CN103669865A - Stair construction method through shaped supports - Google Patents

Stair construction method through shaped supports Download PDF

Info

Publication number
CN103669865A
CN103669865A CN201310708421.5A CN201310708421A CN103669865A CN 103669865 A CN103669865 A CN 103669865A CN 201310708421 A CN201310708421 A CN 201310708421A CN 103669865 A CN103669865 A CN 103669865A
Authority
CN
China
Prior art keywords
stair
template
baseboard
horizontal
shaping support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310708421.5A
Other languages
Chinese (zh)
Inventor
陈敏
温文
李启辉
燕霄
何柱
陈冬枫
邱黎
房汉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Fourth Construction Engineering Corp
Original Assignee
Guangdong Fourth Construction Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Fourth Construction Engineering Corp filed Critical Guangdong Fourth Construction Engineering Corp
Priority to CN201310708421.5A priority Critical patent/CN103669865A/en
Publication of CN103669865A publication Critical patent/CN103669865A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention provides a stair construction method through shaped supports. The stair construction method through the shaped supports comprises the steps of (1) preparing the shaped stair supports, skirt board formworks, a bottom formwork and an opening side formwork; (2) carrying out erection of a supporting frame, assembly of the bottom formwork and laying of rebars at the position of a stair; (3) erecting the shaped stair supports, wherein a pair of shaped stair supports are symmetrically erected at the position of the stair through transverse steel pipes; (4) installing the skirt board formworks, wherein the skirt board formworks are transversely erected at skirt board formwork installing positions of the two shaped stair supports; (5) installing the opening side formwork; (6) carrying out pouring of concrete and maintenance; (7) carrying out formwork disassembly. Each shaped stair support in the step (1) comprises a long rod, a plurality of transverse short rods and a plurality of vertical short rods, wherein the tail ends of the transverse short rods are welded to the long rod according to the inclination of steps, the separation distance between every two adjacent transverse short rods is equal to the height of the corresponding designed step, each vertical short rod is vertically welded to the corresponding two adjacent transverse short rods, and each skirt board formwork installing position is formed by the corresponding vertical short rod and the corresponding two adjacent transverse short rods. The stair construction method through the shaped supports has the advantages that construction quality is high, the cost is low, and the construction period is short.

Description

Setting bracket stair construction method
Technical field
The present invention relates to building stair technical field of construction.
Background technology
The Chinese patent that the construction method of existing a kind of building stair is 201110104747 as application number is disclosed, comprise the following steps: (1) is according to stair step width and highly make " L " shape steel plate member, by welding, uses two channel-section steels that are arranged in parallel several " L " shape steel plate members to be assembled into the epithelium template of marking time of stair shape; (2) according to stair two sides size, make the zigzag end side form of marking time, and form upper side template with the epithelium template welding of marking time; (3) build successively supporting row frame and bed die, and respectively follow closely a little batten in the both sides of edges of bed die, upper side template is installed on to the stair template that forms a sealing on bed die by the little batten place of bed die; (4) concreting maintenance; (5) dismantle successively upper side template, bed die and supporting row frame.The weak point of this construction method is: the epithelium template of marking time is as the cope match-plate pattern of stair construction, very inconvenient during stair construction, and concrete is difficult for filling the position, corner in full template, affects construction quality.
The Chinese patent that the construction method that also has a kind of building stair is 201210370715 as application number is disclosed, comprises the following steps: (1) prefabricated bench side form and the side form of marking time; (2) the stair mould bases that assembling consists of two width bench side forms and several side forms of marking time; (3) bed die is fixed on to the bottom of the bench side form of stair mould bases; (4) the stair mould bases of step 3 is lifted into construction location; (5) concreting maintenance.This construction method has the feature of stair easy construction, its weak point is: the stair mould bases consisting of two width bench side forms and several side forms of marking time is as the top mold frame of stair construction, two width bench side forms are indispensable, and this method is not suitable for only needs constructing by wall stair of bench side form on one side.
Summary of the invention
The object of the invention is to propose a kind of setting bracket stair construction method, have advantages of that construction quality is high, cost is low, the duration is short.
Object of the present invention can be achieved through the following technical solutions:
Setting bracket stair construction method, comprises the steps.
1) prepare staircase shaping support, baseboard template, soffit formwork and face sky side template;
Described staircase shaping support is to be welded by 1 stock, some horizontal quarter butts and some perpendicular quarter butts, horizontal quarter butt is welded in end on stock by step gradient, between every two adjacent horizontal quarter butts, be separated by and design the height of step and be vertically welded with a perpendicular quarter butt, perpendicular quarter butt and adjacent two horizontal quarter butts form baseboard template installation position;
Described baseboard template consists of a rectangular baseboard and the reinforcing flitch that is fixed on baseboard one side, and the height of baseboard is suitable with the height of design step, and the length of baseboard is suitable with the width of design step;
Facing sky side template is the parallelogram template of making to lower floor's stair deck roof by upper strata stair deck roof.
2) at stair position place, set up bracing frame according to a conventional method and on bracing frame assembled soffit formwork, then lay reinforcing bar at soffit formwork upper surface.
3) set up staircase shaping support;
The flat raft of being separated by place, stair position is placed a pair of staircase shaping support of being prepared by step 1), the horizontal quarter butt of staircase shaping support top is overlapped on the bench platform of upper strata, the horizontal quarter butt of staircase shaping support lowermost end is overlapped on lower floor's bench platform, use at least 2 horizontal steel pipes that two staircase shaping supports are fixed, the place, nearly two ends of described horizontal steel pipe is fixedly connected with by connector with the stock of two staircase shaping supports respectively.
4) baseboard template is installed;
Some baseboard templates of crossbearer on a pair of staircase shaping support of step 3), the horizontal baseboard template installation position that is connected to of reinforcing flitch of every baseboard template, make the baseboard lower limb of baseboard template be posted by horizontal quarter butt end, the top of baseboard is connected to a horizontal quarter butt bottom.
5) install and face sky side template;
Sky side template is faced in the sky side installation of facing in stair position, the following portion that faces sky side template is fixedly connected with the side of soffit formwork, in the top portion outside of facing sky side template, install and reinforce flitch, use a plurality of clasp to reinforce the connection facing the stock of sky side template top portion by flitch and staircase shaping support.
Above step 2)-5) complete setting up of stair construction mould bases.
6) concreting maintenance,
The concreting vibrating in construction mould bases from the gap between baseboard template toward stair, carries out the equating of marking time of artificial tread after vibrating.
7) template dismounting;
After stair hardening of concrete, sky side template, staircase shaping support and baseboard template, soffit formwork and bracing frame are faced in dismounting successively.Specifically: unclamp step fastener fastener dismounting and face sky side template → unclamp connector to dismantle horizontal steel pipe, staircase shaping support and dismounting baseboard template → dismounting soffit formwork and bracing frame.
The present invention has following outstanding substantive distinguishing features and significant progressive:
1, the present invention adopts the stair construction of setting bracket and baseboard template, be that gap between baseboard template concreting vibrating in stair construction mould bases makes the full stair construction of the Concrete Filled mould bases of building, there is the feature of the good and convenient and quick construction of stair construction quality.
2, staircase shaping support of the present invention from heavy and light, rigidity is large, the number of turnover is many, installation and the take-down time short, easy construction.
3, sky side template, baseboard template, staircase shaping support, soffit formwork and the bracing frame of facing of the present invention is all dismountable, and convenient disassembly, quick, accelerated construction speed, also can be recycled, and reduced construction cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of stair construction mould bases of the present invention.
Fig. 2 is the construction schematic diagram of the bracing frame set up of step 2 of the present invention and assembled soffit formwork.
Fig. 3 is the construction schematic diagram of the staircase shaping support set up of step 3 of the present invention.
Fig. 4 is the construction schematic diagram that step 4 of the present invention is installed baseboard template.
Fig. 5 is that step 5 of the present invention is installed the construction schematic diagram that faces sky side template.
The specific embodiment
To lean on the stair of wall on one side, be that place, stair position only has the stair construction of facing sky side to be specifically described the present invention below.
With reference to figure 1-Fig. 5, setting bracket stair construction method, comprises the steps.
1) prepare staircase shaping support 1, baseboard template 2, soffit formwork 3 and face sky side template 4;
Specifically with reference to figure 1, described staircase shaping support 1 is to be welded by 1 stock 11, some horizontal quarter butts 12 and some perpendicular quarter butts 13, horizontal quarter butt 12 is welded in end on stock 11 by step gradient, it is the gradient that horizontal quarter butt 12 and the angle of stock 11 equal stair, between every two adjacent horizontal quarter butts 12, be separated by and design the height of step and be vertically welded with a perpendicular quarter butt 13, perpendicular quarter butt 13 forms baseboard template installation position 15 with adjacent two horizontal quarter butts 12;
Described baseboard template 2 consists of with the reinforcing flitch 22 that is fixed on baseboard 21 1 sides a rectangular baseboard 21, and the height of baseboard 21 is suitable with the height of design step, and the length of baseboard 21 and reinforcing flitch 22 is suitable with the width of design step;
Facing sky side template 4 is the parallelogram templates of making to lower floor's stair deck roof by upper strata stair deck roof.
2) at stair position place, set up bracing frame 5 according to a conventional method and on bracing frame 5 assembled soffit formwork 3, then lay reinforcing bars 30 at soffit formwork 3 upper surfaces, as shown in Figure 2.
3) set up staircase shaping support;
As shown in Figure 3, at a pair of staircase shaping support 1 of being prepared by step 1) of the symmetrical placement in place, stair position, the horizontal quarter butt 12 of staircase shaping support 1 top is overlapped on the bench platform of upper strata, the horizontal quarter butt 12 of staircase shaping support 1 lowermost end is overlapped on lower floor's bench platform, use 3 horizontal steel pipes 14 that two staircase shaping supports 1 are interfixed, the nearly two ends of described horizontal steel pipe 14 are fixedly connected with by connector with the stock 11 of two staircase shaping supports 1 respectively.
4) baseboard template is installed;
As shown in Figure 4, some baseboard templates 2 of crossbearer on a pair of staircase shaping support 1 of step 3), the horizontal baseboard template installation position 15 that is connected to of reinforcing flitch 22 of every baseboard template 2, make baseboard 21 lower limbs of baseboard template 2 be posted by horizontal quarter butt 12 ends, the top of baseboard 21 is connected to horizontal quarter butt 12 bottoms.
5) install and face sky side template 4;
As shown in Figure 5, sky side template 4 is faced in the sky side installation of facing in stair position, the following portion that faces sky side template 4 is fixedly connected with the side of soffit formwork 3, in the top portion outside of facing sky side template 4, install and reinforce flitch 40, using a plurality of clasp will face sky side template 4 top portions reinforces the connection by flitch (40) and staircase shaping support 1, the present embodiment clasp used is step fastener fastener 41, the fixedly eave tile of step fastener fastener 41 inserts on the stock 11 of staircase shaping support 1, and the movable chuck of step fastener fastener 41 is clamped on the reinforcing flitch 40 that faces sky side template 4.
Above step 2)-5) complete setting up of stair construction mould bases.
6) concreting maintenance, the construction mould bases concreting vibrating from the gap between baseboard template 2 toward stair, carries out the equating of marking time of artificial tread after vibrating.
7) template dismounting;
After stair hardening of concrete, sky side template 4, staircase shaping support 1 and baseboard template 2, soffit formwork 3 and bracing frame 5 are faced in dismounting successively, specifically: unclamp step fastener fastener 41 dismounting and face sky side template 4 → unclamp connector to dismantle horizontal steel pipe 14, staircase shaping support 1 and dismounting baseboard template 2 → dismounting soffit formwork 3 and bracing frame 5.
The present embodiment makes the full stair construction of the Concrete Filled mould bases of building by vibrating, effectively guaranteed stair construction quality, for leaning on wall stair and not leaning on the construction of wall stair to be all suitable for, the present embodiment also has construction and form removable feature fast, easily, in work progress, each template and support are all dismountable, can recycle, reduce construction cost.

Claims (1)

1. setting bracket stair construction method, comprises the steps:
1) prepare staircase shaping support, baseboard template, soffit formwork and face sky side template,
Described staircase shaping support is to be welded by 1 stock (11), some horizontal quarter butts (12) and some perpendicular quarter butts (13), horizontal quarter butt (12) is welded in end on stock (11) by step gradient, between every adjacent two horizontal quarter butts (12), be separated by and design the height of step and be vertically welded with a perpendicular quarter butt (13), perpendicular quarter butt (13) forms baseboard template installation position (15) with adjacent two horizontal quarter butts (12);
Described baseboard template (2) consists of a rectangular baseboard (21) and the reinforcing flitch (22) that is fixed on baseboard (21) one sides, the height of baseboard (21) is suitable with the height of design step, and the length of baseboard (21) is suitable with the width of design step;
Facing sky side template is the parallelogram template of making to lower floor's stair deck roof by upper strata stair deck roof;
2) at stair position place, set up according to a conventional method bracing frame (5) and at the upper assembled soffit formwork (3) of bracing frame (5), then at the upper reinforcing bar (30) of laying of soffit formwork (3);
3) set up staircase shaping support,
The flat raft of being separated by place, stair position is placed a pair of staircase shaping support of being prepared by step 1), the horizontal quarter butt (12) of staircase shaping support top is overlapped on the bench platform of upper strata, the horizontal quarter butt (12) of staircase shaping support lowermost end is overlapped on lower floor's bench platform, use at least 2 horizontal steel pipes (14) that two staircase shaping supports are interfixed, the place, nearly two ends of described horizontal steel pipe (14) is fixedly connected with by connector with the stock (1) of two staircase shaping supports respectively;
4) baseboard template is installed,
Some baseboard templates of crossbearer (2) on a pair of staircase shaping support of step 3), the horizontal baseboard template installation position (15) that is connected to of reinforcing flitch (22) of every baseboard template (2), make baseboard (21) lower limb of baseboard template (2) be posted by horizontal quarter butt (12) end, the top of baseboard (21) is connected to horizontal quarter butt (12) bottom;
5) install and face sky side template,
Sky side template (4) is faced in the sky side installation of facing in stair position, the following portion that faces sky side template (4) is fixedly connected with the side of soffit formwork (3), in the top portion outside of facing sky side template (4), install and reinforce flitch (40), use a plurality of clasp (41) to reinforce the connection by flitch (40) and the stock (1) of staircase shaping support facing sky side template (4) top portion;
Above step 2)-5) complete setting up of stair construction mould bases;
6) concreting maintenance,
The concreting vibrating in construction mould bases from the gap between baseboard template (2) toward stair, carries out the equating of marking time of artificial tread after vibrating;
7) template dismounting,
After stair hardening of concrete, sky side template (4), staircase shaping support and baseboard template (2), soffit formwork (3) and bracing frame (5) are faced in dismounting successively.
CN201310708421.5A 2013-12-20 2013-12-20 Stair construction method through shaped supports Pending CN103669865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310708421.5A CN103669865A (en) 2013-12-20 2013-12-20 Stair construction method through shaped supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310708421.5A CN103669865A (en) 2013-12-20 2013-12-20 Stair construction method through shaped supports

Publications (1)

Publication Number Publication Date
CN103669865A true CN103669865A (en) 2014-03-26

Family

ID=50308574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310708421.5A Pending CN103669865A (en) 2013-12-20 2013-12-20 Stair construction method through shaped supports

Country Status (1)

Country Link
CN (1) CN103669865A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113786A (en) * 2015-08-17 2015-12-02 刘海宁 Pad block support system for supporting fixed adjustable cast-in-situ stair formwork
CN105155846A (en) * 2015-09-15 2015-12-16 成都市第四建筑工程公司 Construction method for arc-shaped reinforced concrete stand
CN106088588A (en) * 2016-08-05 2016-11-09 中国建筑第七工程局有限公司 A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete
CN107100366A (en) * 2017-05-09 2017-08-29 中冶天工集团天津有限公司 A kind of construction method for skyscraper reinforced concrete stairs formwork
EP3183398A4 (en) * 2014-08-19 2018-01-10 Form 700 Pty Ltd Concrete formwork and a formwork support bracket
CN107965141A (en) * 2018-01-10 2018-04-27 山西三建集团有限公司 The stair tread formwork that both sides are provided with shear wall installs device and erection method
CN108661257A (en) * 2018-06-21 2018-10-16 中国五冶集团有限公司 A kind of construction method of building stair
CN110185215A (en) * 2019-06-11 2019-08-30 方远建设集团股份有限公司 A kind of construction method of stair
CN110409723A (en) * 2019-04-29 2019-11-05 中冶天工集团天津有限公司 A kind of assembled stair mounting bracket and its installation method
CN112609970A (en) * 2020-12-22 2021-04-06 成都华阳建筑股份有限公司 Cast-in-situ stair formwork
CN112663953A (en) * 2021-01-26 2021-04-16 山西三建集团有限公司 Method for erecting support vertical pipe in multi-stair-section stair formwork support system
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit
CN114922365A (en) * 2022-05-06 2022-08-19 中建科工集团有限公司 Stair construction method
CN115095092A (en) * 2022-07-25 2022-09-23 重庆建工第一市政工程有限责任公司 Construction method of slope surface step
CN118148355A (en) * 2024-05-09 2024-06-07 山西三建集团有限公司 Template construction equipment and method for aluminum film closed type stairs

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
JP2001090340A (en) * 1999-09-28 2001-04-03 Buiaaku Corporation Kk Form for step
CN201292663Y (en) * 2008-10-20 2009-08-19 中建三局第一建设工程有限责任公司 Stereotype stairway steel formwork
CN201722927U (en) * 2010-07-23 2011-01-26 中国建筑第二工程局有限公司 Drawable slat type stair template
CN102140839A (en) * 2011-01-28 2011-08-03 四川省建筑机械化工程公司 Staircase shaping support formwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
JP2001090340A (en) * 1999-09-28 2001-04-03 Buiaaku Corporation Kk Form for step
CN201292663Y (en) * 2008-10-20 2009-08-19 中建三局第一建设工程有限责任公司 Stereotype stairway steel formwork
CN201722927U (en) * 2010-07-23 2011-01-26 中国建筑第二工程局有限公司 Drawable slat type stair template
CN102140839A (en) * 2011-01-28 2011-08-03 四川省建筑机械化工程公司 Staircase shaping support formwork

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙跃红等: "《高层建筑楼梯定型模板施工技术》", 《建筑安全》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3183398A4 (en) * 2014-08-19 2018-01-10 Form 700 Pty Ltd Concrete formwork and a formwork support bracket
CN105113786A (en) * 2015-08-17 2015-12-02 刘海宁 Pad block support system for supporting fixed adjustable cast-in-situ stair formwork
CN105155846A (en) * 2015-09-15 2015-12-16 成都市第四建筑工程公司 Construction method for arc-shaped reinforced concrete stand
CN106088588A (en) * 2016-08-05 2016-11-09 中国建筑第七工程局有限公司 A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete
CN107100366A (en) * 2017-05-09 2017-08-29 中冶天工集团天津有限公司 A kind of construction method for skyscraper reinforced concrete stairs formwork
CN107965141A (en) * 2018-01-10 2018-04-27 山西三建集团有限公司 The stair tread formwork that both sides are provided with shear wall installs device and erection method
CN108661257A (en) * 2018-06-21 2018-10-16 中国五冶集团有限公司 A kind of construction method of building stair
CN110409723A (en) * 2019-04-29 2019-11-05 中冶天工集团天津有限公司 A kind of assembled stair mounting bracket and its installation method
CN110185215A (en) * 2019-06-11 2019-08-30 方远建设集团股份有限公司 A kind of construction method of stair
CN112609970A (en) * 2020-12-22 2021-04-06 成都华阳建筑股份有限公司 Cast-in-situ stair formwork
CN112609970B (en) * 2020-12-22 2022-03-11 成都华阳建筑股份有限公司 Cast-in-situ stair formwork
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit
CN112727152B (en) * 2020-12-28 2022-06-03 宜昌富海建设工程有限公司 Connection structure between construction stair and floor in deep basal pit
CN112663953A (en) * 2021-01-26 2021-04-16 山西三建集团有限公司 Method for erecting support vertical pipe in multi-stair-section stair formwork support system
CN114922365A (en) * 2022-05-06 2022-08-19 中建科工集团有限公司 Stair construction method
CN115095092A (en) * 2022-07-25 2022-09-23 重庆建工第一市政工程有限责任公司 Construction method of slope surface step
CN115095092B (en) * 2022-07-25 2023-09-29 重庆建工第一市政工程有限责任公司 Construction method of slope surface step
CN118148355A (en) * 2024-05-09 2024-06-07 山西三建集团有限公司 Template construction equipment and method for aluminum film closed type stairs
CN118148355B (en) * 2024-05-09 2024-07-19 山西三建集团有限公司 Template construction equipment and method for aluminum film closed type stairs

Similar Documents

Publication Publication Date Title
CN103669865A (en) Stair construction method through shaped supports
CN110439270B (en) Construction method of post-cast strip disassembly-free support system
CN104088461B (en) Y type cast-in-situ concrete columns template system and construction method thereof
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN110374321B (en) Assembled multi-ribbed beam floor system combined template and construction method
CN104196055B (en) Outer wall of basement lower die board construction method
CN104746435A (en) Wide-angle Y-shaped pier column construction method
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN210712751U (en) Aqueduct trough body post-cast strip concrete formwork mounting structure
CN107460889A (en) Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof
CN203640278U (en) Stair construction die shelf
CN111472540A (en) Integrated formwork system suitable for concrete pouring of pool wall and construction method thereof
CN109826232B (en) Construction method of subway station
CN204510813U (en) L-type cladding panel structure under a kind of novel frame Liang Liang
CN216616835U (en) Ultrahigh ultralimit combined formwork system
CN107386638B (en) The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN214834781U (en) Supporting vertical pipe structure in multi-stair-section stair formwork supporting system
CN110306443B (en) Aquatic tie beam bracket device and corresponding construction method
CN211775752U (en) Outer batter post template steel pipe scaffold support system
CN109629447B (en) Variable cross-section cast-in-situ box girder construction and concrete pouring method
CN102691409A (en) HR (height regulation) heavy portal frame and temporary reinforced concrete column jointed formwork erecting device and construction method
CN111622264A (en) Underground pipe gallery automatic control creeping formwork system and operation method thereof
CN206053129U (en) A kind of light steel construction post of T-shaped
CN110748221A (en) Prefabricated assembled pond guide wall
CN110735529A (en) Construction process for shear wall plastic-wood combined template ultra-low-loss supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Min

Inventor after: Li Qihui

Inventor after: Yan Xiao

Inventor after: He Zhu

Inventor after: Chen Dongfeng

Inventor after: Fang Hanhui

Inventor after: Zhong Ziqiang

Inventor after: He Hanlin

Inventor after: Zhou Yu

Inventor after: Wen Zhiping

Inventor after: Lin Peidong

Inventor after: Yang Qubo

Inventor after: Zhang Jianfeng

Inventor after: Wen Wen

Inventor before: Chen Min

Inventor before: Wen Wen

Inventor before: Li Qihui

Inventor before: Yan Xiao

Inventor before: He Zhu

Inventor before: Chen Dongfeng

Inventor before: Qiu Li

Inventor before: Fang Hanhui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN MIN WEN WEN LI QIHUI YAN XIAO HE ZHU CHEN DONGFENG QIU LI FANG HANHUI TO: CHEN MIN ZHONG ZIQIANG HE HANLIN ZHOU YU WEN ZHIPING LIN PEIDONG YANG QUBO ZHANG JIANFENG WEN WEN LI QIHUI YAN XIAO HE ZHU CHEN DONGFENG FANG HANHUI

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326