jiaos of settings of every block of plate; The suspension member rear end with bolt be welded on the lip-deep angle of embedded part sign indicating number and be connected, front end embeds in the GRC plate and uses cloud stone glue to fix.
The width of splicing seams keeps 10mm-20mm in the described step (4), and it is closely knit to be convenient to the gap joint filling, and has strengthened piece obturator and grout blanket bonded area; During the shutoff splicing seams, use epoxy resin to paste the fine tough cloth of TYFO virtue at the plate joint surface earlier, further control joint cracking, the seam of shutoff simultaneously is for grouting creates conditions; Fill the grouting material again in the splicing seams gap, and be in the milk to the plate surface, make piece obturator and whole grout blanket connect to one, improve strength of connection with GRC decorative panel homogeneous.
The lower surface of described GRC plate resettlement groove is installed and the clear distance easily that is in the milk to having the stainless steel of assurance suspension member between the building concrete face.
Obtain the present invention according to technique scheme and can be good at realizing that artistic GRC plate carries out the seamless installation of multi-line section on various buildings; Technology of the present invention is simple, practical, can be good at shortening engineering time.Realize seamless link between the GRC plate that adopts the present invention to install, make the overall appearance grace of engineering; GRC plate splicing is simultaneously installed firmly, finishes the quality height, accelerates the examination process of engineering.
Description of drawings:
Further specify the present invention below in conjunction with the drawings and specific embodiments.
Fig. 1 is the flow chart of technology of the present invention.
Fig. 2 is the scheme of installation of GRC plate in the technology of the present invention.
Fig. 3 is the node schematic diagram of flat seam among the present invention.
Fig. 4 is the node schematic diagram of angle seam among the present invention.
The specific embodiment:
For technological means, creation characteristic that the present invention is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the present invention.
Can not realize the defective of GRC plate seamless installation on building in order to solve existing mounting process, the present invention has designed a kind of can being implemented in and has carried out the seamless installation technology of multi-line section art GRC plate on the various buildings.This implementation of processes is as shown in Figure 1 following:
(1) puts vertical, the horizontal piecemeal line of GRC plate well at the case beam sides, be embedded part and GRC plate installing and locating; Simultaneously the translation of facade reference line is led to operating surface, control GRC facade is parallel with the facade reference line;
(2) determine good piecemeal line installation embedded part and firm framework according to step (1);
(3) determine that according to step (1) good piecemeal line and facade reference line employing dry hanging article divide row from bottom to top splicing installation by horizontal piecemeal line, every row is installed to two sides splicing by span centre, every row's installation post-grouting;
(4) splicing seams between the GRC plate that splicing is finished to step (3) carries out shutoff.
The basic principle of above-mentioned technology, the detailed process in practical operation is as follows:
The bridge that adopts this technology to carry out the new bridge decorative engineering is the concrete cantilever hanging hole bridge of 64.46 meters of total lengths, and this bridge mesopore span reaches 37.64 meters, 5.6 meters of height, the barge that P Passable is 100 tons, 15 tons of bridge floor limits for tonnage, but 60 tons of limit load-carryings.Consider that for " style reproduction " angle the new bridge decorative engineering adopts the job practices of GRC member as the permanent decoration template, utilize the plasticity of GRC material, duplicate the lines and the embossing pattern that run through full-bridge, reduce the cultural images of this bridge.
According to the regulation of the construction aggregate scheduling of this decorative engineering, when entering GRC plate erection stage, the case beam and on the concrete breast board all finish, the scaffold of case beam sides also should be set up and finish simultaneously.
The first step:
The GRC plate is installed at first and should be emitted the piecemeal line of GRC plate at the case beam sides according to GRC plate block diagram, is embedded part and GRC plate installing and locating.Next provides the facade reference line, and is horizontal vertically flat guarantee to decorate facade itself, and meets the appropriate distance of plan requirement with the maintenance of case beam sides.
The wherein setting-out of GRC plate piecemeal line: use coordinate method to emit the piecemeal line of GRC plate at the case beam sides according to revising back GRC plate block diagram.When the piecemeal line was set, the middle span centre point with bridge was the origin of coordinates earlier, calculates the coordinate figure of each piecemeal line intersection point according to size marking in the block diagram.According to block diagram, vertical piecemeal line wherein is equidistantly to cut apart with the spacing of 1.2m to both sides with the span centre point at mid span area, and trans-regionally on both sides equidistantly cut apart to both sides from corresponding bridge pier axis respectively, above vertically cutting apart all is provided with CCP on the start line.
Use level gauge (being erected on People's Bank of China's stair, the ramp) to cross the origin of coordinates and emit a horizontal control line, and connect all bridge pier axis at the case beam sides.X value punctuate on horizontal control line in the coordinate figure of each the piecemeal line intersection point that obtains according to aforementioned calculation is drawn vertical piecemeal line; On each vertical piecemeal line, mark Y value in the coordinate figure of each piecemeal line intersection point in two ends up and down, be linked to be horizontal piecemeal line by horizontal control line.And do check with other 4 place axial line control point.
The facade reference line is set: suitably distance is provided with the facade reference line beyond the breast board of body of a bridge both sides, and this reference line should be parallel with road face center line, and it is parallel with road face center line with breast board to decorate facade with the GRC plate of control body of a bridge both sides.When the facade reference line is provided with, at first determine road face center line, its two centerline points positions by the bridge two ends determine, these 2 positions are respectively at the bridge pier near axis at bridge two ends.On these 2 the People's Bank of China's stair that move to both sides, ramp, and as for suitable distance beyond the main bridge railing plate.All bridge pier axis and span centre position at main bridge concrete breast board lateral surface upper edge hole are provided with angle-iron frame, on People's Bank of China's stair, ramp, transit is set, to project by the some position that road face center line translation is come on above-mentioned five place's angle-iron frames, and form the facade reference line by the incident point stretching wire.Reference line is moved on to the trend of controlling whole decoration facade on the scope of operation by hanging vertical line.
Second step:
According to the above-mentioned piecemeal line of finishing, carry out embedded part and steel framework and install:
Piecemeal line place in case beam sides and concrete breast board two sides is provided with embedded part, and the position is determined by embedded part figure and on-the-spot piecemeal line.Each embedded part is fixed on the concrete surface by 4 M10 expansion bolts at four jiaos.Erection sequence is launched to both sides by middle span centre portion.
The outstanding moulding that while is provided with in lower edge, the main bridge railing plate outside, its inner chamber need be provided with 5 bugle steel frameworks, in order to bear the weight of inner chamber concrete perfusion.This angle bar framework is prefabricated by joint earlier, about the long 1.2m of every joint, is welded on the embedded part by the piecemeal line position again.It is provided with PVC conduit and projector, should be earlier before concrete perfusion the shell of projector be fixed in this framework according to design attitude.
Above-mentioned embedded part and angle iron frame are mortar and covering that concrete wraps up, so do not do antirust processing, remove but welding slag and corrosion are essential.
The 3rd step:
Carry out the previous preparation that placement of above-mentioned piecemeal line and embedded part and steel framework are installed, can enter into the firm and hard border of GRC erection stage:
Primary and secondary according to bridge construction is divided preface, the RGC plate of this bridge is installed be divided into a plurality of construction section sequential deployments.Also to finish following preparation before concrete the installation:
A. the every cross-domain GRC plate of need installing in main bridge side should carry out pre-assembly unit on the ground according to block diagram measuring curve before dispatching from the factory, through the project engineer check errorless after, vanning is transported to the building site again.Should should not retain too much plate in the building site for a long time, in advance according to the installation progress plan in batches balancedly to the building site shipping, in case damage in addition.
B. before comprehensive formal the installation, the cross-domain side between optional preceding two bridge pier axis is done the examination of GRC plate and is installed, to check whether reliable, effective, convenient etc. of whole technologies.
C. because the cast-in-situ bridge concrete surface is comparatively smooth bright and clean,, before the GRC plate is installed, should needs on the bridge concrete bonding surface, to use concrete interface agent to do whitewashing and handle for making GRC plate grouting physical efficiency and bridge construction body reliable connection.
D. the clear distance to case beam concrete surface keeps 4cm in the resettlement groove bottom surface of the GRC of case beam sides plate, to guarantee that the stainless steel suspension member is installed and grouting is convenient.
When installing, adopt dry hanging article that the GRC plate is installed according to the piecemeal line and the embedded part of above-mentioned setting, in four jiaos of settings of every block of plate according to above-mentioned preparation.The suspension member rear end with bolt be welded on the lip-deep angle of embedded part sign indicating number and be connected, front end embeds in the GRC plate and uses cloud stone glue to fix.As shown in Figure 2: the erection sequence of GRC plate should divide row from bottom to top to install by horizontal piecemeal line, and every row is launched to both sides by span centre, every row's installation post-grouting.The GRC plate is installed the requirement control of allowable variation according to metal item in Code for construction quality acceptance of building decoration (GB50210-2001) the 8.2.9 bar simultaneously.
The 4th step:
The shutoff stage of splicing seams for control GRC decorative panel splicing seams cracking, guarantees whole decorative effect, and the plate splicing seams is taked following construction measure:
The plate joint gap keeps 10mm-20mm, and it is closely knit to be convenient to the gap joint filling, and has strengthened piece obturator and grout blanket bonded area; The splicing seams of GRC plate requires shutoff according to the structure of flat seam, angle seam node diagram (as shown in Figure 3 and Figure 4).
As shown in Figure 3, the GRC plate should establish to seam edge in length and breadth that 0.05m is wide, the concave edge of recessed 2-3mm 301 so that paste the fine tough cloth of TYFO virtue.
When carrying out the piece shutoff, use epoxy resin 304 to paste the fine tough cloth 303 of TYFO virtue at plate 302 joint surfaces referring to Fig. 3 and Fig. 4 earlier, further control joint cracking, the seam of shutoff simultaneously is for grouting creates conditions.The specification of the fine tough cloth of TYFO virtue: 425 gram/m2.
Expect 306 in gap joint filling grouting, and be in the milk to the plate surface, make obturator (the grouting material) 306 and the whole grout blanket 305 of piece connect to one, improve strength of connection with GRC decorative panel homogeneous.
For improving the fine tough cloth of TYFO virtue surface adhesive property, can be at epoxy resin 304 that the fine tough cloth of TYFO virtue is pasted its external coating of back twice of brushing concrete interface agent thereon before the drying not as yet.
After the sclerosis of grouting material, should check the grouting quality at plate splicing seams place, must take the fine tough cloth of original TYFO virtue off, polish, repair and paste the fine tough cloth of TYFO virtue again problem on deformation such as tangible projection, bulge, depression, piece filling leakiness are arranged.
More than show and described basic principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that describes in the foregoing description and the manual just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (8)

1. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board, this mounting process is used for various buildings are carried out the installation of GRC plate, it is characterized in that, and this technology may further comprise the steps:
(1) puts vertical, the horizontal piecemeal line of GRC plate well at building surface to be decorated, be embedded part and GRC plate installing and locating;
(2) determine good piecemeal line installation embedded part and firm framework according to step (1);
(3) determine that according to step (1) good piecemeal line and facade reference line employing dry hanging article divide row from bottom to top splicing installation by horizontal piecemeal line, install every row's installation post-grouting to two sides splicing among every row;
(4) splicing seams between the GRC plate that splicing is finished to step (3) carries out shutoff.
2. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1 is characterized in that, vertical, the horizontal piecemeal line in the described step (1) uses coordinate method emitting at building surface to be decorated according to GRC plate block diagram.
3. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1 is characterized in that, described step also need be provided with the facade reference line in (1), and it is horizontal vertically flat to decorate facade itself with control GRC plate; This facade reference line moves on the operating surface by hanging vertical line.
4. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1, it is characterized in that, the position that is provided with of the embedded part in the described step (2) is determined by embedded part figure and on-the-spot piecemeal line, four jiaos of each embedded part are fixed on the concrete surface by expansion bolt, and erection sequence is launched to both sides by middle span centre portion simultaneously; Described firm framework is prefabricated by joint earlier, is welded on the embedded part by the piecemeal line position again.
5. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1, it is characterized in that, in the described step (3), before the GRC plate is installed, on the building bonding surface, use concrete interface agent to do whitewashing and handle, make GRC plate grouting physical efficiency and fabric structure body reliable connection.
6. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1 is characterized in that, adopts the dry hanging article splicing that the GRC plate is installed in the described step (3), in four jiaos of settings of every block of plate; The suspension member rear end with bolt be welded on the lip-deep angle of embedded part sign indicating number and be connected, front end embeds in the GRC plate and uses cloud stone glue to fix.
7. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1 is characterized in that, the width of splicing seams keeps 10mm-20mm in the described step (4), and it is closely knit to be convenient to the gap joint filling, and has strengthened piece obturator and grout blanket bonded area; During the shutoff splicing seams, use epoxy resin to paste the fine tough cloth of TYFO virtue at the plate joint surface earlier, further control joint cracking, the seam of shutoff simultaneously is for grouting creates conditions; Fill the grouting material again in the splicing seams gap, and be in the milk to the plate surface, make piece obturator and whole grout blanket connect to one, improve strength of connection with GRC decorative panel homogeneous.
8. seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board according to claim 1 is characterized in that, the lower surface of described GRC plate resettlement groove is installed and the clear distance easily that is in the milk to having the stainless steel of assurance suspension member between the building concrete face.
CN2009100523963A 2009-06-02 2009-06-02 Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board Active CN101906858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100523963A CN101906858B (en) 2009-06-02 2009-06-02 Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100523963A CN101906858B (en) 2009-06-02 2009-06-02 Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board

Publications (2)

Publication Number Publication Date
CN101906858A true CN101906858A (en) 2010-12-08
CN101906858B CN101906858B (en) 2012-04-04

Family

ID=43262432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100523963A Active CN101906858B (en) 2009-06-02 2009-06-02 Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board

Country Status (1)

Country Link
CN (1) CN101906858B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287034A (en) * 2011-06-29 2011-12-21 中建二局第三建筑工程有限公司 Special-shaped rail and construction method thereof
CN102704636A (en) * 2012-06-15 2012-10-03 北京港源建筑装饰工程有限公司 Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN108086608A (en) * 2017-12-17 2018-05-29 北京首钢建设集团有限公司 A kind of steel structure stairway is marked time the construction method of prefabricated facing
CN108625499A (en) * 2018-05-23 2018-10-09 五冶集团上海有限公司 A kind of anti-water management construction method of GRC plates and its application
CN110259003A (en) * 2019-06-24 2019-09-20 中国建筑设计研究院有限公司 The seamless process processing method of external wall cement class Decorative hanging board
CN114685124A (en) * 2022-05-31 2022-07-01 中建六局(天津)绿色建筑科技有限公司 Prefabricated rail top air duct assembling gap sealing filler and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1047425C (en) * 1993-01-21 1999-12-15 中建建筑承包公司 Attaching process for colour facing concrete board
CN1963062A (en) * 2005-11-07 2007-05-16 张伟生 Exterior thermal-insulation and exterior decoration system for external wall and construction method therefor
CN101042010A (en) * 2007-04-10 2007-09-26 唐澄育 Building board installing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287034A (en) * 2011-06-29 2011-12-21 中建二局第三建筑工程有限公司 Special-shaped rail and construction method thereof
CN102287034B (en) * 2011-06-29 2013-02-13 中建二局第三建筑工程有限公司 Special-shaped rail and construction method thereof
CN102704636A (en) * 2012-06-15 2012-10-03 北京港源建筑装饰工程有限公司 Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN102704636B (en) * 2012-06-15 2014-02-26 北京港源建筑装饰工程有限公司 Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN108086608A (en) * 2017-12-17 2018-05-29 北京首钢建设集团有限公司 A kind of steel structure stairway is marked time the construction method of prefabricated facing
CN108625499A (en) * 2018-05-23 2018-10-09 五冶集团上海有限公司 A kind of anti-water management construction method of GRC plates and its application
CN110259003A (en) * 2019-06-24 2019-09-20 中国建筑设计研究院有限公司 The seamless process processing method of external wall cement class Decorative hanging board
CN114685124A (en) * 2022-05-31 2022-07-01 中建六局(天津)绿色建筑科技有限公司 Prefabricated rail top air duct assembling gap sealing filler and construction method thereof
CN114685124B (en) * 2022-05-31 2022-09-02 中建六局(天津)绿色建筑科技有限公司 Prefabricated rail top air duct assembling gap sealing filler and construction method thereof

Also Published As

Publication number Publication date
CN101906858B (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN103821276B (en) A kind of assembled, modular architectural system
CN101892717B (en) Large autoclaved lightweight aerated concrete slab and installation method thereof
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN103669865A (en) Stair construction method through shaped supports
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN105672664A (en) Integral heat insulation wallboard building system
CN102677895A (en) Suspended formwork pouring method for concrete foundation steps
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN101372842B (en) Construction method of non-support formwork gunning concrete bearing wall
CN103362307A (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN206616725U (en) A kind of assembled decorative heat preservation partition plate
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN206503159U (en) A kind of effective typified form for reducing piping lane haunch area concrete formation bubble
CN206000160U (en) A kind of wall construction is with carrying the large-scale plank sheathing of reinforced
CN206205139U (en) A kind of prefabricated composite construction parapet
WO2018126950A1 (en) Modular stairway
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN201225001Y (en) Composite die for casting building frame
CN110130556B (en) Waterproof board frame and one-floor board structure and production method thereof
CN111636603A (en) Curtain wall system applied to staggered effect of glass bricks and metal bricks of outer wall
CN112302332A (en) Template for single-side formwork support of color decorative rammed earth background wall and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI BUILDING DECORATION ENGINEERING GROUP CO.

Free format text: FORMER NAME: SHANGHAI CONSTRUCTION DECORATION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200081 No. 55, Quyang Road, Shanghai, Hongkou District

Patentee after: Shanghai Building Decoration Engineering Group Co., Ltd.

Address before: 200081 No. 55, Quyang Road, Shanghai, Hongkou District

Patentee before: Shanghai Construction Decoration Engineering Co., Ltd.