CN207597869U - A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension - Google Patents

A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension Download PDF

Info

Publication number
CN207597869U
CN207597869U CN201720507647.2U CN201720507647U CN207597869U CN 207597869 U CN207597869 U CN 207597869U CN 201720507647 U CN201720507647 U CN 201720507647U CN 207597869 U CN207597869 U CN 207597869U
Authority
CN
China
Prior art keywords
stair step
stair
steel pipe
plank sheathing
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720507647.2U
Other languages
Chinese (zh)
Inventor
马全丽
张驰浩
孙志波
宋允刚
王冲
王乃坤
吕立军
班召辉
刘双权
杨永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201720507647.2U priority Critical patent/CN207597869U/en
Application granted granted Critical
Publication of CN207597869U publication Critical patent/CN207597869U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, which includes stair step formwork erection, stair bench zigzag side form and sizing steel pipe locating support;The stair step formwork erection is formed by being suitable for the width of stair step and the first plank sheathing of height and being fixed on the first flitch of the upper and lower both sides of the first plank sheathing with iron nail respectively;The stair bench zigzag side form is formed by being suitable for ladder length with stair step profile height and the second plank sheathing of zigzag fashion being made and is fixed on the second flitch of the second plank sheathing both sides with iron nail respectively;The sizing steel pipe locating support includes the width for being suitable for stair step being processed into round steel and the Z-shaped reinforcing bar of height, and each vertex of the Z-shaped reinforcing bar is welded on successively on same root steel pipe.Its advantage is:Fund is saved, is easily installed construction, is less prone to deformation, can be very good the height and width of control stair step, conducive to construction quality is ensured, there is good practicability.

Description

A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension
Technical field
The utility model is related to a kind of devices for stair formwork erecting, and more specifically, the utility model is related to a kind of use The erecting device for geometric dimension of marking time in control reinforced concrete stairs.
Background technology
Concrete staircase is an important component of high building structure, and construction quality requirement is stringent.It is built at present Stair formwork erecting in field mainly has two Class Types:One kind is to form support top by the connection between iron nail and template, flitch to step on Walk formwork erection;Another kind of is to complete formwork using the assembling technique of the typified forms such as aluminum dipping form, punching block.
Although two class mold methods are widely used by building field more than, are had the following disadvantages when constructing:
(1) it forms support top by the connection between iron nail and template, flitch to mark time the method for formwork erection, iron nail is unique solid Fixed, connector, and mould strip strength is little, the problem of easily deformation;
(2) using the assembling technique of the typified forms such as aluminum dipping form, punching block, once infusion of financial resources is too big while exigent Mounting technique.
Utility model content
The purpose of this utility model is exactly to solve the problems of more than prior art, and provides one kind thus for controlling Reinforced concrete stairs processed is marked time the erecting device of geometric dimension.
The technical solution of the utility model is:
A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, including stair step formwork erection, building Bench zigzag side form and sizing steel pipe locating support;The stair step formwork erection is by being suitable for the width of stair step It is formed with the first plank sheathing of height and the first flitch for being fixed on the upper and lower both sides of the first plank sheathing with iron nail respectively;Institute The stair bench zigzag side form stated is by being suitable for ladder length and stair step profile height and being made the second of zigzag fashion It plank sheathing and the second flitch of the two plank sheathings both sides is fixed on iron nail is respectively formed;The sizing steel pipe positioning branch Frame includes the Z-shaped reinforcing bar for the width for the being suitable for stair step and height being processed into round steel, the Z-shaped reinforcing bar it is each Vertex is welded on successively on same root steel pipe.
In aforementioned setting:
The thickness of first plank sheathing and the second plank sheathing is 15mm;
The sectional dimension of first flitch and the second flitch is 50x80mm;
Make a diameter of 12mm of round steel of the Z-shaped reinforcing bar;
A diameter of 48mm of the steel pipe, wall thickness 3.5mm.
The beneficial effects of the utility model are;
(1) steel pipe locating support is utilized and installs technology, installs what is installed with typified form compared with traditional template, flitch Method is less prone to problem on deformation, conducive to the guarantee of construction quality.
(2) fund input is saved, is easily installed the height of construction, particularly stair step and tread run quality It is well controlled.
(3) solve the art is difficult to ensure that stair step quality in terms of stair formwork erecting all the time well Construction difficult problem has good practicability.
Description of the drawings
Fig. 1 is the structure diagram of stair step formwork erection in the utility model;
Fig. 2 is the structure diagram of stair bench zigzag side form in the utility model;
Fig. 3 is the structure diagram of sizing steel pipe locating support in the utility model;
Fig. 4 is the scheme of installation of stair bench zigzag side form in the utility model;
Fig. 5 is the construction schematic diagram of the utility model stair formwork erecting.
Specific embodiment
In order to which the technical solution of the utility model is made to be easier to be understood, below in conjunction with the accompanying drawings with building in China Democratic National Construction Association engineering The embodiment of terraced formwork construction is described in detail.
With reference to Fig. 1, Fig. 2, Fig. 3, the utility model is used for the formwork that reinforced concrete stairs is controlled to mark time geometric dimension dress It puts, including stair step formwork erection, stair bench zigzag side form and sizing steel pipe locating support;
The stair step formwork erection 1 by be suitable for the width of stair step and the first plank sheathing 11 of height and respectively with The first flitch that iron nail is fixed on the 11 upper and lower both sides of the first plank sheathing forms 12;
The stair bench zigzag side form 2 is by being suitable for ladder length and stair step profile height and sawtooth being made It second plank sheathing 21 of shape and the second flitch 22 of 21 both sides of the second plank sheathing is fixed on iron nail is respectively formed;
The sizing steel pipe locating support 3 includes width and height that stair step is processed into and be suitable for round steel Z-shaped reinforcing bar 31, each vertex of the Z-shaped reinforcing bar 31 are welded on successively on same root steel pipe 32.
With reference to Fig. 4, Fig. 5, it is using the method that the utility model carries out stair formwork erecting:
(1) using the concrete staircase that ground or lower floor have poured as supporting point, using diameter 48mm, wall thickness 3.5mm Supporting steel pipe 41 support top is carried out, and on the shear wall at stair to the staristep plate bed die of concrete staircase that will be poured Pop up the snap the line of plate bed die installation site;
(2) the stair bench zigzag side form 2 to complete is mounted on to the side of bench, and faces short side using staristep Split bolt 24 into the split bolt hole on the shear wall 23 at place is inserted into the split bolt of diameter 48mm, wall thickness 3.5mm In steel pipe 25, the other end of the split bolt steel pipe 25 forms the supporter of side form to top to stair bench zigzag side form 2 System;
(3) it is popped up with reference to the riser height of layout design, on the shear wall in staristep high with each top mark marked time The straight line being linked to be, to position the position of stair step formwork erection 1, and by the stair step formwork erection 1 and stair bench sawtooth The junction of shape side form 2 is reinforced using nail;
(4) the sizing steel pipe locating support 3 is close to the stair step formwork erection 1, and is stuck in the Z At the dog-ear of font reinforcing bar 31;
(5) the stair bench zigzag side form 2 is hung in the sizing steel pipe locating support 3 using iron wire 42 On steel pipe 32, stair formwork erecting is completed.
In the work progress of stair formwork erecting is carried out using the utility model, there is stringent construction monitoring, so as to ensure Reliable construction quality.
The new process of stair formwork erecting is carried out using the utility model, is installed better than traditional template, flitch and typified form Erection method, it can be ensured that construction quality and the height and width for effectively controlling stair step have good practicability.
Above by reference to drawings and examples, the technical solution of the utility model is schematically described, which does not have Restrictive.Those skilled in the art will be understood that in practical applications the structure setting of the utility model is likely to occur Certain changes, and other staff may also make similar Design under its enlightenment.In particular, it should be pointed out that:Without departing from this The design aim of utility model, all obvious variations in detail or similar Design, are all contained in the protection of the utility model Within the scope of.

Claims (5)

1. a kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, including stair step formwork erection, stair Bench zigzag side form and sizing steel pipe locating support;The stair step formwork erection by be suitable for the width of stair step with It first plank sheathing of height and the first flitch of the upper and lower both sides of the first plank sheathing is fixed on iron nail is respectively formed;It is described Stair bench zigzag side form by being suitable for ladder length and stair step profile height and the second wood of zigzag fashion being made It template and the second flitch of the second plank sheathing both sides is fixed on iron nail is respectively formed;The sizing steel pipe locating support Including the width for being suitable for stair step being processed into round steel and the Z-shaped reinforcing bar of height, each top of the Z-shaped reinforcing bar Point is welded on successively on same root steel pipe.
2. the erecting device according to claim 1 for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, feature It is:The thickness of first plank sheathing and the second plank sheathing is 15mm.
3. the erecting device according to claim 1 for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, feature It is:The sectional dimension of first flitch and the second flitch is 50x80mm.
4. the erecting device according to claim 1 for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, feature It is:Make a diameter of 12mm of round steel of the Z-shaped reinforcing bar.
5. the erecting device according to claim 1 for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension, feature It is:A diameter of 48mm of the steel pipe, wall thickness 3.5mm.
CN201720507647.2U 2017-05-09 2017-05-09 A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension Expired - Fee Related CN207597869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720507647.2U CN207597869U (en) 2017-05-09 2017-05-09 A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720507647.2U CN207597869U (en) 2017-05-09 2017-05-09 A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension

Publications (1)

Publication Number Publication Date
CN207597869U true CN207597869U (en) 2018-07-10

Family

ID=62751863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720507647.2U Expired - Fee Related CN207597869U (en) 2017-05-09 2017-05-09 A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension

Country Status (1)

Country Link
CN (1) CN207597869U (en)

Similar Documents

Publication Publication Date Title
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN206306252U (en) A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN107905522A (en) A kind of exterior wall assembly plank sheathing monolithic construction method
CN206903022U (en) A kind of steel bar truss floor support plate
CN105735625B (en) A kind of side form support system for floor construction
CN109610817A (en) Cross beam falsework and its design and construction method
CN204676879U (en) Model sheetinstallat structure
CN207513157U (en) A kind of expansion joint shear wall formwork
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN113931446B (en) Construction method of one-time pouring bay window formwork erecting structure
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN107100366A (en) A kind of construction method for skyscraper reinforced concrete stairs formwork
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN109750828A (en) Formwork erecting structure and construction method between a kind of small spacing shear wall
CN207597869U (en) A kind of erecting device for being used to that reinforced concrete stairs to be controlled to mark time geometric dimension
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN207314523U (en) A kind of Novel steel-mixed bean column node constructing structure
CN206599994U (en) One kind is exempted to pierce formula form bracing system branch head part
CN102605945B (en) Manufacturing method of big wood formwork
CN204418666U (en) A kind of building site is with there being side wall stair template
CN209145185U (en) A kind of staircase external angle protective device and constructing device
CN108193874A (en) A kind of stairway steel formwork for building
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710