CN206205139U - A kind of prefabricated composite construction parapet - Google Patents
A kind of prefabricated composite construction parapet Download PDFInfo
- Publication number
- CN206205139U CN206205139U CN201621234264.4U CN201621234264U CN206205139U CN 206205139 U CN206205139 U CN 206205139U CN 201621234264 U CN201621234264 U CN 201621234264U CN 206205139 U CN206205139 U CN 206205139U
- Authority
- CN
- China
- Prior art keywords
- parapet
- prefabricated
- sash
- concrete
- composite construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of prefabricated composite construction parapet, including concrete sash, ecological filling bulk is embedded in concrete sash, concrete sash top is provided with prefabricated double-deck capping beam, the utility model additionally provides the construction method of the prefabricated composite construction parapet, the a large amount of light ecological materials of filling in the prefabricated assembled compound parapet wall, greatly reduce the consumption of concrete and reinforcing bar, not only reduce construction cost, alleviate dead load, and use fabricated construction technology, it is quick and easy for installation, save speed of application, reduce live a large amount of wet trades, be conducive to environmental protection, realize standardization, assembling, industrialization and the information-based modern industrialization mode of production;Meanwhile, the double-deck capping beam in assembled parapet top so that elevation of building effect corner angle distinguish obvious, not only effectively raise the stability of parapet, and add the rich of elevation of building.
Description
Technical field
The utility model belongs to technical field of buildings, more particularly to a kind of prefabricated composite construction parapet.
Background technology
At present, the building industry of China still uses traditional handicraft, traditional handicraft to exist in large quantities:Raw material scene wastes
Greatly, the construction period is long, and architectural energy consumption is big, builds garbage environment pollution, influence of noise resident living, the dust pollution air for producing
The shortcomings of.For problem above, " 13 " planning outline is proposed:Development is applicable, economy, green building, improves Building technology
Level, safety standard and construction quality, widely popularize assembled architecture.There is assembled architecture component to industrialize, design standard
Change, mechanization of building operation the features such as, greatly reduce the use of situ wet operation and labour, energy-saving and environment friendly, be China not
Come the main development direction built.Assembled-type house has the characteristics that:Substantial amounts of building subassembly is machined by Workshop Production;
Situ wet operation greatly reduces;The informationization of standardization and the management of design;Meet the requirement of green building.
Parapet is a very important part in residential housing, and it is the parapet of building roof surrounding, Main Function
In addition to safeguarding safety, it is additionally included in bottom and receives head as anti-hydraulic pressure brick, avoids roof rain water cross flow or waterproof layer from oozing with this
Water.At present, existing parapet construction technology there are problems that a lot, and speed of application is slow, the overall construction speed of influence;Workman works
Amount is big, improves construction cost.Therefore finding a kind of new parapet construction technology has become present problem demanding prompt solution.
The content of the invention
In order to overcome the shortcoming of above-mentioned prior art, the utility model provides a kind of prefabricated composite construction parapet and applies
Work method, compared with traditional parapet construction technology, the construction technology have save material, construction cost is low, speed of application is fast,
The features such as high-strength light, environmental protection, and component can industrialized production, install connection it is simple and quick, greatly shorten the cycle.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of prefabricated composite construction parapet, including concrete sash, embed ecological filling bulk 1 in concrete sash,
Concrete sash top is provided with prefabricated double-deck capping beam 7.
The concrete sash is connected and composed by longitudinal rib 3 and cross rib 4, and multiple ecological filling bulks 1 are embedded in sash, ecological
The height for filling bulk 1 is highly consistent with sash, and vertical piece 5 is formed between adjacent ecological filling bulk 1.
Have in the cross rib 4 between cross rib reinforcing bar 2, adjacent concrete sash and realized by connecting post-cast strip 6 and cross rib reinforcing bar 2
Connection.
In the prefabricated double-deck capping beam 7, the section of the section more than lower floor's beam of upper strata beam, lower floor's beam passes through bonding mortar
8 tops for being arranged on concrete sash.
The utility model additionally provides the construction method of the prefabricated composite construction parapet, including:
Step one:Produce prefabricated composite construction parapet wallboard;
Special steel form is assembled first, bottom pours 20mm thickness C30 pea gravel concretens, ecological filling bulk 1 is put immediately,
The cross rib reinforcing bar 2, reinforcing bar with longitudinal ribs that will be processed is put into template, then pours C30 pea gravel concretens, then catch up with it is flat, wipe one's face, it is prefabricated
After the completion of carry out standard curing, when intensity reaches requirement, form removal forms prefabricated composite construction parapet wallboard, treats
When concrete strength reaches design load, can lift by crane.
Step 2:Produce prefabricated double-deck capping beam;
Assemble special steel form first, put reinforcing bar immediately, it is to be confirmed it is errorless after, pour C30 pea gravel concretens, then catch up with
Put down, wipe one's face, it is prefabricated after the completion of carry out standard curing, when intensity reaches requirement, form removal forms prefabricated bilayer and bears down on one
Beam, when concrete strength reaches design load, can lift by crane.
Step 3:The Fast Installation of prefabricated composite construction parapet, construction.
Ash cake is made in the prefabricated daughter's wall displacement of roofing layer first, then colligation connecting pole framework of steel reinforcement, carries out parapet
Lifting, treats that parapet is installed to appointed part, after confirmation is errorless, pours connection post part concrete, treats that concrete strength reaches
After design requirement, carry out parapet and bear down on one lifting, and it is connected with assembled parapet by bonding mortar.
Compared with prior art, the beneficial effects of the utility model are:
1. a large amount of light ecological materials of filling in the prefabricated assembled compound parapet wall, greatly reduce concrete and
The consumption of reinforcing bar, not only reduces construction cost, alleviates dead load, and uses fabricated construction technology, easy for installation
Fast, save speed of application, reduce live a large amount of wet trades, be conducive to environmental protection, realize standardization, assembling,
Industrialization and the information-based modern industrialization mode of production.
2. the double-deck capping beam in assembled parapet top so that elevation of building effect corner angle distinguish obvious, not only effectively
The stability of parapet is improve, and adds the rich of elevation of building.
Brief description of the drawings
Fig. 1 is the prefabricated assembled compound parapet panel structure schematic diagram of the utility model.
Fig. 2 is the prefabricated assembled compound parapet wallboard profile construction structural representation of the utility model.
Fig. 3 is the prefabricated composite construction parapet attachment structure schematic diagram of the utility model.
Fig. 4 is the prefabricated composite construction parapet of the utility model and capping beam splicing structure schematic diagram.
Fig. 5 is that the full assembled composite wall structure architecture for using the prefabricated composite construction parapet of the utility model is illustrated
Figure.
Specific embodiment
Describe implementation method of the present utility model in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of prefabricated composite construction parapet, including concrete sash, in concrete sash
Embedded ecological filling bulk 1, concrete sash top is provided with prefabricated double-deck capping beam 7.
Wherein, concrete sash is connected and composed by longitudinal rib 3 and cross rib 4, and multiple ecological filling bulks 1 are embedded in sash, raw
The height of state filling bulk 1 is highly consistent with sash, and vertical piece 5 is formed between adjacent ecological filling bulk 1.Have in cross rib 4
Between cross rib reinforcing bar 2, adjacent concrete sash connection is realized by connecting post-cast strip 6 and cross rib reinforcing bar 2.
Prefabricated double-deck capping beam 7 is made up of upper strata beam and lower floor's beam, the section of the section more than lower floor's beam of upper strata beam, lower floor
Beam is arranged on the top of concrete sash by bonding mortar 8.
It can be seen that, the compound parapet of this prefabricated reinforced concrete assembled is by prefabricated compound parapet wallboard 9, prefabricated double-deck pressure
Back timber 7 is combined.Technical points:
1. prefabricated compound parapet wallboard 9:It is, with section and the less concrete sash of arrangement of reinforcement, to embed light ecological filling
Bulk is constituted, with ordinary reinforced concrete is cast-in-place or brick masonry parapet compare with light weight, ductility is good, anti-seismic performance is excellent,
Economic and practical the advantages of.Simultaneously as using two-sided troweling when prefabricated components are produced, later stage building only needs Puttying, swabbing,
Without secondary levelling troweling treatment.
10 is the seat pulp layer of thickness 20mm in figure, is built by laying bricks or stones using Mb20 mortars, is connected with agent structure for parapet, and
The connection that parapet bears down on one with parapet wall.11 wipe one's face for the fine-stone concrete of thickness 20mm.
2. prefabricated double-deck capping beam 7:Double-deck capping beam uses prefabricating technique, and be prefabricated in the factory completion, not only effectively protects
Component quality is demonstrate,proved, speed of application has been accelerated, and has reduced the wet trade area of job site, ring has been protected to greatest extent
Border, be truly realized " five section one environmental protection " (economize on water, section when, energy-conservation, section material, save land and environmental protection).
Reference picture 4, Specific construction process of the present utility model is as follows:
Step one:Prefabricated composite construction parapet wallboard 9 is produced.Special steel form is assembled first, and it is thick that bottom pours 20mm
C30 pea gravel concretens 11, put ecological bulk 1 immediately, and the cross rib 4 that will process, reinforcing bar with longitudinal ribs 3 are put into template, to be confirmed
After errorless, then pour C30 pea gravel concretens 11, then catch up with it is flat, wipe one's face, it is prefabricated after the completion of carry out standard curing, treat that intensity reaches
It is required that when, form removal forms prefabricated composite construction parapet wallboard 9.When concrete strength reaches design load, Fang Keqi
Hang;
Step 2:Prefabricated double-deck capping beam 7 is produced.Special steel form is assembled first, immediately according to design drawing requirement pendulum
Put reinforcing bar, it is to be confirmed it is errorless after, pour C30 pea gravel concretens 11, then catch up with it is flat, wipe one's face, it is prefabricated after the completion of carry out standard curing,
When intensity reaches requirement, form removal forms prefabricated double-deck capping beam 7, when concrete strength reaches design load, can
Lifting;
Step 3:Prefabricated composite construction parapet Fast Installation, construction.Made in the prefabricated daughter's wall displacement of roofing layer first
Ash cake, then colligation connecting pole framework of steel reinforcement, organizes specialized lifting troop to carry out parapet lifting, treats that parapet is installed to finger
Determine position, after confirmation is errorless, pour connection post part concrete 6, after concrete strength reaches design requirement, carry out parapet
Bear down on one 7 liftings, and it is connected with assembled parapet by bonding mortar 10.
The structure for finally giving is applied to full assembled composite wall structure system, as shown in Figure 5.
Claims (4)
1. a kind of prefabricated composite construction parapet, it is characterised in that including concrete sash, embeds ecology and fills out in concrete sash
Bulk (1) is filled, concrete sash top is provided with prefabricated double-deck capping beam (7).
2. prefabricated composite construction parapet according to claim 1, it is characterised in that the concrete sash is by longitudinal rib (3)
Connected and composed with cross rib (4), multiple ecological fillings bulk (1) are embedded in sash, the height of ecology filling bulk (1) is high with sash
Degree is consistent, and vertical piece (5) is formed between adjacent ecological filling bulk (1).
3. prefabricated composite construction parapet according to claim 2, it is characterised in that have cross rib reinforcing bar in the cross rib (4)
(2), connection is realized by connecting post-cast strip (6) and cross rib reinforcing bar (2) between adjacent concrete sash.
4. prefabricated composite construction parapet according to claim 1, it is characterised in that in the prefabricated double-deck capping beam (7),
The section of upper strata beam is more than the section of lower floor's beam, and lower floor's beam is arranged on the top of concrete sash by bonding mortar (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621234264.4U CN206205139U (en) | 2016-11-17 | 2016-11-17 | A kind of prefabricated composite construction parapet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621234264.4U CN206205139U (en) | 2016-11-17 | 2016-11-17 | A kind of prefabricated composite construction parapet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206205139U true CN206205139U (en) | 2017-05-31 |
Family
ID=58749278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621234264.4U Active CN206205139U (en) | 2016-11-17 | 2016-11-17 | A kind of prefabricated composite construction parapet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206205139U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106499045A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | A kind of prefabricated composite construction parapet and construction method |
-
2016
- 2016-11-17 CN CN201621234264.4U patent/CN206205139U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106499045A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | A kind of prefabricated composite construction parapet and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947788B (en) | A kind of modular assembly formula building systems and its method of construction | |
CN103374986B (en) | A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof | |
CN106436893A (en) | Fully-prefabricated structure and construction method thereof | |
CN101408039A (en) | Bamboo-wood mixed structure of house architecture | |
CN204531076U (en) | Light steel latticework cast-in-place foamed concrete combined wall | |
CN106149937B (en) | Assembly concrete beam and its dry type connection method | |
CN106499045A (en) | A kind of prefabricated composite construction parapet and construction method | |
CN202324323U (en) | Outer wall plate | |
CN105672664A (en) | Integral heat insulation wallboard building system | |
CN103352569A (en) | Construction method of integrally-poured architecture building | |
CN210032319U (en) | Steel construction assembled ecological house wallboard | |
CN2846567Y (en) | Steel net structure concrete composite building | |
CN110344535A (en) | A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork | |
CN100451257C (en) | Concrete complex building of steel meshwork framework, and construction procedure | |
CN206205139U (en) | A kind of prefabricated composite construction parapet | |
CN205475877U (en) | Compound outer thermal insulation walling system of assembled self preservation temperature wallboard | |
CN107747378A (en) | The body composite board processing method of Fast Installation heat insulation decorative load-bearing one | |
CN201865365U (en) | Anti-seismic reinforcing structure for old brickwork buildings | |
CN203412143U (en) | Wall body structure of integrally poured building house | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN114658141A (en) | Connecting structure and method for T-shaped constructional column and independent foundation of assembled composite wallboard | |
CN203296209U (en) | Self-insulation mortarless block masonry shear wall system | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
CN106150191A (en) | A kind of full ground form assembled light bounding wall system and construction method | |
CN202117166U (en) | Shape steel gypsum combined type building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Matrix matrix Industrial Co., Ltd. Assignor: Xi ` an Industrial Co., Ltd. Contract record no.: 2019610000016 Denomination of utility model: Prefabricated composite structure parapet wall and construction method Granted publication date: 20170531 License type: Exclusive License Record date: 20190611 |