CN107100366A - A kind of construction method for skyscraper reinforced concrete stairs formwork - Google Patents

A kind of construction method for skyscraper reinforced concrete stairs formwork Download PDF

Info

Publication number
CN107100366A
CN107100366A CN201710321327.2A CN201710321327A CN107100366A CN 107100366 A CN107100366 A CN 107100366A CN 201710321327 A CN201710321327 A CN 201710321327A CN 107100366 A CN107100366 A CN 107100366A
Authority
CN
China
Prior art keywords
stair
steel pipe
formwork
bench
staristep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710321327.2A
Other languages
Chinese (zh)
Inventor
马全丽
张驰浩
孙志波
宋允刚
王冲
王乃坤
吕立军
班召辉
刘双权
杨永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201710321327.2A priority Critical patent/CN107100366A/en
Publication of CN107100366A publication Critical patent/CN107100366A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of construction method for skyscraper reinforced concrete stairs formwork, the stair template in this method is installed including making the step such as staristep plate bed die and the installation of staristep plate bed die.It the advantage is that:Technology is installed using steel pipe locating support, overcome traditional template, flitch and install the various shortcoming installed with typified form, it is less prone to problem on deformation, beneficial to the guarantee of construction quality, also save fund input simultaneously, construction is easily installed, the construction difficult problem that the art is difficult to ensure that stair step quality in terms of stair formwork erecting all the time is solved well, with good practicality.

Description

A kind of construction method for skyscraper reinforced concrete stairs formwork
Technical field
The present invention relates to a kind of formwork construction method of stair, it is more particularly related to which one kind is built for high level Build the construction method of reinforced concrete stairs formwork.
Background technology
Concrete staircase is an important component of high building structure, and the requirement of its construction quality is strict.Built at present Stair formwork erecting in field, mainly there is two Class Types:One class is to form support top by the connection between iron nail and template, flitch to step on Walk formwork erection;Another kind of is to complete formwork using the assembling technique of the typified forms such as aluminum dipping form, punching block.
Although the class mold method of the above two is widely used by building field, had the following disadvantages during construction:
(1) form support top by the connection between iron nail and template, flitch to mark time the method for formwork erection, iron nail is unique solid Fixed, connector, and mould strip strength is less, the problem of easily deforming;
(2) using the assembling technique of the typified forms such as aluminum dipping form, punching block, once inject capital into too big, while exigent Mounting technique.
The content of the invention
The purpose of the present invention is exactly to solve the problems of above prior art, and for this provide one kind built for high level Build the construction method of reinforced concrete stairs formwork.The implementation of the construction method, overcomes the shortcoming of above two form erecting technology, Reliable guarantee with construction quality.
The technical scheme is that:
A kind of construction method for skyscraper reinforced concrete stairs formwork, including the colligation of staircase boards reinforcing bar, stair The construction process such as formwork erection, concreting, template removing and concrete curing, stair template therein install including with Lower step:
(1) staristep plate bed die is made:
1) stair step formwork erection is made:
According to the width and height of stair step, plank sheathing is selected, and distinguish in the upper and lower both sides of first plank sheathing Iron nail fixes the first flitch;
2) stair bench zigzag side form is made:
According to the length of bench and the profile height of stair step, zigzag fashion is made in the second plank sheathing of selection, and at it Iron nail fixes the second flitch respectively for both sides;
3) sizing steel pipe locating support is made:
According to the width and height of stair step, Z-shaped reinforcing bar is processed into round steel, and each summit is welded successively by it On same steel pipe;
(2) installation of staristep plate bed die:
1) concrete staircase poured using ground or lower floor is as the strong point, using supporting steel pipe to that will pour The staristep plate bed die of concrete staircase carries out support top, and ejects on the shear wall at stair the bullet of plate bed die installation site Line;
2) by the stair bench zigzag side form completed be arranged on bench side, and using staristep face short side to The split bolt in split bolt hole on the shear wall at place is inserted into split bolt steel pipe, the split bolt steel pipe it is another Stair bench zigzag side form is arrived in one end to top;
3) combine and ejected on the riser height of layout design, the shear wall in staristep with the high institute of each top mark marked time The straight line being linked to be, to position the position of stair step formwork erection 1, and by described stair step formwork erection and stair bench zigzag side The junction of mould is reinforced with iron nail;
4) described sizing steel pipe locating support is close to described stair step formwork erection and is stuck in described Z font reinforcing bars Knuckle at;
5) described stair bench zigzag side form is hung to the steel pipe in the sizing steel pipe locating support using iron wire On, complete formwork.
In abovementioned steps (1):
The thickness of first, second plank sheathing is 15mm, and its length and width is layout design size.
The specification of first, second flitch is 50*80mm.
The round steel specification for making the Z-shaped reinforcing bar is φ 12.
In abovementioned steps (1), (2):
Described steel pipe, supporting steel pipe, the specification of split bolt steel pipe are φ 48*3.5mm.
Instant invention overcomes the shortcoming that prior art is present, its advantage is;
(1) it make use of steel pipe locating support to install technology, install what is installed with typified form than traditional template, flitch Method, is less prone to problem on deformation, beneficial to the guarantee of construction quality.
(2) fund input is saved, it is easy to installation, particularly the height of stair step and tread run quality It is well controlled.
(3) solve the art is difficult to ensure that stair step quality in terms of stair formwork erecting all the time well Construction difficult problem, with good practicality.
Brief description of the drawings
Fig. 1 is the structural representation of stair step formwork erection in the present invention;
Fig. 2 is the structural representation of stair bench zigzag side form in the present invention;
Fig. 3 is the structural representation of sizing steel pipe locating support in the present invention;
Fig. 4 is the scheme of installation of stair bench zigzag side form in the present invention;
Fig. 5 is the construction schematic diagram of stair formwork erecting of the present invention.
Embodiment
In order that technical scheme is easier to be understood, below in conjunction with the accompanying drawings with stair branch in China Democratic National Construction Association engineering The embodiment of mould construction is described in detail.
Reference picture 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, the present invention are used for the construction party of skyscraper reinforced concrete stairs formwork Method, including the construction stream such as the colligation of staircase boards reinforcing bar, stair template are installed, concreting, template removing and concrete curing Journey, stair template therein, which is installed, to be comprised the following steps:
(1) staristep plate bed die is made:
1) stair step formwork erection 1 is made:
According to the width and height of stair step, thickness 15mm the first plank sheathing 11 is selected, and in the first described wooden model The upper and lower both sides difference iron nail of plate 11 fixes 50*80mm the first flitch 12, is fabricated to the formwork erection 1 of stair step;
2) stair bench zigzag side form 2 is made:
According to the length of bench and the profile height of stair step, sawtooth is made in selection thickness 15mm the second plank sheathing 21 Shape, and distinguish the second flitch 22 that iron nail fixes 50*80mm in its both sides, it is fabricated to high with stair segment length and stair step The suitable stair bench zigzag side form 2 of degree;
3) sizing steel pipe locating support 3 is made:
According to the width and height of stair step, Z-shaped reinforcing bar 31 is processed into from φ 12 round steel, and each is pushed up by it Point is welded on same φ 48*3.5mm steel pipe 32 successively, forms sizing steel pipe locating support 3;
(2) installation of staristep plate bed die:
1) concrete staircase poured using ground or lower floor is as the strong point, using φ 48*3.5mm supporting steel The staristep plate bed die for the concrete staircase that 41 pairs of pipe will be poured carries out support top, and the pop-up board bottom on the shear wall at stair The snap the line of mould installation site;
2) the stair bench zigzag side form 2 completed is arranged on to the side of bench, and faces short side using staristep Split bolt 24 into the split bolt hole on the shear wall 23 at place is inserted into φ 48*3.5mm split bolt steel pipe 25 Interior, the other end of the split bolt steel pipe 25 arrives stair bench zigzag side form 2 to top, constitutes the support system of side form;
3) combine and ejected on the riser height of layout design, the shear wall in staristep with the high institute of each top mark marked time The straight line being linked to be, to position the position of stair step formwork erection 1, and by described stair step formwork erection 1 and stair bench zigzag The junction of side form 2 is reinforced using nail;
4) described sizing steel pipe locating support 3 is close to described stair step formwork erection 1, and is stuck in described Z At the knuckle of font reinforcing bar 31;
5) described stair bench zigzag side form 2 is hung in the sizing steel pipe locating support 3 using iron wire 42 On steel pipe 32, stair formwork erecting is completed.
In the implementation process of the inventive method, each step that especially staristep plate bed die is installed has strict Construction monitoring, so as to ensure reliable construction quality.
The inventive method installs the method installed with typified form better than traditional template, flitch, forms in stair branch New technology in mould construction, it is ensured that construction quality, can be good at controlling the height and width of stair step, with good Practicality.
Above by reference to drawings and examples, technical scheme is schematically described, the description is not limited Property processed.Those skilled in the art will be understood that in actual applications the implementation detail of each step is possible in the present invention The some changes of generation, and other staff may also make similar Design under its enlightenment.In particular:As long as not taking off From the design aim of the present invention, all obvious variations in detail or similar Design are all contained in protection scope of the present invention Within.

Claims (4)

1. a kind of construction method for skyscraper reinforced concrete stairs formwork, including the colligation of staircase boards reinforcing bar, stair mould The construction process such as plate is installed, concreting, template removing and concrete curing, it is characterized in that:Building in the construction method Terraced formwork erection comprises the following steps:
(1) staristep plate bed die is made:
1) stair step formwork erection is made:
According to the width and height of stair step, plank sheathing is selected, and distinguish iron nail in the upper and lower both sides of first plank sheathing Fix the first flitch;
2) stair bench zigzag side form is made:
According to the length of bench and the profile height of stair step, zigzag fashion is made in the second plank sheathing of selection, and in its both sides Iron nail fixes the second flitch respectively;
3) sizing steel pipe locating support is made:
According to the width and height of stair step, Z-shaped reinforcing bar is processed into round steel, and each summit is welded on together successively by it On a piece steel pipe;
(2) installation of staristep plate bed die:
1) concrete staircase poured using ground or lower floor is as the strong point, using supporting steel pipe to the coagulation that will pour Tulou ladder staristep plate bed die carry out support top, and on the shear wall at stair eject plate bed die installation site snap the line;
2) the stair bench zigzag side form completed is arranged on to the side of bench, and faces short side to place using staristep The split bolt in split bolt hole on shear wall is inserted into split bolt steel pipe, the other end of the split bolt steel pipe Stair bench zigzag side form is arrived to top;
3) combine to eject on the riser height of layout design, the shear wall in staristep and be linked to be with each top mark height marked time Straight line, to position the position of stair step formwork erection 1, and by described stair step formwork erection and stair bench zigzag side form Junction is reinforced with iron nail;
4) described sizing steel pipe locating support is close to the knuckle that described stair step formwork erection is stuck in described Z-shaped reinforcing bar Place;
5) described stair bench zigzag side form is hung using iron wire on the steel pipe in the sizing steel pipe locating support, it is complete Into formwork.
2. the construction method according to claim 1 for skyscraper reinforced concrete stairs formwork, it is characterized in that:Institute The thickness for stating first, second plank sheathing is 15mm;The specification of first, second flitch is 50*80mm.
3. the construction method according to claim 1 for skyscraper reinforced concrete stairs formwork, it is characterized in that:System The round steel specification for making the Z-shaped reinforcing bar is φ 12.
4. the construction method according to claim 1 for skyscraper reinforced concrete stairs formwork, it is characterized in that:Institute The steel pipe stated, supporting steel pipe, the specification of split bolt steel pipe are φ 48*3.5mm.
CN201710321327.2A 2017-05-09 2017-05-09 A kind of construction method for skyscraper reinforced concrete stairs formwork Pending CN107100366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710321327.2A CN107100366A (en) 2017-05-09 2017-05-09 A kind of construction method for skyscraper reinforced concrete stairs formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710321327.2A CN107100366A (en) 2017-05-09 2017-05-09 A kind of construction method for skyscraper reinforced concrete stairs formwork

Publications (1)

Publication Number Publication Date
CN107100366A true CN107100366A (en) 2017-08-29

Family

ID=59669649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710321327.2A Pending CN107100366A (en) 2017-05-09 2017-05-09 A kind of construction method for skyscraper reinforced concrete stairs formwork

Country Status (1)

Country Link
CN (1) CN107100366A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035548A (en) * 2017-11-24 2018-05-15 常州第建筑集团有限公司 The closed template construction method of cast-in-place concrete stair
CN108661322A (en) * 2018-07-10 2018-10-16 鞠久如 A kind of novel constructing structure of portable stair step plank sheathing
CN110029819A (en) * 2019-04-30 2019-07-19 中国十七冶集团有限公司 A kind of construction method of cast-in-situ steel reinforced concrete stair bench
CN110644782A (en) * 2019-09-28 2020-01-03 福建源竑建设工程有限公司 Building stair template structure and erecting method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05209452A (en) * 1992-01-30 1993-08-20 Yasuyuki Tsuruta Finish work executing method for riser device, bearing device, bearing stand device, and concrete stairway, to be used for finish work execution for concrete stairs
JPH08218643A (en) * 1995-02-17 1996-08-27 Sadao Yamamoto Method of placing mortar and cover sheet used therefor
JP2001002158A (en) * 1999-06-25 2001-01-09 Matsushita Electric Works Ltd Tread-board packing material also serving as curing sheet
CN103669865A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Stair construction method through shaped supports
CN104120880A (en) * 2014-06-30 2014-10-29 中国建筑第二工程局有限公司 Forming-tool-type staircase formwork system and constructing method thereof
CN203905482U (en) * 2013-12-15 2014-10-29 山西四建集团有限公司 Steel-wood combined integral detachable stair step template
CN204645624U (en) * 2015-05-08 2015-09-16 青岛一建集团有限公司 A kind of cast-in-place concrete stair is marked time set shaped steel formwork
CN206128637U (en) * 2016-10-30 2017-04-26 中建八局第一建设有限公司 Stair template reinforcement member that marks time

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05209452A (en) * 1992-01-30 1993-08-20 Yasuyuki Tsuruta Finish work executing method for riser device, bearing device, bearing stand device, and concrete stairway, to be used for finish work execution for concrete stairs
JPH08218643A (en) * 1995-02-17 1996-08-27 Sadao Yamamoto Method of placing mortar and cover sheet used therefor
JP2001002158A (en) * 1999-06-25 2001-01-09 Matsushita Electric Works Ltd Tread-board packing material also serving as curing sheet
CN203905482U (en) * 2013-12-15 2014-10-29 山西四建集团有限公司 Steel-wood combined integral detachable stair step template
CN103669865A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Stair construction method through shaped supports
CN104120880A (en) * 2014-06-30 2014-10-29 中国建筑第二工程局有限公司 Forming-tool-type staircase formwork system and constructing method thereof
CN204645624U (en) * 2015-05-08 2015-09-16 青岛一建集团有限公司 A kind of cast-in-place concrete stair is marked time set shaped steel formwork
CN206128637U (en) * 2016-10-30 2017-04-26 中建八局第一建设有限公司 Stair template reinforcement member that marks time

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035548A (en) * 2017-11-24 2018-05-15 常州第建筑集团有限公司 The closed template construction method of cast-in-place concrete stair
CN108661322A (en) * 2018-07-10 2018-10-16 鞠久如 A kind of novel constructing structure of portable stair step plank sheathing
CN110029819A (en) * 2019-04-30 2019-07-19 中国十七冶集团有限公司 A kind of construction method of cast-in-situ steel reinforced concrete stair bench
CN110644782A (en) * 2019-09-28 2020-01-03 福建源竑建设工程有限公司 Building stair template structure and erecting method thereof

Similar Documents

Publication Publication Date Title
CN107100366A (en) A kind of construction method for skyscraper reinforced concrete stairs formwork
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN202090591U (en) Lift type climbing formwork of building operations
CN103669865A (en) Stair construction method through shaped supports
CN104963431A (en) Corner structural column construction method
CN104264984B (en) Concrete structures formwork for casting and casting construction method
CN106368245A (en) Construction method for post-cast strip supporting formwork easy to clean
CN107083804B (en) A kind of wall structure column joint bar construction method
CN205894681U (en) Closed staircase template
CN108571166A (en) A kind of deformation joint formwork construction method
CN103510466B (en) Wet joint construction method of T-shaped beam bridge floor system
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN212428077U (en) Stair step template construction structures
CN108098978A (en) A kind of assembled underground pipe gallery epimere producing device and production method
CN106320662A (en) Construction method for decorating superwide concrete lines on outer wall of building
CN209145185U (en) A kind of staircase external angle protective device and constructing device
CN102220808A (en) Beam lowering construction method of frame structure
CN206942134U (en) A kind of embedded stair template device
CN214424007U (en) Pouring template system for independent stair step in cast-in-place frame structure
CN207597869U (en) A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170829

WD01 Invention patent application deemed withdrawn after publication